Measure, cut and fix pre-formed beads and EML

Unit 123: Fixing sheet materials

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

2 of 20

Assessment criteria

3.2 state the importance of accurate measurements

3.3 describe different methods for fixing pre-formed beads and EML

4.3 measure pre-formed beads and EML

4.4 cut pre-formed beads and EML to given sizes

4.5 select methods for fixing pre-formed beads and EML

4.6 fix pre-formed beads and EML

4.7 apply safe working procedures for measuring, cutting and fixing pre-formed beads and EML

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

3 of 20

EML

Expanded metal lathing can be

fixed for a variety of reasons.

Most common for a plasterer is to

use strips to cover timber wall

plates and composite

backgrounds.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

4 of 20

Thanks to its flexibility, it

can also be shaped to

make curved walls and

to form arches.

EML

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

5 of 20

Cutting EML

EML is sharp and gloves

should be worn when cutting

and handling.

1. Measure size required.

2. Mark on EML.

3. Join the marks using a

straight edge.

4. Snip the mesh and fold

away as you go.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

6 of 20

Cutting Rib Lath

• Use the same process used for EML.

• A hacksaw will be needed to cut ribs

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

7 of 20

Fixing EML

EML can be fixed to

timber backgrounds

by using:

• clout nails

• staples

• galvanised nails.

It should be spaced

150mm apart.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

8 of 20

Fixing EML

EML can be fixed to metal frame backgrounds by using: • galvanised wire • galvanised screws.

It should be spaced 150mm apart.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

9 of 20

Fixing EML

• EML should be fixed from the centre outwards.

• EML must be kept taut when fixing.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

10 of 20

Fixing EML

EML sheets should

overlap by 50mm on the

short edge and 25mm

along the long edge

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

11 of 20

Cutting pre-formed beads

1. Measure the length required.

2. Mark length on bead.

3. Cut through nosing with a hacksaw.

4. Cut through wings with snips.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

12 of 20

Fixing beads

Beads can be fixed in a variety of ways depending on their size and use:

• nail

• screw

• staple

• adhesive.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

13 of 20

Fixing floating beads

• Floating beads are also known as angle beads.

• Check background for plumb prior to fixing so that you have a good idea of thickness of adhesive.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

14 of 20

1. Apply adhesive to both sides of the external corner using a hand board and trowel.

2. Dots/fixings should be spaced at 600mm apart.

3. Press bead into fixing compound, ensuring the wings are held in place.

4. Using a spirit level and straight edge, check for plumb.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

15 of 20

Fixing floating beads

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

16 of 20

Openings

The nosing of the bead should be

checked in 3 places and all of the

bead must be touching the spirit

level.

Spirit level checking 3

positions

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

17 of 20

Fixing skim beads

Skim beads should be fixed using:

• clout nails

• staples.

Screws can be used but the head tends to sit proud.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

18 of 20

Fixing skim beads

• The fixings will be put through the pre-formed holes and into the background.

• Care must be taken not to hit the nosing during fixing.

• The fixings must be below the nosing to allow a covering of plaster.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

19 of 20

Extending beads

• Beads can be joined to extend their length by placing a rod or headless nail in the nosing.

• Ensure that the beads run continuously in line.

Level 1 Diploma in Plastering

© 2013 City and Guilds of London Institute. All rights reserved.

20 of 20