EVALUASI FAKTOR YANG MEMPENGARUHI BIAYA DENGAN MENGGUNAKAN METODE REGRESI LINIER BERGANDA
PELAKSANAAN REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH DI KABUPATEN PASURUAN
TESIS
Untuk Memenuhi Sebagian Persyaratan Guna Mencapai Gelar Magister Teknik Sipil
Diajukan oleh :
SOETARJANI
NIM : 1471800063
PROGRAM STUDI MAGISTER TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA 2020
ii
TESIS
EVALUASI FAKTOR YANG MEMPENGARUHI BIAYA DENGAN MENGGUNAKAN METODE REGRESI LINIER BERGANDA
PELAKSANAAN REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH DI KABUPATEN PASURUAN
Diajukan oleh :
SOETARJANI NIM : 1471800063
Disetujui untuk diuji :
Surabaya, .................................................................
Prof. Dr. Dr(TS). H. Ir. Wateno Oetomo, MM, MT, MH Dosen Pembimbing I
....................................
Dr. Koespiadi, MT. Dosen Pembimbing II
....................................
PROGRAM STUDI MAGISTER TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA 2020
iii
TESIS
EVALUASI FAKTOR YANG MEMPENGARUHI BIAYA DENGAN MENGGUNAKAN METODE REGRESI LINER BERGANDA PELAKSANAAN REHABILITASI DAN RENOVASI SARANA
PRASARANA SEKOLAH DI KABUPATEN PASURUAN
Diajukan oleh :
SOETARJANI
NIM : 1471800063
Telah dipertahankan di depan Tim Penguji dan dinyatakan lulus pada ujian Tesis Program Studi Magister Teknik Sipil
Program Pascasarjana Universitas 17 Agustus 1945 Surabaya Pada tanggal : ..........................................
Tim Penguji
Ketua: : Prof. Dr. Dr(TS). H. Ir. Wateno Oetomo, MM, MT, MH ............................
Anggota : Dr. Koespiadi, MT. ............................ Anggota : Dr. Budi Witjaksana, ST, MT ............................
Mengetahui
Fakultas Teknik Universitas 17 Agustus 1945 Surabaya
Dekan Kaprodi Dr. Ir. H. Sajiyo, M.Kes, IPM Prof. Dr. Dr (TS). Ir. H. Wateno Oetomo, MM, MT, MH.
iv
KATA PENGANTAR Dengan memanjatkan puji syukur penulis panjatkan ke hadirat Allah SWT yang telah memberikan rahmat dan hidayah-Nya, sehingga penulis dapat menyelesaikan tesis ini dengan judul EVALUASI FAKTOR YANG MEMPENGARUHI BIAYA DENGAN MENGGUNAKAN METODE REGRESI LINIER BERGANDA PELAKSANAAN REHABILITASI DAN RENOVASI SARANA PRASARANA SEKOLAH DI KABUPATEN PASURUAN sebagai salah satu syarat untuk mencapai derajat strata 2 (S2) pada Program Studi Magister Teknik Sipil Fakultas Teknik Universitas 17 Agustus 1945 Surabaya. Dalam menyususn tesis ini penulis merasakan mendapatkan bantuan dari berbagai pihak berupa pengarahan, perhatian dan bimbingan. Oleh karena itu pada kesempatan yang baik ini penulis menyampaikan ucapan terima kasih kepada: 1. Prof. Dr. Dr (TS). Ir. H. Wateno Oetomo, MM, MT,MH, selaku
pembimbing I atas bimbingannya selama ini sampai selesai 2. Dr. Koepiadi, MT, selaku pembimbing II atas bimbingannya selama ini
sampai selesai 3. Dr. Budi Witjaksana, ST, MT, selaku dosen penguji atas arahan dan koreksi
yang diberikan sebagai kesempurnaan tesis saya. Ucapan terima kasih saya sampaikan juga kepada: 4. Dr. Mulyanto Nugroho, MM, CMA, CPA, selaku Rektor Universitas 17 Agustus
1945 Surabaya 5. Dr. Ir. H. Sajiyo, M.Kes, IPM selaku Dekan Fakultas Teknik Universitas 17
Agustus 1945 Surabaya 6. Prof. Dr. Dr (TS). Ir. H. Wateno Oetomo, MM, MT,MH, selaku Kaprodi
Magister Teknik Sipil Fakultas Teknik Universitas 17 Agustus 1945 Surabaya 7. Bapak dan Ibu dosen yang tidak dapat saya sebutkan satu per satu atas
bimbingannya selama penulis mengikuti perkuliahan 8. Para staff tata usaha baik umum dan akademik atas bantuannya yang telah
memberikan informasi kepada penulis selama ini 9. Keluarga besar saya, suami Ir. Tranggono, M.MT, anak anak Rahardiyan Ari
Wicahyo, ST, MT dan dr. Septina Yani Wicahya yang selalu memberikan semangat dan support atas keberhasilan saya.
