Malaysian Green Building Index
IEN Consultants Sdn. Bhd
www.ien.com.m
16 September 2009
Introduction to GBI
8/2/2019 02 Malaysian GBI
2/34
10/14/2009
2
Sustainable Site Planningand Management
WaterInnovation c ency
Energy EfficiencyIndoor
EnvironmentQuality
Materials & Resources
GBI address 2 Types of Building
on- es ent a
Residential100 points score sheet
8/2/2019 02 Malaysian GBI
3/34
10/14/2009
3
50-65Certified
Levels of GBI Ratings for NRNC
86+Platinum
76-85Gold
66-75Silver
GBI Categories Max. Points
GBI Overall Points Score for Non-Residential
Indoor Environmental Quality 21
Site Planning & Mgt. 16
Materials and Resources 11
Water Efficiency 10
Innovations 7
8/2/2019 02 Malaysian GBI
4/34
10/14/2009
4
GBI Criteria Non ResidentialEnergy Efficiency 35 pts
EE1: Minimum EE Performance
OTTV 50, RTTV 25 Provision of Energy Management Control
System
1 Point
8/2/2019 02 Malaysian GBI
5/34
10/14/2009
5
EE2: Lighting Zoning All individual or enclosed spaces to be individually
switched; and the size of individually switchedlighting zones shall not exceed 100m for 90% of the NLA; with switching clearly labelled and easilyaccessible by building occupants.
Provide auto-sensor controlled lighting inconjunction with daylighting strategy for all
perimeter zones and daylit areas, if any Provide motion sensors or equivalent tocomplement lighting zoning for at least 25% NLA
3 Points
EE3: Electrical sub-metering &Tenant sub-meteringProvide sub-metering for all energy uses of > 100kVa; with
se arate sub-meterin for li htin and se aratel for power at each floor or tenancy, whichever is smaller.
1 Point
8/2/2019 02 Malaysian GBI
6/34
10/14/2009
6
EE4: Renewable EnergyWhere 0.5 % or 5 kWp whichever is thegreater, of the total electricity consumptionWhere 1.0 % or 10 kWp whichever is thegreater, of the total electricity consumption 3
Where 1.5 % or 20 kWp whichever is thegreater, of the total electricity consumption 4
5 Points
.greater, of the total electricity consumption 5
EE5 Advanced EE Performance
BEI < 150 kWh/m 2.yr 2,
BEI < 130, OR 5BEI < 120, OR 8BEI < 110, OR 10BEI < 100, OR 12
15 Points
BEI < 90 15
8/2/2019 02 Malaysian GBI
7/34
10/14/2009
7
EE6 Enhanced Commissioning1. Conducting at least one commissioning design review during thedetail design stage.
2. Developing and incorporating commissioning requirements into thetender documents.3. Developing and implementing a commissioning plan.4. Verifying the installation and performance of the systems to becommissioned.5. Reviewing contractor submittals applicable to systems beingcommissioned for compliance.
.the information needed to understand and optimally operate thecommissioned systems.7. Verifying that the requirements for training operating personnel andbuilding occupants are completed.
3 Points
EE7: Post OccupancyCommissioning1. Design engineer shall review all tenancy fit-out plans to
ensure ori inal desi n intent is not com romised and upon completion of the fit-out works, verify and fine-tune the installations to suit.
2. Within 12 months of practical completion (or earlier if there is at least 50% occupancy), the CxS shall carryout a full post/re-commissioning of the building's energyrelated s stems to verif that their erformance is sustained in conjunction with the completed tenancy fit-outs.
2 Points
8/2/2019 02 Malaysian GBI
8/34
10/14/2009
8
EE8: EE Verification1. Use Energy Management System to
mon or an ana yse energy consump onincluding reading of sub-meters, AND
2. Fully commission EMS includingMaximum Demand Limiting programmewithin 12 months of ractical com letion
(or earlier if there is at least 50%occupancy).
2 Points
EE9: Sustainable Maintenance1. At least 50% of permanent building maintenance team to
be on-board one (1) to three (3) months before practicalcompletion and to fully participate (to be specified incontract conditions) in the Testing & Commissioning of all building energy services.
