PRIMAVERAProject management softwares
2013C45-Sahil Nagpal2013B45-Manjeet Maini2013A65-Surabhi Vartak2013A51-Rohang Adhikari2013A54-Satish Channareddy
8/10/2019 Primavera Final Ppt_class
2/22
PROJECT MANAGEMENT
Identifying requirements Addressing stakeholdersneeds, concerns and expectations as the project is
planned and executed
Communicating to stakeholders
Managing them to succeed in the project
Balancing project constraints:Scope (both project and product)
Quality
Schedule (Time)
Budget (cost)
Resources (People, Machines)
RisksA project evolves and requirements may change
Progressive elaboration and improving the PM plan
8/10/2019 Primavera Final Ppt_class
3/22
PRIMAVERA PROJECT
MANAGEMENT MODULE
Primavera was launched in 1983 by Primavera Systems Inc. and was
acquired by Oracle Corporationin 2008. The latest version of Primavera is
8.3 of Primavera P6 Enterprise Project Portfolio Management
The Project Management module enables us organization to store and
manage its projects in a central location. The module supports workbreakdown structures (WBS), organizational breakdown structures (OBS),
user-defined fields and codes, critical-path-method (CPM) scheduling, and
resource leveling.
http://en.wikipedia.org/wiki/Oracle_Corporationhttp://en.wikipedia.org/wiki/Oracle_Corporationhttp://en.wikipedia.org/wiki/Oracle_Corporationhttp://en.wikipedia.org/wiki/Oracle_Corporation8/10/2019 Primavera Final Ppt_class
4/22
BENEFITS
Management benefits Ensures thoroughly control of deadlines and the provisioning of resourcesassigned to the projects at organization level and accurately describes the
progression and identifies the key events
Provides unitary and structured insights for all the ongoing investments
Allows finding the blind spots of the investments and making corrective decision
in real-time.User benefits Automatically retrieves the information from the quotes/cost estimates programs;
Tracks down to the smallest detail the execution stage of the works and the
settlements, and allows comparing the execution stage to the initial planning
Provides information about the project progress stages as tables and Gantt
charts
Tracks, coordinates and corrects by scenario method
Provides real-time information for fast and objective decisions;
Builds "What If"-type analyses.
8/10/2019 Primavera Final Ppt_class
5/22
Cost benefits
Ensures features for risk
management, documentmanagement or alerting in case of
exceeding the costs, terms or time;
Analyzes the contractors'
performance via economic efficiency
indicators (Earned Value and ROI-
type analyses) Makes available completely
assessed terms, costs and
resources;
Automatically matches the spent item
quantities to the work's physical
stage (the payments can be done
depending on the achievements).
Decreases the project execution time
by 22-27% and achieves a savings of
15% of the total cost of the project
8/10/2019 Primavera Final Ppt_class
6/22
2.Primavera ToolsStructuring Projects - Planning
Setting-up and define EPS (Enterprise Project Structure).
Add a project to the EPS hierarchy.
Defining WBS (Work breakdown structure) to the Project.
Defining OBS (Organizational breakdown structure)
Defining Resources.
Create Calendar for Activities & Resources.
Add activities to WBS.
Input activity details. Schedule project.
Updating progress after project starts.
Preview / Print reports (Default / Custom made reports).
Executing Projects Monitoring & Implementation
Delay Analysis EV Analysis against baseline
Reports
Revising Projects - Modifications
Revise baseline
Status change & Much more
(EPS)Enterprise Project
Structure
Projects
(WBS)Work Breakdown
Structure
Activities
(OBS)Organisational
BreakdownStructures
8/10/2019 Primavera Final Ppt_class
7/22
2.1 OBS (Organizational Breakdown Structure)
The organizational breakdown structure (OBS)
is a global hierarchy that represents the
managers responsible for the projects in
enterprise.
The OBS usually reflects the management
structure of organization, from top-level
personnel down through the various levels
constituting your business. We can associate the responsible managers
with their areas of the EPS either nodes or
individual projects.
