แบบเขียนสั่งงาน (working drawing)

Embed Size (px)

Citation preview

  • 8/7/2019 (working drawing)

    1/29

    2

    (Working Drawing)

    2.1

    2.2

    (Parts) (Assemblies)

    2.3

    3

  • 8/7/2019 (working drawing)

    2/29

    4

    (Working Drawing)

    2.1 (Main Assembly Draw-ing) (Subassembly) / (Part) (Standard Part-s, Comercial Parts)

    1. (Cover)

    2. (Assembly Drawing)

    3. (Bill of Material)

    4. (Manufacturing Detail Drawing)

    2.4 2

    1. Lanscape

    2. Portrait

    In-ternational sheet sizes US sheet sizes

    2.4.1 International sheet sizes

    International size A4 A3 A2 A1 A0 A4 297 mm x210 mm

    Lanscape

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    3/29

    5

    2.1:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    4/29

    6

    (Working Drawing)

    International sheet size US sheet sizeCode Size (mm) Code Size (inch)A4 297 x 210 A 11 x 8.5

    A3 420 x 297 B 17 x 11A2 594 x 420 C 22 x 17A1 840 x 594 D 34 x 22A0 1188 x 840 E 44 x 34

    2.1: International sheet size US sheet sizes

    2.2: International sheet size US sheet size

    2.1 2.2

    2.4.2 US sheet sizes A B C D E 2.1 International sheet size 2.2

    2.5 (Formal Drawing Header in WorkingDrawings)

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    5/29

    7

    2.3:

    2.3

    1. Border

    2. Location grid

    3. Main title block Secondarytitle block 2.3

    title block

    Units MM (millimeters), M (Meters), IN (inches) FT (feet) 2.4

    Type of Projection

    2.4

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    6/29

    8

    (Working Drawing)

    2.4:

    2.5:

    Scale () full size 2.4

    Owner 2.5

    Part number / Part number Part number Part number 100 % Part number

    Part number 2.6 Part name

    L-Bracket, Base Plate Pillow Bock Part number

    2.6

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    7/29

    9

    2.6: Part number, Part name, EC, Next Assembly Q/M

    EC level Engineering Changes

    Part number EC EC 2.6

    Next ASM Part number 2.6

    Quantity per Machine (Q/M) 2.6

    Approval signatures

    2.7 Drawn by: (Drafter) Checked by:

    Approved by:

    Released by:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    8/29

    10

    (Working Drawing)

    2.7:

    2.8: Additional Information Required for the Fabricator

    2.8

    Material Hardness Surface Threatment

    Default tolerances and Edge/Conrner Breaks

    2.6

    1. Exploded Assembly Drawings

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    9/29

    11

    2.9: Vise Camp

    2. Outline Assembly Drawings

    3. Sectioned Assembly Drawings

    Vise Clamp 2.9

    2.6.1 Exploded Assembly Drawings

    / (Trail) Item Number Balloon

    (Part number) (Part name)

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    10/29

    12

    (Working Drawing)

    2.10: Exploded Drawing Vise Camp

    Part number Item number Balloon Vise Camp

    2.10

    2.6.2 Outline Assembly Drawings

    Outline Assembly Drawings Layout Drawings Vise Camp 2.11

    Bal-loon

    2.6.3 Sectioned Assembly Drawings

    Sectioned Assembly Drawings

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    11/29

    13

    2.11: Layout Drawing Vise Camp

    Balloon Vise Camp 2.12

    2.7 (Bill of Materials, (BOM))

    BOM BOM

    BOM Item num-ber, Part name Part number Item number Item number Item BOMs Part name Part number BOMs 2.10

    2.8

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    12/29

    14

    (Working Drawing)

    2.12: Sectioned Drawing Vise Camp

    ViseCamp 2.13

    2.8.1 (Object Views)

    3

    1.

    2.

    1

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    13/29

    15

    2.13:

    ()

    3.

    4.

    5. note

    6.

    Vise Camp 2.14 - 2.16

    2.8.2 (Notes)

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    14/29

    16

    (Working Drawing)

    2.14: Vise Camp

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    15/29

    17

    2.15: Vise Camp ()

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    16/29

    18

    (Working Drawing)

    2.16: Vise Camp ()

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    17/29

    19

    2.17:

    Main title block Part

    to be cleaned and degreased when completed ( ) All internal edges to be free of burrs () Title block

    2.9

    2.17 Title block Title block 2.18

    2.19

    2.20

    2.21

    2.22

    2.23

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    18/29

    20

    (Working Drawing)

    2.18: Title block Title block

    2.19:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    19/29

    21

    2.20:

    2.21:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    20/29

    22

    (Working Drawing)

    2.22:

    2.24

    Part number 2.25

    Part number 2.26

    Title block 2.27

    Portrait Lanscape 2.28

    2.29

    2.30

    2.31

    2.32

    2.33

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    21/29

    23

    (a)

    (b)

    2.23:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    22/29

    24

    (Working Drawing)

    (a)

    (b)

    2.24:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    23/29

    25

    2.25: Part number

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    24/29

    26

    (Working Drawing)

    2.26: Part number

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    25/29

    27

    2.27: Title block

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    26/29

    28

    (Working Drawing)

    2.28: Portrait Lanscape

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    27/29

    29

    2.29:

    2.30:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    28/29

    30

    (Working Drawing)

    2.31:

    2.32:

    2/2552 Ver. 0.5

  • 8/7/2019 (working drawing)

    29/29

    31

    2.33: