View
245
Download
1
Category
Preview:
Citation preview
1
v TAIWAN HON CHUAN GROUP – Malaysia Plant – Phase 2 Project Owner : HON CHUAN Malaysia Sdn. Bhd.
Project Status : Engineering Stage
v NSCI Bahau Plant – BioMass Project Project Owner : CIMA
Technology Partner : Taiheyo Engineering Corporation (TEC) Project Status : Engineering Stage
v AEON Kulai Shopping Complex Project Owner : AEON CO. (M) BHD
Main Contractor: NAKANO Construction Sdn Bhd Project Status : Construction Stage
v HONDA Malaysia Engineering Center Project Owner : Honda Malaysia Sdn Bhd
Project Status : Construction Stage
v Fibertex Nilai 3 New Line Extension Project Owner: Fibertex Nonwovens Sdn. Bhd
Turnkey Builder: Shimizu Corporation Project Status: Construction Stage
v HONDA Malaysia LINE 2
Project Owner : Honda Malaysia Sdn Bhd Main Contractor: Shimizu Corporation
Project Status : Construction Stage
v MLNG NEW BOILDER (MNB) PROJECT Project Owner : Malaysia LNG Sdn. Bhd.
EPCC Contractor: SYNERLITZ – NEM CONSORTIUM SYNERLITZ Malaysia Sdn Bhd
Project Status : Construction Stage
v EPCC of CRUDE DISTILLATION UNIT (CDU) PARALLEL PREHEAT TRAIN PROJECT Project Owner : PETRONAS PENAPISAN (TERENGGANU) SDN BHD.
EPCC Contractor: SYNERLITZ Malaysia Sdn Bhd Project Status : Construction Stage
v HONDA Malaysia PDI Building Fast-Track Project
Project Owner : Honda Malaysia Sdn Bhd Project Status : Completed
v KLIA2 Watch Tower – Steel Structure Works
Project Owner : Malaysia Airports Holdings Berhad Design & Built Contractor: Perkasa Jauhari Sdn Bhd
Project Status : Construction Stage
v Singapore Marina Bay Sands DCP2 Expansion Project Owner : Singapore District Cooling Pte Ltd
Specialist Builder: Truwater Cooling Towers Sdn Bhd
v TAIWAN HON CHUAN GROUP – Malaysia Plant Project Owner : HON CHUAN Malaysia Sdn. Bhd.
Main Contractor: Multiguna Construction & Development Sdn Bhd Project Status : Construction Stage
v NSCI Bahau Second Clinker Production Line of 5000 TPD
Project Owner : CIMA Project Management Team : OPUS Management Sdn Bhd. and
L.V. Technology Public Company Limited Turnkey Contractor: SINOMA International Engineering Co. Ltd
Project Status : Construction Stage
2
v BOOSTER COMPRESSOR For LABUAN GAS TERMINAL (LGAST) PROJECT Project Owner : Petronas CARIGALI
EPCM Contractor: CHIYODA MALAYSIA Sdn Bhd Project Status : Completed
v KIMANIS Power Project
EPCC For 300MW Combined Cycle Power Plant Project Owner : KIMANIS POWER Sdn. Bhd.
EPCC Contractor: CTCI Corporation; Synerlitz (Malaysia) Sdn Bhd; SCHB Engineering Services Sdn Bhd CONSORTIUM Project Status : Construction Stage
v Shell Refining Co. Bhd- Hijau Gasoil Project
Project Owner : Shell Refining Co. Bhd EPC : Fluor Corporation
Builder: Synerlitz (Malaysia) Sdn Bhd Project Status : Commissioning Stage
v KLIA2-District Cooling Plant Project
Project Owner : Malaysia Airport Holding Berhad Concessionaires : TNB Engineering Corporation Sdn. Bhd.
Project Status : Commissioning Stage
v Kawasan Perindustrian Senai 3, Warehouse Project Project Owner : KYM Senai Sdn Bhd
Project Status :Completed
v PROPOSED DATA CENTER COMPRISING OF PHASE 1 (BLOCK A-5/6 STOREY DATA CENTER AND OFFICES INCLUDING MEZZANINE FLOOR, BLOCK B-5
STOREYS DATA CENTER AND OFFICES INCLUDING MEZZANINE FLOOR, BLOCK C- 5 STOREYS DATA CENTER AND OFFICES) AND PHASE 2 (1 UNIT OF 2
STOREYS CAFE) AND ALL ASSOCIATED INFRASTRUCTURE WORKS ON PART OF LOT PT44045, ZON FLAGSHIP (ZON CYBER 12), CYBERJAYA
Project Owner: INTEGRATED DC BUILDERS SDN. BHD Project Status :Completed
. v Kapar, Klang Warehouse Extension
Project Owner : SAMUDRA KIMIA Sdn Bhd Project Status :Construction Stage
v Demolition & Rebuild 2 Storey Bungalow
At Lot 30595 & 30596, No. 29 PersiaranBurhanuddinHelmi, Taman Tun Dr. Ismail, 60000 Kuala Lumpur.
