System Proposal
Mohamed Abbas
Info 361 Section 001
Professor Albert Wynne
Table of Contents
Page
I. Description of Project…………………………………………………………………..3-6
II. Team Charter……………………………………………………………………………….7-10
III. Business Case……………………………………………………………………………….11-19
IV. Use Case Diagram………………………………………………………………………….19-26
V. Class Diagram………………………………………………………………………………...26-30
VI. Sequence Diagrams…………………………………………………………………………31-34
VII. State Machine Diagrams………………………………………………………………….34-38
VIII. User Interface Design………………………………………………………………………38-51
IX. Gantt Chart………………………………………………………………………………………52-56
Summary: This project was comprised in order to show examples of the functional, structural,
and behavioral modeling that takes place during the elaboration phase of the unified process by creating
UML diagrams to describe most of the major use cases and entity classes, as well as some of the dynamic
aspects of the system using sequence and state machine diagrams.
Business Need: The need is to generate a level of sales through brick-and-mortar and virtual
store fronts and to lower the cost of business operations by enabling effective and efficient business
processes for customer ordering processing and inventory management. It’s also to manage employee
work schedules, and to create management reports that will enable the business to make better
decisions to create a competitive advantage to make profit.
Executive Summary: I was able to design a Use-Case diagram showing an illustration of the
functional requirements and narratives describing Customer Orders, Flow of Events, Payment
Authorization information and Tracking Number plus shipping Costs information. I was able to
implement and design a Class Diagram and Sequence Diagram which shows information of the business
such as Order, Customer, Payment Provider, Account System, Account Payable, Create Schedule, and
Management Reports. What can be improved might be new systems that might be faster to use and
make it easier for customers to have a smooth and efficient transactions and orders as time goes by.
System Request
Project Name: The Richmond Millennial Chocolatier Company
Project Sponsor: Coco Caramel (Chocolatier Entrepreneur)
Coco Caramel has decided that she wants to make a career change and venture outas a
chocolatier entrepreneur. She has always had a flair for anything chocolate when it comes to desserts
and has spent most of her free time inviting close friends and associates to chocolate parties when she
wasn’t busy consulting with. Fortune 500 companies to help them resolve their complex IT problems.
Over the last 15 years working in IT, she has developed professional associations with a number of very
successful CEOs and entrepreneurs. A group of these associates has offered to provide the initial funding
necessary to help get her up and running as a chocolatier and she has decided to accept the challenge.
The first thing they have asked her to do is create a business plan that will help assure them that she is
capable of understanding how to make this new business a success.
Functionality: The information system should allow customers to:
Purchase products in-store and through an Internet store website; this would
include the ability to:
View images of current product inventory through an Internet store
Website.
Display full product description.
Check availability of inventory.
Select delivery option (in-store pickup or delivery service)
Confirm and track Internet orders.
Determine delivery cost and date.
Provide customer delivery tracking identification number.
Specify customized products (special orders).
Confirm custom order within 24 hours.
Generate customer order invoice
Accommodate payment by micro payment system (credit & debit card)
Such as PayPal.
Manage Product Inventory to include the ability to:
Track all supply ingredient quantities (add/update/delete quantities)
Manage all product recipes (ingredient batch quantities)
Generate supply acquisition orders
Send order payment
Track damaged supplies
Manage Employee Schedules
Add/update/remove employees
Create employee work schedules
Track employee work hours
Generate Management Reports
Create production reports
Create employee work reports
Create sales reports
Create inventory reports
Create customer reports
Business Value:
Tangible:
Gross customer order sales of $400,000 during the first year of operations
Keep inventory supplies’ costs @ or below $150,000
Keep employee costs @ or below $100,000
Keep Website costs @ or below $12,000
Intangible:
Maximize customer base
Promote business
Develop store/product brand
Create high customer satisfaction
Create excellent customer service
Know customer base
Know product demand
Intelligent management reporting system
Develop excellent supply chain relationships
Special Issues or Constraints:
Lead time for specialty products & custom orders
Determine competition
Timely implementation—by summer season
Determine IT hardware, software, and communication systems requirements
Determine Website hosting responsibilities
Dedicated operation’s location (brick-and-mortar)
Determine overhead costs of facilities & required human resource
requirements
Establish work schedule
Provide for warehousing and inventory control (expiration dates are important
for ingredients)
Establish secure payment service
Establish delivery service contracts (FedEx, UPS, USPS)
Establish link to accounting service
Create Business Case for Investment Group
Kitchen equipment
Brick-and-mortar store location
The 4/4 Club
Purpose and Statement of Team Charter:
The team has been formed in order to cooperate together in order to complete a set of
assignments which is compiled into a group project. Our overall objectives are to integrate our
own research and become proficient in the materials taught in class in order to come to a
conclusion with our own individual presentations to create a unified project. We are confident in
each other’s abilities to bring out the best of the team, and to also work effectively, with
commitment to each other to create a learning experience.
