View
54
Download
1
Category
Preview:
Citation preview
Page | 1
A H M E D A D E L
CIVIL/ CONSTRUCTION ENGINEER
Oud Metha, Dubai, United Arab Emirates
#055 297 0864
ahmedadellotfy@gmail.com
Objective
Ambitious engineer seeking to join a leading company, in a position, where I can utilize and integrate my
academic background, raising my leadership capabilities, and developing my professional experience.
Education
2012 BSc in Civil Engineering, Ain-Shams University, Egypt Graduation project : water supply and sewerage treatment and networks design
Professional Summary
Project engineer, works at Atlas Foundations CO.LLC.
Civil/site engineer perform engineering duties in overseeing construction of reinforced concrete and
structures elements, and sub-structures such as; deep foundation and shoring works.
Setting out, levelling and surveying the site.
Checking plans, drawings and quantities for accuracy of calculations.
Day-to-day management of the site, including supervising and monitoring the site labor force and the
work of machines.
Preparing daily, weekly and monthly reports and time sheets for all people in site as required.
Overseeing quality control and health and safety matters on site.
Ensuring that all materials used and work performed are as per specifications and as per authorities
and safety terms.
Liaising with the local authority Dubai Municipality “DM” and Roads and Transport “RTA” to ensure
compliance with local construction regulations and by-laws.
Attending meetings with consultant and main-contractor to keep them informed of progress.
Prepare projects time schedules using “Primavera P6” and excel Gantt charts.
Shoring system analysis using “ReWaRD”.
Design working piles manually.
Prepare detailed, layout and shop drawings for projects.
Prepare method of statements for projects.
Attend discussions with consultants and authorities engineers at Dubai Municipality “DM”.
Apply for building permits, trial bits, demarcation & control points from “DM”
Apply for construction NOC and related permits from roads and transportation authority “RTA”
Make quotations for projects.
Page | 2
1. Atlas foundation CO. LLC. ,Dubai, UAE from 24/4/2016 to present 1. Project engineer : Piling, pile testing, shoring, dewatering and excavation works
Projects : 1. Proposed 2B+G+M+15 floors, Sharjah Expo Hotel, Plotno.820 at Al Khan, Sharjah
Working piles with all tests, Shoring works “ Secant piles and I beams” –from 24/8/2016 to present
Employer: KPW Group
Engineer: Sharjah Engineering Consultants
Main Contractor: Klampfer Middle East LLC
2. Proposed 2B+G+5P+15 floors residential building, Plot no.172 at Al Nahda, Sharjah
Working piles with tests and Shoring works “I beams”–from 25/11/2016 to present
Employer: Emirates Aluminium Company Limited
Engineer: Emirates Aluminium Consultants
Main Contractor: Amana steel buildings contracting LLC
3. Proposed 2B+G+3P+23 typical floors residential building, Plot no.3460572 at Business Bay, Dubai
Shoring works “Secant piles with anchors” –from 24/5/2016 to 24/8/2016
Employer: Al Khaleej Al Arabi properties
Engineer: Adnan Saffarini Consultants
Main Contractor: Atlas Foundations Co.LLC.
Responsibilities :
Checking plans, drawings and quantities for accuracy of calculations.
Work Plan and day-to-day management of the site.
Supervision of construction stages and structures elements.
All material, manpower and machines supply coordination.
NOCs and permits submittals and prepare time schedules for projects.
Approvals for materials, suppliers and subcontractor.
Liaising with the local authority “DM” to ensure work compliance within regulations and by-laws; like asking for
inspection or for a construction NOC.
Attend meetings with consultant and main-contractor to keep them informed of progress.
Preparing daily, weekly and monthly reports, inspection requests and time sheets.
Overseeing quality control and health and safety matters on site.