Structure of the organization, from top-level
personnel down through the various levels.
Constraints: Maximum of 25 levels can becreated.
Maximum character length of an OBS element
is 100.
President
Regd. Office
Engineering
ProjectAdministration
Sr. GM
GM
Sr.Manager
Design
Design Engineer
Finance
GM Finance
HRD & Admin
Sites
Project Manager
Planning &Billing Engineer
EngineerExecution
8/10/2019 Primavera Final Ppt_class
8/22
2.2 EPS (Enterprise Project Structure)
EPS create/edit form :
The Enterprise Project Structure (EPS) forms the hierarchical structure of your database of projects.
Each EPS node (or folder) can be subdivided into multiple levels to represent the work that needs to be
done in your organization. The number of levels and their structure depend on the scope of your projects
and how you want to summarize data.
Perform top down budgeting. Organize OBS and WBS into one common structure.
Manage multiple projects.
Adding project to EPS hierarchy. We can organize unlimited number of Projects in EPS in groups.
8/10/2019 Primavera Final Ppt_class
9/22
2.3 Creating Calendars
Create and assign calendars to each
resource and each activity. These
calendars define the available work-hours
in each calendar day. We can also specifynational holidays, your organization's
holidays, project-specific work/non-
workdays, and resource vacation days.
Calendar assignments are used for
activity scheduling, tracking, and resource
leveling.
Global: Contains calendar that apply to all
projects.
Resource: Separate pool of calendars for
each resource.
Project: Separate pool of calendars for
each project.
8/10/2019 Primavera Final Ppt_class
10/22
2.4 WBS (Work Breakdown Structure)
A WBS is a hierarchy of
work that must be
accomplished to completea project, which defines a
product or service to be
produced.
The WBS is structured in
levels of work detail,beginning with the
deliverable itself, and is
then separated into
identifiable work elements.
Maximum of 50 levels are
available.
Activities are fundamental
work elements of a project.
They are the lowest level of
Work Breakdown Structure.
Project
Civil Works
Buildings
Ware House
Foundation
Superstructure
Finishing Works
Admin Building
Roads & Drains
Equipment Fdns
Mech. Works
Tanks
Fire Water Tank
Diesel Tank
Piping
8/10/2019 Primavera Final Ppt_class
11/22
2.5 Defining Resources.
Resources include the personnel and equipment that perform work on
activities across all projects. Resources are generally reused between
activities and/or projects.
8/10/2019 Primavera Final Ppt_class
12/22
2.6 Adding activity to WBS
WBS
Task / ActivityActivity Detail form
8/10/2019 Primavera Final Ppt_class
13/22
Activity ID, Name & Type of activity.
Start, Finish Dates (Early, Late).
Steps of an Activity (Breakdown the activity to smaller units).
Relationship between activities (Predecessor, Successor). Resource Assignment (Labor, Non-Labor & Material)
Activity Calendar.
Constraints.
Status of activity (Actual start & finish dates, % of progress).
Expenses.
Any other comments, notes etc.
List of common Inputs / Information to be given to an activity
Project schedule can be calculatedone of two ways: when we choosethe Scheduling command or eachtime we make a change that affectsschedule dates.
The Critical Path Method (CPM)scheduling technique is used tocalculate project schedules. CPMuses activity durations andrelationships between activities tocalculate the project schedule.
2.7 Scheduling Project
8/10/2019 Primavera Final Ppt_class
14/22
To update the progress of the individual activity, the following inputs are to be given in the activity detail form.
1. Start Date (If activity is started)
2. Finish Date (If activity is completed)
3. % of duration completed (if activity is in progress)4. Remaining duration to complete the activity
Updating Progress EV Analysis
8/10/2019 Primavera Final Ppt_class
15/22
Objective
Problem statement:
Plan college admissions drive SNAP-IT with SCMHRD.
