27
METRADO DE ESTRUCTURAS - (BLOQUE - 1) INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº: OBRA : Plano: PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por: FECHA: MARZO -2014 Revisado: 01. ESTRUCTURAS AULAS Descripción Medidas Parcial Total Und. Largo Ancho Altura 01.01 ESTRUCTURAS 01.01.01 TRABAJOS PRELIMINARES 01.01.01.01 LIMPIEZA DE TERRENO MANUAL 1 1 398.80 398.80 M2 01.01.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA 1 1 398.80 398.80 M2 01.01.02 MOVIMIENTO DE TIERRAS 01.01.02.01 EXCAVACION PARA CIMIENTOS-ZAPATAS 141.03 M3 Zapatas Z - 1 20 1 1.30 1.30 2.00 67.60 Z - 2 6 1 1.80 1.80 2.00 38.88 Cim/Vigas cim EJE A, G 2 1 6.85 0.40 1.05 5.75 Depósito 2 1 4.50 0.40 1.05 3.78 EJE B, F 2 1 1.20 0.40 1.05 1.01 EJE B', F' 2 1 0.75 0.40 1.05 0.63 EJE C,E 2 1 7.95 0.40 1.05 6.68 EJE 1'-1' TRAMO C-E 1 1 5.75 0.40 1.05 2.42 EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 1.05 4.70 EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 1.05 2.21 EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 1.05 4.91 EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 1.05 2.46 01.01.02.02 RELLENO Y COMPACTADO MANUAL 22.39 M3 ZAPATAS Z 1 20 1 Area= 1.14 0.60 13.68 Z 2 6 1 Area= 2.42 0.60 8.71 01.01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES Y OTROS 148.29 M3 TOTAL 118.63 148.29 01.01.02.04 ELIMINACION DE MATERIAL EXEDENTE CON MAQUINARIA A 5KM 148.29 148.29 M3 01.01.02.05 NIVELACION Y COMPACTACION PARA FALSO PISOS, VEREDAS Y PATIOS 349.60 M2 Aulas 3 1 area= 59.00 177.00 Depósito 3 1 area= 6.50 19.50 Ss.Hh. 2 1 area= 9.45 18.90 Hall 1 1 area= 63.70 63.70 Vereda perimetral 1 1 area= 70.50 70.50 01.01.03 CONCRETO SIMPLE 01.01.03.01 SOLADOS 01.01.03.01.01 SOLADO E= 2" MEZCLA 1:12 CEMENTO-HORMIGON 32.40 M2 Cim/Vigas cim EJE A, G 2 1 6.85 0.40 5.48 Depósito 3 1 4.50 0.40 5.40 EJE B, F 2 1 1.20 0.40 0.96 EJE B', F' 2 1 0.75 0.40 0.60 EJE C,E 2 1 7.95 0.40 6.36 EJE 1'-1' TRAMO C-E 1 1 5.75 0.40 EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 4.48 EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 2.10 EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 4.68 EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 2.34 01.01.03.01.02 CONCRETO EN SUB ZAPATAS C.H: 1:12+30% PM 26.62 M3 Z 1 20 1 1.30 1.30 0.50 16.90 Z 2 6 1 1.80 1.80 0.50 9.72 01.01.03.02 CIMIENTOS CORRIDOS 3.90 M3 Depósito 3 1 4.50 0.40 0.65 3.51 EJE B', F' 2 1 0.75 0.40 0.65 0.39 01.01.03.03 SOBRE CIMIENTOS 2.10 M3 Depósito 3 1 4.50 0.40 0.35 1.89 EJE B', F' 2 1 0.75 0.40 0.35 0.21 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS HASTA 0.60M. 10.50 M2 Depósito 3 2 4.50 0.35 9.45 EJE B', F' 2 2 0.75 0.35 1.05 01.01.04 CONCRETO ARMADO 01.01.04.01 ZAPATAS 01.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 23.07 M3 “MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC” Nº de Partida Nº de Elem. Nº de Cant.

01 Bloque - 1 Aulas Humaca

Embed Size (px)

DESCRIPTION

METRADOS

Citation preview

Page 1: 01 Bloque - 1 Aulas Humaca

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:

OBRA : Plano:

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:

FECHA: MARZO -2014 Revisado:

01. ESTRUCTURAS AULAS

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

01.01 ESTRUCTURAS

01.01.01 TRABAJOS PRELIMINARES

01.01.01.01 LIMPIEZA DE TERRENO MANUAL 1 1 398.80 398.80 M2

01.01.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA 1 1 398.80 398.80 M2

01.01.02 MOVIMIENTO DE TIERRAS

01.01.02.01 EXCAVACION PARA CIMIENTOS-ZAPATAS 141.03 M3

Zapatas

Z - 1 20 1 1.30 1.30 2.00 67.60

Z - 2 6 1 1.80 1.80 2.00 38.88

Cim/Vigas cim

EJE A, G 2 1 6.85 0.40 1.05 5.75

Depósito 2 1 4.50 0.40 1.05 3.78

EJE B, F 2 1 1.20 0.40 1.05 1.01

EJE B', F' 2 1 0.75 0.40 1.05 0.63

EJE C,E 2 1 7.95 0.40 1.05 6.68

EJE 1'-1' TRAMO C-E 1 1 5.75 0.40 1.05 2.42

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 1.05 4.70

EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 1.05 2.21

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 1.05 4.91

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 1.05 2.46

01.01.02.02 RELLENO Y COMPACTADO MANUAL 22.39 M3

ZAPATAS

Z 1 20 1 Area= 1.14 0.60 13.68

Z 2 6 1 Area= 2.42 0.60 8.71

01.01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES Y OTROS 148.29 M3

TOTAL 118.63 148.29

01.01.02.04 ELIMINACION DE MATERIAL EXEDENTE CON MAQUINARIA A 5KM 148.29 148.29 M3

01.01.02.05 NIVELACION Y COMPACTACION PARA FALSO PISOS, VEREDAS Y PATIOS 349.60 M2

Aulas 3 1 area= 59.00 177.00

Depósito 3 1 area= 6.50 19.50

Ss.Hh. 2 1 area= 9.45 18.90

Hall 1 1 area= 63.70 63.70

Vereda perimetral 1 1 area= 70.50 70.50

01.01.03 CONCRETO SIMPLE

01.01.03.01 SOLADOS

01.01.03.01.01 SOLADO E= 2" MEZCLA 1:12 CEMENTO-HORMIGON 32.40 M2

Cim/Vigas cim

EJE A, G 2 1 6.85 0.40 5.48

Depósito 3 1 4.50 0.40 5.40

EJE B, F 2 1 1.20 0.40 0.96

EJE B', F' 2 1 0.75 0.40 0.60

EJE C,E 2 1 7.95 0.40 6.36

EJE 1'-1' TRAMO C-E 1 1 5.75 0.40

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 4.48

EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 2.10

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 4.68

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 2.34

01.01.03.01.02 CONCRETO EN SUB ZAPATAS C.H: 1:12+30% PM 26.62 M3

Z 1 20 1 1.30 1.30 0.50 16.90

Z 2 6 1 1.80 1.80 0.50 9.72

01.01.03.02 CIMIENTOS CORRIDOS 3.90 M3

Depósito 3 1 4.50 0.40 0.65 3.51

EJE B', F' 2 1 0.75 0.40 0.65 0.39

01.01.03.03 SOBRE CIMIENTOS 2.10 M3

Depósito 3 1 4.50 0.40 0.35 1.89

EJE B', F' 2 1 0.75 0.40 0.35 0.21

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS HASTA 0.60M. 10.50 M2

Depósito 3 2 4.50 0.35 9.45

EJE B', F' 2 2 0.75 0.35 1.05

01.01.04 CONCRETO ARMADO

01.01.04.01 ZAPATAS

01.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 23.07 M3

“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”

Nº de Partida

Nº de Elem.

Nº de Cant.

Page 2: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

Z -1 20 1 1.20 1.20 0.50 14.40

Z -2 6 1 1.70 1.70 0.50 8.67

01.01.04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 643.20 KG

Ver planilla de metrados de acero 1 1 643.20 643.20

01.01.04.02 VIGAS DE CIMENTACION

01.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION 14.69 M3

EJE A, G 2 1 10.20 0.40 0.40 3.26

EJE B, F 2 1 2.15 0.40 0.40 0.69

EJE C,E 2 1 11.80 0.40 0.40 3.78

EJE 1'-1' TRAMO C-E 1 1 7.75 0.40 0.40

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.40 0.40 2.42

EJE 2-2 TRAMO C-D-E 1 1 7.45 0.40 0.40 1.19

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.40 0.40 2.42

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 0.40 0.94

01.01.04.02.02 ACERO F'Y=4200 KG/CM2 GRADO 60 VIGAS DE CIMENTACION 1,546.91 KG

Ver planilla de metrados de acero 1 1 1546.91 1546.91

01.01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION 73.44 M2

EJE A, G 2 2 10.20 0.40 16.32

EJE B, F 2 2 2.15 0.40 3.44

EJE C,E 2 2 11.80 0.40 18.88

EJE 1'-1' TRAMO C-E 1 2 7.75 0.40

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 2 15.10 0.40 12.08

EJE 2-2 TRAMO C-D-E 1 2 7.45 0.40 5.96

EJE 3-3 TRAMO A-B-C-E-F-G 1 2 15.10 0.40 12.08

EJE 4-4 TRAMO A-B-F-G 1 2 5.85 0.40 4.68

01.01.04.03 CIMIENTOS REFORZADOS

01.01.04.03.01 CONCRETO EN CIMIENTOS Y SOBRE CIMIENTOS REFORZADOS 22.69

EJE A, G 2 1 10.20 0.25 1.00 5.10

EJE C,E 2 1 11.80 0.25 1.00 5.90

Puertas 2 -1 1.50 0.25 1.00 -0.75

EJE 1'-1' TRAMO C-E 1 1 7.75 0.25 1.00 1.94

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.25 1.00 3.78

EJE 2-2 TRAMO C-D-E 1 1 7.45 0.25 1.00 1.86

Puertas 1 -1 1.50 0.25 1.00 -0.38

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.25 1.00 3.78

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.25 1.00 1.46

01.01.04.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 538.24 KG

Ver planilla de metrados de acero 1 1 538.24 538.24

01.01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS REFORZADOS 181.50

EJE A, G 2 2 10.20 1.00 40.80

EJE C,E 2 2 11.80 1.00 47.20

Puertas 2 -2 1.50 1.00 -6.00

EJE 1'-1' TRAMO C-E 1 2 7.75 1.00 15.50

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 2 15.10 1.00 30.20

EJE 2-2 TRAMO C-D-E 1 2 7.45 1.00 14.90

Puertas 1 -2 1.50 1.00 -3.00

EJE 3-3 TRAMO A-B-C-E-F-G 1 2 15.10 1.00 30.20

EJE 4-4 TRAMO A-B-F-G 1 2 5.85 1.00 11.70

01.01.04.04 COLUMNAS

01.01.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 9.29 M3

Columna C-1 20 1 0.35 0.25 4.55 7.96

Columna C-2 6 1 0.25 0.25 3.55 1.33

01.01.04.04.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1,992.00 KG

Ver planilla de metrados de acero 1 1 1992.00 1992.00

01.01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 139.50 M2

Columna C-1 20 1 1.20 4.65 111.60

Columna C-2 6 1 1.00 4.65 27.90

01.01.04.05 COLUMNETAS

01.01.04.05.01 CONCRETO EN COLUMNETAS F'C=210 KG/CM2 7.61 M3

Columna Ca-1 34 1 0.25 0.20 2.85 4.85

Columna Ca-2 11 1 0.25 0.20 1.00 0.55

Columna Ca-3 6 1 0.25 0.20 1.75 0.53

Columna Ca-4 15 1 0.25 0.15 3.00 1.69

01.01.04.05.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 920.76 KG

Ver planilla de metrados de acero 1 1 920.76 920.76

01.01.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS 65.36 M2

Columna C-1 34 2 0.20 2.85 38.76

Columna C-2 11 2 0.20 1.00 4.40

Columna C-3 6 2 0.20 1.75 4.20

Columna C-4 15 2 0.20 3.00 18.00

01.01.04.06 VIGAS

Page 3: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

01.01.04.06.01 CONCRETO EN VIGAS F'C=210 KG/CM2 11.29 M3

EJE A, G 2 1 10.20 0.25 0.40 2.04

2 1 2.15 0.25 0.35 0.38

2 2 0.60 0.25 0.20 0.12

2 2 0.60 0.25 0.20 0.12

EJE B, F 2 1 2.15 0.25 0.40 0.43

2 2 0.60 0.25 0.20 0.12

EJE C,E 2 1 11.80 0.25 0.40 2.36

2 2 0.60 0.25 0.20 0.12

EJE 1'-1' TRAMO C-E 1 1 7.75 0.25 0.40 0.78

1 2 0.60 0.25 0.20 0.06

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.25 0.40 1.51

1 2 0.60 0.25 0.20 0.06

EJE 2-2 TRAMO C-D-E 1 1 7.45 0.25 0.40 0.75

1 4 0.60 0.25 0.20 0.12

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.25 0.40 1.51

1 4 0.60 0.25 0.20 0.12

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.25 0.40 0.59

1 4 0.60 0.25 0.20 0.12

01.01.04.06.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1,863.34 KG

Ver planilla de metrados de acero 1 1 1863.34 1863.34

01.01.04.06.03 ENCOFRADO Y DESNCOFRADO NORMAL EN VIGAS 77.63 M2

EJE A, G 2 1 10.20 0.65 13.26

2 1 2.15 0.55 2.37

2 2 0.60 0.60 1.44

2 2 0.60 0.20 0.48

EJE B, F 2 1 2.15 0.65 2.80

2 2 0.60 0.60 1.44

EJE C,E 2 1 11.80 0.65 15.34

2 2 0.60 0.60 1.44

EJE 1'-1' TRAMO C-E 1 1 7.75 0.65 5.04

1 2 0.60 0.60 0.72

EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.65 9.82

1 2 0.60 0.60 0.72

EJE 2-2 TRAMO C-D-E 1 1 7.45 0.65 4.84

1 4 0.60 0.60 1.44

EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.65 9.82

1 4 0.60 0.60 1.44

EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.65 3.80

1 4 0.60 0.60 1.44

01.01.04.07 LOSA ALIGERADA EN VOLADOS DE TECHO