2. IGS foundation contracting L.L.C. ,Dubai, UAE from 13/9/2014 to 24/4/2016 1. Site engineer : Piling, pile testing, shoring, dewatering and excavation works
Projects : 1. DAMAC HEIGHTS building on plot A3A (392-569) Al Marsa, Dubai
Jet Grouting –from 20/7/2015 to 16/9/2015
Employer: DAMAC properties
Engineer: Aecom consultant
Main Contractor: Arabtec construction LLC
2. “EMAL” Emirates aluminum smelter complex Phase 2, operation gate- AL TAWEELA-Khalifa port
Working piles with all tests –from 15/6/2015 to 20/7/2015
Employer: Emirates Aluminium Company Limited
Engineer: Emirates Aluminium Consultants
Main Contractor: Amana steel buildings contracting LLC
3. Proposed 2B+G+7FLOORS+GYM Com/Res. Bldg , Plot no : IC1‐CBDC‐02 At International City Phase‐1
Shoring “Re‐Anchoring work” –from 15/4/2015 to 15/5/2015
Employer: M/s. Mars Properties Investment LTD
Engineer: M/s. Al Saraya Engineering Consultant
Main Contractor: “Shoring Specialist” : IGS Foundation Contracting LLC
Page | 3
4. Proposed 4B+G+4FLOORS+S+5,6,7FLOOR+ROOF (Altadawi hospital), On Plot no : 2140857 At Al Garhoud
Shoring works “secant piles” -from 6/3/2015 to 15/4/2015
Employer: Al Tadawi Medical Group
Engineer: Al Shandagha Architects and Engineering Consultants
Main Contractor: National Piling Contracting LLC
5. proposed G+8 TYP+GYM residential building, Plot no.23-020,Nadd Hessa (D.S.O.), Dubai ,UAE
preparation and carrying out all tests for the piles -from 10/2/2015 to 6/3/2015
Employer: Mohamed Abdullah Al Mulla
Engineer: Alkhawajah Engineering Consultancy
Main Contractor: BECON construction LLC
6. proposed G+B+1 district cooling tower, Plot no.P1.D003 ,Palazzo Versace- Park site , Al Jadaf, Dubai ,UAE
Shoring system “Soldier piles” and working piles with all tests -from 1/1/2015 to 10/2/2015
Employer: Emirates district cooling LLC
Engineer: Crown Engineering Consultants
Main Contractor: Crown Emirates Contracting
7.proposed G+B+12 residential building, plot no.2410202, AL NAHDA second, Dubai, UAE
Excavation, Shoring works “ Soldier and contiguous piles” and dewatering -from 13/9/2014 to 1/12/2014
Employer: Youssuf Ahli
Engineer: Desin center
Main Contractor: Modern Building Contracting
Responsibilities:
Checking plans, drawings and quantities for accuracy of calculations.
Day-to-day management of the site.
Supervision of construction stages and structures elements.
All material, manpower and machines supply coordination.
NOCs and permits submittals and prepare time schedules for projects.
Liaising with the local authority “DM” to ensure work compliance within regulations and by-laws; like asking for
inspection or for a construction NOC.
Attend meetings with consultant and main-contractor to keep them informed of progress.
Preparing daily, weekly and monthly reports, inspection requests and time sheets.
Overseeing quality control and health and safety matters on site.
2. Designer and technical engineer Projects designed: From 1/12/2014 to 1/1/2015
1. proposed G+8 TYP+GYM residential building, Plot no.23-020,Nadd Hessa (D.S.O.), Dubai ,UAE
Shoring system of soldier piles.