Team Members:
Mohamed Abbas- abbasm@vcu.edu, 202-763-2778
Mouhanad Azzam- azzamma@vcu.edu, 540-556-7462
Yonis Ainab- ainabym@vcu.edu, 571-623-1055
Shivam Chhagan- chhagansv@vcu.edu, 434-485-9978
Omar Alshareef- alshareefof@vcu.edu, 757-773-9633
Roles and Responsibilities-
Mohamed Abbas- Mohamed’s role as the leader is to motivate the group and ensure objectives
are met and the steps to a successful team is underway.
Mouhanad Azzam- Mouhanad’s role is to accumulate all team collaborative information, data,
and research and organize it in a presentable fashion.
Shivam Chhagan- Shivam’s role in this team is make sure all work is presented correctly with
the needed information and details. Having the role of the enforcer, Shivam is responsible for
making sure all members are showing up, participating, and work completing their assigned
work.
Yonis Ainab- The role of Yonis will be defined as determining the right types of research and
information which will need to be presented in a professionally crafted document by making sure
the layout meets the ideal standards.
Omar Alshareef- The roles of Omar are:
1- motivate the group and ensure objectives are with the leader
2- to accumulate all team collaborative information, data, and research and organize it in a
presentable fashion with Mouhanad.
3- make sure all work is presented correctly with the needed information and details with
Shivam
4- determining the right types of research and information which will need to be presented in a
professionally with Yonis
Team Strengths and Weaknesses:
By analyzing each team member’s strength and weakness, we can work towards a productive
and improve ourselves in the criteria that we lack, even by motivating each other. As we
identified our skills and experiences, we can dictate where we are strong and where we lack in
ability.
Strengths
1. Interpersonal skills: All of the group members seem quite inept in this category, as they
come from a background of communicating and have leadership building experience.
2. Background: Each member has had experience with team-based settings dealing with
problems that require more than one solution. Whether it’s volunteering in an
organization or job based work, each member understands the definition of collaborative
projects.
3. Skills & Knowledge: As one member is able to juggle being in different organizations and
holding a job, this will provide a balance and a strong source of motivation to each
group member, and the group as a whole.
Weaknesses
Shivam Chhagan- Shivam tends to overthink problems or solutions that need to be
carried, which can consume more time.
Mouhanad Azzam- One weakness that Mouhanad possesses would be investing more
time and energy on part of a project and investing a significantly less amount on another. By
investing an appropriate amount of time
Mohamed Abbas- Mohamed’s lack of focus sometimes would be problematic, as he
tends to zone out and thinks of irrelevant things. By adhering to the objective of the group and
focusing on the outcome, this weakness can be overturned.
Yonis Ainab- Yonis tends to stress over the little details, which leads to consuming time
on things that don't matter. By focusing and using time management, Yonis can overcome these
weaknesses.
Omar Alshareef- Tends to stress over the little details, which leads to consuming time on
things that don't matter. By focusing and using time management.
Members’ Biographies:
Mohamed Abbas- As a student studying Information systems at Virginia Commonwealth
University, Mohamed is looking to gain the knowledge of Information Systems to better
understand what makes a business prosper in the age of technology. Having been at VCU for 1
year has taught Mohamed the meaning of being independent and self-sufficiency, which is an
experience in its own right. Mohamed hails from Arlington, Virginia and looks forward to an
outstanding college experience.
Mouhanad Azzam- Mouhanad Azzam is a Junior at Virginia Commonwealth University,
originally from Roanoke, Virginia. During his time at VCU, Mouhanad has maintained over a
3.0 GPA while working part time at MetroPCS and being involved in two organizations; United
Muslim Relief and Muslim Student Association. Maintaining a busy schedule has taught
Mouhanad time management, organization, communicating efficiently, and building leader
qualities. Building these qualities have become very helpful to Mouhanad in his major and his
professional career.
Yonis Ainab- Mr. Ainab is a junior at VCU, originally from Falls Church, Virginia. Also works
part time at Best Buy. Living on his own has taught Mr. Ainab, responsibilities, time
management, and organization. These responsibilities have given Mr. Ainab the right tools to be
self-sufficient.
Shivam Chhagan- In his junior year at VCU, Mr. Chhagan is an Information Systems major
from Lynchburg, Virginia who takes pride in programming, auditing, and infrastructure. Mr.
Chhagan is also a member of the Pi Kappa Phi Fraternity here at VCU part of the Epsilon Pi
chapter. Being involved with academics and extracurricular activities, Mr. Chhagan strives to
complete tasks efficiently through team-based projects.
Omar Alshareef- In his senior year at VCU, Mr. Alshareef is an Information Systems major at
VCU, Mr. Alshareef has engineering degree in communication and more than 6 years of
experience.
