METRADO DE ESTRUCTURAS - (BLOQUE - 1)
INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:
OBRA : Plano:
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:
FECHA: MARZO -2014 Revisado:
01. ESTRUCTURAS AULAS
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
01.01 ESTRUCTURAS
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL 1 1 398.80 398.80 M2
01.01.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA 1 1 398.80 398.80 M2
01.01.02 MOVIMIENTO DE TIERRAS
01.01.02.01 EXCAVACION PARA CIMIENTOS-ZAPATAS 141.03 M3
Zapatas
Z - 1 20 1 1.30 1.30 2.00 67.60
Z - 2 6 1 1.80 1.80 2.00 38.88
Cim/Vigas cim
EJE A, G 2 1 6.85 0.40 1.05 5.75
Depósito 2 1 4.50 0.40 1.05 3.78
EJE B, F 2 1 1.20 0.40 1.05 1.01
EJE B', F' 2 1 0.75 0.40 1.05 0.63
EJE C,E 2 1 7.95 0.40 1.05 6.68
EJE 1'-1' TRAMO C-E 1 1 5.75 0.40 1.05 2.42
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 1.05 4.70
EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 1.05 2.21
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 1.05 4.91
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 1.05 2.46
01.01.02.02 RELLENO Y COMPACTADO MANUAL 22.39 M3
ZAPATAS
Z 1 20 1 Area= 1.14 0.60 13.68
Z 2 6 1 Area= 2.42 0.60 8.71
01.01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES Y OTROS 148.29 M3
TOTAL 118.63 148.29
01.01.02.04 ELIMINACION DE MATERIAL EXEDENTE CON MAQUINARIA A 5KM 148.29 148.29 M3
01.01.02.05 NIVELACION Y COMPACTACION PARA FALSO PISOS, VEREDAS Y PATIOS 349.60 M2
Aulas 3 1 area= 59.00 177.00
Depósito 3 1 area= 6.50 19.50
Ss.Hh. 2 1 area= 9.45 18.90
Hall 1 1 area= 63.70 63.70
Vereda perimetral 1 1 area= 70.50 70.50
01.01.03 CONCRETO SIMPLE
01.01.03.01 SOLADOS
01.01.03.01.01 SOLADO E= 2" MEZCLA 1:12 CEMENTO-HORMIGON 32.40 M2
Cim/Vigas cim
EJE A, G 2 1 6.85 0.40 5.48
Depósito 3 1 4.50 0.40 5.40
EJE B, F 2 1 1.20 0.40 0.96
EJE B', F' 2 1 0.75 0.40 0.60
EJE C,E 2 1 7.95 0.40 6.36
EJE 1'-1' TRAMO C-E 1 1 5.75 0.40
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.20 0.40 4.48
EJE 2-2 TRAMO C-D-E 1 1 5.25 0.40 2.10
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.70 0.40 4.68
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 2.34
01.01.03.01.02 CONCRETO EN SUB ZAPATAS C.H: 1:12+30% PM 26.62 M3
Z 1 20 1 1.30 1.30 0.50 16.90
Z 2 6 1 1.80 1.80 0.50 9.72
01.01.03.02 CIMIENTOS CORRIDOS 3.90 M3
Depósito 3 1 4.50 0.40 0.65 3.51
EJE B', F' 2 1 0.75 0.40 0.65 0.39
01.01.03.03 SOBRE CIMIENTOS 2.10 M3
Depósito 3 1 4.50 0.40 0.35 1.89
EJE B', F' 2 1 0.75 0.40 0.35 0.21
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS HASTA 0.60M. 10.50 M2
Depósito 3 2 4.50 0.35 9.45
EJE B', F' 2 2 0.75 0.35 1.05
01.01.04 CONCRETO ARMADO
01.01.04.01 ZAPATAS
01.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 23.07 M3
“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”
Nº de Partida
Nº de Elem.
Nº de Cant.
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
Z -1 20 1 1.20 1.20 0.50 14.40
Z -2 6 1 1.70 1.70 0.50 8.67
01.01.04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 643.20 KG
Ver planilla de metrados de acero 1 1 643.20 643.20
01.01.04.02 VIGAS DE CIMENTACION
01.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION 14.69 M3
EJE A, G 2 1 10.20 0.40 0.40 3.26
EJE B, F 2 1 2.15 0.40 0.40 0.69
EJE C,E 2 1 11.80 0.40 0.40 3.78
EJE 1'-1' TRAMO C-E 1 1 7.75 0.40 0.40
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.40 0.40 2.42
EJE 2-2 TRAMO C-D-E 1 1 7.45 0.40 0.40 1.19
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.40 0.40 2.42
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.40 0.40 0.94
01.01.04.02.02 ACERO F'Y=4200 KG/CM2 GRADO 60 VIGAS DE CIMENTACION 1,546.91 KG
Ver planilla de metrados de acero 1 1 1546.91 1546.91
01.01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION 73.44 M2
EJE A, G 2 2 10.20 0.40 16.32
EJE B, F 2 2 2.15 0.40 3.44
EJE C,E 2 2 11.80 0.40 18.88
EJE 1'-1' TRAMO C-E 1 2 7.75 0.40
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 2 15.10 0.40 12.08
EJE 2-2 TRAMO C-D-E 1 2 7.45 0.40 5.96
EJE 3-3 TRAMO A-B-C-E-F-G 1 2 15.10 0.40 12.08
EJE 4-4 TRAMO A-B-F-G 1 2 5.85 0.40 4.68
01.01.04.03 CIMIENTOS REFORZADOS
01.01.04.03.01 CONCRETO EN CIMIENTOS Y SOBRE CIMIENTOS REFORZADOS 22.69
EJE A, G 2 1 10.20 0.25 1.00 5.10
EJE C,E 2 1 11.80 0.25 1.00 5.90
Puertas 2 -1 1.50 0.25 1.00 -0.75
EJE 1'-1' TRAMO C-E 1 1 7.75 0.25 1.00 1.94
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.25 1.00 3.78
EJE 2-2 TRAMO C-D-E 1 1 7.45 0.25 1.00 1.86
Puertas 1 -1 1.50 0.25 1.00 -0.38
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.25 1.00 3.78
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.25 1.00 1.46
01.01.04.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 538.24 KG
