View
234
Download
0
Category
Preview:
Citation preview
7/22/2019 Proses Produksi PTKS
1/24
Partnership for Sustainable Growth
ROMBONGAN MAHASISWA
TEKNIK KIMIA POLITEKNIK NEGERI SRIWIJAYAPALEMBANG
Di
Cilegon, 26 Agustus 2013
7/22/2019 Proses Produksi PTKS
2/24
Partnership for Sustainable Growth
1. Sambutan ;
- Pimpinan Romongan
- Management PT Krakatau Steel (Persro) Tbk
2. Film Company Profile of PT KS
3. Presentasi Business Process PTKS
4. Kunjungan Lapangan (Plant Visit)
7/22/2019 Proses Produksi PTKS
3/24
Partnership fo r Sustainable Grow th
)
7/22/2019 Proses Produksi PTKS
4/24
Map Of anten Province
PT Krakatau Steel
Partnership fo r Sustainable Grow th
7/22/2019 Proses Produksi PTKS
5/24
SEJARAH PT KRAKATAU STEEL
1956 1957 Gagasan Ir.H Juanda untuk membangun Industri baja danPenelitian lokasi oleh Biro Perancang Nasional
07-06-1960 Kontrak Pembangunan dengan Uni Sovyet20-05-1962 Peletakan Batu Pertama Proyek Besi Baja TRIKORA
( TAP MPRS No.2 tahun 1962)
1965 1967 Terhenti ( terjadi gejolak politik ) meletusnya G30SPKI
28 - 12 -1967 Pembangunan Industri Baja dilanjutkan status Proyek
diganti menjadi PT KRAKATAU STEEL( Inpres No.17)
31 - 08 -1970 PT KRAKATAU STEEL didirikan melanjutkan Proyek BesiBaja TRIKORA ( Peraturan Pemerintah No.35)
1977 Diresmikan Pabrik Kawat,Pabrik Baja Tulangan danPabrik Baja Profil
1979 Diresmikan Pabrik Besi Spons ( HYL-I),Pabrik Billet Baja,Pabrik Batang Kawat,dan Fasilitas infrastruktur ( PLTU,Pengadaan Air,Pelsus Cigading dan Telekomunikasi)
1983 Diresmikan Pabrik Slab Baja dan Pabrik Baja Lembaran
Panas
7/22/2019 Proses Produksi PTKS
6/24
1983 Diresmikan Pabrik Slab Baja dan Pabrik BajaLembaran Panas
1991 Pabrik Baja Lembaran Dingin diakuisisi ( merger)menjadi unit produksi PT KS Pabrik Kawat,PabrikBaja Tulangan dan Pabrik Baja Profil menjadi PTKrakatau Wajatama
1993 Diresmikan Pabrik Besi Spons HYL III dan Pabrik Slab
Baja -21996 Restrukturisasi Perusahaan : PLTU, Pengadaan Air
Pelabuhan dan Rumah Sakit
1999 Bergabung menjadi anggota PT BPIS ( BahanaPakarya Industri Strategis)
2002 Pembubaran PT BPIS menjadi BUMN2003 Optimalisasi Cold Rolling Mill : 950.000 ton/thn
Optimalisasi Hot Rolling Mill : 2.4juta ton/thn
7/22/2019 Proses Produksi PTKS
7/24
Korporasi PTKS
PT KRAKATAU STEEL(Persero) Tbk
ANAK PERUSAHAAN PERUSAHAAN PATUNGAN
PT KRAKATAU INFORMATIONTECHNOLOGY
100%
PT KHI PIPE INDUSTRIES
93,20%
PT KRAKATAU ENGINEERING100%
PT KRAKATAU BANDARSAMUDRA
100%
PT KRAKATAU MEDIKA
100%
PT KRAKATAU WAJATAMA
100%
PT BUKIT BAJA BUANA
30%
PT KRAKATAU NASIONAL,
PT KRAKATAU TIRTA INDUSTRI100%
PT KRAKATAU DAYA LISTRIK100%
PT KRAKATAU INDUSTRIALESTATE CILEGON
100%
PT MARGA MANDALA SAKTI1,29%
PT SPIJ3,24%
PT INDAREF10%
PT METBELOSA
15%
PT KERISMAS W MAKMUR29,34% = PTKS : 9,8%
PT KIEC: 19,54%
PT KPDS30%
PT. Meratus Jaya Iron
SteelPT.Meratus Jaya Iron & Steel
RESOURCES 100 %
7/22/2019 Proses Produksi PTKS
8/24Partnership fo r Sustainable Grow th
Visi Perusahaan
Perusahaan baja terpadu dengan keunggulan kompetitif
untuk tumbuh dan berkembang secara berkesinambungan