Team Expectations and Rules:
Each member will be responsible for completing their assigned task as an individual and be able
to present the material efficiently. Last each member is responsible for showing up to group
meetings on time and one should notify the whole group if they will not be present or late. If a
member misses three meetings without notifying any team member, that member will be
obligated to hold a mandatory meeting with the supervisor about their issues and whether they
can or cannot attend group meetings for the time being. Each member is expected to present their
pure, honest work and should equally divide the work equally within the team to ensure positive
results.
Meeting Times:
In each meeting, every member will discuss their ideas and thoughts and we will begin by
brainstorming. We will discuss our objective for the day and what will be expected from each
member. Each member will have the opportunity and time to express their thoughts and ideas.
Each meeting is expected to be met at the timely manner, if a member is unable to make it to a
meeting, he or she will have to address the group or leader ahead of time so adjustments will be
made. Everyone is expected to contribute equally so the group will function properly and
efficiently. Participation is critical to a successful project. Outside of meetings, the group will
have other resources to stay in touch with one another including emails, text messaging, video
chat, and Google Docs.
Code of Ethics:
The 4/4 Club strives on mutual respect. Each member will respect one another, and if a conflict
arises, we will discuss the matter in a professional manner. No slandering one’s work or ideas, or
use of profanity, as this is a professional setting. One will not take another’s work and submit it
as their own. Each member will be responsible for following the same practices of the VCU
Code of Conduct when working together as a team and individuals.
Signature of Agreement:
By adhering to the above information, I hereby, accept and more importantly, understands, and
agree to the rules, conditions, and expectations noted in the Team Charter, The 4/4 Club.
-Shivam Chhagan
-Mouhanad Azzam
-Mohamed Abbas
-Yonis Ainab
-Omar alshareef
The Richmond Millennial Chocolatier Company
2016
Team: 4/4 club
Members
(Mohamed Abbas, Yonis Ainab, Omar Alshareef, Mouhanad Azzam& Shivam Chhagan)
Class (Info 361)
A statement of purpose for the project:
The Richmond Millennial Chocolatier Company founded by Coco Caramel, an
entrepreneur who is experienced in the field of IT for 15 years, is devoted to making this starting
company a leading producer of chocolate by giving its customers high-quality chocolate. Driven
by her passion, Coco Caramel hopes to use her passion to produce the best chocolate possible.
Expected Business Value:
Functionality and Tangible Values include generating sales through in-store and online Business-
to-Consumer E-Commerce, efficient and reliable functionality of online store, proper inventory
management, employee schedule management, and management report generator. Intangible
Values include growing a customer base, promoting the business, developing a product brand,
creating high customer satisfaction, creating excellent customer service, knowing customer base,
knowing product demand, intelligent management reporting system, and developing excellent
supply chain relationships.
Scope Statement:
This project is to develop an information system for the Richmond Millennial Chocolatier
Company. The system will include, inventory management, a customer database, loan tracking,
financial accounting, POS capabilities, legal reporting and online presence.
Goals and Objectives:
This system is expected to innovate the staff and customer experience, cut down losses due to
clerical errors, reduce staffing costs, improve decision-making and price-setting in making loans,
smoothly operate transactions, and improve customer satisfaction and experience.
Technical Feasibility
Location: Medium
It can definitely impact the sales and the amount of customers would come to the store. A plaza
that's a busy shopping center or Mall would be a good location.
Project size: Low Risk
We are working with a small chocolatier so training users and managing the system should be
simply understood given all the full descriptions of products.
.
Shipping: Low
When customers are ordering their products from online would you charge them for shipping or
would the company pay for that service? It would be appealing and satisfying for customers if
they saw that they didn't have to pay for any shipping fees.
Legal requirements: Low
Company must meet the legal requirements of the state. Must be able to safely store correct
information of customers and accounting data.
Economic Feasibility (Medium Risk)
Assumptions
●Revenue will increase by 0.96%
The percentage reflects a moderate prediction of an increase of one additional customer per week
on average relatable to the information system the chocolatier has to offer.
●Clerk salary costs will be reduced by 15%
Confirmations of customer orders within 24 hours and generating customer order invoices will
create less work to monitor. Accommodating payments by the micro payment system (credit &
debit card) such as PayPal will keep track of customer order profiles creating an automated
tracking system.
●Discount Rate of 5% required rate of return by the firm.
Tangible Benefits:
●ROI over 5 years: 3%
●NPV over 5 years: 528,486
●Breakeven occurs after: 5 years
Intangible Benefits:
Maximize and know customer base
Promote business through advertisements
Develop store/product brand
Create high customer satisfaction and excellent customer service
Know product demand
Intelligent management reporting system
Develop excellent supply chain relationships
Developmental Costs
Consulting Fees: $5,050.25
-$849.99 annual service contract
Hardware Costs (Upfront): $1,245.55
Ongoing Maintenance Costs
Software Licensing Costs: $1,110.00 annually
Operational Costs
Manager Training: $2,000.00
Clerk Training: $1,425.00
Web Service Fees: $250.00
Risks
Security: Low
Establishing a secure payment service will encourage customers to make frequent purchases off
the web if PayPal is the entrusted service.