Ver planilla de metrados de acero 1 1 538.24 538.24
01.01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS REFORZADOS 181.50
EJE A, G 2 2 10.20 1.00 40.80
EJE C,E 2 2 11.80 1.00 47.20
Puertas 2 -2 1.50 1.00 -6.00
EJE 1'-1' TRAMO C-E 1 2 7.75 1.00 15.50
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 2 15.10 1.00 30.20
EJE 2-2 TRAMO C-D-E 1 2 7.45 1.00 14.90
Puertas 1 -2 1.50 1.00 -3.00
EJE 3-3 TRAMO A-B-C-E-F-G 1 2 15.10 1.00 30.20
EJE 4-4 TRAMO A-B-F-G 1 2 5.85 1.00 11.70
01.01.04.04 COLUMNAS
01.01.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 9.29 M3
Columna C-1 20 1 0.35 0.25 4.55 7.96
Columna C-2 6 1 0.25 0.25 3.55 1.33
01.01.04.04.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1,992.00 KG
Ver planilla de metrados de acero 1 1 1992.00 1992.00
01.01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 139.50 M2
Columna C-1 20 1 1.20 4.65 111.60
Columna C-2 6 1 1.00 4.65 27.90
01.01.04.05 COLUMNETAS
01.01.04.05.01 CONCRETO EN COLUMNETAS F'C=210 KG/CM2 7.61 M3
Columna Ca-1 34 1 0.25 0.20 2.85 4.85
Columna Ca-2 11 1 0.25 0.20 1.00 0.55
Columna Ca-3 6 1 0.25 0.20 1.75 0.53
Columna Ca-4 15 1 0.25 0.15 3.00 1.69
01.01.04.05.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 920.76 KG
Ver planilla de metrados de acero 1 1 920.76 920.76
01.01.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS 65.36 M2
Columna C-1 34 2 0.20 2.85 38.76
Columna C-2 11 2 0.20 1.00 4.40
Columna C-3 6 2 0.20 1.75 4.20
Columna C-4 15 2 0.20 3.00 18.00
01.01.04.06 VIGAS
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
01.01.04.06.01 CONCRETO EN VIGAS F'C=210 KG/CM2 11.29 M3
EJE A, G 2 1 10.20 0.25 0.40 2.04
2 1 2.15 0.25 0.35 0.38
2 2 0.60 0.25 0.20 0.12
2 2 0.60 0.25 0.20 0.12
EJE B, F 2 1 2.15 0.25 0.40 0.43
2 2 0.60 0.25 0.20 0.12
EJE C,E 2 1 11.80 0.25 0.40 2.36
2 2 0.60 0.25 0.20 0.12
EJE 1'-1' TRAMO C-E 1 1 7.75 0.25 0.40 0.78
1 2 0.60 0.25 0.20 0.06
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.25 0.40 1.51
1 2 0.60 0.25 0.20 0.06
EJE 2-2 TRAMO C-D-E 1 1 7.45 0.25 0.40 0.75
1 4 0.60 0.25 0.20 0.12
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.25 0.40 1.51
1 4 0.60 0.25 0.20 0.12
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.25 0.40 0.59
1 4 0.60 0.25 0.20 0.12
01.01.04.06.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1,863.34 KG
Ver planilla de metrados de acero 1 1 1863.34 1863.34
01.01.04.06.03 ENCOFRADO Y DESNCOFRADO NORMAL EN VIGAS 77.63 M2
EJE A, G 2 1 10.20 0.65 13.26
2 1 2.15 0.55 2.37
2 2 0.60 0.60 1.44
2 2 0.60 0.20 0.48
EJE B, F 2 1 2.15 0.65 2.80
2 2 0.60 0.60 1.44
EJE C,E 2 1 11.80 0.65 15.34
2 2 0.60 0.60 1.44
EJE 1'-1' TRAMO C-E 1 1 7.75 0.65 5.04
1 2 0.60 0.60 0.72
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.10 0.65 9.82
1 2 0.60 0.60 0.72
EJE 2-2 TRAMO C-D-E 1 1 7.45 0.65 4.84
1 4 0.60 0.60 1.44
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.10 0.65 9.82
1 4 0.60 0.60 1.44
EJE 4-4 TRAMO A-B-F-G 1 1 5.85 0.65 3.80
1 4 0.60 0.60 1.44
01.01.04.07 LOSA ALIGERADA EN VOLADOS DE TECHO
01.01.04.07.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 7.64 M3
CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN VOLADOS 3.91 M3
EJE A,G 2 1 9.25 0.60 0.05 0.56
EJE E,C 2 1 9.25 0.60 0.05 0.56
EJE E',C' 2 1 4.35 0.60 0.05 0.26
EJE 1' 1' 1 1 7.75 0.60 0.05 0.23
EJE 1 1 2 1 7.15 0.60 0.05 0.43
EJE 3 3 2 1 7.75 0.60 0.05 0.46
EJE 2-2 1 1 6.55 0.60 0.05 0.20
CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH
EJE 4-4 TRAMO A-B,F-G 2 1 2.40 5.58 0.05 1.34
2 -1 2.15 0.25 0.05 -0.05
1 -1 5.58 0.25 0.05 -0.07
4 0.1 0.60 0.25 0.05 0.00
CONCRETO EN VIGUETAS DE LOZA ALIGERADA F'C=210 KG/CM2 3.73 M3
EJE A,G 2 2 9.25 0.15 0.15 0.83
EJE E,C 2 2 9.25 0.15 0.15 0.83
EJE E',C' 2 2 4.35 0.15 0.15 0.39
EJE 1' 1' 1 2 7.75 0.15 0.15 0.35
EJE 1 1 2 1 7.15 0.15 0.15 0.32
EJE 3 3 2 1 7.75 0.15 0.15 0.35
EJE 2-2 1 1 6.55 0.15 0.15 0.15
CONCRETO EN VIGUETAS DE LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH
EJE 4-4 TRAMO A-B,F-G 2 7 2.40 0.10 0.15 0.50
01.01.04.07.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN LOZA ALIGERADA 426.77 KG
Ver planilla de metrados de acero 1 1 426.77 426.77
01.01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOZA ALIGERADA 96.19 M2
EJE A,G 2 1 9.25 0.80 14.80
EJE E,C 2 1 9.25 0.80 14.80
EJE E',C' 2 1 4.35 0.80 6.96
EJE 1' 1' 1 1 7.75 0.80 6.20
EJE 1 1 2 1 7.15 0.80 11.44
EJE 3 3 2 1 7.75 0.80 12.40
EJE 2-2 1 1 6.55 0.80 5.24
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
SS.HH. 2 1 2.40 5.58 26.76
2 -1 2.15 0.25 -1.08
1 -1 5.58 0.25 -1.39
4 0.1 0.60 0.25 0.06
01.01.04.07.04 LADRILLO DE ARCILLA HUECO 15X30X30 PARA TECHO 465.17 UND
EJE A,G 2 1 9.25 61.67
EJE E,C 2 1 9.25 61.67
EJE E',C' 2 1 4.35 29.00
