8/18/2019 BOQ-01 Sabahiya Villa
1/22
DIVISION 1 GENERAL REQUIREMENTS
S.No. Item description Unit Qty.
DIVISION 1 GENERAL REQUIREMENTS GENERAL REQUIREMENTS
The Tendered shall include the costs associated withrequirements mentioned hereunder
To Collection Kd
8/18/2019 BOQ-01 Sabahiya Villa
2/22
DIVISION 2 SITE WORK
DIVISION SIT! "O#K
$ %& '()*
+ %# &*
DIVISION 2 EXTERNAL WORK
S.No. Item description Unit Qty.
!,ca-ation includin le-ellin/ radin/ rammin/ and remo-in surplus e,ca-ated materials o00site.
e,ca-ation in all 1inds o0 soil 0or 0oundation 0rom23(.'4 5e-el include trenches/ etc up to anydepth as per D"6S7 specs includin disposal o0 surplus materials 0rom site o pu8lic dump yardsto the satis0action o0 enineer
Desin/ 0urnishin and installation o0 shorin wor1s includin sheet pilin as necessary to protectwor1men/ 8an1s/ ad9acent pa-in/ structures and utilities/ 8racin and sheetin shall 8e ase,ca-ations are 8ac10illed in a manner to pre-ent ca-in 2pro-isional and remeasured as per sitecondition 4
To Collection Kd
S.No. Item description Unit Qty.
8/18/2019 BOQ-01 Sabahiya Villa
3/22
$ + EXTERNAL WORK
The 0ollowin items to 8e priced as provisional andR!as"rd as per site conditionco-er the supply and installation as per tender drawins :
Cur8 stones 0or the sidewal1s and roads to 8e supplied 8y Kuwait National Industries
Interloc1 tiles to 8e supplied 8y Kuwait National Industries. ;cm thic1 0or side wal1s
8/18/2019 BOQ-01 Sabahiya Villa
4/22
DIVISION # $ON$RETE
DIVISION # $ON$RETE
'>
?
&)'
&&
DIVISION # $ON$RETE
S.No. Item description Unit Qty.
S.No. Item description Unit Qty.
$ +
C
D
!
@ 6
mA
mA
mA
mA
mA mA mA
mA
m mA
'>
?
&)'
&&
>')*?
'
>>*
&('
%lain insi&" 'on'r& (avin) )rad K 1*+ K),'!-
"sin) SR$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s
)** mm thic1 8lindin concrete under #a0t all as per drawins
'* mm thic1 sand cement protection screed o-er mem8rane insulation
Rin.or'd insi&" 'on'r& (avin) )rad #*+ K),'!- "sin)
SR$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s
#ein0orced insitu concrete 0or ra0t S#C 6rade K &'* withsulphat resistance cement/under N.6.5. includin/ 0air 0ace/ 0ormwor1 water proo0in withappro-ed 8itumen paint in three coat/ 0inishin/ and -i8ratin etc all as per drawins.
Rin.or'd insi&" 'on'r& 3as!n& 2 and 3as!n& 14&rnal pri!&r r&ainin) /alls
SR$ Grad K #*+ in'l"din) .or!/or0 .inis(in) vi5ra&in) &' all as pr dra/in)s
+asement retainin wall '*mm thic1
Rin.or'd insi&" 'on'r& (avin) )rad K #*+ "sin)
K),'!- O%$ in'l"din) .or!/or0 '"rin) &' as pr dra/in)s
#ein0orced insitu concrete solid sla8s/OBC 6rade K &'* includin 0ormwor1/ 0inishin/ -i8ratin etc all as per drawins.)'* mm thic1 );* mm thic1 )
8/18/2019 BOQ-01 Sabahiya Villa
5/22
DIVISION 6 7 T8ERMAL AND MOISTURE %ROT
S.No. Item description Unit Qty.
I
DIVISION # $ON$RETE
#ein0orced insitu concrete columns OBC 6rade K >** includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins2 iclude parapet column4.
#ein0orced insitu concrete !le-ator "alls OBC 6rade K &'* includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins2 iclude parapet column4.
#ein0orced insitu stairs steps/ landins/ sla8s/ OBC 6rade K &'* includin 0ormwor1/ 0inishin/-i8ratin etc all as per drawins.
mA mA mA )
&*
To Collection Kd
DIVISION 6 7 T8ERMAL AND MOISTURE %ROT
6uarantee all waterproo0in wor1s 0or a period o0 ten years 0rom the date o0 su8stantialcompletion. The uarantee to 8e in the 0orm o0 a +an1erEs 6uarantee equal to2 4 K.D.
!ater proofing for basement "alls and rafts including curing and filling all hone#comps$ holes$ etc and
to appl# %"o la#ers of appro-ed mem8rane material.
