Steve Jones - Transport for NSW

Preview:

Citation preview

1

Collaboration for Safety Wins - A Sydney Metro Perspective

RISSB Rail Safety Conference 4 April 2017

Stephen Jones Executive Director, SSE

2

Overview

1. Program Overview2. Sydney Metro Core Values3. Heavy Haulage4. Mental Health5. Skills Shortage6. Station Concept Prototype7. Security

3

Program Overview

4

66km new metro line31 metro railway stations

Northwest Stage 1 – open 2019 train every 4 minutesCity & South West Stage 2 – open 2024 Ultimate capacity – every 2 minutes under the CBD in each direction

5

Skytrain - Rouse Hill Station

Sydney Metro Trains FacilitySydney Metro Trains FacilityCable-stayed Bridge

Tunnelling

6

Customer Experience

7

Core Values

8

Sydney Metro Core Values

Collaboration

ConsultationCommunication

9

Heavy Haulage

10

Construction Transport Task

Demolition of High Rise commercial buildings

Construction transport task

§ 1 million tonnes of demolished materials

§ 6 -7 million tonnes of spoil (excavated rock)

§ 350,000 cubic metres of concrete

Truck operations in highly pedestrianised and

congested roads

Increased public safety risk exposure and regulatory

oversight

Problem

11

12

Safer Road Users

Safer Vehicles

Managing Risks to Vulnerable Road Users

Safer Roads

§ Minimum Vehicle Safety Technologies and Equipment

§ Accreditation of Haulage Operators

§ Sydney Metro Heavy Vehicle Driver Introduction

§ Stakeholder and Community Awareness Campaign

§ Intersection Risk Profiling on Haulage Routes

§ Road Safety Reviews/Audits

13

Mental Health

14

§ 150 suicides on the rail network/ year, accounting for 2/3 of all rail fatalities.

§ Net cost from railway suicide to Australian economy estimated >$1 billion annually.

§ Effects of single railway suicide incident have potential to negatively impact the psychological well-being of hundreds of people, including train drivers, station staff, bystanders, first responders, etc.

Problem Definition

15

The Solution

§ Fully automated and enclosed railway network segregating station from track through provision of platform screen doors (PSDs).

§ Engagement with communities and transport operators to manage the risk of track suicide through education and welcoming station design.

§ Partnering with MATES in Construction and TrackSAFE Foundation to provide the education, training and support to staff intervening in mental health crisis.

16

The Benefits

§ Elimination and minimisation of track fatalities and serious injuries.

§ Reduced disruptions.§ Minimising risk of trauma to workforce.§ Providing staff with skills to recognise and assist. § Providing immediate support to staff adversely affected.

17

Industry Curriculum

18

The Problem (1)

19

The Problem (2)

20

Rolespecific

AllWorkersMandatorycompletionpriortostartingwork

The Solution

Demolition

IntroductionSkills

ExperiencedWorker

NominatedSupervisor

Tunnelling

IntroductionSkills

ExperiencedWorker

Introductionto

Leadership

CivilConstruction

IntroductionSkills

Introductionto

Leadership

Rail

IntroductionSkills

Introductionto

Leadership

HeavyHaulage

IntroductionSkills

City&SouthwestWorkforce

SydneyMetroOrientationTraining

21

Collaborating Partners

22

Sydney Metro Industry Curriculum

§ Possession Officers receive technical training equipping them with sufficient skills to manage possessions.

§ Training does not include “soft” skills such as communication, negotiation and dealing with conflict.

§ This could lead to some potentially unsafe situations.

23

Sydney Metro Industry Curriculum

Collaboration with TAFE and Sydney Trains to produce atraining package for possession officers working on SydneyMetro sites.

It provides possession officers with the following Units of Competency:

§ TLIE2007 Use of communication systems § TLIE1003 Participate in basic workplace communication § TLIE2029 Conduct workplace information briefing § TLIF2010 Apply fatigue management strategies

24

Station Concept Prototype

25

The Problem§ Sydney Metro represents a new generation of world

class, fast, safe and reliable trains utilising the latest technologies and revolutionising the way Australia’s biggest city travels.

§ Built environment has a significant impact on how customers perceive their journeys and overall reputation for Sydney Metro.

§ Most basic factors are feeling safe and secure and having a sense of order as the minimum expectation to be able to allow customers to complete their journey safely and efficiently.

26

The Solution§ Contract calls for prototype installations of all customer and

staff facing aspects of the Railway, and forms part of the design submission and review process.

§ Demonstrate the integration of all customer facing elements with the platform and entrance and to be located in a facility where authorised access can be gained by TfNSW, stakeholders, media and user groups.

Cut and Cover Station of 20m length at Platform Level Station entrance area of 20m length

27

The Benefits

§ Used to help mitigate particular identified risks and assurance of the right outcome.

§ Test technical aspects of the design where there is a particular risk.

§ Improved quality through minimisation of re-work.§ Help identify issues that have not been raised before.§ Verify design with customer testing, ergonomics or

safety.§ For publicity and general stakeholder engagement.

28

Security

29

Current Security Context§ National Terrorism Threat Level for Australia is

Probable under the new five level of terrorism threat level system. Places of mass gathering are considered to be attractive targets.

§ It is highly likely that a terrorist attack in Australia would use weapons and tactics that are low-cost and relatively simple, including basic weapons, explosives and/or firearms.

§ Railway systems becoming increasingly vulnerable to cyber-attack due to use of automated systems and use of ‘open’ systems.

Credible Intelligence indicates that Australia is a target of terrorist with an intention and capability to conduct an attack

The Problem

30

The Solution§ Adoption of best practice approach involving progressive

steps being undertaken by Sydney Metro based on industry expertise including:

– Development of Sydney Metro Security Framework at Program level the defines the tasks and activities and related assurance services to be performed by the Projects.

– Security Risk Assessment Workshoputilising security experts and current members of the Counter Terrorism NSW Police Unit and Federal advisors.

– International Research of Similar Operations utilising existing safety forum with UK Crossrail and other Transport Operators including Singapore Mass Transit to identify emerging trends and use of technology and techniques for security risk mitigation.

31

The Benefits§ An established and structured approach to

security management applied throughout the Sydney Metro project lifecycle.

§ To provide clarity to key stakeholders on the crucial vulnerability issues and the need for and application of security controls throughout the whole asset lifecycle.

§ To be prepared and prevent, or to act in the event of malicious threats or critical incidents to minimise impacts on Sydney Metro.

32

Feedback and Questions

Recommended