2. Provide for a designated building maintenance office thatis fully equipped with facilities (including tools andinstrumentation) and inventory storage.
3. Provide evidence of documented plan for at least 3-year facility maintenance and preventive maintenance budget(inclusive of staffing and outsourced contracts).
3 Points
8/2/2019 02 Malaysian GBI
9/34
10/14/2009
9
Indoor Environment Quality
21 pts
EQ1: Minimum IAQPerformanceMeet the minimum requirements of
ven a on ra e n . : or the local building code whichever is themore stringent.
1 Point
8/2/2019 02 Malaysian GBI
10/34
10/14/2009
10
EQ2: Environmental Tobacco
Smoke (ETS) ControlProhibit smoking in the building, AND Locate
any ex er or es gna e smo ng areas aleast 10m away from entries, outdoor air intakes and operable windows.
1 Point
EQ3: Carbon Dioxide Monitoringand ControlInstall carbon dioxide (CO 2) monitoring and
con ro sys em w a eas one 2sensor at all main return points on eachfloor t o facilitate continuous monitoringand adjustment of outside air ventilationrates to each floor, and ensureindependent control of ventilation rates tomaintain CO 2 level < 1,000 ppm
1 Point
8/2/2019 02 Malaysian GBI
11/34
10/14/2009
11
EQ 4: Indoor Air Pollutants1. Low VOC for Paint & Coating, Carpet &
oor ng an es ve ea an2. Products with no Added Urea
Formaldehyde. Composite wood & agrifiber products, MDF,
l wood etc..
Laminating adhesives Insulation foam Etc.
2 Points
EQ5: Mould Prevention
To demonstrate design will prevent moldgrow .
AHU Design parameters Positive pressure building Prevention of infiltration Etc.
1 Point
8/2/2019 02 Malaysian GBI
12/34
10/14/2009
12
EQ6: Thermal Comfort: Design
& Controllability of Systems. .
2. 50% building occupants have controlover their individual comfort condition.
2 Points
EQ7: Air Change Effectiveness
The ventilation systems are designed toac eve an o . w en measurein accordance with ASHRAE 129-1997:Measuring air change effectiveness where
ACE is to be measured in the breathingzone (nominally 1.0 m from finished floor level)
1 Point
8/2/2019 02 Malaysian GBI
13/34
10/14/2009
13
EQ8: DaylightingDemonstrate that 30% of the NLA has a
ay g ac or n e range o . .as measured at the working plane, 800mmfrom floor level 1 point
Demonstrate that 50% of the NLA has ada li ht factor in the ran e of 1.0 3.5%
as measured at the working plane, 800mmfrom floor level 2 points
2 Points
EQ9: Daylight Glare Control a) Eliminate glare from all direct sun penetration and
keep horizontal workspace lux level below 2000; b Eliminate glare rom di use sky radiation or occupant
workspace at viewing angles of 15 to 60 from the
horizontal at eye level (typically 1.2m from floor level) c) Control with an automatic monitoring system (for
atrium and windows with incident direct sun light only -not applicable for fixed blinds/screens); AND d) Equipw a manua overr e unc on access e y occupan s(not applicable for fixed blinds/screens)
1 Point
8/2/2019 02 Malaysian GBI
14/34
10/14/2009
14
EQ10: Electric Lighting LevelsDemonstrate that office lighting design
ma n a ns a um nance eve o no morethan specified in MS1525:2007 for 90% of NLA as measured at the working plane(800 mm above the floor level).
1 Point
EQ11: High Frequency Ballasts
Install high frequency ballasts in fluorescentum na res over a m n mum o o .
1 Point
8/2/2019 02 Malaysian GBI
15/34
10/14/2009
15
EQ12: External ViewsDemonstrate that 75% of the NLA has a
rec ne o s g roug v s on g az ng aa height of 1.2m from floor level. - 2 points
2 Points
EQ13: Internal Noise Levels
Within the entire baseline building generalo ce, space no se rom e u ngservices does not exceed 40dBAeq.
