Upload
adnan-abdulmateen
View
174
Download
0
Embed Size (px)
Citation preview
MUHMMAD ADNAN ABDUL MATEEN
Present Address: Al Ghubrah Muscat Oman Phone No.: Mobile#+ 00968- 97739031 E-mail: (1) [email protected], And (2) [email protected]
OBJECTIVE Seeking a challenging, development-oriented career within a dynamic and progressive organization where enthusiasm, dedication and the abil ity to manage task s ef f ec t ively a r e the p re- r equis i t e i n dr iv ing the organiza t ion forward.
EDUCATION
Diploma in Electrical Engineering from Board of technical education Peshawar -
1998 Pakistan
EXPERIENCE SUMMARY
(15) Years of various working experience as MEP QA/QC inspector.
Familiar with below standard
• BS standard
• ASME section XI ( WPS & BPS) also has done CSWIP 3.0 (Level 1): Visual Welding Inspector
• NFPA standard
• SMACNA standard
DUTIES AND RESPONSIBILITY
AS QUALITY CONTROL:
• Operation & Maintenance instruction manual Preparation.
• Witness Pre commissioning and commissioning testing & Attend Testing & Commissioning from supplier and records all test which are not
• Snagging & De snagging.
• Method Statement Preparation.
• Coordinate MEP works / drawings to all Eng. disciplines
• Perform Inspection and witness test as required.
• Prepare reports and quality records in compliance with procedures
• Monitor all works related to MEP works as per approved drawing and record all works that are not complied with the Contract Specifications.
• Perform system verification on completed on system to assure correct installation per design specification.
• Coordinate with Consultants prior for site inspection.
• Complying with standards and specifications.
• Rejecting materials that do not complying with Contract Specification and not as per Approved Material Submittals.
• Developing ITP’s
• Material Inspection Requests(MIR)
• Preparing Activity Commencement Notice
• Issuing Internal NCR and Closing Consultant’s NCR
• Manage the MEP Contractors daily construction activities, schedule and progress.
• Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for Information (RFI). Inspect and approve MEP Installation on site.
• Witness and verify Continuity, Merger, HI-POT and component testing for Medium voltage & Low voltage equipment.
• Supervise and Inspect Subcontractor construction activities.
• Witness Pre commissioning and commissioning testing.
• Review all test packages; prepare QA/QC documentation for Turn over Specialty
LV, HV SYSTEMS
• HV & LV Cable Trenches and Ducts
• LV Panels
• L.T Switchgears
• Distribution Board
• MCC Panels
• Lighting Control Panels
• Dimming Control Panels
• Fuse Switches & Isolator Units
• Cables, Bus Bars & Conduits
• Cable Trays & Trunking
• Electrical Wiring and its Accessories
• UPS and Battery Banks
• Light Fixtures
• Earthing System(Mesh type & Bore Type, FURSE ,UK)
• Lightening Protection System(Internal & External, FURSE, UK)
1-EMPLOYER: - DRAKE AND SCULL INTERNATIONAL
1. GOLDEN MILE HOTEL PROJECT (PALUM JUMEIRAH) DUBAI)
14-APR-2005 TO 20-APR-2008. Electrical QA/QC Inspector
Golden Mile Project $ 300 million Cost of the Project Nakheel & IFA Launch the 10 Buildings of the "Golden Mile" Jumeirah Dubai. The flagship Golden Mile - an international shopping and residential destination - will cover 60,000 square meters - one whole side of The Palm, Jumeirah's trunk and will include a 1.5 kilometer waterside Corniche. Being developed at a cost of US $300 million it comprises 780 luxury apartments, in 10 waterside buildings and 220 upscale boutique shops and restaurants. The Palm Golden Mile joins IFA's extensive development portfolio for The Palm, Jumeirah. The company is also behind The Palm Hotel & Resort with 300 rooms, the five-star Palm Vacation Club on the island's trunk, a 1,000 room five-star Palm Sun Hotel and Resort on the island's crescent. In addition, IFA Hotels & Resorts is behind The Palm Residence, with luxury apartments in the twin Al Nabat and Al Haseer towers. Client: Nakheel & IFA. Consultant: RPW Int’l. & CKR Int’l. MEP Contractor: Drake & Scull Int’l.