v
10. Rekan rekan Pengurus DPP Inkindo Jawa Timur Periode 2018 – 2021 yang selalu memberikan semangat dan motivasi untuk melanjutkan kuliah di Magister Teknik Sipil.
11. Rekan-rekan mahasiswa Magister Teknik Sipil pada umumnya, khususnya angkatan tahun 2018/2019 yang selalu mendorong untuk menyelesaikan kuliah dan tesis ini
Surabaya, Soetarjani
vi
EVALUASI FAKTOR YANG MEMPENGARUHI BIAYA DENGAN MENGGUNAKAN METODE REGRESI LINIER BERGANDA PELAKSANAAN REHABILITASI DAN RENOVASI SARANA
PRASARANA SEKOLAH DI KABUPATEN PASURUAN
ABSTRAK Usaha peningkatan sumber daya manusia dapat dilakukan melalui beberapa cara, salah satunya melalui peningkatan kualitas pendidikan. Akan tetapi apabila dilihat dari kualitas prasarana infrastruktur pendidikan yang terdapat di Indonesia masih terdapat beberapa prasarana infrastruktur pendidikan yang belum layak, sehingga dapat mengakibatkan terhambatnya kegiatan belajar mengajar. Supervisi Rehabilitasi dan Renovasi Sarana Prasarana Sekolah Kabupaten Pasuruan dilakukan pada 10 (sepuluh) Sekolah Dasar Negeri yang terpencar lokasinya. Tujuan dari penelitian adalah menganalisis penggunaan jumlah tenaga kerja, mendapatkan faktor yang mempengaruhi biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah di Kabupaten Pasuruan, mendapatkan model regresi biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah di Kabupaten Pasuruan. Teknik analisis data yang digunakan adalah analisis regresi liner berganda. Hasil penelitian ini adalah laporan kemajuan pekerjaan menunjukan penggunaan jumlah tenaga kerja sudah sesuai dengan yang direncanakan, terbukti adanya peningkatan percepatan pekerjaan di minggu ke 6 sampai minggu ke 15. Faktor yng mempengaruhi biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah di Kabupaten Pasuruan adalah jumlah tenaga kerja. Model regresi biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah di Kabupaten Pasuruan adalah Y = -87.452.639,807 + 50.520,875 X2. Persamaan regresi tersebut menunjukkan bahwa biaya pelaksanaan rehabilitasi dan renovasi (Y) nilainya berkurang sebesar Rp 87.452.639,807 bila tidak disertai jumlah tenaga kerja (X2). Biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah akan naik nilainya sebesar Rp 50.520,875 bila faktor jumlah tenaga kerja (X2) bertambah 1 orang. Analisis regresi yang dilakukan menggunakan variabel jumlah tenaga kerja terhadap besar biaya pelaksanaan rehabilitasi dan renovasi sarana prasarana sekolah di Kabupaten Pasuruan untuk memprediksi besarnya anggaran pemeliharaan untuk tahun yang akan datang. Kata kunci : regresi stepwise, rehabilitasi dan renovasi, sarana prasarana
vii
EVALUATION OF FACTORS AFFECTING THE COST BY USING MULTIPLE LINIER REGRESSION METHODS THE IMPLEMENTATION
OF REHABILITATION AND RENOVATION OF SCHOOL INFRASTRUCTURE FACILITIES IN PASURUAN DISTRICT
ABSTRACT Efforts to improve human resources can be done in several ways, one of them through improving the quality of education. However, when viewed from the quality of educational infrastructure in Indonesia, there are still some educational infrastructure that is not yet feasible, so that it can result in inhibition of teaching and learning activities. Supervision of School Infrastructure and Facilities Improvement for Pasuruan District was conducted in 10 (ten) scattered public elementary schools. The purpose of the study is to analyze the use of the number of workers, get factors that affect the cost of implementing rehabilitation and renovation of school infrastructure facilities in Pasuruan District, obtain a regression model of the costs of implementing rehabilitation and renovation of school infrastructure facilities in Pasuruan District. The data analysis technique used is multiple regression analysis. The results of this study were work progress reports showing the use of the number of workers as planned, as evidenced by an increase in work acceleration in weeks 6 to week 15. Factors affecting the cost of implementing rehabilitation and renovation of school infrastructure in Pasuruan District were the number of workers . The regression model of the cost of implementing rehabilitation and renovation of school infrastructure facilities in Pasuruan District was Y=-87,452,639,807 + 50,520,875 X2. The regression equation shows that the cost of implementing rehabilitation and renovation (Y) is reduced by Rp 87,452,639,807 if not accompanied by the number of workers (X2). The cost of implementing the rehabilitation and renovation of school infrastructure will increase in value by Rp.50,520,875 if the number of workers (X2) increases by 1 person. Regression analysis conducted using the variable number of workers on the cost of implementing rehabilitation and renovation of school infrastructure in Pasuruan District to predict the amount of maintenance budget for the coming year. Keywords: stepwise regression, rehabilitation and renovation, infrastructure