menjadi perusahaan terkemuka di dunia
Misi Perusahaan
Menyediakan produk baja bermutu dan jasa terkait bagikemakmuran bangsa
7/22/2019 Proses Produksi PTKS
9/24
Fasilitas Pabrik PTKS
Pabrik
Kapasitas
(ton/th)2004
Teknologi & Kontraktor TahunPembuatan
Pabrik Besi Spons 1 1.000.000 Direct Reduction HyL-1 / HYLSA 1978
Pabrik Besi Spons 2 1.500.000 Direct Reduction HyL-3 / HYLSA 1993
Pabrik Slab Baja 1 1.000.000 EAF & CCM / MANGHH & CONCAST 1983
Pabrik Slab Baja 2 800.000 EAF & CCM / VAI & CONCAST 1993
Pabrik Billet Baja 675.000 EAF & CCM / MANGHH & CONCAST 1978
Pabrik Baja Lembaran
Panas
2.400.000 Conventional Hot Rolling Mill / SMS 1983
Pabrik Baja LembaranDingin
950.000 Continuous Tandem / VAI CLECIM 1986
Pabrik Batang Kawat 450.000 Wire Rod Mill / SMS & MORGAN 1978
7/22/2019 Proses Produksi PTKS
10/24
ALIRAN PRODUK PT KRAKATAU STEEL
Hot Strip Coil
Billet SteelWire Rod
Cold Roll C/S
Hot Strip Sheet
Slab Steel
Steel MakingSpongePellet
Iron Pellet Besi
Spons
Dapur
Listrik
Billet Baja Batang Kawat /Baja Batangan
Slab BajaCoil Shet /
Plat Baja
Gulungan
Plat Baja
Lembaran
7/22/2019 Proses Produksi PTKS
11/24
1650oC
7/22/2019 Proses Produksi PTKS
12/24
Gas Based IRON MAKING
PROCESS
MANUFACTURING METHOD(AT PTKS)
Typical DRI quality :
Metalization 92 - 94%Fe Metal 92 - 94%
Total Carbon 1 - 3 %
Phosphor max. 0.05%Sulphur max. 0.03%
Partnership fo r Sustainable Grow th
7/22/2019 Proses Produksi PTKS
13/24
Jenis Produk Baja
Baja Carbon Rendah
Baja Carbon Medium
Baja Carbon Tinggi
7/22/2019 Proses Produksi PTKS
14/24
14
Gas Base Integrated Steel Plant Route
Direct Reduction Plantconvert iron ore pellet into
sponge iron
Slab Steel Plantproduce slab steel fromsponge iron and scrap
Hot Strip Millroll slab steel into
hot rolled coil and plateCold Rolling Mill
manufacture cold rolled plateand sheet from hot rolled coil
Billet Steel Plantmake billet steel fromsponge iron and scrap
Wire Rod Millfabricate wire rodfrom billet steel
7/22/2019 Proses Produksi PTKS
15/24
15
Coal BaseIntegrated Steel Plant Route
Blast Furnace Plantconvert iron ore into hot
metal/pigiron
Slab Casterproduce slab steel
Hot Strip Millroll slab steel into
hot rolled coil and plate
Cold Rolling Millmanufacture cold rolled plateand sheet from hot rolled coil
Billet Casterproduce billet steel
Wire Rod Millfabricate wire rodfrom billet steel
BF
BOF
Basic OxygenFurnace
convert hot metal into
liquid steel
7/22/2019 Proses Produksi PTKS
16/24
Proses Produksi di PT Krakatau Steel
Pabrik Besi Spons
Pabrik Slab Baja Pabrik Baja GulunganHot Rolled
(2,000,000 t/y)Pabrik Baja GulunganCold Rolled
(850,000 t/y)
Pabrik Bilet Baja Pabrik Batang Kawat(600,000 t/y)
Pellet:
Bijih Besi
(2,200,000t/thn)
7/22/2019 Proses Produksi PTKS
17/24
PERBEDAANBESIDAN BAJA
BESI
Paduan antara unsur besi (Fe) dengan unsur karbon(C).Apabila paduan tersebut mengandung Carbon lebih besardari pada 2%maka disebut BESI. BESImempunyai sifat-sifatdominant kekerasanyang relative tinggi, tetapi sangat getas
(brittle)dan tidak dapat ditempa.
