View
28
Download
0
Category
Preview:
DESCRIPTION
cambio de método de producción
Citation preview
POZO EST. FLUJO MET. DE PROD. CHEVRON #BN_0808 10 PRB RO8200
NETA POTENCIAL DIFERIDA0 215 215
COD B.G/CAM/TUB HRS. TRAB. LIMPIO HASTA103 BG 8725'
ANC. TUB. ANC. GAS TUB. DRAIN BARRA PULIDA TUB. SUCC. PROF. SUCCIONN/A N/A N/A N/A 4-1/2" N/A
FECHA INST: FECHA INST:DIAMETRO GRADO CANTIDAD LONG.(Pies) SECCION DIAMETRO GRADO CANTIDAD LONG.(Pies)
4-1/2" N-80 154 4837 N/A N/A N/A N/A N/A4-1/2" N-80 110 3454
DIAMETRO GRADO PESO DESDE HASTA ROSCA TAPON / TD13-3/8" K-55 54.5 0' 608' BTC9-5/8" TAC-95 47 0' 8513' BUTT
7" N-80 26 8368' 9119' LTC CHECK VALVE SI NO SI NO
FECHAINACTIVO
HORAS EST. TRAB. REAL HORAS ACT. PROD EST. %AyS EST. PRIORIDAD CO. SERVICIO96 215 30 18.8 BORETS
Costos ($) :
TUBERIA
FECHA17-May-14
29-Aug-2014
CASING
BRUTA DRAW DOWNESTATICA(Lpc) O NF(Pies) DINAMICA(Lpc) O NF(Pies)
FECHA DEL PROGRAMA :
8111865 10540
PROGRAMA DE SUBSUELOCAMPO
290
PRODUCCION ACTUAL
TIRO: MAXIMO/ ACTUALN/ABembeo Electrosumergible
UNIDAD DE BOMBEO
PRESION ACTUAL
TRAB. EST.1.1S
POZO S/P. LIMPIEZA + CAMBIO DE BOMBA ELECTROSUMERGIBLE (BES) CON CAMISA TIPO DE TRABAJO A REALIZAR
PONER CINTA TEFLON EN TODAS LAS CONEXIONES DEL CABEZAL # AFE / # MEJ
Iris Carroz
22-Mar-14REEMPLAZO
SI NOSIN PROD. DESDE NUMERO DE TRABAJOS REALIZADOS
N/A
N.F. ESTATICO
EQUIPO DE SUBSUELO INSTALADO
DESCRIPCIONAsegur pozo con tubera punta libre S/I
TIPOREVESTIDORES
N/A
9136'
PERFORACIONES
8587'-9051'
ACTIVO 2007 (0) 2008 (1) 2009 (0) 2010 (0) 2011 (1) 2013 (2) 2014 (1)ESTADO DEL POZO
MESHRITE
*****PROGRAMA*****
DRAIN VALVE
ULTIMO TRABAJO
12
INGENIERO
BOMBA TIPO Y TAMAO
SECCION
SERIAL
1.-2.-3.-4.-5.-6.-
7.-
8.-9.-10.-11.-12.-13.-
2.-3.- Cumplir con todas las normas de seguridad de Petroboscan4.- Contactar al ingeniero encargado del pozo Iris Carroz, 0412-0700886 . Ingeniero de guardia 0416-50335075.- Persona contacto Borets: Marcelino Mota: 0414-8315085
Bajar la siguiente Configuracion del equipo BES (configuracion de abajo hacia arriba): Sensor de fondo View Point ESP-HT + motor 330 HP + 2 cuerpos de sellos 538 BPBSL + separador de gas + bombas upper / middle / lower (Equipo de fondo BES 400 -1250 de 354 Etapas + Descarga + Valvula Check / Drain + 02 tubos de 4-1/2" N-80 + Valvula de drenaje + 259 tubos de 4-1/2" N-80, colocando protectores de cable en cada cuello de tubera y haciendo mediciones electricas F-F y F-T del equipo de fondo y cable de potencia durante la bajada cada 20 tubos o cada 600'. Bajar a una velocidad de 20 tubos/hora y verificar continuamente el peso de la sarta durante la bajada del equipo. Verificar la alineacion de la cabria con respecto al hoyo. A partir de +/- 4816' (100 pies por encima del KOP= 4916') reducir la velocidad de bajada a 10 tubos/hora. Bajar los ultimos cuatro (4) tubos lo mas lento posible, para el asentamiento final del equipo. Dejar succion @ +/- 8267' (MD). Fondo del equipo BES @ +/- 8316' (MD) y Fin de las camisas @ +/- 8334' (MD)
Dejar produciendo y en condiciones seguras en comn acuerdo con Operaciones de Produccin.
Limpiar el rea debidamente. Eliminar toda condicin insegura en la localizacin.
Verificar y reportar presion de tuberia y de casing
1.- El pozo no debe ser arrancado hasta que el representante de Operaciones firme en seal de conformidad, el formato de entrega de pozo emitido por el Dpto de Perforacionpara Operaciones que se encuentra anexo a este programa.
Equipo de Fondo BES 400 -1250 de 354 + Miscelaneos Suministrados por BORETS
NOTAS:
Desahogar pozo, controlar si es necesarioVerificar y asegurar que el pozo no presente riesgos para ejecutar el trabajo
OTROS:
TUB / CABILLAS:
ANCLA DE GAS:
POZO S/P. LIMPIEZA + CAMBIO DE BOMBA ELECTROSUMERGIBLE (BES) CON CAMISA
Arrancar el pozo de acuerdo al procedimiento de arranque a 48 Hz y dejarlo trabajando a 50 Hz.
AUTORIZADO POR: FECHA DE AUTORIZACION: 29-Aug-2014
El uso de BOP es estrictamente necesario
FILTRO:
DATOS DE INTERES:Miscelneos y Sensor suministrados por BORETS
ANCLA DE TUBERIA:
Mudar equipo.
Danny Socorro
S.T.N. Sacar toda la completacion existente (264 juntas de tuberia de 4-1/2" punta libre). Reemplazar tuberia que este rota o daada.
En caso de que el pozo no quede produciendo, asegurar completamente el pozo.
BOMBA:
MATERIAL REQUERIDO:
Instalar BOP
Realizar limpieza del pozo hasta el fondo de las rejillas @ 9119' MD de acuerdo a programa emitido por perforacion, en su defecto hasta la profundidad de limpieza recomendada, 9020'.
AUTORIZADO POR: FECHA DE AUTORIZACION: 29-Aug-2014
_____________________________
Danny Socorro
Actualizado por Iris Carroz Junio 2014
HISTORIA DEL POZO BN_0808
POZO: BN-808 (LOC. AH-61) E.M.R.: 151 YACIMIENTO: BOSCAN SUPERIOR REVESTIDORES: 13-3/8 , 54.5 # / PIE, K-55 A 608
9-5/8, 47 # / PIE, TAC-95, A 8513 (MD) y 8126 (TVD) FORRO: MESHRITE COMPRESSED 7, 26 # / PIE, N-80, DESDE 8373 (MD) HASTA 9119 (MD) RANURAS: 8587- 9051 (MD) PROFUNDIDAD TOTAL: 9136 (MD), 8661 (TVD) EF. : 10 ESTADO ACTUAL: PRB
HISTORIA
El Pozo BN_0808 fue perforado como desviado el 25 de Diciembre de 2005, en la arena de
Boscn Superior, especficamente en el intervalo 8513-9136 (MD), hasta llegar a la
profundidad final @ 9136 (MD). Las labores de perforacin culminaron el 14 de Enero de 2006.
