Drop in traffic UK 1. Situation 2009 – crisis beats hard in the port of Oostende

Preview:

Citation preview

THE FUTURE FOR HAVEN OOSTENDE

STRATEGY FOR SUSTAINABLE GROWTH

OOSTENDE GREEN PORT

Drop in traffic UK

1. Situation 2009 – crisis beats hard in the port of Oostende

12 projecten voor duurzame groei

1. Situation 2009

1st 6 months (tonnage) 2008 (tonnage) 2009 %

Oostende 3.535.528 2.320.163 - 34,38 %

12 projecten voor duurzame groei

Statistics Ro-Ro Oostende1st semester 2008 versus 1st semester 2009

Statistics Total Tonnage Haven OostendePeriod 1999 -2009

1. Situation 200912 projecten voor duurzame groei

Drop in traffic UK

Stop activities Cobelfret in Oostende

TEF recovers

a little drop in bulk

conclusion: -30% traffic

1. Situation 200912 projecten voor duurzame groei

Strategy for a sustainable diversification of the economic and logistic activities in the port of Oostende.

2. Situation 2010 : new strategy for sustainable growth.

12 projecten voor duurzame groei

Stress on accompanied freight (roro)

Consolidating gravel and sand

Stress on renewable energy

New activities : leverage

Cruises: stimulating actively

consolidating fishery

Follow-up ro-ro

2. Action-points of the strategy

12 projecten voor duurzame groei

The port of Oostende : homeport for renewable and offshore energy, and related equipment

12 projecten voor duurzame groei

3. Port of Oostende - Green Port

3.Port of Oostende : todayRenewable energy Port of Oostende

3. Port of Oostende – Green Port

Renewable energy Port of Oostende

3. The port of Oostende – Green port

Renewable energy Port of Oostende

The port of Oostende – Green port:

assets and instruments

3.1. Port of Oostende Renewable energy Port of Oostende

Financial & operational engineering Design of port facilities Financing Management coordinator

3.1.Port of Oostende – Zeewezendock

Renewable energy Port of Oostende

3.1.Port of Oostende – Zeewezendock

Renewable energy Port of Oostende

3.2.Port of Oostende – New port entrance

Renewable energy Port of Oostende

Project has started : - building permit Eastern dam OK - building permit Western dam introduced

September 09Goal: finished end of 2012Budgets OK

3.2. Port of Oostende - New port entrance

12 projecten voor duurzame groei

3.3. Port of Oostende offshore: C-Power

Renewable energy Port of Oostende

3.3. Port of Oostende offshore: Re-Power

Renewable energy Port of Oostende

3.4. Area for renewable energy in Port

Renewable energy Port of Oostende

3.4. Quays for renewable energy

Renewable energy Port of Oostende

3.4. Quays for renewable energy

Renewable energy Port of Oostende

3.4.The Fjell – Chiwan Port

Renewable energy Port of Oostende

3.5. Plassendale I – Industrial area

Renewable energy Port of Oostende

3.5. Plassendale II – Industrial area

Renewable energy Port of Oostende

Biofuel Plant

Biosteam Plant

3.6. Greenbridge IncubatorGent University – Port Oostende

Renewable energy Port of Oostende

Cleantech business park Incubator high tech starters R&D environment

3.6. The Energy Box

Renewable energy Port of Oostende

Emergent energy technologies Combine, demonstrate, monitor,

Commercialise Research – development -

entrepreneurship

3.6. The Energy Box in Shanghai

Renewable energy Port of Oostende

Model of the Energy box for the World Exposition in Shanghai

3.6.Power-Link

Renewable energy Port of Oostende

Develop a knowledge centre for renewableenergy for scientists, entrepreneurs, authorities.

4. To Summarise…Renewable energy Port of Oostende

The future of offshore

windenergy in the port of

Oostende

4. To Summarise…Renewable energy Port of Oostende

1. Port Infrastructure reorientationLand and water available for off-shoreenergy activities

4. To Summarise…Renewable energy Port of Oostende

2. Port Infrastructure reorientationLand and water available for off-shoreenergy activities

4. To Summarise…Renewable energy Port of Oostende

3. Academic & Start-up support

4. To Summarise…Renewable energy Port of Oostende

4. Clustering & networking

4. Belgian Windfarm ProjectsRenewable energy Port of Oostende

5. Is there an opportunity

Projectgebied Seastar

Projectgebied Norther

4. Belgian Windfarm ProjectsRenewable energy Port of Oostende

Off-shore projects Description Year

C-Power 300 MW in 2 Phases1000 GWh/Year

2011 -2012

Belwind 330 MW in 2 Phases1100 GWh/Year

2011 -2013

Eldepasco 216 MW670 GWh/Year

2013

Rentel 288 MW893 GWh/Year

2015

Norther 420 MW1360 GWh/Year

2014

Seastar 220 MW ?

5. Is there an opportunity

4. To Summarise…Renewable energy Port of Oostende

5. Is there an opportunity

4. To Summarise…Renewable energy Port of Oostende

6. Round 3 - UK

Zones MW Capacity

TCE Target Proposed by developer

Moray Firth 1000 1300

Firth of Forth 1000 3500

Doggerbank 9000 9000

Holderness/Hornsea 4000 4000

Norfolk 5000 7200

Hastings 1000 600

West Isle of Wight 1500 900

Bristol Channel 1000 1500

Irish Sea 1500 4200

4. To Summarise…Renewable energy Port of Oostende

300 MW represents 1 billion Euro Capital expenditure

Round 3 UK = 107 billion euro

Ostend,

Green Port of Oostende:

hub for offshore windfarms and other

equipment