Expenses: Medium
Overhead costs of facilities & required human resource requirements will be relative to change
due to the small size of business. Therefore, consumer satisfaction can severely impact the costs
of facilities and what is required of the employees.
..
Organizational Feasibility:
Strategic Alignment: Low Risk
This project is strongly aligned with the business strategy of The Richmond Millennial
Chocolate Company as sales will increase, inventory errors will be reduced, improved
accounting and tax reporting, and new customers can be brought in through the company’s
website.
Making the new system prevalent: Low Risk
●Management plan: The owner and staff will be consulted as to what functionality would
improve their sales and workload. The system that will be designed will be user friendly. Shop
staff will receive training to use the system and will benefit from the ease of tracking inventory,
loan and sales records, and customer records.
●Customers will benefit from the capability of checking the status of their loans online and also
having in store transactions viewable.
Adapting to the new system: Medium Risk
●Staff will possibly have little experience in POS/inventory management software.
●Consistent training will be provided to the staff. With more knowledge implemented, the
system will improve the simplicity of transactions.
Legal and Contractual:Low Risk
The software fees will be month to month not involving a designated contract.
Cost Benefit Analysis
year 1 ($)
year 2 ($)
year 3 ($)
year 4 ($)
year 5 ($)
Total ($)
Benefits
Reduce inventory losses 0 0 0 0
Improve 0 0 0 0
Improve distribution logistics 0 0 0 0
Reduce cost of data collection 0 0 0 0
Total benefits 0 0 0 0 0 0
Development costs
Analysis 0
Design 0
Programming 0
Documentation 0
Installation 0
Test 0
Initial Training 0
Hardware 0
Software 0
Vendor Installation 0
Data Conversion Costs 0
Total development costs 0 0
Operational costs
Software upgrades 5,000 5,000 5,000 5,000 20,000
Software licensing (communications, network os, etc.) 1,000 1,000 1,000 1,000 4,000
Hardware upgrades 5,000 5,000 5,000 5,000 20,000
Web Services Fees 1,000 1,000 1,000 1,000 4,000
IS Support Staff 125,000 125,025 125,050 125,075 500,150
User training 12,000 12,002 12,005 12,007 48,014
Total operational costs 149,000 149,027 149,055 149,082 596,164
Total costs 0 149,000 149,027 149,055 149,082 596,164
Total benefits 0 0 0 0 0 0
Net benefits 0 -
149,000 -
149,027 -
149,055 -
149,082 -
596,164
Break-Even Analysis
ANNUAL NPV 0 -
141,905 -
135,172 -
128,759 -
122,650
CUMULATIVE NPV Cash Flow 0 -
141,905 -
277,077 -
405,836 -
528,486 -
528,486
Break-Even Point 1.00 years
Return on Investments -100%
Estimated Inflation 2% 2% 2% 2% 2%
Cost Benefit Analysis
year 1 ($) year 2 ($) year 3 ($) year 4 ($) year 5 ($) Total ($)
Benefits
Reduce inventory 1560.5 1943 =C5*($D$42/100+1) =D5*($E$42/100+1) =E5*($F$42/100+1) =SUM(A5:F5)
Improve distribution 2100 4384 =C6*($D$42/100+1) =D6*($E$42/100+1) =E6*($F$42/100+1) =SUM(A6:F6)
Reduce cost of data collection 2974 5820 =C7*($D$42/100+1) =D7*($E$42/100+1) =E7*($F$42/100+1) =SUM(A7:F7)
Total benefits 6634.5 =SUM(C5:C7) =SUM(D5:D7) =SUM(E5:E7) =SUM(F5:F7) =SUM(A8:F8)
Development costs
Analysis =640*100 =SUM(A11:F11)
Design =250*100 =SUM(A12:F12)
Programming =300*100 =SUM(A13:F13)
Documentation =50*75 =SUM(A14:F14)
Installation =300*100 =SUM(A15:F15)
Test =300*100 =SUM(A16:F16)
Initial Training 25000 =SUM(A17:F17)
Hardware 40000 =SUM(A18:F18)
Software 95000 =SUM(A19:F19)
Vendor Installation 20000 =SUM(A20:F20)
Data Conversion Costs 15000 =SUM(A21:F21)
Total development costs =SUM(B11:B21) =SUM(A22:F22)
Operational costs
Software upgrades =C25 =D25 =E25 =SUM(A25:F25)
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
1 2 3 4 5
Do
llars
Years
Break-Even Analysis
Total costs
Total benefits
Software licensing (communications, network os, etc.) =C26 =D26 =E26 =SUM(A26:F26)
Hardware upgrades =C27 =D27 =E27 =SUM(A27:F27)
Web Services Fees =C28 =D28 =E28 =SUM(A28:F28)
IS Support Staff =C29*($D$42/100+1) =D29*($E$42/100+1) =E29*($F$42/100+1) =SUM(A29:F29)
User training =C30*($D$42/100+1) =D30*($E$42/100+1) =E30*($F$42/100+1) =SUM(A30:F30)
Total operational costs =SUM(C25:C30) =SUM(D25:D30) =SUM(E25:E30) =SUM(F25:F30) =SUM(G25:G30)
Total costs =B22+B31 =C22+C31 =D22+D31 =E22+E31 =F22+F31 =G22+G31
Total benefits =B8 =C8 =D8 =E8 =F8 =G8
Net benefits =B8-B33 =C8-C33 =D8-D33 =E8-E33 =F8-F33 =G8-G33
Break-Even Analysis
ANNUAL NPV =B35 =C39-B38 =D39-C39 =E39-D39 =F39-E39