Realiz completacin del pozo con Meshrite Comprimido de 7 dejando el tope del mismo @
8373 (MD).
El 06 de Febrero del 2006, entr maquina de servicio para realizar completacin original del
pozo. Baj y cheque fondo a 9119 con una pequea muestra de arena y un nivel esttico de
fluido a 4200. Baj tubera de 4-1/2 + equipo de fondo BCP MOYNO 95-N-275 (E-158) con
niple perforado + sarta de cabillas con centralizadores segn programa. La succin de la
bomba qued a 8283.
Prueba al 25-Mar-06 194 BFPD, 184 BPPD. 5 % AyS
Prueba al 21-Sep-06 140 BFPD, 132 BPPD. 5 % AyS
EL 01 de Noviembre del 2006, entr maquina de servicio al pozo, para sacar completacin
existente y bajar nueva completacin con nuevos centralizadores. Baj bomba Grant para
chequear fondo y se encontr fondo limpio sin muestra de arena (9123) y detecto un nivel de
fluido esttico a 4050. El pozo fue completado nuevamente con una bomba 95N275 @ 8311
con un total de 274 cabillas distribuidas de la siguiente manera: 1 cabilla de 1-1/8 + 74
cabillas con 3 centralizadores y 198 cabillas de 4 centralizadores C/U. Se procedi a darle
arranque el 03-Nov-06.
Actualizado por Iris Carroz Junio 2014
Actualmente el pozo BN_0808 esta produciendo una tasa de 280 BPPD y 10% de AyS a una
presin dinmica de 1116 Lpc y 160 RPM. Este pozo tiene la capacidad de producir un valor
esperado de 500 BPPD (714 BFPD) con una presin dinmica de 700 Lpc, cuyas condiciones no
pueden ser alcanzadas con el sistema de bombeo existente, debido a que por ser un pozo
desviado, ha sido necesario la utilizacin de centralizadores de cabillas para evitar la friccin
generada por el roce de las cabillas con la tubera de produccin y como consecuencia la
generacin de alto torque, lo cual no permite optimizar el pozo, por lo cual se propuso la
conversin del mtodo de levantamiento artificial de BCP a BES.
Desde Febrero del 2008, los niveles de torque han estado por encima de 1200 lbs*pie, por lo
que la velocidad ha tenido que ser reducida progresivamente hasta 90 RPM. La ultima medida
validada del pozo para el 30 de septiembre del 2008 es de 158 BFPD / 142 BOPD / 90 RPM /
PIP: 1062 PSI.
El 07 de diciembre del 2008, entro maquina de servicio para realizar cambio de mtodo de
PCB a BES. Saco sarta de cabillas de 1 1/8 con centralizadores + rotor. Saco tubera de 4
con tecline + estator. Bajo sarta de limpieza compuesta por taper mill 6 + tubera combinada
de de 3 4 . Toco @ 8388 donde consigui apoyo (TD: 9119). Maniobro sin lograr
avance. Saco 1 tubo y bombeo 104 bls de agua por tubing @ 4 BPM. Baja nuevamente para
maniobrar sin avance. Decide vestir power swivel. Maniobro para pasar 8388, 30-60 RPM, 1-
1.5 Klbs de peso, tensin 6-8 Klbs. Continuo trabajando en obstruccin sin xito. Decide
desvestir power swivel y sacar sarta de tubera combinada + taper mill 6. Saco taper mill
trabajado. Bajo taper mill de 5 5/8 + sarta de tubera combinada tocando @ 9110 fondo
limpio. No hay obstruccin en el tope del liner. Saco taper mill sin muestra de arena ni
elastmero. Bajo camisas de 7 x 26 #. Bajo equipo BES encamisado 538-P17 SXD de 192
etapas + tubera de 4 . Succin @ 8227. Fin de la instalacin @ 8298.
El 18 de Octubre del 2011, fue reportado el pozo detenido. El Tcnico de Recorrido realiz un
intento de arranque sin xito limitndose en 10 Hz, procedi a desconectar el equipo de fondo
a nivel de caja de venteo para tomar medidas elctricas, observando desbalanceo entre fases y
bajo aislamiento. El pozo queda fuera de servicio por equipo de fondo. Run Life de 1043
das.
El 30 de Octubre del 2011, sali maquina de servicio de realizar cambio de bomba. Sac
sarta de tubera de 4 (262 jtas) + equipo de fondo ESP P17 de 192 etapas. Baj tubera de
4 para medir fondo tocando @ 9104 (15 de relleno), base de la rejilla de 7 @ 9119, NFE
Actualizado por Iris Carroz Junio 2014
@ 4564. Sac sarta de tubera. Baj equipo BES encamisado P8 de 360 etapas + sarta de
tubera de 4 (261 jtas). Succin @ 8237. Fin de la instalacin @ 8290.
El 13 de Junio del 2013, fue reportado el pozo detenido. El tcnico de recorrido lleg al pozo
y lo encontr parado por Low Speed, se realizaron varios intentos de arranque sin xito
quedando limitado en 10 Hz el equipo BES. Desconect equipo de fondo en superficie y se
cheque elctricamente encontrndolo balanceado entre fases y con buen aislamiento con
respecto a tierra. Lo reporto a personal de CIBO fuera de servicio por atascamiento del equipo
de fondo.
Medidas elctricas:
Fase-Fase= 3.7 3.7 3.7 Ohms
Fase-Tierra= 100 100 100 M Ohms
Bajo estas condiciones el equipo no levanta produccin y queda fuera de servicio parado por
atascamiento del equipo de fondo. Este equipo de Fondo tena un Run Life de 591 das. El
Sensor tipo Centinel 3 estuvo operativo hasta el momento de la falla.
El 02 de Julio del 2013, sali maquina de servicio luego de intentar realizar cambio de
bomba (s/e). Sac sarta de tubera de 4 + equipo de fondo ESP P17 de 192 etapas. Arm y
baj bomba grant para medir fondo tocando @ 8670 (449 de relleno). Suspendi operaciones
para entrar con mquina con capacidad de limpieza.
