View
27
Download
3
Category
Preview:
DESCRIPTION
CNGrid: Today and Tomorrow. Depei Qian Sino-German Joint Software Institute Beihang University depeiq@buaa.edu.cn Oct. 28, 2007. Key project supported by the National High-Tech R&D Program (the 863 program) Earliest and largest Grid project in China Two phase development - PowerPoint PPT Presentation
Citation preview
CNGrid: Today and Tomorrow
Depei QianSino-German Joint Software InstituteBeihang University
depeiq@buaa.edu.cnOct. 28, 2007
Overview of CNGrid
Key project supported by the National High-Tech R&D Program
(the 863 program)Earliest and largest Grid project in China Two
phase developmentHigh performance computer and core software
(2002-2005)100 Mil. Government fundingHigh productivity computer
and Grid Service Environment (2006-2010) 640 Mil. Government
funding
The current 863 key project
Period: 2006-2010, launched in Oct. 2006640 million (RMB) from the
MOST and at least equal amount of matching funding from different
organizationsMajor efforts:High productivity Computer
developmentCNGrid developmentCNGrid GOS continuous development12-15
Grid applications
HPC development
Two phase developmentTwo 100TFlops machines in the first phase (By
the end of 2008)One 1000Tflops in the second phase
(TBD)Installation in CNGrid Major sites
CNGrid infrastructure
Upgrading of CNGrid resourcesincreased to 12 nodesAggregated
computing power of 300TF1PB storageGrid monitoring and
managementStrengthen CNGrid operation center
CNGrid resources
10 sites currently2 major sites, 8 ordinary sitesComputing
resource: >25 TFlops Disk storage: >400TB>150 Application
software
SCCAS
Equipped with Lenovo DeepComp 6800, 5.324TFlopsAverage utilization
86%Applications155 registered usersSupporting more than 120
important projects
SSC
Equipped with Dawning 4000A, 10.2 TFlopsUtilization >80About 150
users
Grid software development
Major tasksRobust softwareData grid functionaityGrid workflowGrid
user interfaceGrid securityGrid management
CNGrid GOS architecture
Tomcat(Apache)+Axis, GT4, gLite, OMII
Dynamic DeployService
CA Service
System Mgmt Portal
Hosting Environment
Core
System
Tool/App
Message Service
Agora
User Mgmt
Res Mgmt
Agora Mgmt
Naming
HPCG, Data & Workflow Portals
GSML Browser
ServiceController
Other RController
BatchJob mgmt
MetaSchedule
Account mgmt
File mgmt
metainfo mgmt
HPCG Backend
Resource Space
GOS System Call (Resource mgmtAgora mgmt, User mgmt, Grip mgmt, etc
GOS Library (Batch, Message, File, etc)
Other Domain Specific Applications
Grip Runtime
Grip Instance Mgmt
Security
Res AC & Sharing
Other 3rd software & tools
Java J2SE
GridWorkflow
DataGrid
IDE
Compiler
GSML Composer
GSML Workshop.
Debugger
Grip
Gsh & cmd tools
VegaSSH
Cmd Line Tools
DB Service
Work Flow Engine
CNGrid GOS deployment
CNGrid GOS 3.2 deployed on 10 nodesSupport heterogeneous HPCs:
Dawning 4000A, DeepComp 6800, Galaxy, etc.Support multiple
platforms: Unix, Linux, Windows, Apache, WebSphere, etc.
CNGrid Applications
Applications from selected areasResource and EnvironmentNGG, DFG,
SeisGrid, computational chemistryResearchSDG, BAGrid, DDG, Chinese
medicine databasesServicesCMAG, TIG, railway cargo
infomationManufacturingAviGrid, SimGrid
National Geological survey Grid: NGG
Undertaken by China National Geological Survey BureauNation-wide
productive gridData exchange and sharing by servicesGrid-enabled
resource evaluationShorten the evaluation time from 3 years to 3
monthsAchievementsNorth China ground water resources
evaluationMineral resources evaluation
Scientific Data Grid
Drug discovery grid: DDG
Undertaken by Shanghai Institute of Materia Medica CASChemical
Compound screening for new drug discoverySpeed up the process by
computer simulationHigher accuracyUsing HPC in P2P mode New drug
for diabetes is under development and will enter clinic
testing
DDG Portal
Aviation Grid: AviGrid
Undertaken by AVIC II of ChinaSupporting distributed design,
simulation, and manufacturingCAD software sharingData exchange and
sharingComputing resource sharing
AviGrid
Aviation grid platform composed of three clusters in different
locations
Railway cargo Information system
MICROSOFT CORPORATION
Railway cargo information system
Physical Databases
Virtual databasesUniform data schemaUniform access interfaceDynamic
data integrationSingle system image
Business databasesDynamic data view construction
China Meteorological Grid
Process flow of ensemblenumerical weather prediction
CNGrid (2006-2010)
HPC Systems100 Tflop/s by 2008,Pflop/s by 2010Grid Software: CNGrid
GOSMerge with international effortsEmphasize maturenessCNGrid
EnvironmentNodes, Centers, mgtApplicationsResearchResource &
EnvironmentManufacturingServices
Cooperation with EU FP6
EUChinaGridInteroperability between CNGrid GOS and gLiteIPv6
supportApplication in HEPH, Biology and bioinformaticsEchoGridGrid
roadmapCoordination between EU and Chinese grid researchers
OMII-EuropeGrid standardization effortInteroperbility between main
stream grid middlewareBRIDGEInteroperability between CNGrid GOS and
GRIAGrid applications: Aerospace, Phama, MeteoXtreemOSNetwork
centric OS
Future Cooperation:Kay Technology
VirtualizationVOVM Security and dependable computingData
federation, access and sharingVirtual data spaceData driven
software Cloud ComputingWorkflow and service
coordinationProgramming supportMulti-coreNetwork
computing
Future Cooperation: Grid infrastructure
Grid interoperabilityGrid Monitoring and managementCA and user
managementInternational joint grid infrastructure
Future Cooperation: Grid-enabled applications
Grid enabled domain applicationsScientific databaseBiology and
bioinformaticsGeo-scienceAviation (optimization)Pharmaceutical
(drug discover)Product design & optimizationGrid application
frameworkSpecialize Grid communityServe a range of usersScientific
and engineering computing
New level of cooperation
Top down + bottom upContinue the current bottom-up
approachGovernment level coordinationIdentifying common
interestsNew funding schemeJoint fundingJoint calls and
evaluation
Thank you!
Recommended