CUMULATIVE NPV Cash Flow =B35 =NPV(0.05,C35)+B38 =NPV(0.05,C35,D35)+B38 =NPV(0.05,C35,D35,E35)+B38 =NPV(0.05,C35,D35,E35,F35)+B38 =F39
Break-Even Point =(C38-C39)/C38+1 years
Return on Investments =G35/G33
Estimated Inflation 0.02 0.02 0.02 0.02 0.02
Use-Case Diagram:
Illustration of functional requirements
Richmond MillennialChocolatier CompanyInformation System
3rd PartyShippingProvider
Customer Order details
Payment amount & method
Shipping preference
Contact information
Customer
ACCTSystem
PaymentProvider
Payment authorizationinformation
3rd Party PaymentProvider
RMCCMGMT/Staff
Vendor
Manager
shipping option
Tracking #
Shipping cost information
Management Reports
Update confirmations
Report requests
Marketing Campaign information
Reports: (Financial,Inventory)
Vendor information
Item information
Completed order details
New inventory
details
Acct status request
Acct Payable &Receivable details
Transactionpayment
details
Order InvoiceConfirmation #
Create schedule
Use Case Narrative
Descriptions:
Actors:
Customer: Order chocolate products
3rd Party Payment Provider: Payment authorization information
3rd Party Shipping Provider: Tracking # Shipping cost information
MGTM/Staff: Report requests: (Vendor, Customer, Inventory, 3rd Party Shipping, 3rd Party Payment, Customer, Sales, Inventory) ,New/Updated Information (Vendor, Customer, 3rd Party Shipping, 3rd Party Payment, inventory) Marketing Campaign information
Vendor: Reports(Financial, Inventory) Order information Payments
ACCT System: Acct Payable & Receivable details
Use Case: Customer Order
Actors: Customer, Richmond Millennial Chocolatier Company(RMCC)
Purpose: Take Customer order details
Description: Customer will place an order
Flow of Events
1. Customer wants service 2. RMCC will place order in system 3. RMCC will take customer’s shipping and contact info 4. RMCC will identify payment amount & method 5. Customer places an order
Use Case: Payment
Actors: Richmond Millennial Chocolatier Company(RMCC), 3rd Party
Payment Provider
Purpose: To identify contact info, Payment method, and Payment
account
Description: RMCC and Payment provider will come to a conclusion if
method of payment is accepted
Flow of Events
1. RMCC will run payment method 2. Payment Provider will authorize funds 3. RMCC will a place completed order Information for shipment
Use Case: Order Shipment
Actors: Richmond Millennial Chocolatier Company(RMCC), 3rd Party
Shipping Provider
Purpose: Transportation of Product and Costs
Description: RMCC will receive tracking number and shipment price
Flow of Events
1. 3rd Party Shipping Provider will receive completed order info for shipment 2. RMCC will pay asking payment 3. 3rd Party Shipping Provider will send out tracking number of product to RMCC plus shipping cost
info
Use Case: Managing
Actors: Richmond Millennial Chocolatier Company(RMCC), MGMT/Staff
Purpose: Manage company operations and transactions.
Description: Management will command marketing campaign strategies,
Manage reports, keep and update inventory, take requests
from ,Vendor, Customer, Inventory, 3rd Party Shipping, 3rd
Party Payment, Sales, Inventory
Flow of Events
1. RMCC sends management reports and updated confirmations 2. Management and Staff will manage marketing campaigns to attract customers and potential
business partners 3. MGMT and Staff will take report requests from : (Vendor, Customer, Inventory, 3rd Party
Shipping, 3rd Party Payment, Customer, Sales, Inventory)
Use Case: Vendor
Actors: Richmond Millennial Chocolatier Company(RMCC), Vendor
Purpose: Distribution of products
Description: RMCC will receive distribution from its Vendor
Flow of Events
1. RMCC reports financial inventory to its Vendor 2. RMCC sends its order information and payment 3. Vendor sends completed order details and item details 4. Vendor also sends out an Acct status request
Use Case: Transaction
Actors: Richmond Millennial Chocolatier Company(RMCC), Account
System
Purpose: Balance accounting details
Description: RMCC sends its transaction payment details and Account
system balances the payables and receivables
Flow of Events
1. RMCC system will report its transactions to the account system 2. Account system will begin to balance the accounts.
Nonfunctional Requirements:
Description
Performance -The system will have to process all transactions in less than three seconds. -The system will need to be ready for use 24/7 all throughout the year. -Once transactions are made, the system will have to update the inventory.