01.01.04.07.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 7.64 M3

CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN VOLADOS 3.91 M3

EJE A,G 2 1 9.25 0.60 0.05 0.56

EJE E,C 2 1 9.25 0.60 0.05 0.56

EJE E',C' 2 1 4.35 0.60 0.05 0.26

EJE 1' 1' 1 1 7.75 0.60 0.05 0.23

EJE 1 1 2 1 7.15 0.60 0.05 0.43

EJE 3 3 2 1 7.75 0.60 0.05 0.46

EJE 2-2 1 1 6.55 0.60 0.05 0.20

CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH

EJE 4-4 TRAMO A-B,F-G 2 1 2.40 5.58 0.05 1.34

2 -1 2.15 0.25 0.05 -0.05

1 -1 5.58 0.25 0.05 -0.07

4 0.1 0.60 0.25 0.05 0.00

CONCRETO EN VIGUETAS DE LOZA ALIGERADA F'C=210 KG/CM2 3.73 M3

EJE A,G 2 2 9.25 0.15 0.15 0.83

EJE E,C 2 2 9.25 0.15 0.15 0.83

EJE E',C' 2 2 4.35 0.15 0.15 0.39

EJE 1' 1' 1 2 7.75 0.15 0.15 0.35

EJE 1 1 2 1 7.15 0.15 0.15 0.32

EJE 3 3 2 1 7.75 0.15 0.15 0.35

EJE 2-2 1 1 6.55 0.15 0.15 0.15

CONCRETO EN VIGUETAS DE LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH

EJE 4-4 TRAMO A-B,F-G 2 7 2.40 0.10 0.15 0.50

01.01.04.07.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN LOZA ALIGERADA 426.77 KG

Ver planilla de metrados de acero 1 1 426.77 426.77

01.01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOZA ALIGERADA 96.19 M2

EJE A,G 2 1 9.25 0.80 14.80

EJE E,C 2 1 9.25 0.80 14.80

EJE E',C' 2 1 4.35 0.80 6.96

EJE 1' 1' 1 1 7.75 0.80 6.20

EJE 1 1 2 1 7.15 0.80 11.44

EJE 3 3 2 1 7.75 0.80 12.40

EJE 2-2 1 1 6.55 0.80 5.24

Page 4: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

SS.HH. 2 1 2.40 5.58 26.76

2 -1 2.15 0.25 -1.08

1 -1 5.58 0.25 -1.39

4 0.1 0.60 0.25 0.06

01.01.04.07.04 LADRILLO DE ARCILLA HUECO 15X30X30 PARA TECHO 465.17 UND

EJE A,G 2 1 9.25 61.67

EJE E,C 2 1 9.25 61.67

EJE E',C' 2 1 4.35 29.00

EJE 1' 1' 1 1 7.75 25.83

EJE 1 1 2 1 7.15 47.67

EJE 3 3 2 1 7.75 51.67

EJE 2-2 1 1 6.55 21.83

0.00

SS.HH. 2 6 5.58 223.00

2 -1 5.58 -37.17

4 -6 0.25 -20.00

01.01.05 JUNTAS DE CONSTRUCCION

01.01.05.01 JUNTAS DE TEKNOPOR DE 1" 50.19 M

EJE A-A TRAMO 1'-1,2,3,4 1 8 0.25 3.65 7.30

EJE B-B TRAMO 1-2-3-4 1 7 0.25 3.65 6.39

EJE C-C TRAMO 1'-1,2,3,4 1 11 0.25 3.65 10.04

EJE D-D TRAMO 1'-1-2-3-4 1 4 0.25 3.65 3.65

EJE E-E TRAMO 1'- 1,2,3,4 1 10 0.25 3.65 9.13

EJE F-F TRAMO 1'-1-2-3-4 1 6 0.25 3.65 5.48

EJE G-G TRAMO 1'-1-2-3-4 1 9 0.25 3.65 8.21

01.01.06 ESTRUCTURAS METALICAS

01.01.06.01 TIJERAL METALICO, TIPO - 01 1 3 3.00 3.00 UND

01.01.06.02 TIJERAL METALICO, TIPO - 02 1 6 6.00 6.00 UND

01.01.06.03 TIJERAL METALICO, TIPO - 03 1 20 20.00 20.00 UND

01.01.06.04 TIJERAL METALICO, TIPO - 04 1 20 20.00 20.00 UND

01.01.06.05 TIJERAL METALICO, TIPO - 05 1 2 2.00 2.00 UND

01.01.06.06 TIJERAL METALICO, TIPO - 06 1 2 2.00 2.00 UND

01.01.06.07 TIJERAL METALICO, TIPO - 07 1 2 2.00 2.00 UND

01.01.06.08 TIJERAL METALICO, TIPO - 08 1 10 10.00 10.00 UND

01.01.06.09 TIJERAL METALICO, TIPO - 09 1 2 2.00 2.00 UND

01.01.06.10 TIRANTES DE TUBO LAC 2''*3''X2.5MM 1 1 55.50 55.50 55.50 ML

01.01.06.11 CORREAS DE TUBO LAC 2''X3''X2.5MM 1 1 315.88 315.88 315.88 ML

01.01.06.12 CORREAS DE TUBO LAC 2''X2''X2.5MM 1 1 80.70 80.70 80.70 ML

01.01.07 COBERTURA

01.01.07.01 COBERTURA DE POLICARBONATO 65.60 M2

PATIO 1 1 AREA=65.60 65.60

01.01.07.02 COBERTURA DE TEJA ANDINA 275.56 M2

Bloque - Aulas 1 1 area= 275.56 275.56

01.01.07.03 CUMBRERA DE TEJA ANDINA 73.00 M

Bloque - Aulas 1 1 73.00 73.00

01.01.08 PRUEBAS

01.01.08.01 PRUEBAS DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 10 1 10.00 10.00 UND

Page 5: 01 Bloque - 1 Aulas Humaca

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº: 1

OBRA : Plano:

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:

FECHA: MARZO -2014 Revisado:

Partida Descripción Ø

Clasificacion (m) Peso Peso

1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

1.05 CONCRETO ARMADO

01.04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 643.20

Zapata - 1

Longitudinal 5/8" 20 6 1.00 120.00 1.6 192.00

Transversal 5/8" 20 6 1.00 120.00 1.6 192.00

Zapata - 2

Longitudinal 5/8" 6 9 1.50 81.00 1.6 129.60

Transversal 5/8" 6 9 1.50 81.00 1.6 129.60

01.04.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 538.24

Longitudinal 3/8" 1 4 103.00 412.00 0.58 238.96

Transversal 3/8" 1 344 1.50 516.00 0.58 299.28

01.04.02.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION 1,546.91

EJE A-A TRAMO 1,2,3,4 5/8" 14 12.05 48.20 1.6 77.12

EJE B-B TRAMO 3,4 5/8" 14 2.95 11.80 1.6 18.88

EJE C-C TRAMO 1'-1,2,3 5/8" 14 13.65 54.60 1.6 87.36

EJE E-E TRAMO 1' 1,2,3 5/8" 14 13.65 54.60 1.6 87.36

EJE F-F TRAMO 3,4 5/8" 14 2.95 11.80 1.6 18.88

EJE G-G TRAMO 1-2-3-4 5/8" 14 12.05 48.20 1.6 77.12

EJE 1'-1' TRAMO C-E 5/8" 14 8.80 35.20 1.6 56.32

EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 14 17.80 71.20 1.6 113.92

EJE 2-2 TRAMO C-D-E 5/8" 14 8.80 35.20 1.6 56.32

EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 14 17.80 71.20 1.6 113.92

EJE 4-4 TRAMO A-B-F-G 5/8" 14 9.78 39.12 1.6 62.59

“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”