El 31 de Julio del 2013, entro maquina de servicio para realizar limpieza + cambio de
mtodo de PCB a BES. Desvisti equipo en el pozo BN_0640 da 10/07/2013 mud y visti
equipo Bohai 73 en el pozo BN_0808, en un 100% el da 11/07/2013. Desahog pozo, bombe
60bls de agua industrial, instal BOP y desinstal colgador. Sac 258 juntas de tubera de 4-
1/2" EUE con dificultad hasta superficie. Realiz prueba de hermeticidad de la BOP con 2500
psi x 15 min. con xito. Instal tubo campan y lnea de retorno. Arm y baj BHA de limpieza
con Junk Mill de 5-3/4". Baj 246 tubos de 4-1/2" HYD 533 y consigui apoyo @ 8657 (tope
del relleno). Trabaj sarta de limpieza con Junk Mill de 5-3/4" desde 8657' hasta 8768' con los
siguientes parmetros psm= 0 lbs; torque= 0 lbs-pie; rpm = 40-60, tasa de bombeo 3 - 3,6
bpm. En la junta 248 bajo con los mismos parmetros anteriores, al reciprocar observ
incremento de torque y psm. Trabaj sarta desde 8768' a 8778' con los siguientes parmetros
torque =0 - 2500 lbs-pie (el torque incrementaba y disminua rpidamente); psm= 2-4 lbs, al
levantar kelly para hacer siguiente conexin, perdi circulacin total el pozo. Bombe 490 bls
para buscar circulacin sin xito. Baj y esper 2 horas de decantacin de la arena. Baj
tubera 4-1/2" HYD 1x1 para medir fondo consiguiendo apoyo a 8791' (317' de relleno) Nota:
Actualizado por Iris Carroz Junio 2014
132' limpiados, rejillas de 7" 26 lbs desde 8586'- 9050' (205' de rejillas sin relleno), por orden
de la gerencia Pdvsa Servicios decidi preparar pldora y trabajar sarta con peso en el tope del
relleno. Maniobr para avanzar con peso sin bomba sin xito, prob avanzar con bomba y peso
avanzando 10' sac sarta por no tener circulacin. Nota: consult con gerencia Pdvsa Servicio y
decidi sacar sarta y evaluar trabajo en el Junk Mill. Sac y quebr BHA de limpieza, sac 249
tbg 4-1/2" HYD 533 hasta superficie. Baj 10 tbg 4-1/2" para asegurar pozo. Gerencia Pdvsa
Servicio decidi utilizar bomba Schlumberger y bajar Junk Mill de 5-1/2". Esper 6 hrs. por
suministro de herramienta Cia. Baker (Junk Mill de 5-1/2"). Saco 10 tbg HYD 4-1/2" de
asegurar pozo. Arm, calibr y baj BHA de limpieza con tbg de 4-1/2 HYD y Junk Mill 5-1/2",
consiguiendo apoyo contundente con el tbg # 249 + 20' del tbg # 250 @ 8792'. Baj tbg 4-
1/2" HYD @ 8898'. (6 bpm/ 860 psi). (Limpieza en circuito cerrado) Nota: despus del chequeo
de fondo, se bombe 265 bls @ 6,5- 7 bpm/ 1075 psi, hasta obtener nuevamente circulacin
para continuar limpieza. Baj tbg 4-1/2" HYD a limpiar arena, hasta conseguir apoyo
contundente con el tubo # 258 + 30' del kelly @ 9086'; realiz fondo y medio arriba (circuito
cerrado), bombeando 1338 bls; al sacar hasta el tope de liner se present pega de la tubera y
perdi circulacin de manera inmediata. Se mantuvo una rata de bombeo de 6 bpm con
presin de 825 psi. Maniobr sarta con 70 klbs de peso, 1100-1200 lbs/pie de torque y un
mx. De over pool de 250 klbs (sin xito). Se realiz registro punto libre determinando estar
libre hasta 8710'. Por las condiciones del pozo se recomienda realizar desenrosque de tubera.
Baj y corri segundo registro free point corroborando punto libre @ 8710' (tbg # 2 de 3-1/2"
HYD). Baj herramienta string shoot o back off para desenrosque @ 8716' (sin xito), enrosc
4-1/2" HYD tubera nuevamente. Decidi realizar corte qumico. Al aplicar los 130 klbs de
tensin para bajar cortador qumico, la sarta perdi tensin y se consigui accin del martillo,
lo que permiti trabajar la sarta hasta liberar la pega, sac tubera y BHA de limpieza # 2
hasta superficie sin problemas, arm y baj BHA # 3 con Bull Dog Bailer, Baj tbg 4-1/2" HYD
y BHA de limpieza # 3 con Bull Dog Bailer (en pareja), consigui apoyo contundente con 23'
del tbg # 257 @ 9049'. Trabaj sarta de limpieza, limpi desde 9049' el tbg # 257 @ 9060'
(11' limpiados) sin lograr ms avance, registrando apoyo contundente y sin accin de la
herramienta, se repaso de 5-6 veces la zona limpiada. Trabaj sarta de limpieza con Bull Dog
Bailer, se presentaron 2 conatos de pega tensionando la sarta hasta 160 klbs (56 klbs de over
pool), en ambas ocasiones se logr liberar trabajando la misma. Segn programa, el Dpto. de
Geologa recomienda realizar limpieza hasta 9025', se lleg hasta 9060' (35' por debajo de lo
recomendado). Limpieza exitosa. Sac y quebr 257 tbg 4-1/2" HYD y BHA de limpieza # 3
con Bull Dog Bailer. Sac 30' de arena con flejes metlicos desde el rotary shoe. A nivel de la
zapata se observ que la herramienta trabaj con material metlico. Se tom muestra de la
arena para estudio granulomtrico y del fleje en fondo. Baj camisa de refrigerante de 7",
Actualizado por Iris Carroz Junio 2014
intent bajar sensor de fondo, sin pasar a nivel del centralizador. Arm, lubric y baj equipo
BES desde superficie hasta 30' consigui obstruccin. Decidi sacar equipo de fondo y camisa y
evaluar componentes. Sac sellos, motor, sensor, centralizador, camisa de refrigeracin y
evalu componentes. Baj 5 tbg 4-1/2" EUE para asegurar pozo. Nota: por orden de supervisor
de campo decidi reemplazar centralizador. Sac 5 tbg 4-1/2" EUE de asegurar pozo, baj
camisa de refrigeracin de 7". Arm, lubric y baj equipo BES. Reemplaz centralizador.
Acopl separador de gas a camisa de refrigeracin. Baj y lubric bomba inferior. Arm y
lubric bomba #2 resultando eje de la misma pegado, intent despegar sin xito. Nota:
desarm y baj bomba #2 de la planchada para intentar despegar eje logrando despegar pero
quedando giro del mismo forzado, consult con Ing. de Produccin Petroboscan y se decidi
reemplazo de la misma. Arm, lubric y baj bomba superior, instal descarga de la bomba, x-
over 2 3/8" EUE pin x 4-1/2" EUE pin, cuello 4-1/2" EUE, Vlvula check drain + 02 tbg 4-1/2"
EUE + Vlvula drain. Baj 259 tbg 4-1/2" EUE @ 8299 con cable de potencia y protectores
Cannon, probando hermeticidad de la tubera con 500psi x 5 min. y megando cable de potencia
cada 600' con xito. Instal y asent colgador de tubera succin 8228' final de la completacin
8299'. Realiz pack off al cable de potencia megando antes y despus de realizarlo arrojando
los siguiente valores: f-f= 4,5; f-t= 700; pip=1964psi-1996psi; ti=180f-185f; tm=171f-176f.
Nota: fases balanceadas. Retir pateclas del cable de potencia. Cia. Tisvenca afloj esprragos
del conjunto BOP. Retir preventor anular. Instal vlvula corona. Megando consigui equipo
ido a tierra, prob en diferentes puntos sin xito. Nota: por orden de equipo de guardia Pdvsa
Servicios se orden sacar 02 tbg EUE 4-1/2" cortar cable y megar. Maniobr e instal BOP.
Sac sarta de completacin BES @203 Nota: se realiz reparacin del cable en el 4-1/2 # 176
@5548 sin obtener xito en la megada (cable se encontr golpeado en 3 puntos ms sin
reparar). Sac sarta de tubera 4-1/2" EUE, observ explosin en el MLE. Desarm equipo BES,
prob motor de fondo, organiz planchada para bajar equipo nuevamente Nota: desinstal
equipo BES para reemplazo de los sellos. Sac camisa de 7" y asegur pozo con 10 tbg de 4-
1/2" EUE para esperar suministro de cable de potencia. Sac 10 tbg EUE 4-1/2" EUE y baj
camisa de refrigeracin @ 71'. Arm, lubric y baj equipo BES + 259 tbg de 4-1/2 @ 8300
(final de la completacin); succin @8229' con cable de potencia y protectores Cannon. Cia.