Operational -The system has to contain an inventory management system. -The system will need to accessible to the Internet. -The system needs to be able to link credit card transactions with their associated companies. -The system will need to connect to the label printers, scanners, and receipt printers. -The system should be backing up all information routinely.
Cultural/Political -System will contain a simple design and be natural for non-technical staff. -The system will only accept currency from the U.S. -All descriptions/serial numbers of inventory must be recorded in real time. -The system will comply with all tax and accounting laws. -The system will comply with all state or federal laws in order to maintain legality.
Security -Customer and employee personal information must be kept protected at all times. -Only the general manager should have access to personal documents for applicable reasons.
System User
First and Last NameAddressPhone numberEmailDate of BirthRegister UserUpdate User Info
Customer
Customer IDCustomer NameDate of BirthPhone Number
Order
Order IDOrder Date OpenOrder Date Closed Registration DateRegistration TimeAdd OrderDelete OrderConfirm Order
Payment Provider
Payment Order IDDate PaymentConfirm Payment
Account System
Customer IDPayment IDOrder ID
Transaction Payment Detal
Order IDConfirmation IDPayment ID
Account Payable
Customer IDOrder IDPayable NumberDate Start Date End
Recievable Details
Customer IDOrder IDPayable IDDate StartDate End
Manager
Employee IDDate StartDate EndAssign ScheduleApprove ScheduleDetail UserApprove Request
Create Schedule
Customer IDEmployee IDOrder IDReport ID
Management Report
Employee IDSchedule IDRMCC IDAssign Schedule
RMCC Management
Employee IDReport IDStart DateEnd DateReport StartReport End
Payment Provider
Customer IDConfirmation NumberReciept Number
Vendor
Customer IDEmployee IDManager ID
Report
Efficient DateSchedule DateTotal PriceVendor IDCustomer IDAssign Time StartAssign Time End
Update
Update Efficient DateUpdate Schedule DateUpdate Total PriceUpdate Vendor IDUpdate Customer IDUpdate Assign Time StartUpdate Assign Time End
Provider
Customer IDOrder IDPayment ID
Shipping
Order IDPayment IDCustomer IDShipping NumberDate ShippingDate Arrival
Payment Authorization
Customer IDOrder IDPayment IDAuthorization StartAuthorization EndShipping Number
-memberName-memberName
Short Descriptions
Order: The order consists of what product or service the customer is trying to attain. It consists
of the order ID, date the order was opened and closed, registration date and time, and when the
order was added, deleted, and confirmed.
Customer: The customer is responsible for the purchase. Each customer has an ID, name,
date of birth, and phone number.
Payment Provider: The payment provider is the amount paid by a customer and includes the
customer ID, confirmation, number, and receipt number.
Account System: The system keeps track of all accounting activities and includes the
customer ID, payment ID, and order ID.
Account Payable: The account payable is what account the payment is being made and
includes the customer ID, order ID, payable number, start date, and end date.
Transaction Payment Deal: The individual that makes a transaction is part of the final deal and
includes the order ID, confirmation ID, and payment ID.
Receivable Details: The receivable includes which transactions are receivable. It includes the
customer ID, order ID, payable ID, start date, and end date.
System User: The system user is responsible for fulfilling all the criteria necessary to complete
a business deal from the customer to the employee. The system user includes the member’s
first and last name, address, phone number, email, date of birth, the registration of a user, and
updating the user’s info.
Create Schedule: The schedule refers to what times and days certain tasks have to be
completed and includes the customer ID, employee ID, order ID, and report ID.
Provider: The customer that completes the transaction. This includes Customer ID, Order ID,
and Payment ID.
Vendor: Supply the business with what it needs to run. Customer ID, Employee ID, and
Manager ID.
Shipping: Keeps track of orders coming in to the store and orders that are leaving. This
includes Order ID, Payment ID, Customer ID, Shipping number, Date of shipping and Date of
arrival.
Update: Updates everything about the store on a daily basis. This includes Update Efficient
Date, Update Schedule Date, Update Total Price, Update Vendor ID, Update Customer ID,
Update Assign Time Start, and Update Time End.
Report: A Report of the whole day. Example: Transactions, Inventory, Sales. This includes
Efficient Date, Schedule Date, Total Price, Vendor ID, Customer ID, Assign Time Starts, and
Assign Time Ends.