Or Within the baseline building office space, the
open plan and not exceed 40dBAeq for closed offices
1 Point
8/2/2019 02 Malaysian GBI
16/34
10/14/2009
16
EQ 14: IAQ Before & During
Occupancy1. Perform Flush Out before Occupancy.
ac or m n ac n t a ays ooccupancy or
10 ach for 15 min & 1 ach initial 7 days of occupancyif EQ4 is met (Low VOC and no formaldehyde used)or
Conduct IAQ testing
2. Permanent air flushing system of at least10 ach is installed during occupancystage.
2 Points
EQ15: Post Occupancy ComfortSurvey: Verification1. Within 12 months, conduct occupant
survey on erma , v sua an acous ccomfort. And
2. Develop action plan if survey resultindicate that > 20% of occupants aredissatisfied with overall comfort.
2 Points
8/2/2019 02 Malaysian GBI
17/34
10/14/2009
17
Sustainable Site Planning &
Management 16 pts
SM1: Site SelectionDo not develop building, hardscape, road or parking area on a site or part of a site that meet any one of the following criteria:-
a) Prime farmland
b) Forest reserve or State Environmental Protection Zones
c) Within 30 m of any wetlands
d) Previously undeveloped land that is within 30 m of Mean High Water Spring(MHWS) sea level which supports or could support wildli fe or recreational use
e) Previously undeveloped land that is within 20 m of lake, river, stream and tributary.
f) Land which prior to acquisition for the project was public parkland, unless land of equal or greater value as parkland is provided.
1 Point
8/2/2019 02 Malaysian GBI
18/34
10/14/2009
18
SM2: Brownfield RedevelopmentReduce pressure on undeveloped land by
re a a ng amage s es.Typically, rubbish tips, former mining land,
old factory sites, etc.
1 Point
SM3: Development Density &Community ConnectivityConstruct a new building or renovate an
ex s ng u ng on a prev ous ydeveloped site AND within 1 km of aresidential zone or neighbourhood with anaverage density of 25 units per hectare net(10 units per acre net) AND within 1 km of at least 10 Basic Services AND withpedestrian access between the buildingand the services.
1 Point
8/2/2019 02 Malaysian GBI
19/34
10/14/2009
19
SM4: Environment Management
Open Space Reduce by 25%, the development footprint
(defined as the total area of the buildingfootprint, hardscape, access road andparking) and/or provide vegetated open spacewithin the project boundary to exceed the
site.
1 Point
SM5: Earthworks - Construction Activity Pollution ControlReduce pollution from construction activities
y con ro ng so eros on, wa erwaysedimentation and airborne dustgeneration:-
1 Point
8/2/2019 02 Malaysian GBI
20/34
10/14/2009
20
SM6: QLASSIC Achieve a minimum score of 70% on
ass c
1 Point
SM7: Workers Site Amenities
a) Proper accommodation for construction workers at the.
b) Prevent pollution of storm sewer or receiving stream byhaving proper septic tank.
c) Prevent polluting the surrounding area from open
1 Point
burning and proper disposal of domestic waste.
d) Provide adequate health and hygiene facilities for workers on site.
8/2/2019 02 Malaysian GBI
21/34
10/14/2009
21
SM8: Public Transportation
AccessLocate project within 1 km of an existing, or
p anne an un e , commu er ra , grail or subway station.
Or Locate project within 500 m of at least one
.
1 Point
SM9: Green Vehicle Priority
Preferred Parking Spaces for Low Emittingan ue c en e c es or o uTime Equivalent (FTE).
1 Point
8/2/2019 02 Malaysian GBI
22/34
10/14/2009
22
SM10: Parking CapacitySize parking capacity to meet but not
excee e m n mum oca zon ngrequirements.
AndProvide preferred parking for carpools or
spaces.
1 Point
SM11: Stormwater Design Quantity and Quality ControlExisting imperviousness is 50%
Meet MASMA.
Existing imperviousness is > 50%25% better than MASMA.
90% of the average annual rainfall to becaptured & treated before discharge fromsite.
1 Point
8/2/2019 02 Malaysian GBI
23/34
10/14/2009
23
SM12: Greenery & Roof A) 50% of the site hardscape
To be shaded within 5 years of occupancyOr Paving materials SRI > 71Or Open grid pavement system.
B) Roof
SRI > 75Or vegetated roof > 50% area.