Nº Elemento Iguales

Nº Piezas por

Elemento

Longitud por Pieza

(m)

Longitud Parcial

(m)

Page 6: 01 Bloque - 1 Aulas Humaca

Partida Descripción Ø

Clasificacion (m) Peso Peso

1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

Nº Elemento Iguales

Nº Piezas por

Elemento

Longitud por Pieza

(m)

Longitud Parcial

(m)

ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION

EJE A-A TRAMO 1,2,3,4 1/2" 12 12.05 24.10 1.02 24.58

EJE B-B TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02

EJE C-C TRAMO 1'-1,2,3 1/2" 12 13.65 27.30 1.02 27.85

EJE E-E TRAMO 1' 1,2,3 1/2" 12 13.65 27.30 1.02 27.85

EJE F-F TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02

EJE G-G TRAMO 1-2-3-4 1/2" 12 12.05 24.10 1.02 24.58

EJE 1'-1' TRAMO C-E 1/2" 12 8.80 17.60 1.02 17.95

EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 12 17.80 35.60 1.02 36.31

EJE 2-2 TRAMO C-D-E 1/2" 12 8.80 17.60 1.02 17.95

EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 12 17.80 35.60 1.02 36.31

EJE 4-4 TRAMO A-B-F-G 1/2" 12 9.78 19.56 1.02 19.95

ESTRIBOS EN VIGAS DE CIMENTACION

EJE A-A TRAMO 1,2,3,4 3/8" 159 1.20 70.80 0.58 41.06

EJE B-B TRAMO 3,4 3/8" 115 1.20 18.00 0.58 10.44

EJE C-C TRAMO 1'-1,2,3 3/8" 144 1.20 52.80 0.58 30.62

EJE E-E TRAMO 1' 1,2,3 3/8" 144 1.20 52.80 0.58 30.62

EJE F-F TRAMO 3,4 3/8" 115 1.20 18.00 0.58 10.44

EJE G-G TRAMO 1-2-3-4 3/8" 159 1.20 70.80 0.58 41.06

EJE 1'-1' TRAMO C-E 3/8" 180 1.20 96.00 0.58 55.68

EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 1160 1.20 192.00 0.58 111.36

EJE 2-2 TRAMO C-D-E 3/8" 180 1.20 96.00 0.58 55.68

EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 1160 1.20 192.00 0.58 111.36

EJE 4-4 TRAMO A-B-F-G 3/8" 148 1.20 57.60 0.58 33.41

01.04.04.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1,992.00

Page 7: 01 Bloque - 1 Aulas Humaca

Partida Descripción Ø

Clasificacion (m) Peso Peso

1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

Nº Elemento Iguales

Nº Piezas por

Elemento

Longitud por Pieza

(m)

Longitud Parcial

(m)

Columna C-1 5/8" 20 4 6.45 516.00 1.6 825.60

1/2" 20 2 6.45 258.00 1.02 263.16

Columna C-2 5/8" 6 6 5.35 192.60 1.6 308.16

ESTRIBOS

ESTRIBO EN C 1 3/8" 2036 1.20 864.00 0.58 501.12

ESTRIBO EN C 2 3/8" 630 0.90 162.00 0.58 93.96

01.05.05 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 920.76

Columna C-1 3/8" 34 4 3.60 489.60 0.58 283.97

Columna C-2 3/8" 11 4 1.70 74.80 0.58 43.38

Columna C-3 3/8" 6 4 3.15 75.60 0.58 43.85

Columna C-4 3/8" 15 4 3.75 225.00 0.58 130.50

ESTRIBOS EN COLUMNETAS

Columna C-1 3/8" 34 41 0.75 1045.50 0.25 261.38

Columna C-2 3/8" 11 25 0.75 206.25 0.25 51.56

Columna C-3 3/8" 6 38 0.75 171.00 0.25 42.75

Columna C-4 3/8" 15 26 0.65 253.50 0.25 63.38

01.05.06.1 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1,863.34

EJE A-A TRAMO 1,2,3,4 5/8" 14 13.40 53.60 1.6 85.76

EJE B-B TRAMO 3,4 5/8" 14 3.80 15.20 1.6 24.32

EJE C-C TRAMO 1'-1,2,3 5/8" 14 15.15 60.60 1.6 96.96

EJE D-D TRAMO 1'-2 5/8" 14 1.50 6.00 1.6 9.60

EJE E-E TRAMO 1' 1,2,3 5/8" 14 14.30 57.20 1.6 91.52

EJE F-F TRAMO 3,4 5/8" 14 3.30 13.20 1.6 21.12

EJE G-G TRAMO 1-2-3-4 5/8" 14 13.40 53.60 1.6 85.76

Page 8: 01 Bloque - 1 Aulas Humaca

Partida Descripción Ø

Clasificacion (m) Peso Peso

1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

Nº Elemento Iguales

Nº Piezas por

Elemento

Longitud por Pieza

(m)

Longitud Parcial

(m)

EJE 1'-1' TRAMO C-E 5/8" 14 9.40 37.60 1.6 60.16

EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 14 27.00 108.00 1.6 172.80

EJE 2-2 TRAMO A-B-C-D-E-F-G 5/8" 14 27.00 108.00 1.6 172.80

EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 14 20.10 80.40 1.6 128.64

EJE 4-4 TRAMO A-B-F-G 5/8" 14 10.28 41.12 1.6 65.79

EJE A-A TRAMO 1,2,3,4 1/2" 12 12.05 24.10 1.02 24.58

EJE B-B TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02

EJE C-C TRAMO 1'-1,2,3 1/2" 12 13.65 27.30 1.02 27.85

EJE E-E TRAMO 1' 1,2,3 1/2" 12 13.65 27.30 1.02 27.85

EJE F-F TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02

EJE G-G TRAMO 1-2-3-4 1/2" 12 12.05 24.10 1.02 24.58

EJE 1'-1' TRAMO C-E 1/2" 12 8.80 17.60 1.02 17.95

EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 12 17.80 35.60 1.02 36.31

EJE 2-2 TRAMO C-D-E 1/2" 12 8.80 17.60 1.02 17.95

EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 12 17.80 35.60 1.02 36.31

EJE 4-4 TRAMO A-B-F-G 1/2" 12 9.78 19.56 1.02 19.95

EJE A-A TRAMO 1,2,3,4 3/8" 163 1.20 75.60 0.58 43.85

EJE B-B TRAMO 3,4 3/8" 119 1.20 22.80 0.58 13.22

EJE C-C TRAMO 1'-1,2,3 3/8" 152 1.20 62.40 0.58 36.19

EJE E-E TRAMO 1' 1,2,3 3/8" 152 1.20 62.40 0.58 36.19

EJE F-F TRAMO 3,4 3/8" 119 1.20 22.80 0.58 13.22

EJE G-G TRAMO 1-2-3-4 3/8" 163 1.20 75.60 0.58 43.85

EJE 1'-1' TRAMO C-E 3/8" 184 1.20 100.80 0.58 58.46

EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 1168 1.20 201.60 0.58 116.93

Page 9: 01 Bloque - 1 Aulas Humaca

Partida Descripción Ø

Clasificacion (m) Peso Peso

1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

Nº Elemento Iguales

Nº Piezas por

Elemento

Longitud por Pieza

(m)

Longitud Parcial

(m)

