Cronograma de Obra
Citation preview
Hoja3CRONOGRAMA VALORIZADO DE OBRAPROYECTO : MEJORAMIENTO DE VIAS URBANAS, PAVIMENTACION DEL JR. BOLOGNESI, JR. SAN LORENZO, AV. HEROES SICAINOS, AV. CEMENTERIO Y JR. ALEJANDRO O DEUSTUA, DISTRITO DE PUCARA- HUANCAYO-JUNIN
UBICACIN : PUCARA - HUANCAYO - JUNINFECHA : OCTUBRE DEL 2013
ItemDescripcinUndMetradoP.UParcial (S/.)Mes 1Mes 2Mes 3Mes 401.00 OBRAS PROVISIONALES 945.87945.870.000.000.0001.01 CARTEL DE OBRA DE 8.60 X 3.50m UNA CARAUND 1.00945.87945.87945.8702.00 TRABAJOS PRELIMINARES 27,008.6713,914.823,531.293,531.296,031.2902.01 LIMPIEZA DE TERRENO MANUALM2 17,138.100.467,883.537,883.5302.02 DESVIO DE TRANSITO Y SEALIZACION DURANTE LA CONSTRUCCIONM2 180.005.16928.80232.20232.20232.20232.2002.03 TRAZO, NIVELES Y REPLANTEO DE VIASM2 17,138.100.7713,196.343,299.093,299.093,299.093,299.0902.04 MOVILIZACION DE MAQUINARIASGLB 1.005,000.005,000.002,500.002,500.0003.00 MOVIMIENTO DE TIERRAS 222,741.77222,741.770.000.000.0003.01 EXCAVACION A NIVEL DE SUB RASANTEM3 5,743.962.4213,900.3813,900.3803.02 PERFILADO Y COMPACTADO DE LA SUB RAZANTEM2 9,510.961.5414,646.8814,646.8803.03 SUB BASE GRANULAR H=0.20 M.M2 9,510.965.3550,883.6450,883.6403.04 BASE AFIRMADO E=0.20 M.M2 9,510.966.0657,636.4257,636.4203.05 CARGIO Y TRANSPORTE BASE Y SUB BASEM3 3,804.386.6025,108.9125,108.9103.06 ELIMINACION DE MATERIAL EXCEDENTEM3 4,536.7413.3560,565.5460,565.5404.00 PAVIMENTOS FLEXIBLES 374,396.290.0024,300.5124,300.51325,795.2804.01 IMPRIMACION ASFALTICAM2 9,510.965.1148,601.0124,300.5124300.5104.02 CARPETA ASFALTICA EN CALIENTE E=2"M2 8,569.0531.96273,866.84273,866.8404.03 SELLADO ASFALTICOM2 8,569.056.0651,928.4451,928.4405.00 SARDINEL 83,900.760.0083,900.760.000.0005.01 SARDINEL ENCOFRADO Y DESENCOFRADOM2 1,255.4820.6625,938.2225,938.2205.02 SARDINEL CONCRETO F'C=175 KG/CMM3 235.40246.2357,962.5457,962.5406.00 DRENAJE PLUVIAL 34,270.680.000.0034,270.680.0006.01 CUNETA ENCOFRADO Y DESENCOFRADOM2 470.8120.669,726.939,726.9306.02 CUNETA CONCRETO F'C=175 KG/CMM3 94.16260.6624,543.7524,543.7507.00 SEALIZACION HORIZONTAL 4,039.500.000.000.004,039.5007.01 PINTURA ZONAL CRUCE PEATONALM2 90.0021.321,918.801,918.8007.02 PINTURA INTERM. DISCONT.-CENTRO DE VIAML 525.002.741,438.501,438.5007.03 PINTURA DE SIMBOLOS - FLECHASM2 45.0015.16682.20682.20COSTO DIRECTO747,303.54237,602.46111,732.5562,102.47335,866.07GASTOS GENERALES7.00%52,311.2516,632.177,821.284,347.1723,510.62UTILIDAD3.00%22,419.117,128.073,351.981,863.0710,075.98SUBTOTAL822,033.90261,362.70122,905.8168,312.71369,452.67IGV (18%)18.00%147,966.1047,045.2922,123.0512,296.2966,501.49TOTAL PRESUPUESTO970,000.00308,407.99145,028.8680,609.00435,954.16
PORCENTAJE MENSUAL%31.79%14.95%8.31%44.94%PORCENTAJE ACUMULADO%31.79%46.75%55.06%100.00%
Recommended