Tisvenca afloj pernos del preventor anular. Retir patleca de Cia. Backer Centrilift. Asent
colgador en cabezal. Maniobr y retir BOP. Ajust prisioneros al colgador. Nota: realiz
megado de prueba.
Su ultima medida de produccin fue el 03 de Marzo de 2014, con 325 BPPD, 30 %AyS, 9
PCN/BN, 3.69 lbs de arena / 1000 bls de fluido.
Actualizado por Iris Carroz Junio 2014
El da sbado 22 de Marzo de 2014, fue reportado parado el pozo BN-808_R3. El tcnico de
recorrido lleg a la locacin encontrando el VSD detenido, se procedi a dar arranque al equipo
sin xito. Se desconect equipo de fondo y se tomaron medidas elctricas encontrando el
equipo de fondo desbalanceado entre fases y con bajo aislamiento con respecto a tierra, el
pozo queda fuera de servicio por equipo de fondo.
Medidas Elctricas:
Fase-Fase = 5.3 3.7 4.7 Ohms
Fase-Tierra = 0 MOhms
Con estas medidas elctricas el equipo no puede arrancar y queda fuera de servicio parado por
equipo de fondo. Este equipo de fondo tena un tiempo de operacin de 231 das. Las ltimas
lecturas del Sensor tipo Centinel III fueron el 18 de Octubre de 2013 = PIP: 1330 psi y TM:
214 F. El equipo instalado actualmente es el siguiente
Se prepara programa para cambio de bomba BES. Se instalara una bomba P6 con triple sello.
El 07 de Junio de 2014, sali maquina de servicio de realizar cambio de bomba. Sac
tubera de 4-1/2 EUE llena de crudo, agua y arena. Recuper bomba BES P6 400PMSSD. Baj
casco de mula 2-7/8 y TBG 4-1/2 combinada para chequear fondo. Toc tope de relleno a
8725. Se decide suspender cambio de bomba y realizar limpieza con equipo de coiled tubing.
Dej pozo asegurado con 264 jtas de tubera de 4-1/2 y empacadura arrow set 9-5/8.
Actualizado por Iris Carroz Junio 2014
El 16 de Junio de 2014, se prepara programa de limpieza con Maquina de Servicio y cambio
de bomba BES con maquina de servicio. Se instalar una bomba BES 400 -1250 de 340
etapas.
Hoyo de 12-1/4 hasta 8526 MD / 8137 TVD
Revestidor 13 3/8, 54.5#, K-55 @ 608 (MD)
COMPLETACION MECANICA ACTUALBN_0808 (Loc:AH-61)
Junio 2014
Punto de Desviacin (KOP) @ 4916 MD/TVD, DLS: 3 /100 ft, inc: 2.43 deg
264 Jtas tub 4-1/2 N-80 Punta Libre
Punto final de la curva (EOC) @ 5917 MD / 5879TVD, inc: 29.95 deg
Empacadura arrow set 9-5/8
@ 4783,5 MD
Revestidor 9-5/8, 47#, TAC-95, BUTT @ 8513 MD / 8126 TVD
E.M.R. : 151PF: 9136 MD / 8661 TVD
Compressed Meshrite 7, 26#, N-80: Fondo @ 9119 MD / 8655 TVD
Rejillas: 8587-9051 MD
Intervalo Completado:Boscn Superior8513-9136 MD8126-8661 TVD
Fin de la Instalacin @ 8335,5 (MD)
Hoyo de 8-1/2 @ 9136 MD / 8661 TVD, inc:
31.08 deg
Empacadura 9-5/8 x 7 @ 8373 MD
ltimo HUD @ 8725 (394 de relleno)
(Mayo 2014)
Hoyo de 12-1/4 hasta 8526 MD / 8137 TVD
Revestidor 13 3/8, 54.5#, K-55 @ 608 (MD)
COMPLETACION MECANICA PROPUESTABN_0808 (Loc:AH-61)
Agosto 2014
Punto de Desviacin (KOP) @ 4916 MD/TVD, DLS: 3 /100 ft, inc: 2.43 deg
261 Jtas tub 4-1/2 N-80
Punto final de la curva (EOC) @ 5917 MD / 5879TVD, inc: 29.95 deg
Revestidor 9-5/8, 47#, TAC-95, BUTT @ 8513 MD / 8126 TVD
Empacadura 9-5/8 x 7 @ 8373 MD
E.M.R. : 151PF: 9136 MD / 8661 TVD
Compressed Meshrite 7, 26#, N-80: Fondo @ 9119 MD / 8655 TVD
Rejillas: 8587-9051 MD
Intervalo Completado:Boscn Superior8513-9136 MD8126-8661 TVD
Camisa de 7, 26 lbs/ftFin de las camisas @ 8334 (MD)
Hoyo de 8-1/2 @ 9136 MD / 8661 TVD, inc:
31.08 deg
Bomba Electro Sumergible BES 400 -1250 de 354 etapas.
Succin @ 8267 (MD) y Fin del equipo BES @ 8316 (MD)
Rep
ort
e d
e T
ub
ing
Lan
din
g D
eta
ils
PD
VS
A P
ET
RO
BO
SC
AN
Pgin
a 1
de 1
Nom
. Legal P
ozo :
Pro
yecto
:
Report
e #
:
Chevro
n N
o.
:
Pro
yecto
No.
:
Fec.
Inic
io :
Inic
. P
erf
:
Fec.
Report
e :
Fec.
Fin
:
BN
_0808
WE
LL S
ER
VIC
E
2
RO
8200
7 17/0
5/2
014
28/1
2/2
005
07/0
6/2
014
07/0
6/2
014
Impre
so:
16/0
6/2
014
03:5
1:0
6 p
.m.
Com
ponente
:F
echa I
nsta
laci
n:
LO
NG
TU
BIN
G07/0
6/2
014
Suspend D
esde:
Fecha R
etiro
: S
UR
FA
CE
EQ
UIP
ME
NT
@
(ft)
Corr
ecci
n T
MD
:P
eso F
inal S
art
a:
(ft
) (
lb)
Long.