EJE 2-2 TRAMO C-D-E 3/8" 1168 1.20 201.60 0.58 116.93

EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 1130 1.20 156.00 0.58 90.48

EJE 4-4 TRAMO A-B-F-G 3/8" 148 1.20 57.60 0.58 33.41

01.04.07.02 LOZA ALIGERADA 426.77

ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGUETAS

EJE A-A TRAMO 1,2,3,4 1/2" 1 4 11 44.00 1.02 44.88

EJE C-C TRAMO 1'-1,2,3 1/2" 1 4 13 52.00 1.02 53.04

EJE E-E TRAMO 1,2,3 1/2" 1 4 13 52.00 1.02 53.04

EJE G-G TRAMO 1-2-3-4 1/2" 1 4 9.3 37.20 1.02 37.94

EJE 1'-1' TRAMO C-E 1/2" 1 4 7.01 28.04 1.02 28.60

EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 4 15.11 60.44 1.02 61.65

EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 1 4 6.91 27.64 1.02 28.19

EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 4 7.55 30.20 1.02 30.80

EJE 4-4 TRAMO A-B-F-G 1/2" 1 4 7.76 31.04 1.02 31.66

ACERO DE TEMPERATURA

EJE A-A TRAMO 1,2,3,4 1/2" 1 2 11 22.00 0.25 5.50

EJE C-C TRAMO 1'-1,2,3 1/2" 1 2 13 26.00 0.25 6.50

EJE E-E TRAMO 1,2,3 1/2" 1 2 13 26.00 0.25 6.50

EJE G-G TRAMO 1-2-3-4 1/2" 1 2 9.3 18.60 0.25 4.65

EJE 1'-1' TRAMO C-E 1/2" 1 2 7.01 14.02 0.25 3.51

EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 2 15.11 30.22 0.25 7.56

EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 1 2 6.91 13.82 0.25 3.46

EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 2 7.55 15.10 0.25 3.78

EJE 4-4 TRAMO A-B-F-G 1/2" 1 8 7.76 62.08 0.25 15.52

Page 10: 01 Bloque - 1 Aulas Humaca

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:

OBRA : Plano:

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OCOBAMBA Hecho por:

FECHA: OCTUBRE -2015 Revisado:

02. ARQUITECTURA AULAS

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

01.02 ARQUITECTURA

01.02.01 OBRAS DE CONCRETO SIMPLE

01.02.01 VEREDA

01.02.01.01.01 VEREDA DE CONCRETO DE 6" Y BRUÑADO 58.95 M2

Fachada principal 1 1 area= 25.47 25.47

Fachada posterior y laterales 1 1 area= 33.48 33.48

01.02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS 13.18 M2

Fachada principal 1 1 perimet= 22.55 0.20 4.51

Fachada posterior y laterales 1 1 perimet= 43.37 0.20 8.67

01.02.01.01.03 JUNTAS ASFALTICAS EN VEREDAS 19.60 M

Fachada principal 6 1 1.10 6.60

Fachada posterior y laterales 13 1 1.00 13.00

01.02.01.02 CUNETA DE EVACUACION PLUVIAL

01.02.01.02.01 CONCRETO EN CUNETA F'C= 175KG/CM2 7.48 M3

Fachada principal 1 1 28.00 area= 0.09 2.38

Fachada posterior y laterales 1 1 60.00 area= 0.09 5.10

01.02.01.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETA 35.20 M2

Fachada principal 2 1 28.00 0.20 11.20

Fachada posterior y laterales 2 1 60.00 0.20 24.00

01.02.02 MUROS Y TABIQUES

01.02.02.01 MURO DE CABEZA LADRILLO KIN-KONG DE ARCILLA area 108.61 M2

Eje 1'-1' entre A-G 1 1 10.22 10.22

Eje 2-2 entre D-E- F 2 1 2.64 5.28

Eje 3-3 entre C-E-F-G 1 1 27.66 27.66

Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55

Eje A-A entre 1-4 8 1 0.92 7.36

Eje G-G entre 1-4 1 1 11.86 11.86

Eje B- B entre 1-4 1 1 26.68 26.68

01.02.02.02 MURO DE SOGA LADRILLO KIN-KONG DE ARCILLA 12.22 M2

Deposito de aulas 1-2-3 2 1 6.11 12.22

01.02.03 REVOQUES ENLUCIDOS Y MOLDURAS

01.02.03.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 1:5 area 93.01 M2

Aula - 1 (SS.HH Niñas) 1 1 54.14 54.14

Aula - 3 (SS.HH Niños) 1 1 38.87 38.87

01.02.03.02 TARRAJEO EN MUROS EXTERIORES MEZCLA 1:5 CEMENTO:ARENA area 45.90 M2

Eje 1'-1' entre A-G 1 1 10.22 10.22

Eje 2-2 entre D-E- F 2 1 2.64 5.28

Eje 3-3 entre C-E-F-G 1 1 27.66 27.66

Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55

Eje A-A entre 1-4 8 1 0.92 7.36

Eje G-G entre 1-4 1 1 11.86 11.86

Eje B- B entre 1-4 1 1 26.68 26.68

01.02.03.03 TARRAJEO EN MUROS INTERIORES MEZCLA 1:5 CEMENTO:ARENA 159.73 M2

Eje 1'-1' entre A-G 1 1 10.22 10.22

Eje 2-2 entre D-E- F 2 1 2.64 5.28

Eje 3-3 entre C-E-F-G 1 1 27.66 27.66

Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55

Eje A-A entre 1-4 8 1 0.92 7.36

Eje G-G entre 1-4 1 1 11.86 11.86

Eje C-C entre 1-4 2 1 26.68 53.36

Deposito de aulas 1-2-3 2 2 6.11 24.44

“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL N, PROVINCIA DE CHINCHEROS, REGIÓN APURIMAC”

Nº de Partida

Nº de Elem.

Nº de Cant.