viii
DAFTAR ISI
Halaman HALAMAN PERSETUJUAN .......................................................................... ii HALAMAN TIM PENGUJI ............................................................................. iii ABSTRAK ........................................................................................................ iv ABSTRACT ........................................................................................................ v KATA PENGANTAR ...................................................................................... vi DAFTAR ISI ..................................................................................................... vii DAFTAR TABEL ............................................................................................. ix DAFTAR GAMBAR ........................................................................................ x DAFTAR LAMPIRAN ..................................................................................... xi BAB 1 PENDAHULUAN ................................................................................ 1 1.1. Latar Belakang ...................................................................................... 1 1.2. Rumusan Masalah .................................................................................. 5 1.3. Tujuan Penelitian ................................................................................... 5 1.4. Manfaat Penelitian ................................................................................. 5 1.5. Batasan dan Ruang Lingkup Penelitian ................................................. 6 1.6. Sistematika Penulisan ............................................................................ 6 BAB 2 TINJAUAN PUSTAKA ....................................................................... 2.1. Penelitian Terdahulu .............................................................................. 8 2.2. Dasar Teori ............................................................................................. 19 2.2.1. Manajemen Sumber Daya Manusia ....................................................... 19 2.2.2. Konsep Pembangunan ............................................................................ 21 2.2.3. Konsep Tenaga Kerja .................................................................................. 22 2.2.4. Proyek ..................................................................................................... 24 2.2.5. Penjadwalan Proyek ............................................................................... 26 2.2.6. Kinerja Proyek ....................................................................................... 28 2.2.7. Penilaian Kinerja .................................................................................... 35 2.2.8. Tugas dan Kewajiban Pelaksana Proyek ............................................... 36 2.2.9. Konsultan Perencana .............................................................................. 38 2.2.10. Konsultan Pengawas ............................................................................. 39 2.2.11. Pelaksana Konstruksi Fisik ................................................................... 39 2.2.12. Pedoman Teknis Pelaksanaan Perencanaan .......................................... 39
ix
2.2.13. Pedoman Teknis Pelaksanaan Pengawasan .......................................... 40 2.2.14. Analisis Regresi .................................................................................... 41 BAB 3 METODE PENELITIAN ..................................................................... 44 3.1. Rancangan Penelitian ............................................................................ 44 3.2. Subyek Penelitian .................................................................................. 45 3.2.1. Populasi ................................................................................................. 44 3.2.2. Sampel ................................................................................................... 44 3.3. Lokasi dan Waktu Penelitian ................................................................ 44 3.4. Instrumen Penelitian ............................................................................. 45 3.4.1. Identifikasi Variabel Penelitian ............................................................. 46 3.4.2. Kerangka Konseptual Variabel ............................................................. 46 3.5. Prosedur Pengumpulan Data ................................................................. 