Tota
l:P
eso A
ncla
do:
8.3
35,5
(ft
) (
lb)
Di
metr
oC
om
ponente
# J
unta
sD
im
Int
Di
m E
xt
Peso
Gra
do
Long
Tope
Con
ecci
nC
om
enta
rios
(in)
(in)
(in)
(lb/f
t)(f
t)(f
t)
9,6
25
TU
BIN
G H
AN
GE
R1
9,6
25
0,5
00
CO
LG
AD
OR
DE
9-5
/8"
X 4
-1/2
"
4,5
00
TU
BIN
G154
4,5
00
12,7
5N
80
4.8
73,0
00
0,5
0B
TC
154 T
BG
DE
4-1
/2"
EU
E N
-80
9,6
25
HY
DR
AU
LIC
PA
CK
ER
19,6
25
8,0
00
4.8
73,5
0E
MP
AC
AD
UR
A A
RR
OW
SE
T D
E 9
-5/8
"
4,5
00
TU
BIN
G110
4,5
00
12,7
5N
80
3.4
54,0
00
4.8
81,5
0B
TC
154 T
BG
DE
4-1
/2"
EU
E N
-80
1,0
00
1,0
00
8.3
35,5
0F
IN D
E L
A I
NS
TA
LA
CIO
N
Well: BN_0808
DATE PLOTTED: 26-Jun-2008
HORIZONTAL UNITS: FEET
Y COORDINATE: 3778404.13
X COORDINATE: 556110.58
LONGITUDE: 72.0000
LATITUDE: 10.0000
LOCATION: PI-527
COMPANY: Chevron
VERTICAL SCALE: 1:500
DATE LOGGED: 23/01/2006
VERTICAL UNITS: FEET
DRILLED DEPTH: 9136.00
ELEVATION MEAS. REF.: 151.22
MEASUREMENT REF.: KB
SURFACE ELEVATION: -
DATUM FOR ELEVATION: MSL
RM
- @ -
RMC
- @ -
RMF
- @ -
DFD
-
BHT
- -
DEPTH (FEET)
8576.81-9136.00 -
SHT BIT SIZE
Composite
WIRE.VSH_1V/V0 1
WIRE.GR_BOS_1GAPI0 150
WIRE.GR_1GAPI0 150
wire.calMV6 16
8590
8610
8620
8630
8640
8660
8670
8680
8690
8710
8720
8730
8740
8760
8770
8780
8790
8810
8820
8830
8840
8860
8870
8880
8890
8910
8920
8930
8940
8960
8970
8980
8990
9010
9020
9030
9040
9060
9070
9080
9090
9110
9120
8600
8650
8700
8750
8800
8850
8900
8950
9000
9050
9100
8576.8
9136.0
DEPTHFEET
-8029.6
-8050
-8100
-8150
-8200
-8250
-8300
-8350
-8400
-8450
-8500
-8510.2
Elevation(T
VD
)F
EE
T
85907" H
igh Com
pressed Meshrite
460
9050
PE
RF
.FO
RM
AT
ION
MEMORY.RACHM_1OHMM0.2 200
MEMORY.RACLM_1OHMM0.2 200
MEMORY.RPCHM_1OHMM0.2 200
MEMORY.RPCLM_1OHMM0.2 200
WIRE.RT_1OHMM0.2 200
WIRE.SW_INDO_1V/V1 0
WIRE.SAND_1V/V0 10
WIRE.NERR_1V/V10 0
WIRE.KCALB_1MD1 10000
WIRE.PAY_110 0
PHIT_1V/V0.5 0
BVW_1V/V0.5 0
PHIE_1V/V0.5 0
formpressV/V5000 0
hydrostaticV/V5000 0
wire.zdenG/C31.9 2.9
wire.cncfV/V45 -15
wire.nphiV/V0.45 -0.15
wire.zcorG/C3-0.3 0.2
wire.peB/E0 10
EoceneO
ligUnconf
454
9030B
aseUpperR
eservoir106
TO
PS
.FO
RM
AT
ION
9020 MD
Recomendacin: Si encuentran relleno a 9020 MD o por encima a esta profundidad proceder a limpiar hasta el fondo
De: Ramos, Leudy J [mailto:Leudy.Ramos@bakerhughes.com]
Enviado el: Monday, March 24, 2014 9:37 AM Para: MONICA DI CATERINA [Petroboscan]; JUAN VERGARA [Petroboscan]
CC: ANNY DOMINGUEZ [Petroboscan]; Cedeno, Jesus E; Colina, Ricksy A; Matos, Fabian A; Safayeh, Daniel S; DANNY SOCORRO [Petroboscan]; DOUGLAS CHIRINOS [Petroboscan C]
Asunto: PARADA POZO BN-808_R3 - RL: 231dias
Buenos Das,
El da sbado 22 de Marzo de 2014, fue reportado parado el pozo BN-808_R3. El tcnico de
recorrido lleg a la locacin encontrando el VSD detenido, se procedi a dar arranque al
equipo sin xito. Se desconect equipo de fondo y se tomaron medidas elctricas
encontrando el equipo de fondo desbalanceado entre fases y con bajo aislamiento con
respecto a tierra, el pozo queda fuera de servicio por equipo de fondo.
Medidas Elctricas:
Fase-Fase = 5.3 3.7 4.7 Ohms
Fase-Tierra = 0 MOhms
Con estas medidas elctricas el equipo no puede arrancar y queda fuera de servicio parado
por equipo de fondo. Este equipo de fondo tena un Run Life de 231 das. Las ltimas lecturas del
Sensor tipo Centinel III fueron el 18 de Octubre de 2013 = PIP: 1330 psi y TM: 214 F.
El equipo instalado actualmente es el siguiente
Favor enviar la ltimas medidas de produccin, agua, arena, e IPR para ir trabajando en el diseo del prximo equipo a instalar. Saludos..
Leudy (Len) J. Ramos | C&P Application Engineering Baker Hughes | Completion & Production Office: +58 261.730.5400 Cell: + 58 412.250.0454 | leudy.ramos@bakerhughes.com http://www.bakerhughes.com | Advancing Reservoir Performance
This message is intended exclusively for the individual or entity to which it is addressed. This communication may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. If you are not the named addressee, or have been inadvertently and erroneously referenced in the address line, you are not authorized to read, print, retain, copy or disseminate this message or any part of it. If you have received this message in error, please notify the sender immediately by e-mail and delete all copies of the message.
Scale
Max Dog Leg / 100 ft 3.97 @ 5917FT
Casing-1 Casing-2
Tope Tope
Base Base
Tubing-1 Tubing-2
Tope Tope
Base Base
Intervalos perforados Colgador Ft
Desde: Ft Hasta: Ft Modelo de Afluencia
Marca Minimandril
Modelo Maximandril
API
Grav. Gas sg
Grav. Agua sg
%Ays
RGP RGL PIP Mnima
Pb. Rsb
CO2 N2 H2S
Parafinas, Aromticos
y Asfaltenos
Correlacin de flujo multifsico vertical
60 50
Capilar
cP @ F y psi VSD TX Elevador
cP @ F y psi Marca: Marca:
cP @ F y psi KVA: KVA:
Nombre: Johana Villasmil Nombre: Ing. Marcelino Mota
C.I.: 17.335.346
Firma: Firma:
BV-MPR-VA-R-003-F01 Revisin N 2 (16-04-2012) Pgina 1 de 1
BV-MPR-VA-R-003-F01
Hoja de Datos - Equipos BES
Instrucciones: Complete todos los campos posibles y anexe cualquier informacin que considere importante
No de pedido: Contrato Chevron
Cliente PDVSA Contacto Johana Villasmil
Cel: 0424-6736122