Payment Authorization: Authorizes and keeps track of each transaction that occurs. This
includes Customer ID, Order ID, Payment ID, Authorization Start, Authorization End, and
Shipping number.
RMCC Management: The managers of the business. This includes Employee ID, Report ID,
Start Date, End Date, Report Start, and Report End.
Management Report: Reports on performance of employees. This includes Employee ID,
Schedule ID, RMCC ID, and Assign Schedule.
Payment Provider: The middleman between the transactions. This includes Payment Order ID,
Date Payment, and Confirm Payment.
Manager: Manages the business and overseas duties. This includes Employee ID, Date Start,
Date End, Assign Schedule, Approve Schedule, Detail User, and Approve Request.
customer order screen shopping cart
views product items listed
selects product item
place in shopping cart
contenu shopping
contenu shopping/selects product item
select check-out
calculates & displays all selected product item(s),
charges
shipping charges
total order charge
personal contact information
payment information
prompts for confirmation
confirms order
confirms that customer order has been placed
emails confirmation and receipt
Main scenario Flow-of-Events for place-on-line order:
Richmond MillennialChocolatier Company
Top Package::Actor
Employee administrative screen System
selects fill-customer-order menu item
opens the fill-customer-order screen
enters customer order information
customer fill
displays customer order details
checks for product availability in product item inventory
there is sufficient product inventory
asks system to prepare receipt and packing slip
receipt and packing slip
prints receipt & packing slip
asks system to prepare mailing label
prepare mailing label
prints mailing label
updates product item inventory levels
updates customer order as filled
confirms update actions
Top Package::Actor
Main scenario Flow-of-Events for fill-on-line order
Richmond MillennialChocolatier Company
Object Descriptions: Customer: The customers views products listed. They select product item and select check out when
customers are ready to purchase.
Order Screen: Calculates and displays all selected product items. Shows shipping charges and prompts
for confirmation. Also confirms that customer order has been placed. Shows the items selected and
charges, total order charge, and confirms order.
Shopping Cart: Customer continues shopping. Emails confirmations and receipts.
Employee: Customer order menu item, enters customer order information, employee asks system to
prepare receipt and packing slip.
Administrative Screen: Shows customer order screen, displays customer order detail, checks for product
availability and product item inventory. Shows receipt and packing slip. Prepares mailing label and prints
mailing label. Updates product item inventory levels.
System: Customer fill, shows if there sufficient product inventory, prints receipts and packing slip,
Updates customer order as filled, confirms updates of actions.
Project Management:
CustomerOrder Descriptions:
Received: A new customer order is received as a created object and has to be checked for additional
features such as completeness and correctness.
In-Process: The order is being processed with all the necessary information to confirm a final shipment
which is filled by the employee.
Ready-to-be-Shipped: Once the order is checked to see if the product is in stock, the product item is then
retrieved from the inventory and packed for shipping.
On-Backorder: If the product that is ordered is not in stock, the customer is then notified and then a
request to make a new batch is made.
Shipped: The order is en route to its destination with a mailing label applied on the shipping container.
Completed-Order: Once the order is shipped from the facility, the customer will get a notification that
the order has been finalized. An order number and arrival details are also given in the notification.
ProductItem Descriptions:
NewProduct: A recipe is used to put all the contents together to create a product item.
In-Production: The product will be scheduled to go through a production process which will make it
presentable to customers.
In-Stock: When the product is finalized after production, it is packaged and counted to make it available
in-stock.
Out-of-Stock: If the quantity of the product reaches zero, a new request will be made to begin the
production schedule for the product to be available again to customers.
Out-of-Production: The product item is sold out and no longer being produced to be put on the shelves
again. Whatever quantity is left of the product will conclude in a 50% price decrease for the item.
Discontinued: Once the item remains out-of-production where the last batch was made more than seven
days ago, then the item will no longer be available and will be marked as discontinued.
Out-of-Production
Out-of-Production
Out-of-Production
The Richmond Millennial
Chocolatier Company
Contents Interface Designing ....................................................................................................................... 40
Windows Navigation Diagram: ..................................................................................................... 49
Dialogue Diagrams/Windows Navigation Diagram: ..................................................................... 49
Ms Project Plan: ............................................................................................................................ 51
Interface Designing RMCC homepage:
RMCC shopping cart page:
RMCC shopping cart page :
RMCC payment page:
RMCC purchase confirmation Page:
Windows Navigation Diagram:
Dialogue Diagrams/Windows Navigation Diagram:
Usability Testing:
We have conducted the usability test by asking some questions from the user. We have taken
the contact information and their information about their job too. These people were unfamiliar with our
website. They have given us a good response in general. Some of them easily grabbed the concept what
we were trying to do. But few was not sure what our website was. But we gave some information about
our project they understood it right away. Majority of the people liked our concept and our theme and
color and font of the website. But as it was too basic so they told us to increase the content of the website.
But overall they were impressed.