EJE 1' 1' 1 1 7.75 25.83
EJE 1 1 2 1 7.15 47.67
EJE 3 3 2 1 7.75 51.67
EJE 2-2 1 1 6.55 21.83
0.00
SS.HH. 2 6 5.58 223.00
2 -1 5.58 -37.17
4 -6 0.25 -20.00
01.01.05 JUNTAS DE CONSTRUCCION
01.01.05.01 JUNTAS DE TEKNOPOR DE 1" 50.19 M
EJE A-A TRAMO 1'-1,2,3,4 1 8 0.25 3.65 7.30
EJE B-B TRAMO 1-2-3-4 1 7 0.25 3.65 6.39
EJE C-C TRAMO 1'-1,2,3,4 1 11 0.25 3.65 10.04
EJE D-D TRAMO 1'-1-2-3-4 1 4 0.25 3.65 3.65
EJE E-E TRAMO 1'- 1,2,3,4 1 10 0.25 3.65 9.13
EJE F-F TRAMO 1'-1-2-3-4 1 6 0.25 3.65 5.48
EJE G-G TRAMO 1'-1-2-3-4 1 9 0.25 3.65 8.21
01.01.06 ESTRUCTURAS METALICAS
01.01.06.01 TIJERAL METALICO, TIPO - 01 1 3 3.00 3.00 UND
01.01.06.02 TIJERAL METALICO, TIPO - 02 1 6 6.00 6.00 UND
01.01.06.03 TIJERAL METALICO, TIPO - 03 1 20 20.00 20.00 UND
01.01.06.04 TIJERAL METALICO, TIPO - 04 1 20 20.00 20.00 UND
01.01.06.05 TIJERAL METALICO, TIPO - 05 1 2 2.00 2.00 UND
01.01.06.06 TIJERAL METALICO, TIPO - 06 1 2 2.00 2.00 UND
01.01.06.07 TIJERAL METALICO, TIPO - 07 1 2 2.00 2.00 UND
01.01.06.08 TIJERAL METALICO, TIPO - 08 1 10 10.00 10.00 UND
01.01.06.09 TIJERAL METALICO, TIPO - 09 1 2 2.00 2.00 UND
01.01.06.10 TIRANTES DE TUBO LAC 2''*3''X2.5MM 1 1 55.50 55.50 55.50 ML
01.01.06.11 CORREAS DE TUBO LAC 2''X3''X2.5MM 1 1 315.88 315.88 315.88 ML
01.01.06.12 CORREAS DE TUBO LAC 2''X2''X2.5MM 1 1 80.70 80.70 80.70 ML
01.01.07 COBERTURA
01.01.07.01 COBERTURA DE POLICARBONATO 65.60 M2
PATIO 1 1 AREA=65.60 65.60
01.01.07.02 COBERTURA DE TEJA ANDINA 275.56 M2
Bloque - Aulas 1 1 area= 275.56 275.56
01.01.07.03 CUMBRERA DE TEJA ANDINA 73.00 M
Bloque - Aulas 1 1 73.00 73.00
01.01.08 PRUEBAS
01.01.08.01 PRUEBAS DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 10 1 10.00 10.00 UND
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº: 1
OBRA : Plano:
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:
FECHA: MARZO -2014 Revisado:
Partida Descripción Ø
Clasificacion (m) Peso Peso
1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)
1.05 CONCRETO ARMADO
01.04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 643.20
Zapata - 1
Longitudinal 5/8" 20 6 1.00 120.00 1.6 192.00
Transversal 5/8" 20 6 1.00 120.00 1.6 192.00
Zapata - 2
Longitudinal 5/8" 6 9 1.50 81.00 1.6 129.60
Transversal 5/8" 6 9 1.50 81.00 1.6 129.60
01.04.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 538.24
Longitudinal 3/8" 1 4 103.00 412.00 0.58 238.96
Transversal 3/8" 1 344 1.50 516.00 0.58 299.28
01.04.02.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION 1,546.91
EJE A-A TRAMO 1,2,3,4 5/8" 14 12.05 48.20 1.6 77.12
EJE B-B TRAMO 3,4 5/8" 14 2.95 11.80 1.6 18.88
EJE C-C TRAMO 1'-1,2,3 5/8" 14 13.65 54.60 1.6 87.36
EJE E-E TRAMO 1' 1,2,3 5/8" 14 13.65 54.60 1.6 87.36
EJE F-F TRAMO 3,4 5/8" 14 2.95 11.80 1.6 18.88
EJE G-G TRAMO 1-2-3-4 5/8" 14 12.05 48.20 1.6 77.12
EJE 1'-1' TRAMO C-E 5/8" 14 8.80 35.20 1.6 56.32
EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 14 17.80 71.20 1.6 113.92
EJE 2-2 TRAMO C-D-E 5/8" 14 8.80 35.20 1.6 56.32
EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 14 17.80 71.20 1.6 113.92
EJE 4-4 TRAMO A-B-F-G 5/8" 14 9.78 39.12 1.6 62.59
“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”
Nº Elemento Iguales
Nº Piezas por
Elemento
Longitud por Pieza
(m)
Longitud Parcial
(m)
Partida Descripción Ø
Clasificacion (m) Peso Peso
1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)
Nº Elemento Iguales
Nº Piezas por
Elemento
Longitud por Pieza
(m)
Longitud Parcial
(m)
ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION
EJE A-A TRAMO 1,2,3,4 1/2" 12 12.05 24.10 1.02 24.58
EJE B-B TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02
EJE C-C TRAMO 1'-1,2,3 1/2" 12 13.65 27.30 1.02 27.85
EJE E-E TRAMO 1' 1,2,3 1/2" 12 13.65 27.30 1.02 27.85
EJE F-F TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02
EJE G-G TRAMO 1-2-3-4 1/2" 12 12.05 24.10 1.02 24.58
EJE 1'-1' TRAMO C-E 1/2" 12 8.80 17.60 1.02 17.95
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 12 17.80 35.60 1.02 36.31
EJE 2-2 TRAMO C-D-E 1/2" 12 8.80 17.60 1.02 17.95
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 12 17.80 35.60 1.02 36.31
EJE 4-4 TRAMO A-B-F-G 1/2" 12 9.78 19.56 1.02 19.95
ESTRIBOS EN VIGAS DE CIMENTACION
EJE A-A TRAMO 1,2,3,4 3/8" 159 1.20 70.80 0.58 41.06
EJE B-B TRAMO 3,4 3/8" 115 1.20 18.00 0.58 10.44
EJE C-C TRAMO 1'-1,2,3 3/8" 144 1.20 52.80 0.58 30.62
EJE E-E TRAMO 1' 1,2,3 3/8" 144 1.20 52.80 0.58 30.62
EJE F-F TRAMO 3,4 3/8" 115 1.20 18.00 0.58 10.44
EJE G-G TRAMO 1-2-3-4 3/8" 159 1.20 70.80 0.58 41.06
EJE 1'-1' TRAMO C-E 3/8" 180 1.20 96.00 0.58 55.68
EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 1160 1.20 192.00 0.58 111.36
EJE 2-2 TRAMO C-D-E 3/8" 180 1.20 96.00 0.58 55.68
EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 1160 1.20 192.00 0.58 111.36
EJE 4-4 TRAMO A-B-F-G 3/8" 148 1.20 57.60 0.58 33.41
01.04.04.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1,992.00
Partida Descripción Ø
Clasificacion (m) Peso Peso
1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)
Nº Elemento Iguales
Nº Piezas por
Elemento
Longitud por Pieza
(m)
Longitud Parcial
(m)
Columna C-1 5/8" 20 4 6.45 516.00 1.6 825.60
1/2" 20 2 6.45 258.00 1.02 263.16
Columna C-2 5/8" 6 6 5.35 192.60 1.6 308.16
ESTRIBOS
ESTRIBO EN C 1 3/8" 2036 1.20 864.00 0.58 501.12
ESTRIBO EN C 2 3/8" 630 0.90 162.00 0.58 93.96
01.05.05 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 920.76
Columna C-1 3/8" 34 4 3.60 489.60 0.58 283.97
Columna C-2 3/8" 11 4 1.70 74.80 0.58 43.38
Columna C-3 3/8" 6 4 3.15 75.60 0.58 43.85
Columna C-4 3/8" 15 4 3.75 225.00 0.58 130.50
ESTRIBOS EN COLUMNETAS
Columna C-1 3/8" 34 41 0.75 1045.50 0.25 261.38
Columna C-2 3/8" 11 25 0.75 206.25 0.25 51.56
Columna C-3 3/8" 6 38 0.75 171.00 0.25 42.75
Columna C-4 3/8" 15 26 0.65 253.50 0.25 63.38
01.05.06.1 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1,863.34
EJE A-A TRAMO 1,2,3,4 5/8" 14 13.40 53.60 1.6 85.76
EJE B-B TRAMO 3,4 5/8" 14 3.80 15.20 1.6 24.32
EJE C-C TRAMO 1'-1,2,3 5/8" 14 15.15 60.60 1.6 96.96
EJE D-D TRAMO 1'-2 5/8" 14 1.50 6.00 1.6 9.60
EJE E-E TRAMO 1' 1,2,3 5/8" 14 14.30 57.20 1.6 91.52
EJE F-F TRAMO 3,4 5/8" 14 3.30 13.20 1.6 21.12
EJE G-G TRAMO 1-2-3-4 5/8" 14 13.40 53.60 1.6 85.76
Partida Descripción Ø
Clasificacion (m) Peso Peso
1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)
Nº Elemento Iguales
Nº Piezas por
Elemento
Longitud por Pieza
(m)
Longitud Parcial
(m)
EJE 1'-1' TRAMO C-E 5/8" 14 9.40 37.60 1.6 60.16
EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 14 27.00 108.00 1.6 172.80
EJE 2-2 TRAMO A-B-C-D-E-F-G 5/8" 14 27.00 108.00 1.6 172.80
EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 14 20.10 80.40 1.6 128.64
EJE 4-4 TRAMO A-B-F-G 5/8" 14 10.28 41.12 1.6 65.79
EJE A-A TRAMO 1,2,3,4 1/2" 12 12.05 24.10 1.02 24.58
EJE B-B TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02
EJE C-C TRAMO 1'-1,2,3 1/2" 12 13.65 27.30 1.02 27.85
EJE E-E TRAMO 1' 1,2,3 1/2" 12 13.65 27.30 1.02 27.85
EJE F-F TRAMO 3,4 1/2" 12 2.95 5.90 1.02 6.02
EJE G-G TRAMO 1-2-3-4 1/2" 12 12.05 24.10 1.02 24.58
EJE 1'-1' TRAMO C-E 1/2" 12 8.80 17.60 1.02 17.95
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 12 17.80 35.60 1.02 36.31
EJE 2-2 TRAMO C-D-E 1/2" 12 8.80 17.60 1.02 17.95
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 12 17.80 35.60 1.02 36.31
EJE 4-4 TRAMO A-B-F-G 1/2" 12 9.78 19.56 1.02 19.95
EJE A-A TRAMO 1,2,3,4 3/8" 163 1.20 75.60 0.58 43.85
EJE B-B TRAMO 3,4 3/8" 119 1.20 22.80 0.58 13.22
EJE C-C TRAMO 1'-1,2,3 3/8" 152 1.20 62.40 0.58 36.19
EJE E-E TRAMO 1' 1,2,3 3/8" 152 1.20 62.40 0.58 36.19
EJE F-F TRAMO 3,4 3/8" 119 1.20 22.80 0.58 13.22
EJE G-G TRAMO 1-2-3-4 3/8" 163 1.20 75.60 0.58 43.85
EJE 1'-1' TRAMO C-E 3/8" 184 1.20 100.80 0.58 58.46
EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 1168 1.20 201.60 0.58 116.93
Partida Descripción Ø
Clasificacion (m) Peso Peso
1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)
Nº Elemento Iguales
Nº Piezas por
Elemento
Longitud por Pieza
(m)
Longitud Parcial
(m)
EJE 2-2 TRAMO C-D-E 3/8" 1168 1.20 201.60 0.58 116.93
EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 1130 1.20 156.00 0.58 90.48
EJE 4-4 TRAMO A-B-F-G 3/8" 148 1.20 57.60 0.58 33.41
01.04.07.02 LOZA ALIGERADA 426.77
ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGUETAS
EJE A-A TRAMO 1,2,3,4 1/2" 1 4 11 44.00 1.02 44.88
EJE C-C TRAMO 1'-1,2,3 1/2" 1 4 13 52.00 1.02 53.04
EJE E-E TRAMO 1,2,3 1/2" 1 4 13 52.00 1.02 53.04
EJE G-G TRAMO 1-2-3-4 1/2" 1 4 9.3 37.20 1.02 37.94
EJE 1'-1' TRAMO C-E 1/2" 1 4 7.01 28.04 1.02 28.60
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 4 15.11 60.44 1.02 61.65
EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 1 4 6.91 27.64 1.02 28.19
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 4 7.55 30.20 1.02 30.80
EJE 4-4 TRAMO A-B-F-G 1/2" 1 4 7.76 31.04 1.02 31.66
ACERO DE TEMPERATURA
EJE A-A TRAMO 1,2,3,4 1/2" 1 2 11 22.00 0.25 5.50
EJE C-C TRAMO 1'-1,2,3 1/2" 1 2 13 26.00 0.25 6.50
EJE E-E TRAMO 1,2,3 1/2" 1 2 13 26.00 0.25 6.50
EJE G-G TRAMO 1-2-3-4 1/2" 1 2 9.3 18.60 0.25 4.65
EJE 1'-1' TRAMO C-E 1/2" 1 2 7.01 14.02 0.25 3.51
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 2 15.11 30.22 0.25 7.56
EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 1 2 6.91 13.82 0.25 3.46
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 2 7.55 15.10 0.25 3.78
EJE 4-4 TRAMO A-B-F-G 1/2" 1 8 7.76 62.08 0.25 15.52