Page 11: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

01.02.03.04 TARRAJEO DE SUPERFICIE COLUMNAS INCL. ARISTAS MEZCLA 1:5 CEMENTO:ARENA 78.60 M2

Columna C-1 20 1 1.20 3.00 72.00

Columna C-2 3 1 1.00 2.20 6.60

01.02.03.05 TARRAJEO DE SUPERF.VIGAS INCL.ARISTAS, MEZCLA 1:5 CEMENTO:ARENA 50.50 M2

Eje 1-1 entre A-G 1 1 26.76 0.80 21.41

Eje 3-3 entre C-G 1 1 13.51 0.80 10.81

Eje 4-4 entre A-C 1 1 6.00 0.80 4.80

Eje 4-4 entre C-D 1 1 2.85 0.80 2.28

Eje 4-4 entre F-G 1 1 2.95 0.80 2.36

Eje A,C y G entre 1-4 1 1 11.05 0.80 8.84

01.02.03.06 VESTIDURA DE DERRAMES 218.66 M

V - 1 2 1 7.20 14.40

V - 2 2 1 7.50 15.00

V - 3 2 1 6.90 13.80

V - 4 2 1 6.56 13.12

V - 5 14 1 6.26 87.64

V - 6 1 1 6.70 6.70

V - 7 1 1 6.50 6.50

V - 8 4 1 2.20 8.80

V - 9 2 1 2.90 5.80

P - 1 3 1 7.50 22.50

P - 2 2 1 6.90 13.80

P - 3 2 1 5.30 10.60

01.02.03.07 BRUÑA DE 1CM ENTRE MUROS Y ESTRUCTURAS 230.60 M

VIGAS

Eje 1-1 entre A-B-C-D-E-F-G 2 1 5.28 10.56

Eje 3-3 entre C-G 2 1 7.71 15.42

Eje 4-4 entre A-G 2 1 4.15 8.30

Eje C-C entre 1-4 2 1 8.86 17.72

Eje G-G entre 3-4 2 1 2.10 4.20

COLUMNAS

Columna C-1 53 1 3.00 159.00

Columna C-2 7 1 2.20 15.40

01.02.04 CIELORRASOS

01.02.04.01 CIELORRASOS CON BALDOSA 162.32 M2

Aulas 1 1 1 area= 56.10 56.10

Aulas 2 2 1 area= 40.60 81.20

Deposito 2 1 area= 6.10 12.20

SS.HH. 2 1 area= 6.41 12.82

01.02.04.02 CIELORASO DE CEMENTO Y ARENA 39.56 M2

Fachada pricipal 1 1 23.70 0.60 14.22

Fachada posterior y laterales 1 1 42.23 0.60 25.34

01.02.05 PISOS Y PAVIMENTOS

01.02.05.01 FALSO PISO F'c=175 kg/cm2 162.32 M2

Aulas 1 1 1 area= 56.10 56.10

Aulas 2 2 1 area= 40.60 81.20

Deposito 2 1 area= 6.10 12.20

SS.HH. 2 1 area= 6.41 12.82

01.02.05.02 DURMIENTES DEMADERA AGUANO 2.5''X3''X3.5M 280.50 ML

Aulas 1-2-3 3 1 10 9.35 280.50

01.02.05.03 CONTRAPISO DE 48 MM. 162.32 M2

Aulas 1 1 1 area= 56.10 56.10

Aulas 2 2 1 area= 40.60 81.20

Deposito 2 1 area= 6.10 12.20

SS.HH. 2 1 area= 6.41 12.82

01.02.05.04 PISO DE CERAMICO ANTIDESLIZANTE AT. 0.60x0.60 M 162.32 M2

Aulas 1 1 1 area= 56.10 56.10

Aulas 2 2 1 area= 40.60 81.20

Deposito 2 1 area= 6.10 12.20

SS.HH. 2 1 area= 6.41 12.82

Page 12: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

01.02.05.05 PISO DE MADERA MACHIMBREADA AGUANO 96.70 M2

Aulas 1-2-3 1 1 area= 96.70 96.70

01.02.06 ZOCALOS Y CONTRAZOCALOS

01.02.06.01 ZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM. DE H=0.30CM. 65.92 M

Fachada principal, posterior y lateral 1 1 perimet= 65.92 65.92

01.02.06.02 CONTRAZOCALO DE MAYOLICA DE 20x20CM. 23.28 M2

SS.HH (niños y niñas) 2 1 9.70 1.20 23.28

01.02.06.03 CONTRAZOCALO DE CERAMICO DE 40 x 40 CM. H=10CM. 19.56 M

Deposito (aulas 1-2-3) 2 1 perimet= 9.78 19.56

01.02.06.04 CONTRAZOCALO DE MADERA AGUANO H=10CM. 92.10 M

Aulas 1-2-3 3 1 perimet= 30.70 92.10

01.02.07 CARPINTERIA DE MADERA

01.02.07.01 PUERTA DE MADERA CEDRO NACIONAL C/ SOBRELUZ 18.90 M2

P - 1 3 1 1.50 3.00 13.50

P - 3 2 1 0.90 3.00 5.40

01.02.07.02 PUERTA CONTRAPLACADA CON PLANCHA DE TRIPLAY DE 6mm. C/SOBRELUZ 3.96 M2

P - 2 2 1 0.90 2.20 3.96

01.02.08 CARPINTERIA METALICA

01.02.08.01 DIVISION CON MELAMINE SOBRE ESTRUCTURA DE ALUMINIO 10.80 M2

SS.HH (niños y niñas) 2 2 1.5 1.80 10.80

01.02.08.02 PUERTA MELAMINE CON MARCO DE ALUMINIO 5.04 M2

SS.HH (niños y niñas) 2 2 0.70 1.80 5.04

01.02.09 CERRAJERIA

01.02.09.01 BISAGRA CAPUCHINA DE 4" 10.50 PAR

P - 1 3 1.5 4.50

P - 2 2 1.5 3.00

P - 3 2 1.5 3.00

01.02.09.02 CERRADURA PARA PUERTA DE TRES GOLPES 3.00 PZA

P - 1 3 1 3.00

01.02.09.03 CERRADURA DE PERILLA CON SEGURIDAD INTERIOR 4.00 PZA

P - 2 2 1 2.00

P - 3 2 1 2.00

01.02.09.04 PICAPORTE DE 4" 7.00 UND

P - 1 3 1 3.00

P - 2 2 1 2.00

P - 3 2 1 2.00

01.02.10 VIDRIOS, CRISTALES Y SIMILARES

01.02.10.01 VIDRIO TEMPLADO DE 8MM. INCLUYE PROTECTOR 629.33 P2

V - 1 2 1 1.50 2.10 67.81

V - 2 2 1 1.65 2.10 74.59

V - 3 2 1 1.35 2.10 61.03

V - 4 2 1 1.18 2.10 53.35

V - 5 14 1 1.03 2.10 325.96

V - 6 1 1 2.95 0.40 12.70

V - 7 1 1 2.85 0.40 12.27

V - 8 2 1 1.05 0.40 9.04

V - 9 4 1 0.73 0.40 12.57

01.02.10.02 VIDRIO CRUDO INCOLORO DE 6MM. 47.47 P2

P - 1 3 1 1.50 0.70 33.91

P - 2 2 1 0.90 0.70 13.56

01.02.10.03 ESPEJO BISELADO DE 6MM S/PLANOS 21.10 P2

SS.HH (niños y niñas) 2 2 0.70 0.70 21.10

01.02.11 PINTURA

01.02.11.01 PINTURA EN CIELORRASO 14.22 M2

Fachada pricipal 1 1 23.70 0.60 14.22

Fachada posterior y laterales 1 1 42.23 0.60 25.34

01.02.11.02 PINTURA EN EXTERIORES 108.61 M2

Eje 1'-1' entre A-G 1 1 10.22 10.22

Page 13: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

Eje 2-2 entre D-E- F 2 1 2.64 5.28

Eje 3-3 entre C-E-F-G 1 1 27.66 27.66

Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55

Eje A-A entre 1-4 8 1 0.92 7.36

