Upload
pointwest
View
214
Download
0
Embed Size (px)
DESCRIPTION
Pointwest President & PSIA Director Beng Coronel presents a case study on one of our partner-clients in the New Zealand gas industry at the 2nd ICT Partnership Opportunity Mission to New Zealand (May 2012).
Citation preview
PARTNERSHIP WITH SYNERGY
Maria Cris(na (Beng) Coronel President, POINTWEST TECHNOLOGIES Director, PSIA
POINTWEST TECHNOLOGIES The Company that your speaker represents
• The largest 100% Filipino-‐owned IT/BPO services company
• With over 700 resources
• SupporEng companies in Fortune’s List of World’s Most Admired Companies
• Most Progressive Homegrown IT Service Company (2008 e-‐Services Awards)
• Best Mid-‐Sized Locally Owned BPO Company of the Year (2008 InternaEonal ICT Awards)
POINTWEST TECHNOLOGIES The Company that your speaker represents
• 2 Delivery Centers in Metro Manila
• ISO27001-‐cerEfied (InformaEon Security Management System)
• CMM-‐I Level 3 raEng
• MicrosoR, Java, Mainframe Legacy, Mobile Apps Dev, TesEng
• TransportaEon (Airline/Trucking), Banking/Insurance, UEliEes, Retail, Healthcare
The NZ GAS INDUSTRY Case Study
• REGIME PRIOR TO OCT 2004 – Main gas pipeline
• owned by MDL (Maui Dev Ltd) available only to the Crown
• Moved gas from a single producEon field (Maui)
– Vector transmission pipeline system
• Available to all gas shippers
Industry History
The NZ GAS INDUSTRY Case Study
• New Era for the NZ Gas Industry : Year 2004 – OPEN ACCESS GAS TRANSPORTATION for both 313 km Maui pipeline from Maui producEon staEon and 2200 km Vector transmission pipeline system
– Maui pipeline will also carry non-‐Maui gas
The NZ GAS INDUSTRY Case Study
• REQUIREMENT: – Single plaVorm to operate open access arrangements with Vector acEng as technical operator and system operator
– Vector engaged CGNZ (Cap Gemini)
• Develop access regime framework
• SupporEng informaEon systems
BIRTH of OATIS
• OATIS (Open Access Transmission Informa(on System): the pipeline opera(on system – facilitates third party access to the Maui Pipeline. – balances pipeline receipt and delivery nominaEons, – processes pipeline metering informaEon – performs other essenEal pipeline operaEons tasks.
• Scope: – Maui OATIS – Vector OATIS – Vector CriEcal ConEngency Operator
• While waiting for OATIS to be rolled out : SPREADSHEETS
The Applica(on Support
FEB 2007
CHALLENGES
• SYSTEM COMPLEXITY – Over 800,000 lines of soRware codes – 140 screens – 39 interfaces – 25 to 30 batch processes – 4000 pages of design documents
• PROJECT COMPLEXITY – Staggered delivery of modules – Over 100 BUILDS
CHALLENGES
• DELAYS in OATIS development • RESOURCE Constraints
– DomesEc ICT company developing applicaEon
– Vector to do UAT (User Acceptance TesEng)
• BUDGET Overruns
Risk Management
• 11000 Test Cases on SIT – 35000 man-‐hrs – Uncovered over 5000 defects in over 100 BUILDS
• 1200 Test Scenarios on UAT – 5000 man-‐hrs – Uncovered over 600 defects over 3 CYCLES of tesEng
Vector engaged POINTWEST to handle TESTING • SIT (System IntegraEon TesEng)
• UAT (User IntegraEon TesEng) • ONSITE / OFFSHORE TEAM (22 Members)
• Start date: SEP 2005 – FEB 2007
Project Organiza(on
Business Analysts
Pointwest
Users / Specialists
Technical Support
Development
Client
POST OATIS ROLLOUT
• Vector engaged POINTWEST to perform PRODUCTION SUPPORT TESTING aRer iniEal OATIS deployment
• Team of 3 Pointwest Resources based in Manila
• 4 to 5 major MAINTENANCE releases per year
• Helpdesk Support to producEon users
Produc(on Support Tes(ng
• 17 Major releases (over 3 years) • 15 Minor releases (over 3 years)
• Helpdesk (Testing Support)
• User training
• Testing for Server Virtualisation
• Testing for Environment Upgrades
• Testing for System Performance Upgrades, with focus on functional testing
Feedback from the CLIENT (liRed from Oil & Gas Australia, October 2006)
Michael Cummings, Vector’s Divisional CEO, Gas Mr. Cummings warmly acknowledged the team that has worked so hard to get OATIS on board:
‘Working with our IT partners, HP and Pointwest, we have delivered an innovaEve soluEon that has cost significantly less than similar projects in other internaEonal regimes. We have m a n a g e d t o d e l i v e r a n impressive system that should m e e t a n d e x c e e d t h e expectaEons of the users.’
Due to the complexity and industry criEcal nature of the app l i caEon, tesEng was crucial. Vector sought the s e r v i c e s o f P o i n tw e s t Technologies from Manila, a partner it has successfully used in the past.
STRATEGIC PARTNERSHIP
With End-‐CLIENTS
• Accelerate their IT iniEaEves through RESOURCE AUGMENTATION – TEAM composed of members at CLIENT SITE and PARTNER’S SITE (in MANILA)
– Allow Partner team to manage work queue and resource assignment
With NZ ICT COMPANIES
• Assign TESTING requirements of its applicaEon/soRware products
– FASTER and LESS COSTLY delivery to clients
• Assign marke(ng, customiza(on/localiza(on, and implementa(on support
– EXPAND GLOBAL REACH of NZ ICT Companies’ soRware PRODUCTS
tēnā koe Thank You
salamat
Your PARTNER and BRIDGE to the GLOBAL MARKET