They said that this website was very helpful and ease to use for the Chocolate order. This
website includes many advantages like online registration and online order system. They also encouraged
the online transaction that we were to introduce. But they had their some reservations regarding the
security issue of the payment. Some of them has seen the chocolate system, but they said that the formal
chocolate order process is very time taking. People cannot take out time from their busy schedule going
shop for order. But it was very difficult for them, so that’s why they appreciated our concept because of
this, they can fulfill their hobbies without taking out some special time.
We are just a website away from them. But there was not a single person who disliked our
theme of the website. They said that our website is attractive, user friendly and they hope that it will not
be slow. The website provided ease to use, it is very user friendly, email and contact no is provided in
case of any problem.
MS Project Plan:
Gantt chart Task Mode Task Name Duration Start Finish Predecessors
Manually Scheduled
EC Project 0 days? Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Testing 0 days? Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Test Plan 0 days Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Define features and functionality to test
4 days Fri 2/19/16 Wed 2/24/16
Manually Scheduled
Define test methodology 3 days Fri 2/19/16 Tue 2/23/16
Manually Scheduled
Design test cases 2 days Fri 2/19/16 Mon 2/22/16
Manually Scheduled
Develop responsibility matrix 1 day Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Review plan with developer 1 day Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Develop test schedule 5 days Fri 2/19/16 Thu 2/25/16
Manually Scheduled
Milestone: PM signs off on test plan 0 days Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Test Results Report 4 days Fri 2/19/16 Wed 2/24/16
Manually Scheduled
Review test plan with client 1 day Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Carry out test plan 5 days Fri 2/19/16 Thu 2/25/16
Manually Scheduled
Analyze results 4 days Fri 2/19/16 Wed 2/24/16
Manually Scheduled
Prepare test results report and presentation
5 days Fri 2/19/16 Thu 2/25/16
Manually Scheduled
Present test results to client 1 day Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Address any software issues or problems
3 days Fri 2/19/16 Tue 2/23/16
Manually Scheduled
Milestone: Client signs off on Test results
0 days Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Milestone: Testing Completed 0 days Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Use Case 2 days Fri 2/19/16 Mon 2/22/16
Manually Scheduled
Case Diagram 6 hrs Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Flow Charet 4 hrs Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Detaliled Description Of Actors 6 hrs Fri 2/19/16 Fri 2/19/16
Manually Scheduled
Non_funtional requirements 2 hrs Fri 2/19/16 Fri 2/19/16
Manually Scheduled
UML Diagramming 3 days Thu 2/25/16
Mon 2/29/16
Manually Scheduled
Identify Actors 3 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
Identify Attributes 1 hr Thu 2/25/16 Thu 2/25/16
Manually Scheduled
Identify objects 1 hr Thu 2/25/16 Thu 2/25/16
Manually Scheduled
Identify functions 1 hr Thu 2/25/16 Thu 2/25/16
Manually Scheduled
creat UML diagram 3 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
Review Diagram 3 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
creat short description of diagram 2 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
make deliverable prepard 6 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
submit UML Diagram 0 hrs Thu 2/25/16 Thu 2/25/16
Manually Scheduled
Sequence Diagramming 2.5 days Tue 3/1/16 Thu 3/3/16
Manually Scheduled
Identify Actors 2 hrs Tue 3/1/16 Tue 3/1/16
Manually Scheduled
Identify Attributes 2 hrs Tue 3/1/16 Tue 3/1/16
Manually Scheduled
Appoint Lifelines 1 hr Tue 3/1/16 Tue 3/1/16
Manually Scheduled
Display Appropriate messages 2 hrs Tue 3/1/16 Tue 3/1/16
Manually Scheduled
Execution Occurrence 2 hrs Tue 3/1/16 Tue 3/1/16
Manually Scheduled
Validate Diagram 4 hrs Tue 3/1/16 Tue 3/1/16
Manually Scheduled
create short description of sequences
1 hr Tue 3/1/16 Tue 3/1/16
Manually Scheduled
State Machine Diagramming 3 days Tue 3/8/16 Thu 3/10/16
Manually Scheduled
identify Material 3 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
identify objects 1 hr Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Appoint Lifelines 1 hr Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Display Appropriate messages 2 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Execution Occurrence 2 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Validate Diagram 4 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Create short description of sequences
1 hr Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Make deliverable prepard 2 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Submit sequence Diagram 0 hrs Tue 3/8/16 Tue 3/8/16
Manually Scheduled
Risk Speculation 1 hr Tue 3/8/16 Tue 3/8/16
Manually Scheduled
interface desiging 3 days Thu 4/14/16
Mon 4/18/16
Manually Scheduled
interface defining 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
interface desig 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
Determiniation 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
Relation with user 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
Useability report 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
project management plan 1 day Thu 4/14/16 Thu 4/14/16
Manually Scheduled
windows navigation 1 day Thu 4/14/16 Thu 4/14/16
Recommended