Brotected %em8rane #oo0in to all #oo0s includin
%
%
1&60
'(0
8/18/2019 BOQ-01 Sabahiya Villa
6/22
8/18/2019 BOQ-01 Sabahiya Villa
7/22
To 6rand Summary
8/18/2019 BOQ-01 Sabahiya Villa
8/22
$mount
Kd @ils Kd @ils
#ate
8/18/2019 BOQ-01 Sabahiya Villa
9/22
$mount
Kd
).&'* ?/(?
8/18/2019 BOQ-01 Sabahiya Villa
10/22
8/18/2019 BOQ-01 Sabahiya Villa
11/22
$mount
Kd
#ate $mount
Kd
#ate
8/18/2019 BOQ-01 Sabahiya Villa
12/22
#ate $mount
Kd
8/18/2019 BOQ-01 Sabahiya Villa
13/22
D :ILS
8/18/2019 BOQ-01 Sabahiya Villa
14/22
8/18/2019 BOQ-01 Sabahiya Villa
15/22
Sr Item Unit Qty
Excavation M3 5910
Shoring MR 30
Remeasured & Provisional
Kerbstone MR
Interloc M2
K!150 #lin$ing M3 5%
50 && 'rotection scree$ M3 2(
K!350 ) Ra*t M3 315
K!350 ) #ase&ent 1+2 alls M3 233
K!350 I Soli$ Slabs150 && thic M3 2%5
160 && thic M3 10
180 && thic M3 (
S-i&&ing 'ool slab + -alls M3 25
K!300 / or$ 600 && thic M2 %%0
K!350 / #ea&s M3 395
K!%00 / ol&ns M3 180K!350 / Elevator alls M3 1%
K!350 / Stairs M3 30
ater /roo4ng
2 laers &e&brane *or ra*t + base&ent -alls M2 1%60
Roo4ng M2 590
-et areas 2 laers M2 %51
*or s-i&&ing 'ool M2 60
8/18/2019 BOQ-01 Sabahiya Villa
16/22
8/18/2019 BOQ-01 Sabahiya Villa
17/22
Rate Amount
1.3(5 8,126.250
2(5.000 8,250.000
0.0000.000
0.000
0.000
0.000
%0.000 2,160.000
35.000 9%5.000
(5.000 23,625.000
115.000 26,(95.000
0.000
0.000115.000 28,1(5.000
115.000 1,150.000
115.000 805.000
0.000
150.000 3,(50.000
0.000
50.000 22,000.000
110.000 %3,%50.000
0.000
120.000 21,600.000120.000 1,680.000
120.000 3,600.000
0.000
0.000
0.000
%.500 6,5(0.000
16.000 9,%%0.000
9.000 %,059.000
15.000 900.000
0.0000.000
0.000
217,080.2500.000
0.000
0.000
0.000
0.000
0.0000.000
0.000
8/18/2019 BOQ-01 Sabahiya Villa
18/22
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8/18/2019 BOQ-01 Sabahiya Villa
19/22
Sr Item Unit Qty
Excavation M3 5910
Shoring MR 30
Remeasured & Provisional
Kerbstone MR
Interloc M2
K!150 #lin$ing M3 5%
50 && 'rotection scree$ M3 2(
K!350 ) Ra*t M3 315
K!350 ) #ase&ent 1 + 2 alls M3 233
K!350 I Soli$ Slabs150 && thic M3 2%5
160 && thic M3 10
180 && thic M3 (
S-i&&ing 'ool slab + -alls M3 25
K!300 / or$ 600 && thic M2 %%0
K!350 / #ea&s M3 395
K!%00 / ol&ns M3 180K!350 / Elevator alls M3 1%
K!350 / Stairs M3 30
ater /roo4ng
2 laers &e&brane *or ra*t + base&ent -alls M2 1%60
Roo4ng M2 590
-et areas 2 laers M2 %51
*or s-i&&ing 'ool M2 60
8/18/2019 BOQ-01 Sabahiya Villa
20/22
8/18/2019 BOQ-01 Sabahiya Villa
21/22
Rate Amount
1.250 (,38(.500
250.000 (,500.000
0.0000.000
0.000
0.000
0.000
3(.500 2,025.000
32.500 8((.500
68.000 21,%20.000
105.000 2%,%65.000
0.000
0.000105.000 25,(25.000
105.000 1,050.000
105.000 (35.000
0.000
120.000 3,000.000
0.000
%(.500 20,900.000
100.000 39,500.000 85
0.000 1%8(50
105.000 18,900.000 %5.(1%286105.000 1,%(0.000
105.000 3,150.000
0.000
0.000
0.000
%.500 6,5(0.000
1%.000 8,260.000
(.500 3,382.500
12.000 (20.000
0.0000.000
0.000
17,0!7.500
0.000
0.000
0.000
0.000
0.000
0.0000.000
0.000
8/18/2019 BOQ-01 Sabahiya Villa
22/22
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Recommended