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:
OBRA : Plano:
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE OCOBAMBA Hecho por:
FECHA: OCTUBRE -2015 Revisado:
02. ARQUITECTURA AULAS
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
01.02 ARQUITECTURA
01.02.01 OBRAS DE CONCRETO SIMPLE
01.02.01 VEREDA
01.02.01.01.01 VEREDA DE CONCRETO DE 6" Y BRUÑADO 58.95 M2
Fachada principal 1 1 area= 25.47 25.47
Fachada posterior y laterales 1 1 area= 33.48 33.48
01.02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS 13.18 M2
Fachada principal 1 1 perimet= 22.55 0.20 4.51
Fachada posterior y laterales 1 1 perimet= 43.37 0.20 8.67
01.02.01.01.03 JUNTAS ASFALTICAS EN VEREDAS 19.60 M
Fachada principal 6 1 1.10 6.60
Fachada posterior y laterales 13 1 1.00 13.00
01.02.01.02 CUNETA DE EVACUACION PLUVIAL
01.02.01.02.01 CONCRETO EN CUNETA F'C= 175KG/CM2 7.48 M3
Fachada principal 1 1 28.00 area= 0.09 2.38
Fachada posterior y laterales 1 1 60.00 area= 0.09 5.10
01.02.01.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETA 35.20 M2
Fachada principal 2 1 28.00 0.20 11.20
Fachada posterior y laterales 2 1 60.00 0.20 24.00
01.02.02 MUROS Y TABIQUES
01.02.02.01 MURO DE CABEZA LADRILLO KIN-KONG DE ARCILLA area 108.61 M2
Eje 1'-1' entre A-G 1 1 10.22 10.22
Eje 2-2 entre D-E- F 2 1 2.64 5.28
Eje 3-3 entre C-E-F-G 1 1 27.66 27.66
Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55
Eje A-A entre 1-4 8 1 0.92 7.36
Eje G-G entre 1-4 1 1 11.86 11.86
Eje B- B entre 1-4 1 1 26.68 26.68
01.02.02.02 MURO DE SOGA LADRILLO KIN-KONG DE ARCILLA 12.22 M2
Deposito de aulas 1-2-3 2 1 6.11 12.22
01.02.03 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.03.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 1:5 area 93.01 M2
Aula - 1 (SS.HH Niñas) 1 1 54.14 54.14
Aula - 3 (SS.HH Niños) 1 1 38.87 38.87
01.02.03.02 TARRAJEO EN MUROS EXTERIORES MEZCLA 1:5 CEMENTO:ARENA area 45.90 M2
Eje 1'-1' entre A-G 1 1 10.22 10.22
Eje 2-2 entre D-E- F 2 1 2.64 5.28
Eje 3-3 entre C-E-F-G 1 1 27.66 27.66
Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55
Eje A-A entre 1-4 8 1 0.92 7.36
Eje G-G entre 1-4 1 1 11.86 11.86
Eje B- B entre 1-4 1 1 26.68 26.68
01.02.03.03 TARRAJEO EN MUROS INTERIORES MEZCLA 1:5 CEMENTO:ARENA 159.73 M2
Eje 1'-1' entre A-G 1 1 10.22 10.22
Eje 2-2 entre D-E- F 2 1 2.64 5.28
Eje 3-3 entre C-E-F-G 1 1 27.66 27.66
Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55
Eje A-A entre 1-4 8 1 0.92 7.36
Eje G-G entre 1-4 1 1 11.86 11.86
Eje C-C entre 1-4 2 1 26.68 53.36
Deposito de aulas 1-2-3 2 2 6.11 24.44
“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL N, PROVINCIA DE CHINCHEROS, REGIÓN APURIMAC”
Nº de Partida
Nº de Elem.
Nº de Cant.
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
01.02.03.04 TARRAJEO DE SUPERFICIE COLUMNAS INCL. ARISTAS MEZCLA 1:5 CEMENTO:ARENA 78.60 M2
Columna C-1 20 1 1.20 3.00 72.00
Columna C-2 3 1 1.00 2.20 6.60
01.02.03.05 TARRAJEO DE SUPERF.VIGAS INCL.ARISTAS, MEZCLA 1:5 CEMENTO:ARENA 50.50 M2
Eje 1-1 entre A-G 1 1 26.76 0.80 21.41
Eje 3-3 entre C-G 1 1 13.51 0.80 10.81
Eje 4-4 entre A-C 1 1 6.00 0.80 4.80
Eje 4-4 entre C-D 1 1 2.85 0.80 2.28
Eje 4-4 entre F-G 1 1 2.95 0.80 2.36
Eje A,C y G entre 1-4 1 1 11.05 0.80 8.84
01.02.03.06 VESTIDURA DE DERRAMES 218.66 M
V - 1 2 1 7.20 14.40
V - 2 2 1 7.50 15.00
V - 3 2 1 6.90 13.80
V - 4 2 1 6.56 13.12
V - 5 14 1 6.26 87.64
V - 6 1 1 6.70 6.70
V - 7 1 1 6.50 6.50
V - 8 4 1 2.20 8.80
V - 9 2 1 2.90 5.80
P - 1 3 1 7.50 22.50
P - 2 2 1 6.90 13.80
P - 3 2 1 5.30 10.60
01.02.03.07 BRUÑA DE 1CM ENTRE MUROS Y ESTRUCTURAS 230.60 M
VIGAS
Eje 1-1 entre A-B-C-D-E-F-G 2 1 5.28 10.56
Eje 3-3 entre C-G 2 1 7.71 15.42
Eje 4-4 entre A-G 2 1 4.15 8.30
Eje C-C entre 1-4 2 1 8.86 17.72
Eje G-G entre 3-4 2 1 2.10 4.20
COLUMNAS
Columna C-1 53 1 3.00 159.00
Columna C-2 7 1 2.20 15.40
01.02.04 CIELORRASOS
01.02.04.01 CIELORRASOS CON BALDOSA 162.32 M2
Aulas 1 1 1 area= 56.10 56.10
Aulas 2 2 1 area= 40.60 81.20
Deposito 2 1 area= 6.10 12.20
SS.HH. 2 1 area= 6.41 12.82
01.02.04.02 CIELORASO DE CEMENTO Y ARENA 39.56 M2
Fachada pricipal 1 1 23.70 0.60 14.22
Fachada posterior y laterales 1 1 42.23 0.60 25.34
01.02.05 PISOS Y PAVIMENTOS
01.02.05.01 FALSO PISO F'c=175 kg/cm2 162.32 M2
Aulas 1 1 1 area= 56.10 56.10
Aulas 2 2 1 area= 40.60 81.20
Deposito 2 1 area= 6.10 12.20
SS.HH. 2 1 area= 6.41 12.82
01.02.05.02 DURMIENTES DEMADERA AGUANO 2.5''X3''X3.5M 280.50 ML
Aulas 1-2-3 3 1 10 9.35 280.50
01.02.05.03 CONTRAPISO DE 48 MM. 162.32 M2
Aulas 1 1 1 area= 56.10 56.10
Aulas 2 2 1 area= 40.60 81.20
Deposito 2 1 area= 6.10 12.20
SS.HH. 2 1 area= 6.41 12.82
01.02.05.04 PISO DE CERAMICO ANTIDESLIZANTE AT. 0.60x0.60 M 162.32 M2