Project Owner : Tan Sri Rozali Bin Ismail Project Status: Tender Stage
v 99 SpeedMart Warehouse
Proposed 1 storey warehouse with 3 storey office at Lot 5203, KawasanPerindustrian Balakong Jaya, MukimKajang, Daerah Ulu Langat, Selangor
Project Owner: 99 SpeedMart Sdn Bhd Project Status: Completed & Operating
v Lam Soon Bukit Minyak Warehouse with GBI certification submision.
CadanganMendirikan 1 Blok 1 Tingkat Kilang Dan 3 Tingkat Pejabat Di Atas Plot 99, LorongPerindustrian Bukit Minyak 16, KawasanPerindustrian Bukit
Minyak, Mukim 13, S.P.T., Pulau Pinang Project Owner : Lam Soon Edible Oil
Project Status: Completed
v FibertexNilai 3 Factory & Warehouse Extension Project Owner: Fibertex Nonwovens Sdn. Bhd
Turnkey Builder: Shimizu Corporation Project Status: Completed
3
v Nilai 3 Lot 16670 Warehouse & Office Project Project Owner : D.S.S Auto Accessoroes Sdn. Bhd.
Project Status : Completed
v PROPOSED 5&6 STOREY COMPUTER EXCHANGE CENTER AND ALL ASSOCIATED WORKS ON LOT PT12144 & PT12145, ZON FLAGSHIP, CYBERJAYA
Project Owner : CSF-CX SDN. BHD. Project Status : Completed
v Modular District Cooling System
Inventor: Shinryo Corporation
v PDI (Pre-Delivery Inspection) Hub Development (50 acres) for Proton Edar/ KonsortiumLogistikBerhad including PDI Building; Repair Building;
Ancillary Buildings & Facilities and main federal road upgrading at lot 7316 (PT 3609),JalanKlangBanting, Bandar Sijangkang,Selangor.
Project Owner: Corporate Landmarks Sdn. Bhd. Project Status: Completed
v The Engineering, Procurement, Construction and Management (EPCM) of
PSR2 Revamp Project, Sg. Udang, Melaka Project Owner: Malaysian Refining Company [MRC]
EPCM: Foster Wheeler E & C (Malaysia) Project Status: Completed
v Demolition & Rebuild 2 Storey Bungalow with Basement @ Bukit Gasing,
Petaling Jaya. Project Owner: Dato’ Vijayeswaran&DatinUmayal
Project Status: Construction
10.MAXIS-BTS Project Project Owner: Maxis Broadband Sdn. Bhd
Contractor: SediabenaSdn Bhd. Project Status: on going
v Proposed 3 Storey Bungalow with Basement & Swimming Pool @ Bukit
Damansara, KL Project Owner: Dato’ Lee Kok Kwan
Project Status: Construction
v 12. Proposed Development and Construction of the Bab Al Shams Desert Resort & Spa Expansion in Bab Al Shams, Dubai, United Arab Emirates
Project Owner: MEYDAN L.L.C Lead Consultant:: TAK (Teo A. Khing Design Consultant (Dubai Br.)
Project Status: Completed
v 13. The Engineering, Procurement, Installation and Commissioning (EPIC) of HRSG Boiler at Kertih Compressor Station ‘B’ in GPP-1 Complex (KCSB) In GPP-A at
Lot 1903 & lot 3541, MukimKertih, Daerah Kemaman, Terengganu DarulIman Project Owner :Petronas Gas Berhad
EPIC Contractor: Steamline (M) Sdn. Bhd. Project Status : Completed
v The Engineering, Procurement, Construction and Commissioning (EPCC) of PFKSB -
DEBOTTLENECKING Project- EPCC of GAS TURBINE COGENERATION SYSTEM at Lot 10750, MukimGurun Daerah Kuala Muda, Kedah DarulAman
Project Owner :Petronas Fertilizer (Kedah) Sdn. Bhd. EPCC Contractor: Shinryo (M) - Steamline(M) Consortium
Project Status : Completed
4
v The Engineering, Procurement, Construction and Commissioning (EPCC) of PP(M)SB - COGENERATION EXPANSION Project-Sg. Udang, Melaka
Project Owner :PetronasPenapisan Melaka Sdn. Bhd. [PP(M)SB] EPCC Contractor: Shinryo (M) - Steamline(M) Consortium
Project Cost : RM 100 million (Including Machinery and Equipment)
v The Engineering, Procurement, Construction and Commissioning (EPCC) of DXN BIO-FUELS PLANT Project- Lot 9916, KawasanPelabuhanKuantan, Pahang
Project Owner : DXN BIOFUELS Sdn. Bhd. EPCC Contractor: BIO SYNERGY ENGINEERING SDN. BHD.
