    REPORT ON BUILDING DEFECTS(REVISION 1 CONCISE)

    For the property known as

    CENTENNIAL

    at

    88-98 KING STREET, RANDWICK

    On behalf of

    THE OWNERS STRATA PLAN 75411

    Through

    THE STRATA AGENCY PTY LTDPO BOX 1716,

    CROWS NEST NSW 1585

    DECEMBER 2010

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 1

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    2/197

    (Ref: 78088289.doc)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 2

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    3/197

    1.0 INTRODUCTION

    1.1 Overview and brief

    1.1.1 RHM Consultants Pty Ltdwas instructed by The Owners Strata Plan 75411, through The Strata Agency Pty Ltdto inspectthe property known as Centennial located at 88-98 King Street, Randwick.

    1.1.2 The purpose of the inspection was to identify building defects affecting the individual residential units and all internal andexternal common property, and to subsequently provide an expert opinion on the building defects and responsibility for thedefects in the context of a potential claim for defective building work against the original builder.

    1.1.3 Inspections were carried out on Wednesday 07th October 2009, Thursday 08th October 2009, Friday 09th October 2009,Tuesday 13th October 2009, Wednesday 14th October 2009, Friday 06th November 2009 and Thursday 09th December 2010 inthe presence of the respective occupants of the lots. The sole author of this report, Mr. Andrew Stewart conducted theinspections.

    1.2 Building description1.2.1 The property known as Centennial consists of four multi-storey residential buildings (referred to as Pavilions) comprising

    ninety-three lots. The complex is constructed upon a predominantly flat block of land fronting King Street.

    1.2.2 The buildings are constructed upon a reinforced concrete podium slab over a large twin-level basement carpark. Thebasement carpark is constructed of reinforced concrete columns and beams with perimeter core-filled reinforced blockworkboundary walls. The basement carpark floor comprises an in-fill reinforced concrete slab and is accessed via a reinforcedconcrete driveway on the western elevation of the complex off King Street.

    1.2.3 The buildings are constructed with load-bearing, cavity brickwork walls supporting internal reinforced concrete floor slabs.The internal partition walls between the sole-occupancy units are load-bearing, rendered masonry walls. The internal wallswithin the individual sole-occupancy units consist of galvanised steel-framing clad with set plasterboard sheeting. Each unit

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 3

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    4/197

    has access to at least one reinforced concrete balcony (with clear-finished hardwood timber floorboards) or courtyard (with

    ceramic floor tiles) featuring powder-coated aluminium-framed balustrades or rendered masonry perimeter planterboxes.

    1.2.4 The buildings feature exposed, flat, pre-cast reinforced concrete roofs (such as Ultrafloor or similar) with fibreglass-reinforced, liquid-applied waterproof membranes and perimeter powder-coated metal cappings to the low-height parapetwalls. The roofs are drained via recessed (formed) box gutters which are connected to partially concealed downpipes.Stainless steel harness anchorage points are also located on the rooftop. Roof-mounted air-conditioning plant (includingcondensers) is enclosed by painted, timber-framed privacy screens, while the roof-mounted, gas-fired hot water systems aretypically enclosed by steel-framed, custom orb clad privacy screens. Rendered reinforced concrete lift shaft housings withflat, reinforced concrete roofs feature exposed liquid-applied waterproof membranes. The roof of Pavilion 4 is obscured withCoreflute protection boards, geotechnical fabric and pebble ballast, while core-filled reinforced blockwork walls bound thehot water system enclosure in place of privacy screens.

    1.2.5 The complex was constructed on the site of the old Randwick Tramway Workshops and features substantial groundsincluding garden areas and an in-ground reinforced concrete pool and sunbaking deck. A grassed lawn area separatesPavilion 3 and Pavilion 4, while a paved hardstand area incorporating a shallow pond separates Pavilion 1 and Pavilion 2. Theheritage-listed brickwork chimney stack was restored as part of the development and is located on the southern elevation ofthe complex adjacent to Pavilion 1 and Pavilion 2.