Aulas 1 1 1 area= 56.10 56.10
Aulas 2 2 1 area= 40.60 81.20
Deposito 2 1 area= 6.10 12.20
SS.HH. 2 1 area= 6.41 12.82
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
01.02.05.05 PISO DE MADERA MACHIMBREADA AGUANO 96.70 M2
Aulas 1-2-3 1 1 area= 96.70 96.70
01.02.06 ZOCALOS Y CONTRAZOCALOS
01.02.06.01 ZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM. DE H=0.30CM. 65.92 M
Fachada principal, posterior y lateral 1 1 perimet= 65.92 65.92
01.02.06.02 CONTRAZOCALO DE MAYOLICA DE 20x20CM. 23.28 M2
SS.HH (niños y niñas) 2 1 9.70 1.20 23.28
01.02.06.03 CONTRAZOCALO DE CERAMICO DE 40 x 40 CM. H=10CM. 19.56 M
Deposito (aulas 1-2-3) 2 1 perimet= 9.78 19.56
01.02.06.04 CONTRAZOCALO DE MADERA AGUANO H=10CM. 92.10 M
Aulas 1-2-3 3 1 perimet= 30.70 92.10
01.02.07 CARPINTERIA DE MADERA
01.02.07.01 PUERTA DE MADERA CEDRO NACIONAL C/ SOBRELUZ 18.90 M2
P - 1 3 1 1.50 3.00 13.50
P - 3 2 1 0.90 3.00 5.40
01.02.07.02 PUERTA CONTRAPLACADA CON PLANCHA DE TRIPLAY DE 6mm. C/SOBRELUZ 3.96 M2
P - 2 2 1 0.90 2.20 3.96
01.02.08 CARPINTERIA METALICA
01.02.08.01 DIVISION CON MELAMINE SOBRE ESTRUCTURA DE ALUMINIO 10.80 M2
SS.HH (niños y niñas) 2 2 1.5 1.80 10.80
01.02.08.02 PUERTA MELAMINE CON MARCO DE ALUMINIO 5.04 M2
SS.HH (niños y niñas) 2 2 0.70 1.80 5.04
01.02.09 CERRAJERIA
01.02.09.01 BISAGRA CAPUCHINA DE 4" 10.50 PAR
P - 1 3 1.5 4.50
P - 2 2 1.5 3.00
P - 3 2 1.5 3.00
01.02.09.02 CERRADURA PARA PUERTA DE TRES GOLPES 3.00 PZA
P - 1 3 1 3.00
01.02.09.03 CERRADURA DE PERILLA CON SEGURIDAD INTERIOR 4.00 PZA
P - 2 2 1 2.00
P - 3 2 1 2.00
01.02.09.04 PICAPORTE DE 4" 7.00 UND
P - 1 3 1 3.00
P - 2 2 1 2.00
P - 3 2 1 2.00
01.02.10 VIDRIOS, CRISTALES Y SIMILARES
01.02.10.01 VIDRIO TEMPLADO DE 8MM. INCLUYE PROTECTOR 629.33 P2
V - 1 2 1 1.50 2.10 67.81
V - 2 2 1 1.65 2.10 74.59
V - 3 2 1 1.35 2.10 61.03
V - 4 2 1 1.18 2.10 53.35
V - 5 14 1 1.03 2.10 325.96
V - 6 1 1 2.95 0.40 12.70
V - 7 1 1 2.85 0.40 12.27
V - 8 2 1 1.05 0.40 9.04
V - 9 4 1 0.73 0.40 12.57
01.02.10.02 VIDRIO CRUDO INCOLORO DE 6MM. 47.47 P2
P - 1 3 1 1.50 0.70 33.91
P - 2 2 1 0.90 0.70 13.56
01.02.10.03 ESPEJO BISELADO DE 6MM S/PLANOS 21.10 P2
SS.HH (niños y niñas) 2 2 0.70 0.70 21.10
01.02.11 PINTURA
01.02.11.01 PINTURA EN CIELORRASO 14.22 M2
Fachada pricipal 1 1 23.70 0.60 14.22
Fachada posterior y laterales 1 1 42.23 0.60 25.34
01.02.11.02 PINTURA EN EXTERIORES 108.61 M2
Eje 1'-1' entre A-G 1 1 10.22 10.22
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
Eje 2-2 entre D-E- F 2 1 2.64 5.28
Eje 3-3 entre C-E-F-G 1 1 27.66 27.66
Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55
Eje A-A entre 1-4 8 1 0.92 7.36
Eje G-G entre 1-4 1 1 11.86 11.86
Eje B- B entre 1-4 1 1 26.68 26.68
01.02.11.03 PINTURA EN INTERIORES 159.73 M2
Eje 1'-1' entre A-G 1 1 10.22 10.22
Eje 2-2 entre D-E- F 2 1 2.64 5.28
Eje 3-3 entre C-E-F-G 1 1 27.66 27.66
Eje 4-4 entreA-B-C-D y F-G 1 1 19.55 19.55
Eje A-A entre 1-4 8 1 0.92 7.36
Eje G-G entre 1-4 1 1 11.86 11.86
Eje C-C entre 1-4 2 1 26.68 53.36
Deposito de aulas 1-2-3 2 2 6.11 24.44
01.02.11.04 PINTURA EN COLUMNAS 78.60 M2
Columna C-1 20 1 1.20 3.00 72.00
Columna C-2 3 1 1.00 2.20 6.60
01.02.11.05 PINTURA EN VIGAS 41.66 M2
Eje 1-1 entre A-G 1 1 26.76 0.80 21.41
Eje 3-3 entre C-G 1 1 13.51 0.80 10.81
Eje 4-4 entre A-C 1 1 6.00 0.80 4.80
Eje 4-4 entre C-D 1 1 2.85 0.80 2.28
Eje 4-4 entre F-G 1 1 2.95 0.80 2.36
Eje A,C y G entre 1-4 1 1 11.05 0.80 8.84
01.02.11.06 PINTURA EN VESTIDURA DE DERRAMES 218.66 M
V - 1 2 1 7.20 14.40
V - 2 2 1 7.50 15.00
V - 3 2 1 6.90 13.80
V - 4 2 1 6.56 13.12
V - 5 14 1 6.26 87.64
V - 6 1 1 6.70 6.70
V - 7 1 1 6.50 6.50
V - 8 4 1 2.20 8.80
V - 9 2 1 2.90 5.80
P - 1 3 1 7.50 22.50
P - 2 2 1 6.90 13.80
P - 3 2 1 5.30 10.60
01.02.11.07 PINTURA EN CONTRAZOCALOS Y ZOCALOS H= 0.30M C/ESMALTE 56.10 M
Fachada principal, posterior y lateral 1 1 perimet= 56.10 56.10
01.02.11.08 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 23.30 M2
P - 1 3 1 1.50 3.00 13.50
P - 2 2 1 0.90 3.00 5.40
P - 3 2 1 1.00 2.20 4.40
01.02.12 APARATOS Y ACCESORIOS SANITARIOS
01.02.12.01 INODORO SIFON JETT BLANCO COLOCADO, PARA NIÑOS 4.00 PZA
SS.HH (niños y niñas) 2 2 4.00
01.02.12.02 LAVATORIO OVALIN SOBREPONER BLANCO COLOCADO 4.00 PZA
SS.HH (niños y niñas) 2 2 4.00
01.02.12.03 PAPELERA DE LOZA BLANCA DE 13x15 4.00 UND
SS.HH (niños y niñas) 2 2 4.00
01.02.12.04 JABONERA DE LOSA COLOR BLANCO 4.00 UND
SS.HH (niños y niñas) 2 2 4.00
01.02.12.05 MESA DE CONCRETO PARA LAVATORIOS 3.45 ML
SS.HH (niños y niñas) 1 1 3.45 3.45
01.02.13 SISTEMA DE SEGURIDAD, MANTENIMIENTO Y SEÑALIZACION
01.02.13.01 SISTEMA DE SEGURIDAD Y SEÑALIZACION 1.00 GLB
Bloque 1 Aulas 1 1 1.00
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Partida
Nº de Elem.