2. KINGDOM OF SHEBA APPARTMENTS & VILLAS PROJECT (PALUM JUMEIRAH) DUBAI.
Mechanical QA/QC Inspector 21-APR-2008 TO 31-JAN-2009
The resort covers 141,500 sq. meters in a prime location on The Crescent of The Palm Jumeirah, adjacent to the renowned Atlantis development. The Kingdom of Sheba will be managed by Fairmont Hotels & Resorts (Fairmont) and will consist of five separate and unique elements, each strongly influenced by classic Arab architecture - Residences, Hotel, Private Residence Club, Vacation Club and a Souq (Retail Plaza). The combined value of the resort is in excess of US$1 billion. Client: Nakheel & IFA.
Consultant: ACC Int’l, MEP Contractor: Drake & Scull Int’l
3. Ocean-Heights Dubai Marina Electrical QA/QC Inspector (01-FEB-2009 TO 05-MAR-2010)
Ocean Heights is a supertall residential skyscraper in Dubai Marina, Dubai, UAE. The tower stands 310 m (1,017 ft) tall with
83floors.[4] The tower is designed by Andrew Bromberg of Aedas.[5] The building was topped-out on 22 December
2009,[6] and completed in 2010. Currently Ocean Heights is the fifth
tallest residential building in the world,[7] and fourth tallest residential
building in Dubai, behind The Marina Torch, and HHHR Tower.
Project Title: Ocean Heights Client: DAMAC Main Contractor: ARABTEC Consultant: Engineering Consultant Group / Ian Banham
Contract Value: AED 122,000,000.00
4. FAIRMONT PALUM HOTEL & RESORTS (PALUM JUMEIRAH) DUBAI) 01-FEB-2009 TO 30-APR-2011
Mechanical QA/QC Inspector
The Fairmont Palum Hotel & Resorts Dubai US$115 million project is Fairmont Palum Hotel & Resorts in Palm Jumeirah Dubai hotel is features 381 guestrooms and suites including two Presidential Suites and a Fairmont Gold Lounge and rooms, 3,000 squares meters of Conference and meeting Room space and a full service business center Client: Nakheel & IFA. Consultant: RPW Int’l. & CKR Int’l MEP Contractor: Drake & Scull Int’l.
5. NEW OFFICE BUILDING FOR ROYAL COURT AFFAIRS AT AL GHUBRAH 01-JUN-2011 TO 20 -DEC-2012
Client: Royal Court Affairs (RCA) Consultant: Royal Court Affairs (RCA) MEP Contractor: Drake & Scull Int’l.(DSI)
6. COMPLEX FOR MUSCAT ROYAL PHILHARMONIC ORCHESTRA AT NAGAMAT
PHASE –II AT BAIT AL BARAKAH
05 -FEB-2012 TO 20 -JUN-2013 Client: Royal Court Affairs (RCA) Consultant: Consulting Engineering Services (CES) MEP Contractor: Drake & Scull Int’l. (DSI)
7. DIWAN OF ROYAL COURT CLINIC AT SALALAH
02 -FEB-2014 TO 20 -JUN-2014
Client: Royal Court Affairs (RCA) Consultant: National Engineering Office (NEO) MEP Contractor: Drake & Scull Int’l. (DSI)
8. MAIN CONTRACT-2 DEVLOPMENT OF MUSCAT INTERNATIONAL AIRPORT 02 -FEB-2013 TO 27 -JUL-2015
Client: Sultanate of Oman Ministry of Transport and Communications
Consultant: MEP Contractor: Drake & Scull Int’l. (DSI)
9. OMAN CONVENTION AND EXHIBITION CENTER PACKAGE -3
27 -JUL-2015 UP TO NOW
Oman Convention and Exhibition Centre (OCEC) - Scheduled to open in 2017, the larger OCEC complex (Wadi Irfan) will include four hotels, a business park, retail shopping areas and residential districts, surrounded by a nature reserve.] The completed OCEC will also feature the largest fixed seating auditorium in the GCC (3,200 seats) and the largest car park structure in Oman (4,200 spaces), the country’s largest district cooling plant (32,500 refrigeration tons), the largest steel truss span (80 metres) supporting the Exhibition Halls and the largest dome in Oman (120 metre span). Client: OMRAN Consultant: SSH MEP Contractor: Drake & Scull Int’l.
COMPUTER SKILLS
MS office, AutoCAD 2007, Primavera, P3
LANGUAGES
English, Urdu/Hindi, Arabic, Pashto