    1.2.6 The residential units are accessed via a series of tiled or carpeted internal common foyers, some with access to partiallyenclosed Juliet balconies featuring powder-coated aluminium-framed balustrades. Pavilion 1 and Pavilion 2 are serviced by asingle lift each, while Pavilion 3 and Pavilion 4 are serviced by two lifts each (six lifts in total); however access is alsoavailable via separate internal fire stairwells.

    1.2.7 The buildings external facades consist of face brickwork with ironed bed and perpend joints, powder-coated aluminium-framed windows, painted/rendered reinforced concrete elements and adjustable clear-finished cedar louvre screens.

    1.2.8 We have been informed that the complex was completed circa February 2006. The building is approximately four years old,hence rectification of identified defects should be sought through the original Contractor in accordance with Section 18B ofthe Home Building Act 1989 (NSW).

    1.2.9 For the purposes of this report, the King Street frontage of the building is deemed the southern elevation.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 4

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    5/197

    1.3 Building classification

    1.3.1 The design and intended uses ofCentennialattracts the following classifications in accordance with the Building Code ofAustralia (BCA):

    Class 2 a building containing two or more sole-occupancy units each being a separate dwelling;Class 7a a carpark.

    1.3.2 The BCA referred to herein is Volume 1 of the 2005 edition of the Building Code of Australia (BCA) and the New SouthWales variations. We have referred to either the deemed-to-satisfy provisions or the performance requirements of theBCA, both of which can be used for determining compliance with the BCA.

    1.4 Report structure

    1.4.1 Section 2.0 Defect Schedule forms the main body of the report and comprises an itemised defect schedule that is separatedinto three (3) columns:

    1.4.2 The first column nominates the item reference numbers and sub-references (A-F).

    1.4.3 The second column provides commentary on the defect items and is separated into six (6) rows per building defect item:

    i. The first row (sub-reference A) contains the location and description of the defect item.

    ii. The second row (sub-reference B) contains any backgroundinformation (where applicable) pertaining to the defect item.

    iii. The third row (sub-reference C) provides what, in our opinion, is the suspected cause of the defect item.

    iv. The fourth row (sub-reference D) provides our opinion whether the defect item breaches any of the applicable statutorywarranties under Section 18B of the Home Building Act 1989 (NSW), or other relevant codes or standards.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 5

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    6/197

    v. The fifth row (sub-reference E) provides our opinion as to what the recommended scope of works/method of rectification

    is for the defect item.vi. The sixth row (sub-reference F) contains a cost estimate for the recommended scope of works/method of rectification for

    the defect item.

    1.4.4 The third column provides a photograph or photographs of the defect item referred to in the second column.

    1.5 Qualifications1.5.1 All inspections were visual only, without the use of invasive or destructive investigations, flood testing (except where noted

    otherwise) or specialist diagnostics equipment, with the exception of a moisture metre. The moisture metre used was a

    2007 model GE Surveymaster Protimeter Dual-Function Moisture Meter.

    1.5.2 All observations were made from the external common areas and adjoining grounds, the respective floor levels of eachbuilding or the roofs ofCentennialunless otherwise stated.

    1.5.3 We note that the defects contained in the following schedule are in our opinion the result of defective building work and arenot a consequence of normal wear and tear or maintenance issues associated with the ageing of the complex.

    1.5.4 Throughout the following defects schedule under Location and description (second column, row A) relating to internalwater penetration issues within the complex, where it states evidence of water penetration, we have not seen the waterpenetrate directly, unless otherwise stated.

    1.5.5 Where cracking was observed in various locations throughout the internal and external areas, we have provided an opinionon which of these cracks we consider to be within acceptable standards and tolerances as stipulated by The Office of FairTrading (OFT) Guide to Standards and Tolerances dated July 2003 Section 3 Masonry. This section of the document statesthat cracking which is less than 1mm in width or where there are no areas of drummy or delaminating render is notconsidered a justifiable building defect. Given that this document is widely accepted within the building and Home OwnersWarranty (HOW) insurance industry and also by the Consumer, Trader and Tenancy Tribunal (CTTT), cracking which fallsoutside the stipulated parameters outlined within the document is not considered the responsibility of the original

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 6

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    7/197

    Contractor. In other cases, we may have observed cracking which was less than 1mm in width and did not report on same as

    a consequence of the parameters of the aforementioned document.