What is SNAP-IT:
Pan India drive to boost SCMHRD applications and clear aspirant doubts &
queries regarding SNAP & SCMHRD.
Objective:
To enumerate and logically arrange all the activities required for SNAP-ITin a Work Breakdown Structure (WBS), along with resources and
responsibilities assigned to each of those.
Approach:
Using Primavera
Prepare OBS> Create WBS> Create activities and assign to WBS> Assign
Relationships between activities> Assign Resources & Responsibilities
8/10/2019 Primavera Final Ppt_class
16/22
Work Breakdown
Structure (WBS)Project Calendar
8/10/2019 Primavera Final Ppt_class
17/22
SNAP IT
Formationof
AdmissionsTeam
Branding
SocialMedia
Mails Phone &Print Media
Planning &Execution
VolunteerTeam
Selection
PPT & TrangModule
Trng ofVolunteer
s
DocketPreparation
CitySelection& Travel
HallBooking
Seminar
Finance
Procurement
Logistics
DocketMaterial
FlexPrinting
Work Breakdown Structure (WBS)
8/10/2019 Primavera Final Ppt_class
18/22
Work Breakdown Structure
WBS(Screenshot from Primavera)
8/10/2019 Primavera Final Ppt_class
19/22
Gantt Chart
(Screenshot from Primavera)
8/10/2019 Primavera Final Ppt_class
20/22
Activity Codes
Code Department Responsibility
Code Values Admissions Team DirectorCode Values Branding Member-1
Code Values Planning & Execution Member-2
Code Values Finance Member-3
Code Values Logistics Member-4
Admissions
Team
Logistics
volunteer
Presentation
Volunteer
Max. limits 6 13 26
Rate - 400 400
Resources
8/10/2019 Primavera Final Ppt_class
21/22
S No Activity Desc. Duration Relationship WBS Resource
1 Brainstorming 15 P & E AD(6)
2 Volunteer selection form 1 1fs Volunteer Team selection AD(6)
3 Volunteer sign up 4 2fs Volunteer Team selection AD(1)
4 Volunteers Interview 3 3fs Volunteer Team selection AD(6)
5 Volunteers finalization 2 4fsVolunteer Team selection
AD(2)
6 PPt preperation 10 1fs Ppt & Training Module AD(2)
7 Training module preparation 10 1fs Ppt & Training Module AD(2)
8 Training of volunteers 10 6fs,7fs Training of volunteers AD(6),LV(13),PV(26)
9 Inviting quotations 5 1fs Procurement AD(1)
10 Vendor selection 5 9fs Procurement AD(1)
11 PO release 10 10fs Procurement AD(1)
12 Procurement of material 10 11fs Procurement AD(2)13 Docket preparation 4 12fs Docket Preparation AD(6),LV(5),PV(12)
14 HTML-Mail Drafting 7 1fs Mails AD(1)
15 Sending mails to aspirants 2 14fs Mails AD(1)
16 Pagalguy thread preparation & managing 30 14fs Social Media AD(1)
17 Facebook page preparation & managing 30 14fs Social Media AD(1)
18 Twitter account preparation & managing 30 14fs Social Media AD(1)
19 Video upload on you tube 30 14fs Social Media AD(1)
20 Selection of cities 5 1fs City selection & Travel AD(3)
21 Calling for hall booking 20 20fs City selection & Travel AD(2)
22 Hall booking payments 15 21fs Hall booking AD(1)
23 Travel arrangement confirmation of volunteers 5 9fs,20fs City selection & Travel AD(1),LV(13),PV(26)
24 Sending fliplets to aspirants 15 1fs Phone & Print Media AD(2)
25 Presentation at venue 5 23fs Seminar AD(6),LV(13),PV(26)
26 Flex designing & printing 10 10fs Flex printing AD(2)
27 Finalization of docket material 10 10fs Docket Material AD(5)
8/10/2019 Primavera Final Ppt_class
22/22
Thank You