Nº de Cant.
01.02.14 OBRAS COMPLEMENTARIAS
01.02.14.01 Tapa junta vanos y columnas 1 24 3.00 72.00 72.00 m
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
INSTITUCION INSTITUCION EDUCATIVA INICIAL Hoja Nº:
OBRA : Plano:
PROPIETARIO MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:
FECHA: MARZO -2014 Revisado:
03. INSTALACIONES ELECTRICAS
DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
01.03 INSTALACIONES ELECTRICAS Y SISTEMAS ESPECIALES
01.03.01 INSTALACIONES ELECTRICAS
01.03.01.01 TABLEROS
01.03.01.01.0 TABLERO DE DISTRIBUCION T.D. - 1 1 1 1.00 1.00 Eqp
01.03.01.01.0 SUMINSTRO E INSTALACION DE POZO DE PUESTA ATIERRA 1 1 1.00 1.00 JGO
01.03.01.02 DUCTOS O TUBERIAS
01.03.01.02.0 TUBERIA PVC - P Ø 25 mm 1 4 4.00 4.00 m
01.03.01.02.0 TUBERIA PVC - P Ø 20 mm 340.00 m
ILUMINACION 1 220 220.00TOMACORRIENTE 1 90 90.00LUZ DE EMERGENCIA 1 30 30.00
01.03.01.03 CABLEADO
01.03.01.03.0 INSTALACION DE CABLE 2X2.5mm2 ILUMINACION 1 220 220.00 220.00 m
01.03.01.03.0 INSTALACION DE CABLE 2X4.0mm2 + 1X2.5mm2 TOMACORRIENTES 1 90 90.00 90.00 m
01.03.01.03.0 INSTALACION DE CABLE 2X4.0mm2 + 1X2.5mm2 LUZ DE EMERGENCIA 1 30 30.00 30.00 m
01.03.01.04 SALIDA PARA CENTRO DE LUZ
01.03.01.04.0 SALIDA PARA CENTRO DE LUZ 46.00 PTO
Aula - 03 años 7 1 7.00 Aula - 04 años 7 1 7.00 Aula - 05 años 7 1 7.00 Deposito 3 1 3.00 SS.HH 4 1 4.00Aleros exteriores 18 1 18.00
01.03.01.05 ARTEFACTOS DE ILUMINACION
01.03.01.05.0 Artefacto para enpotrar, con 02 fluorecente lineales de 36W, con rejilla y sistema optico parabolico 21.00 UND Aula - 03 años 7 1 7.00 Aula - 04 años 7 1 7.00 Aula - 05 años 7 1 7.00
01.03.01.05.0 Artefacto para enpotrar, con fluorecente circular de 36W, con difusor acrílico balnco opalino 25.00 UND Deposito 3 1 3.00 SS.HH 4 1 4.00Aleros exteriores 18 1 18.00
01.03.01.05.0 Artefacto para enpotrar, Luz de meregencia 8.00 UND8 1 8.00
01.03.01.06 INTERRUPTORES
01.03.01.06.0 SALIDA PARA INTERRUPTOR SIMPLE, INCLUYE INSTALACION DE INTERRUPTOR 5.00 PTO
Deposito 3 1 3.00 SS.HH 2 1 2.00
01.03.01.06.0 SALIDA PARA INTERRUPTOR DOBLE, INCLUYE INSTALACION DE INTERRUPTOR 6.00 PTO
Aula - 03 años 1 1 1.00 Aula - 04 años 1 1 1.00 Aula - 05 años 1 1 1.00Aleros exteriores 3 1 3.00
01.03.01.06.0 SALIDA PARA INTERRUPTOR CONMUTADO, INCLUYE INSTALACION DE INTERRUPTOR 4.00 PTO
Aleros exteriores 4 1 4.00
01.03.01.07 TOMACORRIENTES
01.03.01.07.0 27.00 PTO Aula - 03 años 8 1 8.00 Aula - 04 años 8 1 8.00 Aula - 05 años 8 1 8.00 Deposito 3 1 3.00
01.03.01.07.0 3.00 PTO
Aula - 03 años 1 1 1.00 Aula - 04 años 1 1 1.00 Aula - 05 años 1 1 1.00
01.03.01.07.0 SALIDA PARA LUZ DE EMERGENCIA, INCLUYE INSTALACION DE TOMACORRIENTE 8.00 PTOAulas y Exteriores 8 1 8.00
01.03.02 SISTEMAS ESPECIALES
01.03.02.01.0 TUBERIA PVC - P Ø 25 mm 55.00 m
RED DE DATA 1 23 23.00RED TV 1 32 32.00
01.03.02.01.0 TUBERIA PVC - P Ø 20 mm 31.00 m
RED VIDEO PROYECTOR 1 18 18.00RED TIMBRE/SONIDO 1 13 13.00
01.03.02.01.0 INSTALACION DE CABLE UTP CAT. 8 1 23 23.00 23.00 m
01.03.02.01.0 INSTALACION DE CABLE TV 1 32 32.00 32.00 m
01.03.02.01.0 INSTALACION DE CABLE PARA VIDEO PROYECTOR 1 18 18.00 18.00 m
01.03.02.01.0 INSTALACION DE CABLE PARA TIMBRE/SONIDO 1 13 13.00 13.00 m
01.03.02.01.0 SALIDA PARA RED DE DATOS 3.00 PTO3 1 3.00
01.03.02.01.0 Salida para proyector Multimedia, para empotrar, con 01 puerto 3.00 PTO3 1 3.00
01.03.02.01.0 Salida para TV por cable con tapa ciega 3.00 PTO3 1 3.00
01.03.02.01.1 SALIDA PARA EQUIPO PARLANTE 2.00 PTO2 1 2.00
01.03.02.02 CAJAS METALICAS CON TAPA
01.03.02.02.0 instalacion de cajas metalicas de cajas de 20x20x10 6 1 6.00 6.00 pto01.03.02.02.0 instalacion de cajas metalicas de cajas de 15x15x10 4 1 4.00 4.00 pto
“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”
Nº de Partida
Nº de Elem.