    1.5.6 Throughout the following defects schedule under Suspected Cause (second column, row C), where it states poorworkmanship, we note that we have not reviewed the contract documents which may or may not describe the exactmethod of work required for each building element, unless otherwise stated. In circumstances where there is no exactmethod of work for each building element, it is our opinion that the builder is expected to carry out the work as part of theirduty of care in accordance with all relevant Australian Standards, codes and acceptable building practice.

    1.5.7 We note that classification of defective building works described within the second column, row D of this report is based onour understanding of the provisions of the Home Building Act 1989 (NSW) and is provided to assist in the assessment of anyclaim. The classifications may require qualified legal opinion.

    1.5.8 The Recommended scope of works/method of repair (second column, row E) outlines what in our opinion are the minimumrequirements to address the alleged defects. The scope of works is presented as a guide only and should not be employedwithout express written consent or direction from RHM Consultants Pty Ltd. RHM Consultants Pty Ltdwill not be held liablefor any issues that arise as a result of works being undertaken based on the suggested scope of works by any party, withoutconsultation or supervision.

    1.5.9 Where we have specified preparation and application of paintwork to a surface that is to be repaired on account of defectivebuilding work under Recommended scope of works/method of repair (second column, row E) we have allowed to prepareand paint the entire surface area of the affected element to the nearest architectural break-line (such as an internal cornerof a wall) in accordance with standard industry practice.

    1.6 Cost estimates

    1.6.1 The cost estimates assigned to each individual defect are conservative estimates based on both our calculations of thelabour and material requirements, and our experience with remedial works of this nature undertaken recently on similarbuildings.

    1.6.2 True costs can only be achieved by obtaining competitive tenders based on a detailed scope of works.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 7

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    8/197

    1.6.3 The estimate includes builders margins and preliminaries, but does not include professional fees for preparing

    specifications, calling tenders, and supervising the works.

    1.6.4 Our cost estimates allow for both the rectification of the individual defects, and the rectification of any associated damage(including painting etc). Our estimate is also based on the assumption that the rectification of similar defects will beundertaken simultaneously and continuously throughout the building.

    1.7 Duty to courts

    1.7.1 We confirm that this report was prepared in accordance with the Expert Witness Code of Conduct (Schedule 7 of the UniformCivil Procedure Rules 2005 (UCP Rules)) and the Consumer, Trader & Tenancy Tribunal (CTTT) Chairpersons Directionsheaded Expert Witness Code of Conduct.

    1.7.2 We declare the author has read the Expert Witness Code of Conduct and agrees to be bound by it.

    1.7.3 A copy of the authors Curriculum Vitae is attached for reference.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 8

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    9/197

    2.0 DEFECT SCHEDULE

    2.1 DEFECT SCHEDULE RESIDENTIAL UNITS

    ITEM COMMENTARY PHOTOGRAPH

    1 PAVILION 1 | UNIT 1.04A Location and description

    Storage cupboardEvidence of water penetration in the form of streaming staining emanating from the head ofthe western pre-cast reinforced concrete wall.

    B Background1. This item is considered to be a common propertydefect.2. The occupant advised at the time of inspection that previous remedial building works were

    undertaken in the area adjacent to the external planterbox and that these works have beenonly partially successful.

    3. The occupant advised at the time of inspection that the adjoining external common areaStorage Rooms are affected by similar instances of water penetration, although there wasno available access to the affected areas.