Eje G-G entre 1-4 1 1 11.86 11.86

Eje B- B entre 1-4 1 1 26.68 26.68

01.02.11.03 PINTURA EN INTERIORES 159.73 M2

Eje 1'-1' entre A-G 1 1 10.22 10.22

Eje 2-2 entre D-E- F 2 1 2.64 5.28

Eje 3-3 entre C-E-F-G 1 1 27.66 27.66

Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55

Eje A-A entre 1-4 8 1 0.92 7.36

Eje G-G entre 1-4 1 1 11.86 11.86

Eje C-C entre 1-4 2 1 26.68 53.36

Deposito de aulas 1-2-3 2 2 6.11 24.44

01.02.11.04 PINTURA EN COLUMNAS 78.60 M2

Columna C-1 20 1 1.20 3.00 72.00

Columna C-2 3 1 1.00 2.20 6.60

01.02.11.05 PINTURA EN VIGAS 41.66 M2

Eje 1-1 entre A-G 1 1 26.76 0.80 21.41

Eje 3-3 entre C-G 1 1 13.51 0.80 10.81

Eje 4-4 entre A-C 1 1 6.00 0.80 4.80

Eje 4-4 entre C-D 1 1 2.85 0.80 2.28

Eje 4-4 entre F-G 1 1 2.95 0.80 2.36

Eje A,C y G entre 1-4 1 1 11.05 0.80 8.84

01.02.11.06 PINTURA EN VESTIDURA DE DERRAMES 218.66 M

V - 1 2 1 7.20 14.40

V - 2 2 1 7.50 15.00

V - 3 2 1 6.90 13.80

V - 4 2 1 6.56 13.12

V - 5 14 1 6.26 87.64

V - 6 1 1 6.70 6.70

V - 7 1 1 6.50 6.50

V - 8 4 1 2.20 8.80

V - 9 2 1 2.90 5.80

P - 1 3 1 7.50 22.50

P - 2 2 1 6.90 13.80

P - 3 2 1 5.30 10.60

01.02.11.07 PINTURA EN CONTRAZOCALOS Y ZOCALOS H= 0.30M C/ESMALTE 56.10 M

Fachada principal, posterior y lateral 1 1 perimet= 56.10 56.10

01.02.11.08 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 23.30 M2

P - 1 3 1 1.50 3.00 13.50

P - 2 2 1 0.90 3.00 5.40

P - 3 2 1 1.00 2.20 4.40

01.02.12 APARATOS Y ACCESORIOS SANITARIOS

01.02.12.01 INODORO SIFON JETT BLANCO COLOCADO, PARA NIÑOS 4.00 PZA

SS.HH (niños y niñas) 2 2 4.00

01.02.12.02 LAVATORIO OVALIN SOBREPONER BLANCO COLOCADO 4.00 PZA

SS.HH (niños y niñas) 2 2 4.00

01.02.12.03 PAPELERA DE LOZA BLANCA DE 13x15 4.00 UND

SS.HH (niños y niñas) 2 2 4.00

01.02.12.04 JABONERA DE LOSA COLOR BLANCO 4.00 UND

SS.HH (niños y niñas) 2 2 4.00

01.02.12.05 MESA DE CONCRETO PARA LAVATORIOS 3.45 ML

SS.HH (niños y niñas) 1 1 3.45 3.45

01.02.13 SISTEMA DE SEGURIDAD, MANTENIMIENTO Y SEÑALIZACION

01.02.13.01 SISTEMA DE SEGURIDAD Y SEÑALIZACION 1.00 GLB

Bloque 1 Aulas 1 1 1.00

Page 14: 01 Bloque - 1 Aulas Humaca

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Partida

Nº de Elem.

Nº de Cant.

01.02.14 OBRAS COMPLEMENTARIAS

01.02.14.01 Tapa junta vanos y columnas 1 24 3.00 72.00 72.00 m

Page 15: 01 Bloque - 1 Aulas Humaca

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION INSTITUCION EDUCATIVA INICIAL Hoja Nº:

OBRA : Plano:

PROPIETARIO MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:

FECHA: MARZO -2014 Revisado:

03. INSTALACIONES ELECTRICAS

DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

01.03 INSTALACIONES ELECTRICAS Y SISTEMAS ESPECIALES

01.03.01 INSTALACIONES ELECTRICAS

01.03.01.01 TABLEROS

01.03.01.01.0 TABLERO DE DISTRIBUCION T.D. - 1 1 1 1.00 1.00 Eqp

01.03.01.01.0 SUMINSTRO E INSTALACION DE POZO DE PUESTA ATIERRA 1 1 1.00 1.00 JGO

01.03.01.02 DUCTOS O TUBERIAS

01.03.01.02.0 TUBERIA PVC - P Ø 25 mm 1 4 4.00 4.00 m

01.03.01.02.0 TUBERIA PVC - P Ø 20 mm 340.00 m

ILUMINACION 1 220 220.00TOMACORRIENTE 1 90 90.00LUZ DE EMERGENCIA 1 30 30.00

01.03.01.03 CABLEADO

01.03.01.03.0 INSTALACION DE CABLE 2X2.5mm2 ILUMINACION 1 220 220.00 220.00 m

01.03.01.03.0 INSTALACION DE CABLE 2X4.0mm2 + 1X2.5mm2 TOMACORRIENTES 1 90 90.00 90.00 m

01.03.01.03.0 INSTALACION DE CABLE 2X4.0mm2 + 1X2.5mm2 LUZ DE EMERGENCIA 1 30 30.00 30.00 m

01.03.01.04 SALIDA PARA CENTRO DE LUZ

01.03.01.04.0 SALIDA PARA CENTRO DE LUZ 46.00 PTO

Aula - 03 años 7 1 7.00 Aula - 04 años 7 1 7.00 Aula - 05 años 7 1 7.00 Deposito 3 1 3.00 SS.HH 4 1 4.00Aleros exteriores 18 1 18.00

01.03.01.05 ARTEFACTOS DE ILUMINACION

01.03.01.05.0 Artefacto para enpotrar, con 02 fluorecente lineales de 36W, con rejilla y sistema optico parabolico 21.00 UND Aula - 03 años 7 1 7.00 Aula - 04 años 7 1 7.00 Aula - 05 años 7 1 7.00

01.03.01.05.0 Artefacto para enpotrar, con fluorecente circular de 36W, con difusor acrílico balnco opalino 25.00 UND Deposito 3 1 3.00 SS.HH 4 1 4.00Aleros exteriores 18 1 18.00

01.03.01.05.0 Artefacto para enpotrar, Luz de meregencia 8.00 UND8 1 8.00

01.03.01.06 INTERRUPTORES

01.03.01.06.0 SALIDA PARA INTERRUPTOR SIMPLE, INCLUYE INSTALACION DE INTERRUPTOR 5.00 PTO

Deposito 3 1 3.00 SS.HH 2 1 2.00

01.03.01.06.0 SALIDA PARA INTERRUPTOR DOBLE, INCLUYE INSTALACION DE INTERRUPTOR 6.00 PTO

Aula - 03 años 1 1 1.00 Aula - 04 años 1 1 1.00 Aula - 05 años 1 1 1.00Aleros exteriores 3 1 3.00

01.03.01.06.0 SALIDA PARA INTERRUPTOR CONMUTADO, INCLUYE INSTALACION DE INTERRUPTOR 4.00 PTO

Aleros exteriores 4 1 4.00

01.03.01.07 TOMACORRIENTES

01.03.01.07.0 27.00 PTO Aula - 03 años 8 1 8.00 Aula - 04 años 8 1 8.00 Aula - 05 años 8 1 8.00 Deposito 3 1 3.00