Employer: Mohamed Abdulla Abdul Latif AL Mulla
Engineer: Alkhawajah Engineering Consultancy
Main Contractor: BECON construction LLC
2. 2B+G+9 COMMERCIAL / OFFICE/ RESIDENTIAL BUILDING ON PLOT 248-124, AL QUSAIS IND. – FIFTH;
Shoring system “Contiguous and soldier piles system” - 17/12/2014 Employer: Mohd Ayaz Mohd Farooq & Mohd Farooq Abdulshakoor
Engineer: National Engineering Bureau
3. Project: villa basement +ground+ first + service block
Shoring system “Soldier piles” - 18/12/2014
Employer: Mr. saif bin Abdullah bin majid alshamsy
Engineer: Next Engineering Consultants
4. Project: proposed 3B+G+12+ GYM residential building;
Shoring system “ Contiguous piles with strut members system” -22/12/2014
Employer: Abdulrahman Mohd Taher Alhashimi
Engineer: Design center
Page | 4
Responsibilities :
Design shoring systems and retaining structures.
Shoring system analysis using “ReWaRD”.
Design working piles manually.
Familiar with British and American codes.
Make quotations for projects.
Prepare engineering drawings for projects like plans ,sections and point coordinates.
Prepare method of statements for projects.
Submit drawings, design and method of statement to consultants.
3. ALKAN CONTRACTING, Tanta, Egypt From 15/2/2014 to 7/9/2014 Site engineer : Construction works
Projects : Railway shelters along Cairo-Alexandria railway road “ Sub-contractor of ALKAN construction”
Employer: Egypt railways
Engineer: Alkan Consultants
Main Contractor: Alkan Contracting
Work : Excavation, backfilling, footings, columns, beams, ceiling and brick walls in 8 sites for 8 shelters
Responsibilities :
Supervision on 8 sites “8 shelters; Al Khadrawya, Al Mashroa, Al Maqaber, Al Halafaya, Abu-Mashhour, Nevia, Upper Kafr Al Ais, Lower Kafr Al Ais”.
Checking plans and drawings and checking quantities for accuracy of calculations.
Setting out, levelling and surveying the site using staff level and total station instrument.
Ensuring that all materials used like concrete, wood, bricks,.. and work performed are as per Specifications.
Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Preparing daily, weekly and monthly reports as required.
4. ALBOSTANY REALESTATE design and engineering consultants, Cairo, Egypt From 1/12/2013 to
1/12/2014
Villa 163, North of Showaifat, New Cairo, Egypt
Site engineer : Civil / Construction works
Projects: a residential building and a villa at new Cairo Egypt
Employer: Albostany realestate group
Engineer: Albostany realestate design and engineering consultants
Work : Marble finishing works in the front of the building, foundation and shoring works in a villa
Responsibilities :
Supervision on the execution of structural elements of the projects
Supervision on finishing works in a residential building which were marble fixing on the frontage
Supervision on foundation works for a villa which were working piles and shoring piles
Page | 5
References are available on request
Trainings and Courses
Certified by DM in working in roads right of way January 2016.
Professional site engineer diploma, certified by consultant engineer Hassan Kandil , March-May 2013.
Site training at ALBUSTANY REALESTATE consultants, July-August 2011, 2010, 2009, 2008.
Technical skills
Revit structure 2014 : modeling , coordinating, quantum surveying excel sheets, load analysis
AutoCad drawing
ReWaRD : shoring and retaining structures load analysis
Sap2000 “essentials”: design
Primavera project management “essentials”
Microsoft Excel, Microsoft word and MS Windows
Languages
Arabic (native-mother tongue)
English (fluent command of both spoken & written English)
Skills
presentation , communication, leadership and management skills a proactive decision maker , a creative thinker and a hard worker
Personal data Full name : Ahmed Adel Lotfy Elgharably Date of birth : 23
rd of June 1987
Nationality : Egyptian Marital status : Single
Driving license : UAE driving license Professional membership : Egyptian engineering syndicate
Visa status : Residency till 24/11/2016
Address : Oud Metha, Dubai, United Arab Emirates
Military service in the Egyptian army : Done on 1/12/2013
Hobbies , Sports and Interests
Acting ,drawing, colouring, music, participating and organizing in good works and charity, design and making
of entertainment games.
Recommended