    C Cause1. Absence or failure/poor detailing of the waterproofing provisions within the planterbox

    located immediately over.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Carefully remove the vegetation/finishes from within the affected planterbox. Store

    vegetation in pots. Maintain the health of the plants during the work;

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 9

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    10/197

    ITEM COMMENTARY PHOTOGRAPH

    2. Excavate the soil from within the planterbox and store on site;3. Adequately prepare the substrate;4. Ensure the drainage provisions are adequate. If they are not adequate, install suitable

    drainage provisions;

    (contd)

    5. Supply and apply a new waterproof membrane to the internal surfaces of the planterbox,detailing in accordance with the manufacturers instructions;

    6. Supply and install drainage cells, protection boards and geotechnical fabric;7. Reinstate the soil within the planterbox and compact in appropriate layers;8. Replant the original vegetation. Replace any plants which do not survive with juveniles of the

    same species;9. Supply and install a suitable over-flashing to prevent water bypassing between the

    planterbox wall and the cavity brick faade. The new over-flashing should be lapped onto theexisting cavity flashings to eliminate the possibility of water bypass.

    10.Appropriately prepare the substrate within the storage cupboard;11.Supply and apply a suitable paint for the conditions of service to the substrate within the

    storage cupboard in accordance with the manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 10

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    11/197

    ITEM COMMENTARY PHOTOGRAPH

    2 PAVILION 1 | UNIT 1.04 (contd)A Location and description

    Eastern courtyard

    1mm wide horizontal cracking to the eastern rendered masonry wall at the interface of theconcrete beam.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Differential movement between building elements.2. Shrinkage of the render.3. Insufficient provisions for movement joints.4. Poor workmanship during preparation and application of the render.5. Failure of the Contractor to return to site to rectify cracks in the render.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW) failure to perform work in a properand workmanlike manner. Office of Fair Trading (OFT) Guide to Standards and Tolerancesdated July 2003, Section 3 Masonry, Masonry distress.

    E Recommended scope of works/method of repair1. Remove cracked, drummy and delaminating render from the affected building elements;2. Saw-cut edges square and rake-out cracks in the masonry substrate;

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 11

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    12/197

    ITEM COMMENTARY PHOTOGRAPH

    3. Mechanically secure expanded metal mesh (metal lathe) over cracking in the masonrysubstrate;

    4. Apply new render and install control joints as required;5. Appropriately prepare the substrate;6. Supply and apply a suitable paint for the conditions of service in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    3 PAVILION 1 | UNIT 1.04 (contd)A Location and description

    Western courtyardDetached section of fibre-cement (FC) sheet soffit lining at the northern end in the north-westerncorner.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause

    1. Inadequate or inappropriately installed/secured mechanical fixings or adhesive.2. Poor workmanship during preparation and installation of the FC sheet soffit lining.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Reinstate the detached section of FC sheeting in accordance with the manufacturers

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 12

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    13/197

    ITEM COMMENTARY PHOTOGRAPH

    recommendations;2. Repair any disturbed external surfaces via application of an appropriate mix of set plaster.

    Trowel/finish flush with existing adjacent surfaces;3. Appropriately prepare the substrate;4. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    4 PAVILION 1 | UNIT 2.03A Location and description

    EntryCracked, drummy and delaminating concrete topping to the pre-cast reinforced concrete(Ultrafloor) floor slab. The concrete topping is noticeably displaced and hollow underfoot.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Excessive shrinkage of the concrete.2. Poor workmanship during placement of the concrete topping.

    D Breach(es)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 13

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    14/197

    ITEM COMMENTARY PHOTOGRAPH

    Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Remove the carpeted floor finishes including the underlay and smooth edge;2. Provide appropriate protection to adjoining surfaces;3. Demolish the cracked, drummy and delaminating concrete topping using pneumatic tools as

    required;4. Appropriately prepare any exposed or corroding steel reinforcing including application of an

    epoxy primer;5. Repair the reinforced concrete floor slab using a suitable high-strength repair mortar. Trowel

    flush with existing adjacent surfaces;

    6. Reinstate the carpeted floor finishes including the underlay and smooth edge.

    F Cost (excl. GST)$

    5 PAVILION 1 | UNIT 2.03 (contd)A Location and description

    Western balconyDetached section of fibre-cement (FC) sheet soffit lining at the northern end in the north-westerncorner.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate or inappropriately installed/secured mechanical fixings or adhesive.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 14

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    15/197

    ITEM COMMENTARY PHOTOGRAPH

    2. Poor workmanship during preparation and installation of the FC sheet soffit lining.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Reinstate the detached section of FC sheeting in accordance with the manufacturers

    recommendations;2. Repair any disturbed external surfaces via application of an appropriate mix of set plaster.