46 3.6. Teknik Analisis Data ............................................................................. 46 BAB 4 ANALISIS DATA DAN PEMBAHASAN .......................................... 50 4.1. Deskripsi Data ........................................................................................ 50 4.1.1. Data Proyek ........................................................................................... 50 4.1.2. Lokasi Proyek ....................................................................................... 51 4.1.3. Pengumpulan Data ................................................................................ 53 4.2. Analisis Regresi Linier Berganda ......................................................... 58 4.2.1. Persamaan Model Regresi Linier Berganda .............................................. 59 4.2.2. Uji Multikolinieritas ................................................................................. 60 4.2.3. Uji Model Regresi Linier Berganda .......................................................... 60 4.2.4. Koefisien Determinasi............................................................................... 61 4.2.5. Penentuan Faktor yang Paling Berpengaruh ............................................. 62 4.2.6. Uji Model Regresi Stepwise ..................................................................... 63 4.2.7. Koefisien Determinasi Metode Stepwise .............................................. 63 4.2.8. Perbandingan Biaya dan Estimasi Model Regresi ................................ 64 BAB 5 KESIMPULAN DAN SARAN ............................................................ 67 5.1. Kesimpulan ........................................................................................... 67 5.2. Saran ..................................................................................................... 67 DAFTAR PUSTAKA ....................................................................................... 68
x
DAFTAR TABEL Halaman
Tabel 2.1. Penelitian Terdahulu ........................................................................ 15 Tabel 3.1. Rencana Jadwal Penyusunan Tesis .................................................. 49 Tabel 4.1. Tahapan Pelaksanaan Pekerjaan Rehabilitasi dan Renovasi Sarana Prasarana Sekolah ................................................................ 55 Tabel 4.2. Rekapitulasi Tenaga Kerja (orang-hari) ........................................... 57 Tabel 4.3. Rekapitulasi Biaya Proyek per Lokasi ............................................. 57 Tabel 4.4. Hasil Kemajuan Pekerjaan Mingguan ............................................. 58 Tabel 4.5. Data Untuk Analisis Regresi ............................................................ 59 Tabel 4.6. Koefisien Persamaan Regresi .......................................................... 59 Tabel 4.7. Analisis Varians Model Regresi ...................................................... 61 Tabel 4.8. Koefisien Determinasi ..................................................................... 61 Tabel 4.9. Hasil Seleksi Variabel Metode Stepwise .......................................... 62 Tabel 4.10. Koefisien Persamaan Regresi Metode Stepwise ............................ 62 Tabel 4.11. Analisis Varians Model Regresi Stepwise ..................................... 63 Tabel 4.12. Koefisien Determinasi Metode Stepwise ....................................... 63 Tabel 4.13. Perbandingan Biaya dan Estimasi Model Regresi Pemeliharaan Pelaksanaan Rehabilitasi dan Renovasi Sarana Prasarana Sekolah di Kabupaten Pasuruan................................................................... 65
xi
DAFTAR GAMBAR Halaman
Gambar 2.1. Garis Regresi ................................................................................ 41 Gambar 3.1. Flowchart Rancangan Penelitian ................................................. 44 Gambar 3.2. Kerangka Konseptual Variabel .................................................... 46 Gambar 4.1. Denah Ruang Kelas ...................................................................... 53 Gambar 4.2. Denah Potongan Ruang Kelas ...................................................... 54 Gambar 4.3. Tampak Depan dan Belakang Ruang Kelas ................................. 55
xii
DAFTAR LAMPIRAN Halaman
Lampiran 1. Hasil Kemajuan Pekerjaan Mingguan dan Data Tenaga Kerja .... 71 Lampiran 2. Data Regresi ................................................................................. 73 Lampiran 3. Hasil Regresi Linear Berganda ..................................................... 74 Lampiran 4. Hasil Regresi Stepwise ................................................................. 75 Lampiran 5. Perbandingan Biaya dan Estimasi Model Regresi ........................ 76
1
1
Recommended