CASE STUDYT4Us Mining Solutions for Jindal Africa [JSPL, Chirodzi Coal Mines, Africa]

T4U primarily studied the complete mining operations and its business process flow, key

operational challenges being faced by the Jindal Africa, Mozambique team which e�ects the

operating e�ciency and margin. T4U proposed cost-e�ective and suitable IT solution to

address the existing operational challenges and help them to save cost for the company with

improved operating e�ciency. Telematics4u then introduced a product roadmap to address

the operating challenges of mining industry as a whole.

PROJECT BACKGROUND

CHALLENGES

Jindal Africa faced a lot of challenges in their day to day operations. After a detailed study of the system & workflow, following were the challenges identified:

Heavy revenue loss due todiesel theft.

No automated way to find out the exact location of vehicle and the vehicle status such as the route deviation from the defined maps.

Finding number of trips completed by each vehicle per day / per month/ for a particular duration, trip distance is a cumbersome as all the data needs to be recorded manually.

Overburden management is completely done by manual using excel only.

Identification of key resources is a problem in the workshop.

Requisition Slip creation for inventory is done manually and there is no alerting system in place if the inventory goes below a certain level.

Lack of Historical Data for the mining equipment maintenance. Critical spare parts availability in-time is also a problem in the workshop.

No automated way to find out the vehicle allotment as per the

need of the mine. Hence, vehicles remain unutilized.

No control on the process like if the vehicle has stopped for a long time or idle due to any reason or driver

taking un-authorized route.

Excel-based inventory management for spare parts, manual job card

creation for maintenance jobs and challenges in planning and executing scheduled maintenance. Vehicle wise exact expenses can’t be identified as

everything is billed against plant.

Keeping track of slow moving spare is a problem in the workshop.

There is no tyre management system available as there are many vehicles

and di�cult to plan and manage the tyre inventory including tyre type.

SOLUTIONS, FEATURES AND HIGHLIGHTS

T4U performed a consulting operation and studied all the pain points and proposed a detailed phase-wise plan for Transportation Optimization, Fuel Expenditure Control and o�ered a technology solutions to JSPL, Chirodzi Coal Mines.

Proposed implementation of the project in phases. Broadly we have categorized the solution into the following phases:

Real-time Logistics & Transportation Monitoring and related services Trip Management (Washery / Excavation / Overburden)Fuel Management Solutions for various vehicle mix at the Co MinesVehicle Maintenance Management Solutions Workshop Management Statutory & Preventive Maintenance Tyre Management Reports & MISManagement Reports and AnalyticsMobile Application for Monitoring Services

Phase 1 :

Driver Management Solution with RFID Technology implementation. Setting up Command Control Centre at Chirodzi Coal Mining Plant, TeteCoal Mining Administration Fleet ManagementIntegration with SAP Integration with PLC Of WasheryExcavation Activity Module Excavation Operational Management (A, B, C, D and E) Multi-Pit ExcavationWashery Activity Module Weightment Re-Conciliation Module (Excavation & Washery)Management Reports and Analytics

Phase 2 :

Logistics and Transportation of Final Product(s) to Motiez using third party transportation service providersFuel Management in Locomotives Transportation up to Port (Beira) for Exports and for Local Consumption

Phase 3 :

Phase 4 :

SOLUTIONS, FEATURES AND HIGHLIGHTS

Data Analytics Dashboards and Mobile Applications for various operations SAP Integration Services for Billing and Administration

CRM Solutions CCTV Camera for Real time monitoring in the command control centerSecurity Management and Attendance

Phase 5 :

PROJECT OUTCOMET4U has successfully finished the consulting project and

implemented the fuel management system in four vehicles in JSPL, Chirodzi Coal Mines. At present, all the four vehicles are highly

e�ective in reducing the diesel expenses (that is more than 50% cost of the whole JSPL, Chirodzi Coal Mines operation).

telematics4u Services Pvt Ltd #9, 1st Main, New BEL Road,Sanjaynagar, Bangalore 560 094, INDIA

+91 80 2217 9700/743

+91 80 2217 9700

info@telematics4u.com

www.telematics4u.com

Recommended