    Trowel/finish flush with existing adjacent surfaces;3. Appropriately prepare the substrate;

    4. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with themanufacturers recommendations.

    F Cost (excl. GST)$

    6 PAVILION 1 | UNIT 2.05A Location and description

    Western balconyEvidence of previous water penetration in the form of blistering and flaking paint anddeteriorating plaster to the set fibre-cement (FC) sheet soffit lining in the north-eastern corneradjacent to the Colorbond-clad service riser stack.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 15

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    16/197

    ITEM COMMENTARY PHOTOGRAPH

    B Background1. This item is considered to be a common propertydefect.2. The occupant advised at the time of inspection that the leak has since been rectified;

    however the consequential damage to the set FC sheet soffit lining was not repaired whenthese works were undertaken.

    C Cause1. Failure of the Contractor to return to site to repair the consequential damage caused by a

    previous building defect.

    D Breach(es)

    Under Section 18B (a) and (d) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and within the time stipulated in the contract, or if no time isstipulated, within a reasonable time.

    E Recommended scope of works/method of repair1. Suitably prepare the water-damaged soffit finishes including removal of sections of blistering

    and flaking paint, delaminating set plaster and/or damaged FC sheeting;2. Reinstate any damaged FC sheeting and supply and apply an appropriate mix of set plaster.

    Trowel/finish flush with existing adjacent surfaces;3. Supply and apply a suitable exterior paint system to the affected areas in accordance with

    the manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 16

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    17/197

    ITEM COMMENTARY PHOTOGRAPH

    7 PAVILION 1 | UNIT 3.01A Location and description

    Western balconyEvidence of water penetration in the form of blistering and flaking paint, staining anddeterioration of the set fibre-cement (FC) sheet soffit lining surrounding the Colorbond serviceriser stack at the southern end.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Failure or poor detailing of the waterproofing provisions to the balcony located over at the

    interface of the stormwater drainage provisions.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Carefully remove a portion of the timber decking to the surface of the balcony located

    immediately above in the area above the water penetration damage;2. Identify the exact location of the leak by means of water/flood testing;3. Suitably prepare the substrate in accordance with the membrane manufacturers

    recommendations;4. Supply and apply a new compatible liquid-applied waterproof membrane to the exposed

    surface of the balcony in accordance with the manufacturers recommendations, detailingthe new waterproof membrane into the existing stormwater drainage provisions in anappropriate manner;

    5. Reinstate the original timber decking including rectification of any inadvertent damage to thefinish of same;

    6. Suitably prepare the water-damaged soffit finishes including removal of sections of blisteringand flaking paint, delaminating set plaster and/or damaged FC sheeting;

    7. Reinstate any damaged FC sheeting and supply and apply an appropriate mix of set plaster.Trowel/finish flush with existing adjacent surfaces;

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 17

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    18/197

    ITEM COMMENTARY PHOTOGRAPH

    8. Supply and apply a suitable exterior paint system to the affected areas in accordance withthe manufacturers recommendations.

    F Cost (excl. GST)$

    8 PAVILION 1 | UNIT 3.05A Location and description

    Western balconyEvidence of water penetration in the form of blistering and flaking paint and deterioration of theset fibre-cement (FC) sheet soffit lining surrounding the Colorbond service riser stack at thenorthern end.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Failure or poor detailing of the waterproofing provisions to the balcony located over at the

    interface of the stormwater drainage provisions.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Carefully remove a portion of the timber decking to the surface of the balcony located

    immediately above in the area above the water penetration damage;2. Identify the exact location of the leak by means of water/flood testing;3. Suitably prepare the substrate in accordance with the membrane manufacturers

    recommendations;4. Supply and apply a new compatible liquid-applied waterproof membrane to the exposed

    surface of the balcony in accordance with the manufacturers recommendations, detailingthe new waterproof membrane into the existing stormwater drainage provisions in an

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 18

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    19/197

    ITEM COMMENTARY PHOTOGRAPH

    appropriate manner;5. Reinstate the original timber decking including rectification of any inadvertent damage to the

    finish of same;6. Suitably prepare the water-damaged soffit finishes including removal of sections of blistering

    and flaking paint, delaminating set plaster and/or damaged FC sheeting;7. Reinstate any damaged FC sheeting and supply and apply an appropriate mix of set plaster.