Campo CAMPO BOSCAN e-mail villasmiljz@pdvsa.com
Nombre del Pozo BN_0808 Instalacion: Telfono 0261-7302046
Vertical: Horizontal: Inclinado Datum 9136
Fecha 29 de agosto de 2014
DIAGRAMA MECNICO INFORMACIN DEL YACIMIENTO
Pais VENEZUELA
Formacin Productora N/S
0 Nivel Esttico N/S
Presin @ Datum 1540
Temp @ Datum 190
8220
9136 CHP Esttico N/S
DATOS DE AFLUENCIA
8513 9136
Cabezal
N/S Indice de Productividad N/S
8373
0
N/S Ql @ Prueba 365
DATOS DE FLUIDOS Pwf @ Prueba 1054
30% Produccin deseada 365
10.6 Nivel dinmico @ Prueba N/S
0.66 CHP @ Prueba N/S
200 140 300
1350 N/S Presin en cabezal (THP) 120
1.06 ESPECIFICACIONES DEL DISEO
Arena Temperatura en cabezal 120
Carbonatos
INFORMACIN ADICIONAL
Y Tool Hz
Potenciales Problemas Presin Anular (CHP) N/S
NO NO NO Prof. de Asentamiento 8334
Datos para calibracin por viscosidad
REPRESENTANTE CLIENTE REPRESENTANTE BORETS VENEZUELA S.A
COMENTARIOS Y OBSERVACIONES
Cargo: ING. DE VENTAS Y APLICACIONES
C.I.:
Cargo: ING. DE OPTIMIZACION
BV-MPR-VA-R-003-F02
P/N BORETS DESCRIPCIN DEL COMPONENTE COD. CLIENTE CANT U.M
1. Seccin de bomba(s):
1179769 BOLT ON DISCHARGE HEAD, ESP 400 2-7/8 EUE STAINLESS STEEL 914295 1 PZA
2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA
2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA
2022958 Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 901940 1 PZA
2. Seccin de separador(es) de gas / succin:
826627 Gas Separator, ESP 538 VGS HSS SS 902177 1 PZA
3. Seccin de sello(s) o protector(s):
1396991 Motor Seal, ESP Guardian 538 BPBSL HL HT MT 902046 1 PZA
1396991 Motor Seal, ESP Guardian 538 BPBSL HL HT MT 902046 1 PZA
4. Seccin de motor(es):
1223117 Motor, ESP 562 IL200T 330HP 1950V 102A UT MT HT 923491 1 PZA
5. Sensor de fondo:
1271542 Sensor, ViewPoint ESP-HT Series-5 SS 912580 1 PZA
6. Cable(s) de potencia:
955680 Cable, ESP round SL-450 #1/7 str cpt EETB G 5kV 795118 8800 FT
6. Miscelneos:
2005544 Centralizer, ESP 7in 32 lb/ft carbon steel 922485 1 PZA
604698 Protector, tubing clamp 4-1/2 OD 1-2 flat Cannon 4500-A-05SR 923508 300 PZA
1192820 Connector, wellhead surface 5kV 100A BIW-EM42201-276-030 922487 1 PZA
1192821 Lower Connector, wellhead 5kV 100A BIW-EM43208-766-012 922490 1 PZA
1192644 Feedthru, wellhead 5kV 100A 26in BIW-EM41218-2 922488 1 PZA
794977 MLE, ESP 540/562 4KELB TM 4kV 120ft 922494 1 PZA
922493 Kit, installation 400 922493 1 KIT
923838 SPLICE KIT 923838 3 KIT
593421 Hanger, motor shroud 513/538 pump x 7 inch shroud 922483 1 PZA
C.I.: C.I.: 17.335.346
Firma: Firma:REPRESENTE CLIENTE REPRESENTANTE BORETS VENEZUELA S.A
Fecha:
BV-MPR-VA-R-003-F02 Revisin N 3 (10-06-2013) Pgina 1 de 3
29-Aug-14
Tiempo de entrega ofrecido: 20 SEMANAS despus de recibido el pedido u ODC del Cliente
CARACTERISTICAS TECNICAS EQUIPO RECOMENDADO
RESUMEN DE LA CONFIGURACIN PROPUESTA
Cargo: ING. DE OPTIMIZACION Cargo: ING. DE VENTAS Y APLICACIONES
Nombre: Johana Villasmil Nombre: Ing. Marcelino Mota
Se realiz el diseo considerando la informacin recibida por Ud.(s) la cual se encuentra adjunta en el formato
identificado como "BV-MPR-VA-R-003-F01" teniendo en cuenta las expectativas de produccin y las condiciones
actuales del pozo.
Se propone un Equipo BES asentado a una profundidad de 8316.15 ft la cual garantiza un nivel de fluido mnimo
suficiente sobre la Bomba para su operacin normal (PIPmin= 300 psi para la tasa deseada de 365 bfpd. Los resultados
indican la necesidad de instalar un Separador de Gas de alta eficiencia el cual garantice la operacin adecuada de la
Bomba considerando la Relacin Gas / Petrleo del pozo de 200 pcpd/bnpd . Se recomienda el siguiente equipo BES
convencional:
BN_0808
PROPUESTA DE EQUIPOS
BV-MPR-VA-R-003-F02
POZO: Fecha:
OD (in)Longitud
(ft)
Base
(ft)
1.37
4.00 0.50 8220.5
4.00 14.80 8235.3
4.00 14.80 8250.1
4.00 14.80 8264.9
5.38 2.71 8267.6
5.38 9.00 8276.6
5.38 9.00 8285.6
5.62 25.80 8311.4
3.75 3.74 8315.2
5.70 1.00 8316.2
Camisa de Refrigeracion (Longitud Minima) 5.70 96.15 8,316.15
66.00 FT - 7" 26Lb
Fondo de Camisa Distancia entre fondo de camisa y tope del liner
8333.61 FT 39 FT
BV-MPR-VA-R-003-F02 Revisin N 3 (10-06-2013)Pgina 2 de 3
1.37
8.0
Lb/ft
8220.0
1.8
379.0
1863.0
Motor Seal, ESP Guardian 538 BPBSL HL HT MT
CONFIGURACIN DE EQUIPO A INSTALAR
BN_0808 29-Aug-14
Peso
(lb)Descripcin de Componentes
8220.0
Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 317.0
14796.0
Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT
BOLT ON DISCHARGE HEAD, ESP 400 2-7/8 EUE STAINLESS STEEL
Cable, ESP round SL-450 #1/7 str cpt EETB G 5kV
317.0
Pump, ESP 400-1250 100 HSG 118 STG CP CT HSS HT TA MT 317.0
123.5
3,794.5
Gas Separator, ESP 538 VGS HSS SS
Sensor, ViewPoint ESP-HT Series-5 SS 71.0
Motor Seal, ESP Guardian 538 BPBSL HL HT MT 379.0
Centralizer, ESP 7in 32 lb/ft carbon steel 20.0
Motor, ESP 562 IL200T 330HP 1950V 102A UT MT HT
PROPUESTA DE EQUIPOS
50 1) Tiempo de entrega ofrecido
151.9 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo
2940.1
59.8 2) Tiempo de repuesta del Ing. Ventas
1625 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo
0.654
No 3) Calidad tcnica del equipo ofertado.