Project Cost : USD 30 million
v The Engineering, Procurement, Construction and Commissioning (EPCC) of PP(M)SB -COGENERATION Project- Sg. Udang, Melaka
Project Owner :PetronasPenapisan Melaka Sdn. Bhd. PMC :Consortiom of OGP & Foster Wheeler TechologyPartner :Enprima Limited (Finland)
EPCC Contractor: Shinryo (M) - Steamline(M) Consortium Project Cost : RM 600 million (Including Machinery and Equipment)
v CADANGAN PEMBANGUNAN LOJI SISTEM PENDINGINAN SETEMPAT
2 TINGKAT SERTA SATU TINGKAT SUB BESMEN DAN SATU UNIT GAS METERING STESEN DI ATAS SEBAHAGIAN PLOT 5U1, PRESINT 5, WILAYAH PERSEKUTUAN PUTRAJAYA GAS DISTRICT COOLING
(PUTRAJAYA) SDN BHD. (The Engineering, Procurement, Construction and Commissioning (EPCC)
ofPutrajaya Precinct 5, District Cooling Plant Project- Chiller Plant Package) Concessionaire : Gas District Cooling (Putrajaya) Sdn. Bhd.
EPCC Contractor :Steamline (M) -Shinryo Consortium Project Cost : RM 18 million (Building & Civil Work Contractual Cost
v CADANGAN TAMBAHAN SISTEM PENYEJUKAN (COOLING TOWER)
DAN KERJA NAIK TARAF SISTEM RAWATAN AIR SISA (WASTE WATER TREATMENT) KEPADA KOMPLEKS KILANG SEDIAADA DI ATAS LOT 1863, JALAN PELABUHAN 1, KAWASAN PELABUHAN KUANTAN, MUKIM SG. KARANG, DAERAH KUANTAN, PAHANG
DARUL MAKMUR. Project Owner : FPG OLEOCHEMICALS SDN. BHD.
Project Cost : RM 15 million (including Machinery and Equipment)
v CADANGAN TAMBAHAN LOJI PENAPISAN GLYCERINE KEPADA KOMPLEKS KILANG SEDIAADA DI ATAS LOT 1863, JalanPelabuhan 1, KAWASAN PELABUHAN KUANTAN, MUKIM SG. KARANG, DAERAH
KUANTAN, PAHANG DARUL MAKMUR. (Glycerine Refinery Plant and Tankage Extension Project- Kuantan Port,
Kuantan, Pahang DarulMakmur.) Project Owner : FPG OLEOCHEMICALS SDN. BHD. EPCC Contractor :: TOYO Engineering Corporation
Project Cost : RM 65 million (including Machinery and Equipment)
v CADANGAN TAMBAHAN KILANG ELEKTRONIK 2-TINGKAT KEPADA KILANG SEDIADA DIATAS LOT 8, JALAN SEMENTA 27/91, SEKSYEN
27, 40400 BANDARAYA SHAH ALAM, SELANGOR DARUL EHSAN. (2 Storey Electronic Factory Extension for ShinEtsu- Shah Alam)
Project Owner : S.E.H. (SHAH ALAM) SDN. BHD. Turnkey Contractor : Shimizu Corporation
Project Cost : RM 5.3 million
v CADANGAN MEMBINA SATU TINGKAT KOMPLEKS KILANG DENGAN MEZZANIN DIATAS LOT S11, BEHRANG, MUKIM HULU BERNAM
TIMUR, DAERAH BATANG PADANG, TANJUNG MALIM, PERAK D.R. (Single Storey Factory Complex with Mezzanine Floor and Ancillary
Buildings- Proton City, TanjungMalim, Perak Darul Ridzuan.
5
Project Owner : MODERN SEAT CORPORATION SDN. BHD. Turnkey Contractor : Nakano Construction Sdn. Bhd.
v FACTORY COMPLEX CONSISTING OF WELDING SHOP, PAINT SHOP, BODY SHOP AND CVJ SHOP WITH ADMINS BLOCK on Lot-lot No PT75, PT76 and PT79, HicomPegohIndustrian Park, MukimPegoh, Daerah Alor
Gajah, Melaka. For HONDA MALAYSIA SDN BHD. Project Owner : HONDA MALAYSIA
Turnkey Contractor : Shimizu Corporation
v 2 Storey Office and 1 Storey Factory Complex and Ancillary Buildings and Equipment Foundation- Seremban, Negeri Sembilan DarulKhusus
Project Owner : YAKULT (MALAYSIA) SDN. BHD. Turnkey Contractor: Shimizu Corporation
Recommended