    Trowel/finish flush with existing adjacent surfaces;8. Supply and apply a suitable exterior paint system to the affected areas in accordance with

    the manufacturers recommendations.

    F Cost (excl. GST)$

    9 PAVILION 1 | UNIT 4.01A Location and description

    Main bedroomEvidence of significant water penetration in the form of blistering and flaking paint, staining,mould growth, wet carpet and moisture meter readings to 100%, water-damaged render andswollen timber skirting boards and architraves at the base of the south-facing floor-to-ceilingaluminium-framed window.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Failure and/or poor detailing of the waterproofing provisions to the floor-to-ceiling aluminium-

    framed window.2. Absence of or failure/poor detailing of the sill flashing.3. Absence of or failure/poor detailing of the end-stops to the sub-sill.4. Poor workmanship during construction and installation of the floor-to-ceiling aluminium-

    framed window.

    D Breach(es)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 19

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    20/197

    ITEM COMMENTARY PHOTOGRAPH

    Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Provide appropriate access provisions to the affected section of the floor-to-ceiling

    aluminium-framed window;2. Carefully dismantle the affected section(s) of the floor-to-ceiling aluminium-framed window

    including removal of the glazing and gaskets to allow inspection of the aluminium-frames,sub-sills and/or flashings;

    3. Remove sections of the aluminium framing as required to assist with eliminating waterpenetration into the adjoining habitable area;

    4. Provide temporary weather-resistant protection to prevent water ingress into the adjoininghabitable area;5. Seek advice from the original manufacturer and/or a window specialist regarding the

    appropriate means of repair/reinstatement;6. Reconstruct the floor-to-ceiling aluminium-framed window in accordance with the

    manufacturers recommendations including replacement of faulty/damaged components asrequired;

    7. Reinstate the glazing with new glazing gaskets in accordance with the manufacturersrecommendations;

    8. Supply and install new powder-coated aluminium storm-moulds at the perimeter of the floor-to-ceiling aluminium-framed window in accordance with the manufacturersrecommendations;

    9. Suitably prepare any water-damaged internal wall finishes including removal of sections ofblistering and flaking paint and delaminating set plaster;

    10. Remove the swollen and water damaged MDF skirting boards and replace to match existing;11. Supply and apply an appropriate mix of set plaster to the affected walls and trowel/finish

    flush with existing adjacent surfaces;12.Supply and apply a suitable paint for the conditions of service in accordance with the

    manufacturers recommendations;13. Remove and replace the damaged carpet and smooth edge in the affected areas to match

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 20

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    21/197

    ITEM COMMENTARY PHOTOGRAPH

    existing.

    F Cost (excl. GST)$

    10 PAVILION 1 | UNIT 4.05A Location and description

    Second bedroomEvidence of water penetration in the form of blistering and flaking paint, staining anddeterioration of the plaster to the suspended plasterboard ceiling lining in the north-westerncorner adjacent to the aluminium-framed glass sliding door to the western balcony. The flatreinforced concrete roof featuring a fibreglass-reinforced, liquid-applied waterproof membrane

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 21

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    22/197

    ITEM COMMENTARY PHOTOGRAPH

    and perimeter powder-coated metal cappings to the low-height parapet walls is locatedimmediately above.

    B Background1. This item is considered to be a common propertydefect.2. The occupant advised at the time of inspection that a previous similar instance of water

    penetration within the main bedroom was rectified by the original Contractor.