14.7 ( ) Excelente ( ) Bueno ( ) Regular ( ) Malo
84.8
N/A
N/A
454.26 LEYENDA PONDERACION
354 Excelente 10
483.41 Bueno 7
483.19 Regular 5
27.7 Malo 3
1.7
6648.77
646.8 ESCALA CALIFICACION
3519 25-30 Excelente
124.5 20-24 Bueno
790.9 15-19 Regular
6466.32
48 49 50 51 52
142 147 151.9 157 162
2823 2882 2940.1 2999 3057
57.8 58.8 59.8 60.9 62
1560 1593 1625 1658 1690
0.64 0.65 0.654 0.66 0.67
No No No No No
15.1 14.9 14.7 14.6 14.4
84.4 84.6 84.8 85 85.1
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
407 433 454.26 476 498
354 354 354 354 354
433 460 483.41 507 530
433 460 483.19 506 530
20.6 24.1 27.7 32 37.6
1.2 1.4 1.7 2.1 2.6
6225 6434 6648.8 6866 7083
797 718 646.8 569 484
3486 3498 3519 3535 3543
112 118 124.5 131 138
938 861 790.9 715 632
6049 6268 6466.3 6682 6920
45% 47% 48% 50% 51%
284 285 286 288 289EQUIPO @48Hz
EQUIPO @52Hz
Motor Load, %:
Operating Temp, F:
Total Dynamic Head (TDH), ft:
Pump Intake Pressure, psig:
Pump Discharge Pressure, psig:
Pump Operating Power, HP:
Bottom Hole Pressure , psig:
Fluid Level [MD], ft:
Free Gas by Volume into Pump, %:
Operating Power Factor :
Adjusted for Motor Slip :
Pump Efficiency, %:
Motor Efficiency, %:
Operating Thrust Load, lb:
Maximum Thrust Load, lb:
Surf. Final Liq. Rate(O+W), Bbl/D:
Total Stages :
Avg. Pump Final Fluid, Bbl/D
Avg. Pump Total Rate, Bbl/D
Free Gas by Volume @ Pump, %:
Operating Voltage, Volts:
Sensibilidades equipo 400-1250 354STG en pozo BN_0808
Frequency, Hz:
Required HP, HP:
Operating Speed, RPM:
Operating Current, Amps:
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 1
DESCRIPCIN GENERAL
Nombre de la Compaa: PETROBOSCANNombre del Pozo: BN-0808Nombre del Campo: CAMPO BOSCANNombre del Yacimiento:Analista: MARCELINO MOTATipo de Clculo: Diseo RigurosoUbicacin:
Comentarios: 50hz IDEAL
Fecha: Ago 29, 2014
DATOS DEL POZO
OD Wt ID Rugosidad Base MD Tope MDNo. in lb/ft in in ft ft
Tubing 1 4.500 12.75 3.958 0.0006500 8220.00
Cubierta 1 7.000 26.00 6.276 0.0006500 8320.00
Casing 1 9.625 47.00 8.681 0.0006500 9136.00 0.00
Survey Direccional
MD TVD AnguloNo. ft ft Deg
1 100.00 100.00 1.52 3048.00 3047.00 0.03 4006.00 4005.00 0.04 4916.00 4915.00 8.05 5534.00 5527.00 24.86 6012.00 5961.00 30.07 6585.00 6457.00 30.08 7063.00 6871.00 30.29 7668.00 7394.00 30.210 8014.00 7693.00 30.011 8395.00 8023.00 30.012 8589.00 8191.00 30.813 9136.00 8661.00 0.0
Profundidad de la Bomba, ft: 8220.00Tope de las Perforaciones o Datum (MD), ft: 8513.00Temperatura del Yacimiento, F: 190.0Temperatura en el Cabezal del Pozo, F: 120.0Temperatura del Fluido Antes de pasar por el Motor, F:
187.8Temperatura del fluido Despes de pasar por el Motor, F:
187.8
Correlaciones de Outflow para el Tubing Orkiszewski (1967)Factor de Ajuste de la Correlacin: 1.000
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 2
DATOS DE LA LNEA DE FLUJO
Correlacin de la Lnea de Flujo Ninguno CalculadoCorrelacin del Estrangulador No hay clculos hechos para el estrangulador
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 3
CORRELACIONES PVT
Descripcin Mtodo
Viscosidad del Petrleo, (Muerto) Beggs & RobinsonViscosidad del Petrleo, (Saturado) Chew & ConnallyViscosidad del Petrleo, (Subsaturado) KartoatmodjoViscosidad del Gas LeeViscosidad del Agua Matthews & Russell Factor Volumtrico del Petrleo Vasquez & BeggsFactor Volumtrico del Agua de Formacin HP41CDensidad del Petrleo KatzFactor - Z Hall & YarboroughComprensibilidad Isotrmica del Petrleo Vasquez & BeggsCompresibilidad Isotrmica del Agua MeehanRelacin Gas/Petrleo en Solucin LasaterPresin del Punto de Burbuja LasaterDensidad del Gas BeggsDensidad del Agua BeggsCorrelacin de Tensin Superficial del Petrleo Baker y SwerdloffCorrelacin de Tensin Superficial del Agua Hough
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 4
DATOS DEL FLUIDO
Temperatura Estndar, F: 60.0 Relacin Gas/Petrleo Prod., scf/bbl: 200.00Presin Estndar, psi: 14.7 Relacin Gas/Lq Prod., scf/bbl: 140.00Gravedad del Petrleo, API: 10.6 Presin del Punto de Burbuja, psia: 1340.0Gravedad Especfica del Gas: 0.660 RGP en Solucin, scf/bbl: 154.91Gravedad Especfica del Agua: 1.060 Viscosidad Promedio del Fluido, cP: 586.2Salinidad del Agua, ppm: 80000 Grad. Fluido @ Entrada Bomba, psi/ft: 0.431Corte de Agua, %: 30.0
Datos de calibracin de la Viscosidad
Pnt. Pres. Temp. Visc. Medida Tipo Calc Visc Calib# psia F cP cP Factor
1 14.7 100.0 7600.0 Muerto 1270.4 5.9822 14.7 180.0 500.0 Muerto 35.9 13.927
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 5
DATOS INFLOW
Mtodo de Clculo del IPR: Vogel corregido por Corte de Agua
Caudal a la Presin de Fondo Fluyente de la Prueba, Bbl/D:365.00
Indice de Productividad, blpd/psi: 0.464Caudal al punto de burbuja, Bbl/D: 250.44Caudal Mx de Petrleo, Bbl/D: 595.88Mx. Caudal Total, Bbl/D: 595.88
Esttica Prueba
Presin del Casing, psig: 0.0 0.0Nivel de Fluido, ft: 0.00 0.00Presin de Fondo (BHP), psig: 1865.0 1054.0
DATOS DE PRESIN/CAUDAL
Criterios de Diseo - Calcular: Condiciones de Entrada a la Bomba
Caudal total de fluido, Bbl/D: 365.00Profundidad de la Bomba, ft: 8220.00Fluido sobre la Bomba, ft: 2526.06Nivel de fluido dinmico, ft: 5693.94Presin de Entrada a la Bomba, psig: 915.9Cabeza Dinmica Total, ft: 5889.69Presin del Tubing, psig: 120.0Presin del Casing, psig: 1.0Presin de Fondo , psig: 1054.0Gas a travs de la Bomba Comprimir Gas
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 6
SEPARACIN DEL GAS
Empacadura Instalada? NoGas Libre perm. en la Bomba, %: 16.0Separador de Gas Instalado? SiGas Libre dentro de la Bomba, %: 0.8Eficiencia de la Separacin Natural de Gas, %: 70.0Eficiencia de la Sep. del Gas, %: 85.0
DETALLE DE LA CURVA DEL SISTEMA DEL POZO
(+) (-) (=) Caudal en Caudal Prom. en Nivel deCabeza Cabeza TDH Superficie La Bomba fluidoTubing PIP P+A P+A+G Bombeado
Punto # ft ft ft Bbl/D Bbl/D ft
1 8050.40 4083.98 3966.43 5.72 6.09 3686.402 8003.14 3724.24 4278.90 76.55 81.43 4053.243 7965.52 3364.63 4600.89 147.38 156.76 4420.474 7944.37 3002.53 4941.84 218.20 232.10 4788.005 7955.96 2625.35 5330.61 289.03 307.44 5165.726 8005.07 2162.86 5842.20 359.86 382.78 5648.067 8088.34 1671.71 6416.64 430.69 458.11 6210.468 8193.96 1077.64 7116.32 501.51 533.45 6918.87PumpOff 8283.86 9.16 8274.70 572.34 608.79 8219.10