Nº de Cant.
SALIDA PARA TOMACORRIENTES DOBLE CON PUESTA TIERRA, INCLUYE INSTALACION DE TOMACORRIENTE
SALIDA PARA TOMACORRIENTES EMPOTRADO EN TECHO CON PUESTA TIERRA, INCLUYE INSTALACION DE TOMACORRIENTE
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:
OBRA : Plano:
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:
FECHA: MARZO -2014 Revisado:
04. INSTALACIONES SANITARIAS
Nº de Partida DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
01.04 INSTALACIONES SANITARIAS
01.04.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
INSTALACIONES INTERIORES01.04.01.01 TRAZO Y REPLANTEO 51.00 M
SS.HH Niños y Niñas en aulas 1 1 51.00 51.00
01.04.01.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 51.00 M
SS.HH Niños y Niñas en aulas 1 1 51.00 51.00
01.04.01.03 RELLENO CON MATERIAL PROPIO 51.00 M
SS.HH Niños y Niñas en aulas 1 1 51.00 51.00
01.04.01.04 SALIDAS DE AGUA FRIA 1/2" 11.00 M
SS.HH niñas 1 4 4.00
SS.HH niños 1 6 6.00
Therma 1 1 1.00
01.04.01.05 INSTALACION DE TUB. PVC SAP C-10 Ø 1/2" 18.80 M
SS.HH Niños y Niñas en aulas 1 1 18.80 18.80
01.04.01.06 INSTALACION DE TUB. PVC SAP C-10 Ø 3/4" 39.00 M
SS.HH Niños y Niñas en aulas 1 1 39.00 39.00
01.04.01.07 VALVULA COMPUERTA DE BRONCE Ø 1/2" 6.00 UND
SS.HH Niños y Niñas en aulas 2 3 6.00
01.04.01.08 ACCESORIOS VARIOS 36.00 UND
Codo pvc sap Ø 1/2"x90° 2 8 16.00
Tee pvc sap Ø 1/2"x90° 2 4 8.00
Codo pvc sap Ø 3/4"x90° 1 2 2.00
Tee pvc sap Ø 3/4"x90° 1 5 5.00
Reducción pvc sap Ø 3/4"x1/2" 1 5 5.00
01.04.01.09 PRUEBA HIDRAULICA 1 1 1.00 1.00 M
01.04.02 SISTEMA DE AGUA CALIENTE
INSTALACIONES INTERIORES01.04.02.01 TRAZO Y REPLANTEO 18.60 M
1 1 18.60 18.60
01.04.02.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 18.60 M
1 1 18.60 18.60
01.04.02.03 RELLENO CON MATERIAL PROPIO 18.60 M
1 1 18.60 18.60
01.04.02.04 SALIDAS DE AGUA CALIENTE 1/2" 5.00 M
SS.HH niñas 1 2 2.00
SS.HH niños 1 2 2.00
Therma 1 1 1.00
01.04.02.05 INSTALACION DE TUB. CPVC C-10 Ø 1/2" 26.20 M
SS.HH Niños y Niñas en aulas 1 1 26.20 26.20
01.04.02.06 THERMA A GAS 10LTS 1.00 UND
1 1 1.00
01.04.02.07 ACCESORIOS VARIOS 9.00 UND
Codo cpvc Ø 1/2"x90° 7 1 7.00
Tee cpvc Ø 1/2" 2 1 2.00
01.04.02.08 PRUEBA HIDRAULICA 1 1 1.00 1.00 GLB
01.04.03 SISTEMA DE DESAGUE Y VENTILACION
INSTALACIONES INTERIORES01.04.03.01 TRAZO Y REPLANTEO 35.70 M
1 1 35.70 35.70
01.04.03.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 35.70 M
1 1 35.70 35.70
01.04.03.03 RELLENO CON MATERIAL PROPIO 35.70 M
1 1 35.70 35.70
01.04.03.04 INSTALACION DE TUB. PVC Ø 2" 1 1 11.00 11.00 11.00 M
“MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”
Nº de Elem.
Nº de Cant.
Nº de Partida DescripciónMedidas
Parcial Total Und.Largo Ancho Altura
Nº de Elem.
Nº de Cant.
01.04.03.05 INSTALACION DE TUB. PVC Ø 4" 1 1 28.80 28.80 28.80 M
01.04.03.06 SALIDA DE DESAGUE EN TUB.PVC Ø 2" 1 12 12.00 12.00 PTO
01.04.03.07 SALIDA DE DESAGUE EN TUB.PVC Ø 4" 2 2 4.00 4.00 PTO
01.04.03.08 REGISTRO ROSCADO Ø 4" 2 1 2.00 2.00 UND
01.04.03.09 SUMIDERO DE 2'' 2 3 6.00 6.00 UND
01.04.03.10 SALIDA DE VENTILACION TUB.PVC Ø 2" 2 2 4.00 4.00 PTO
01.04.03.11 SOMBRERO DE VENTILACION Ø 2" 2 2 4.00 4.00 PTO
01.04.03.12 ACCESORIOS VARIOS 24.00 UND
Codo pvc Ø 4"x90° 2 2 4.00
Codo pvc Ø 4"x45° 2 2 4.00
Yee pvc Ø 4"x4" 1 4 4.00
Yee pvc Ø 4"x2" 1 10 10.00
Yee pvc Ø 2" x2' 1 2 2.00
01.04.03.13 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA (para Desague) 1 3 3.00 3.00 PTO
01.04.03.14 PRUEBA HIDRAHULICA 1 1 1.00 1.00 GLB
01.04.04 SISTEMA DE EVACUACION DE AGUA PLUVIAL
01.04.04.01 INSTALACION DE TUB. PVC MONTANTE Ø 4" 10 1 10.00 10.00 UND
01.04.04.02 COLUMNETA DE CONCRETO 0.20 *0.20*1.60M 10 1 10.00 10.00 UND
01.04.04.03 CANALES DE COLECCION EN LOSA DE ALEROS 1 87.2 87.20 87.20 M