2 Points
SM13: Building User Manual
Provide a Building User Manual thatocumen s pass ve an ac ve ea ures
that should not be downgraded.
1 Point
8/2/2019 02 Malaysian GBI
24/34
10/14/2009
24
Materials & Resources
11 pts
MR1: Materials reuse and selection
Reuse building materials 2% of total material cost value 1 pt
5% of total material cost value 2 pts
2 Points
8/2/2019 02 Malaysian GBI
25/34
10/14/2009
25
MR2: Recycled content materials
Recycled Contents in Building Materials 10% of total material cost value 1 pt 30% of total material cost value 2 pts
Pre-consumer (worth 50%) Post-consumer recycled contents (worth
2 Points
MR3: Regional Materials
Use building materials or products that haveeen ex rac e , arves e or recovere ,
as well as manufactured, within 500km of the project site for > 20% (based on cost)of the total material value
1 Point
8/2/2019 02 Malaysian GBI
26/34
10/14/2009
26
MR4: Sustainable Timber
Where > 50% of wood-based materialsan pro uc s use are cer e .Compliance with Malaysian Timber Certification Council & Forest Research Stewardship requirements.
1 Point
MR5: Storage & Collection of recyclablesDuring Construction, provide dedicated
area s an s orage or co ec on o non-hazardous materials for recycling, AND
During Building Occupancy, providepermanent recycle bins .
1 Point
8/2/2019 02 Malaysian GBI
27/34
8/2/2019 02 Malaysian GBI
28/34
10/14/2009
28
GBI Criteria Non ResidentialWater Efficiency 10 pts
WE1: Rainwater Harvesting
Rainwater harvesting that leads to >15%re uc on n po a e wa er consump on 1 point
Rainwater harvesting that leads to >30%
2 points
2 Points
8/2/2019 02 Malaysian GBI
29/34
10/14/2009
29
WE2: Water Recycling
Treat and recycle >10% wastewater leadingo re uc on n po a e wa er consump on;
1 pt
Treat and recycle >30% wastewater leading
2 pts
2 Points
WE3: Water Efficient -Irrigation/LandscapingReduce potable water consumption for
an scape rr ga on y > e.g. rouguse of native or adaptive plants to reduceor eliminate irrigation requirement; 1 pt
irrigation; 2 pts.
2 Points
8/2/2019 02 Malaysian GBI
30/34
10/14/2009
30
WE4: Water Efficient FittingsEncourage reduction in potable water
consump on roug use o e c endevices :-
Reduce annual potable water consumptionby >30%; 1 pt
Reduce annual potable water consumptionby >50%; 2 pts
2 Points
WE5: Metering & Leak DetectionSystemUse of sub-meters to monitor and manage
ma or wa er usage or coo ng owers,irrigation, kitchens and tenancy use; 1 pt
Link all water sub-meters to EMS to facilitate
2 Points
8/2/2019 02 Malaysian GBI
31/34
10/14/2009
31
Innovation
7 pts
IN1: Innovation in Design &Environmental Design Initiatives
. y y u u ybut not addressed by this GBI RatingSystem.
Max 6 Points
8/2/2019 02 Malaysian GBI
32/34
10/14/2009
32
IN2: Green Building Index
Facilitator At least one principal participant of the
pro ec eam s a e a reen u ngIndex Facilitator who is engaged at theonset of the design process untilcompletion of construction and GreenBuilding Index certification is obtained.
1 Point
Thats It! 100 Points!
8/2/2019 02 Malaysian GBI
33/34
10/14/2009
33
GBI Assessment Process
Application GBI Certifier ReviewGBI Certifier
Review
Registration
Appoint ProjectCoordinator/ GBI
Facilitator
GSB issuesprovisional GBI
Certificate
GBI Certifier submit to GSB
GBI Certifier submit CVA to
GSB
GSB issues GBICertification
esgn AssessmentSubmission
u m t or upon completion
of project
GSB Greenbuildingindex Sdn. Bhd.GBI Green Building Index
EnergyConsultant Architect
Owner
ucontractors
ContractorMechanical
Engineer
vEngineer
GBI FacilitatorWorking Togetherto Achieve the Goal
InteriorDesigner
LandscapeArchitect
ElectricalEngineer