Diseo 8011.72 2122.03 5889.69 365.00 388.25 5693.94
COMPORTAMIENTO TERICO DE LA BOMBA
Entrada Descarga Superficie
Caudal de Petrleo, Bbl/D: 344.30 340.05 317.98Caudal de Gas en-sitio en la Bomba, Bbl/D: 4.15 1.08 N/ACaudal de Gas en-sitio en el casing, Bbl/D: 88.01 N/A N/ACaudal Total de Gas, Mscf/D: N/A N/A 63.60Porcentaje de Gas Libre, %: 1.69 0.31 N/ACaudal de Agua, Bbl/D: 140.81 139.86 136.28Caudal Total de Lquido, Bbl/D: 485.11 479.91 454.26
Presin, psig: 646.8 3519.0 120.0 (cabezal)
Gravedad especfica del Lquido, wtr=1: 0.97 0.98 N/AGravedad especfica de la Mezcla, wtr=1: 0.95 0.98 N/ADensidad del Lquido, lb/cf: 60.402 61.067 N/ADensidad de la Mezcla, lb/cf: 59.414 60.910 N/Aviscosidad de la Mezcla, cStokes: 325.9 481.1 N/Aviscosidad de la Mezcla, SSU: 1519.2 2242.5 N/ARGP en Solucin, scf/bbl: 74.48 74.48 N/ARGA en solucin, scf/bbl: 3.47 3.47 N/AFV del Lquido, yacimiento/superficie: 1.06 1.05 N/AFV de la Mezcla, yacimiento/superficie: 1.08 1.05 N/AFactor de desviacin del Gas: 0.944 0.900 N/A
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 7
DATOS DE LA BOMBA 1
Fabricantes: WfordSerie: 400Modelo: 400-1250& Fuente de Datos del Equipo:
Mnimo Caudal Recomendado, Bbl/D: 346.32**Mximo Caudal Recomendado, Bbl/D: 747.45**Caudal a la Mxima Eficiencia, Bbl/D: 607.86**Potencia a la Mxima Eficiencia, HP: 154.5**Frecuencia, Hz: 50.0
** = Corregida para la Frecuencia & Viscosidad
Nmero de Etapas: 354Etapas con Gas Libre: 354
Factores de correccin por Viscosidad Introducidas por el Usuario
Caudal: 0.599 SiCabeza: 0.848 SiPotencia: 1.799 SiEficiencia: 0.280Viscosidad: Fluido
Diseo Catlogo
Cabeza Dinmica Total (TDH), ft: 5889.69 6648.77Caudal en Superficie (P+A), Bbl/D: 365.00 454.26Promedio de Caudal por Etapas (P+G+A), Bbl/D: N/A 483.19Presin de Entrada a la Bomba, psig: 915.9 646.8Potencia de Operacin, HP: N/A 126.5Eficiencia de la Bomba, %: N/A 14.7
Datos del Housing
NO SE HA SELECCIONADO HOUSINGS
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 8
DATOS DEL MOTOR
Fabricantes: WfordSerie: 562Tipo: IL-200 - Upper
Potencia en la Placa de Identificacin, HP: 330.0 Frecuencia de la Placa de Identificacin, Hz: 60Voltaje de la Placa de Identificacin, Volts: 1950.00Corriente de la Placa de Identificacin, Amp: 102.0
Ajustar por Deslizamiento del Motor: No Corriente de Operacin, Amps: 59.8Frecuencia de Diseo, Hz: 50.0 Voltaje de Operacin, Volts: 1625.00Carga de operacin del Motor, HP: 126.5 Factor de Potencia de Operacin, frac: 0.654
(@ Frecuencia de Diseo)Carga Operativa del Motor, %: 46.02 Eficiencia de Operacin, %: 84.79Velocidad de Operacin, RPM: 2940 Velocidad del Fluido, ft/sec: 0.694
Catlogo Actual
Total de Etapas 354 354Deslizamiento en las Etapas 0 0Cabeza Dinmica Total (TDH), ft 6648.77 6648.77Caudal en Superficie (P+A), Bbl/D 454.26 454.26Promedio de Caudal por Etapas (P+G+A), Bbl/D 483.19 483.19Presin de Entrada a la Bomba, psig 646.8 646.8Potencia de Operacin, HP 126.5 124.5Eficiencia de la Bomba, % 14.7 14.7Velocidad de Operacin, RPM 2916 2916
DATOS DEL SELLO
NO HAY SELLO SELECCIONADO
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Vie Ago 29 2014 Reporte Detallado de SubPUMP: CASO 3 Pgina 9
DATOS DEL CABLE
Fabricantes: WfordTipo: E-Lead-Compacted-5KVTamao: 1 CuForma: FlatTipo de Conductor: Stranded Mx.Temp., F: 450.0Longitud del Cable, ft: 8320.00
Calcular: Voltaje de SuperficieCosto de la Electricidad, $/kWH: 0.00
Nota: *Indica que el cable est fuera de rango!
DiseoFrec.
Frecuencia, Hz 50 Mx. Amp Permisible, Amps 169.0 Amperaje, Amps 59.8 Kilovoltio Amperio, KVA 192.7 Kilovatios, kW 126.0 Kilovatios, $/mes 0 Voltaje de Superficie, Volts 1858.6 Cada de Voltaje @ 68.0 F, Volts 185.2 Cada de Voltaje @ 190.0 F BHT, Volts 233.6 Prdida de Kilovatios, kW 15.8 Costo de la Prdida de Voltaje, $/mes 0 Voltaje Requerido por el Motor, Volts 1625.0 Voltaje de Fondo del Motor, Volts 1625.0 Cada de Voltaje In-rush del Motor, Volts 934.4 Mnimo Voltaje de Arranque del Motor , Volts 924.2 Relacin Arranque/Operacin, Relacin 0.6
Reg User: Marcelino Mota - Weatherford ALS C:\...._0808 Ago 2014 (por casos).s95 15:54:45
Nota: Los caudales en "superficie" son calculados a condiciones estndar
10
6
1 4
3
87 9
Vlvula de Aislamiento Estacin de Flujo
2 5 Aguas Arriba Aguas Abajo
Vlvulas:1. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe2. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe3. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe4. Check Vlvula Con Fuga / Sin Fuga Existe / No Existe5. Abierta / Cerrada Con Fuga / Sin Fuga Existe . No Existe6. Sello Con Fuga / Sin Fuga Existe / No Existe7. Indicador de Presin Aguas Arriba ___________________________ Psi8. Indicador de Presin Aguas Abajo___________________________ Psi9. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe10. Abierta / Cerrada Con Fuga / Sin Fuga Existe / No Existe
Hoja de Entrega de Pozo P & C / Operaciones - BALANCIN
Pozo: ______________
Rep. P&C:___________Firma, fecha y hora
Rep. OPS:___________Firma, fecha y hora
TODOS los puntos deben ser marcados para efectuar la entrega del pozo. Si un punto no puede ser marcado poner la observacin.
FLUIDOS DE REHABLITACIN SI NOBLS DEJADOS EN
POZOFluidos de Limpieza (Salmuera)Fluidos de Limpieza ( )Geles TemporalesGeles PermanentesFluidos de Acarreo (Pildoras Viscosas)Fluidos RompedoresAcidosOtros fluidos
Firmar dos copias Una permanecer en el taladro y la otra es para OperacionesEl taladro no esperara por la firma de Operaciones para evitar TNPEl pozo no debera producir hasta que operaciones haya firmado el formulario de entrega.
BN_0808 Programa Limpieza + Cambio de Bomba (Ago 2014)BN_0808 HistoriaBN_0808 Diag actual y propuesto [Modo de compatibilidad]PDFDLBN_0808 Data de ProduccionBN_0808 IPRBN_0808 Recomendaciones de limpiezaBN_0808 XspocBN_0808 Aviso de fallasPropuesta de Sistema BES BORTES 400-1250 354STG MTR 330HP para pozo BN_0808Reporte detallado de SubPump Sistema BES 400-1250 354STG MTR 330HP para BN_0808Hoja de entrega de pozos
Recommended