BAJA
Paduan antara unsur besi (Fe) dengan unsur karbon(C).Apabila paduan tersebut
mengandung Carbon lebih kecildari pada 2%maka disebut BAJA. BAJArelative lebih lenturdan dapatditempadan dilas.
7/22/2019 Proses Produksi PTKS
18/24
Keunggulan Baja
Kaya akan sifat-sifat
Tersedia di alam dalam jumlah yang melimpah
Proses pengolahan yang mudah dan murah Dapat didaur ulang
Partnership fo r Sustainable Grow th
7/22/2019 Proses Produksi PTKS
19/24
HOT ROLLING PROCESS(HSM)
Shape & surface
defect
Dimension
Weighing Sampling
% final thickness
reduction
Temperature
Pass Schedule Automatic Gauge
Control
Rolling speed
Cooling mode
Width setting
% thickness
reduction
Temperature Pass schedule
Rolling speed
Temperature
setting
Soaking time
Air pressure Appearance of slab
DOWN COILERFINISHINGROUGHINGFURNACE
MANUFACTURING METHOD(AT PTKS)HSM : 2,000,000 T/y
7/22/2019 Proses Produksi PTKS
20/24
Cold Rolled Products
Cold Rolled Coil(CRC)
Cold Rolled
Sheet (CRS)
7/22/2019 Proses Produksi PTKS
21/24
SIZE & APPLICATION
PRODUCT SIZE SPECIFICATION MAJOR APPLICATION
HRC/P Thickness 1.8 to 25 mm Automotive Ship Build
(Hot Rolling Width 600 to 2080 mm Constr. & Fab. Containers
Coil / Plate) Pipe & Tube
CRC/S Thickness 0.18 to 3.0 mm Appliance Tin Plate
(Cold Rolling Width 500 to 1250 mm Automotive Enamel
Coil / Shet) Drum Pipe
Galvalum
Wire Rod Diameter 5.5 to 20 mm Nail Electroda
Bendrad Bold & Nut
Wiremesh Spring Bed
Shafting Bar
7/22/2019 Proses Produksi PTKS
22/24
Perhatian!
Tata Tertib Kunjungan Industri PT Krakatau Steel:
1. Memakai Alat Pelindung Diri (APD) : Helm.
2. Dilarang merekam atau mengambil gambar.
3. Berjalan di jalur hijau.
7/22/2019 Proses Produksi PTKS
23/24
Untuk PKL Surat ditujukan
Kepada Yth.
Manager Human Capital Training
& Education Center
PT Krakatau Steel (Persero) Tbk
Jl. Jend. Sudirman Km.3
Cilegon 42435
Telp.: 0254 372130 Fax: 0254 372337
7/22/2019 Proses Produksi PTKS
24/24
TERIMAKASIH
Recommended