01.03.01.07.0 3.00 PTO

Aula - 03 años 1 1 1.00 Aula - 04 años 1 1 1.00 Aula - 05 años 1 1 1.00

01.03.01.07.0 SALIDA PARA LUZ DE EMERGENCIA, INCLUYE INSTALACION DE TOMACORRIENTE 8.00 PTOAulas y Exteriores 8 1 8.00

01.03.02 SISTEMAS ESPECIALES

01.03.02.01.0 TUBERIA PVC - P Ø 25 mm 55.00 m

RED DE DATA 1 23 23.00RED TV 1 32 32.00

01.03.02.01.0 TUBERIA PVC - P Ø 20 mm 31.00 m

RED VIDEO PROYECTOR 1 18 18.00RED TIMBRE/SONIDO 1 13 13.00

01.03.02.01.0 INSTALACION DE CABLE UTP CAT. 8 1 23 23.00 23.00 m

01.03.02.01.0 INSTALACION DE CABLE TV 1 32 32.00 32.00 m

01.03.02.01.0 INSTALACION DE CABLE PARA VIDEO PROYECTOR 1 18 18.00 18.00 m

01.03.02.01.0 INSTALACION DE CABLE PARA TIMBRE/SONIDO 1 13 13.00 13.00 m

01.03.02.01.0 SALIDA PARA RED DE DATOS 3.00 PTO3 1 3.00

01.03.02.01.0 Salida para proyector Multimedia, para empotrar, con 01 puerto 3.00 PTO3 1 3.00

01.03.02.01.0 Salida para TV por cable con tapa ciega 3.00 PTO3 1 3.00

01.03.02.01.1 SALIDA PARA EQUIPO PARLANTE 2.00 PTO2 1 2.00

01.03.02.02 CAJAS METALICAS CON TAPA

01.03.02.02.0 instalacion de cajas metalicas de cajas de 20x20x10 6 1 6.00 6.00 pto01.03.02.02.0 instalacion de cajas metalicas de cajas de 15x15x10 4 1 4.00 4.00 pto

“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”

Nº de Partida

Nº de Elem.

Nº de Cant.

SALIDA PARA TOMACORRIENTES DOBLE CON PUESTA TIERRA, INCLUYE INSTALACION DE TOMACORRIENTE

SALIDA PARA TOMACORRIENTES EMPOTRADO EN TECHO CON PUESTA TIERRA, INCLUYE INSTALACION DE TOMACORRIENTE

Page 16: 01 Bloque - 1 Aulas Humaca

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:

OBRA : Plano:

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:

FECHA: MARZO -2014 Revisado:

04. INSTALACIONES SANITARIAS

Nº de Partida DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

01.04 INSTALACIONES SANITARIAS

01.04.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

INSTALACIONES INTERIORES01.04.01.01 TRAZO Y REPLANTEO 51.00 M

SS.HH Niños y Niñas en aulas 1 1 51.00 51.00

01.04.01.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 51.00 M

SS.HH Niños y Niñas en aulas 1 1 51.00 51.00

01.04.01.03 RELLENO CON MATERIAL PROPIO 51.00 M

SS.HH Niños y Niñas en aulas 1 1 51.00 51.00

01.04.01.04 SALIDAS DE AGUA FRIA 1/2" 11.00 M

SS.HH niñas 1 4 4.00

SS.HH niños 1 6 6.00

Therma 1 1 1.00

01.04.01.05 INSTALACION DE TUB. PVC SAP C-10 Ø 1/2" 18.80 M

SS.HH Niños y Niñas en aulas 1 1 18.80 18.80

01.04.01.06 INSTALACION DE TUB. PVC SAP C-10 Ø 3/4" 39.00 M

SS.HH Niños y Niñas en aulas 1 1 39.00 39.00

01.04.01.07 VALVULA COMPUERTA DE BRONCE Ø 1/2" 6.00 UND

SS.HH Niños y Niñas en aulas 2 3 6.00

01.04.01.08 ACCESORIOS VARIOS 36.00 UND

Codo pvc sap Ø 1/2"x90° 2 8 16.00

Tee pvc sap Ø 1/2"x90° 2 4 8.00

Codo pvc sap Ø 3/4"x90° 1 2 2.00

Tee pvc sap Ø 3/4"x90° 1 5 5.00

Reducción pvc sap Ø 3/4"x1/2" 1 5 5.00

01.04.01.09 PRUEBA HIDRAULICA 1 1 1.00 1.00 M

01.04.02 SISTEMA DE AGUA CALIENTE

INSTALACIONES INTERIORES01.04.02.01 TRAZO Y REPLANTEO 18.60 M

1 1 18.60 18.60

01.04.02.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 18.60 M

1 1 18.60 18.60

01.04.02.03 RELLENO CON MATERIAL PROPIO 18.60 M

1 1 18.60 18.60

01.04.02.04 SALIDAS DE AGUA CALIENTE 1/2" 5.00 M

SS.HH niñas 1 2 2.00

SS.HH niños 1 2 2.00

Therma 1 1 1.00

01.04.02.05 INSTALACION DE TUB. CPVC C-10 Ø 1/2" 26.20 M

SS.HH Niños y Niñas en aulas 1 1 26.20 26.20

01.04.02.06 THERMA A GAS 10LTS 1.00 UND

1 1 1.00

01.04.02.07 ACCESORIOS VARIOS 9.00 UND

Codo cpvc Ø 1/2"x90° 7 1 7.00

Tee cpvc Ø 1/2" 2 1 2.00

01.04.02.08 PRUEBA HIDRAULICA 1 1 1.00 1.00 GLB

01.04.03 SISTEMA DE DESAGUE Y VENTILACION

INSTALACIONES INTERIORES01.04.03.01 TRAZO Y REPLANTEO 35.70 M

1 1 35.70 35.70

01.04.03.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 35.70 M

1 1 35.70 35.70

01.04.03.03 RELLENO CON MATERIAL PROPIO 35.70 M

1 1 35.70 35.70

01.04.03.04 INSTALACION DE TUB. PVC Ø 2" 1 1 11.00 11.00 11.00 M

“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”

Nº de Elem.

Nº de Cant.

Page 17: 01 Bloque - 1 Aulas Humaca

Nº de Partida DescripciónMedidas

Parcial Total Und.Largo Ancho Altura

Nº de Elem.

Nº de Cant.

01.04.03.05 INSTALACION DE TUB. PVC Ø 4" 1 1 28.80 28.80 28.80 M

01.04.03.06 SALIDA DE DESAGUE EN TUB.PVC Ø 2" 1 12 12.00 12.00 PTO

01.04.03.07 SALIDA DE DESAGUE EN TUB.PVC Ø 4" 2 2 4.00 4.00 PTO

01.04.03.08 REGISTRO ROSCADO Ø 4" 2 1 2.00 2.00 UND

01.04.03.09 SUMIDERO DE 2'' 2 3 6.00 6.00 UND

01.04.03.10 SALIDA DE VENTILACION TUB.PVC Ø 2" 2 2 4.00 4.00 PTO

01.04.03.11 SOMBRERO DE VENTILACION Ø 2" 2 2 4.00 4.00 PTO

01.04.03.12 ACCESORIOS VARIOS 24.00 UND

Codo pvc Ø 4"x90° 2 2 4.00

Codo pvc Ø 4"x45° 2 2 4.00

Yee pvc Ø 4"x4" 1 4 4.00

Yee pvc Ø 4"x2" 1 10 10.00

Yee pvc Ø 2" x2' 1 2 2.00

01.04.03.13 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA (para Desague) 1 3 3.00 3.00 PTO

01.04.03.14 PRUEBA HIDRAHULICA 1 1 1.00 1.00 GLB

01.04.04 SISTEMA DE EVACUACION DE AGUA PLUVIAL

01.04.04.01 INSTALACION DE TUB. PVC MONTANTE Ø 4" 10 1 10.00 10.00 UND

01.04.04.02 COLUMNETA DE CONCRETO 0.20 *0.20*1.60M 10 1 10.00 10.00 UND

01.04.04.03 CANALES DE COLECCION EN LOSA DE ALEROS 1 87.2 87.20 87.20 M