    C Cause1. Failure or poor detailing of the fibreglass-reinforced, liquid-applied waterproof membrane to

    the flat reinforced concrete roof located over.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Suitably prepare the exposed reinforced concrete roof slab in accordance with the membrane

    manufacturers recommendations;2. Supply and apply a new liquid-applied waterproof membrane to the exposed surface of the

    roof slab in accordance with the manufacturers recommendations;3. Detail the membrane including any recommended terminations in accordance with the

    manufacturers recommendations;4. Suitably prepare any water-damaged internal ceiling finishes including removal of sections of

    blistering and flaking paint and delaminating set plaster;5. Supply and apply an appropriate mix of set plaster to the affected areas and trowel/finish

    flush with existing adjacent surfaces;6. Supply and apply a suitable interior paint for the conditions of service in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 22

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    23/197

    ITEM COMMENTARY PHOTOGRAPH

    11 PAVILION 1 | UNIT 4.05 (contd)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 23

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    24/197

    ITEM COMMENTARY PHOTOGRAPH

    A Location and descriptionWestern balconyEvidence of water penetration in the form of staining at the location of cracking affecting the setfibre-cement (FC) sheet soffit lining joins. Delaminating set plaster was also observed in thislocation. The flat reinforced concrete roof featuring a fibreglass-reinforced, liquid-appliedwaterproof membrane and perimeter powder-coated metal cappings to the low-height parapetwalls is located immediately above.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause

    1. Failure or poor detailing of the fibreglass-reinforced, liquid-applied waterproof membrane tothe flat reinforced concrete roof located over.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Suitably prepare the exposed reinforced concrete roof slab in accordance with the membrane

    manufacturers recommendations;2. Supply and apply a new liquid-applied waterproof membrane to the exposed surface of the

    roof slab in accordance with the manufacturers recommendations;3. Detail the membrane including any recommended terminations in accordance with the

    manufacturers recommendations;4. Suitably prepare any water-damaged external soffit lining finishes including removal of

    sections of blistering and flaking paint and delaminating set plaster;5. Tape over any cracks between the FC sheets using an appropriate exterior-grade material;6. Supply and apply an appropriate mix of set plaster to the affected areas and trowel/finish

    flush with existing adjacent surfaces;7. Supply and apply a suitable exterior paint for the conditions of service in accordance with the

    manufacturers recommendations.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 24

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    25/197

    ITEM COMMENTARY PHOTOGRAPH

    F Cost (excl. GST)$

    12 PAVILION 2 | UNIT 1.01A Location and description

    Main bedroomEvidence of water penetration in the form of blistering and flaking paint, staining and mouldgrowth at the base of the timber architrave on the LHS of the doorway to the ensuite. Moisturemeter readings to 100% were recorded in this location.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Failure and/or poor detailing of the waterproofing provisions within the adjoining wet area.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW) failure to perform work in aproper and workmanlike manner and breach of AS3740 1994 Waterproofing of wet areaswithin residential buildings and Section F1.7 (a) of the Building Code of Australia (BCA).

    E Recommended scope of works/method of repair1. Remove any necessary bathroom fittings and fixtures including the shower screen;2. Demolish the wall and floor tiles within the ensuite shower recess;3. Suitably prepare the substrate;

    4. Supply and apply a suitable waterproof membrane to full shower height in accordance withthe manufacturers recommendations and AS 3740 2004 Waterproofing of wet areas withinresidential buildings;

    5. Install a suitable sand and cement screed with appropriate falls to the floor waste;6. Replace wall and floor tiles to match existing using a suitable, compatible tile adhesive;7. Reinstate bathroom fittings and fixtures;8. Repair consequential damage to all internal finishes including replacement of water damaged

    timber flooring and timber architraves;9. Supply and apply a suitable paint for the conditions of service in accordance with the

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 25

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    26/197

    ITEM COMMENTARY PHOTOGRAPH

    manufacturers recommendations.

    F Cost (excl. GST)$

    13 PAVILION 2 | UNIT 1.01 (contd)A Location and description

    Second bedroomEvidence of water penetration in the form of blistering and flaking paint and deterioration of theskirting board in the south-eastern corner adjacent to the entry to the ensuite. The southernexternal fire stairwell passage is located immediately adjacent.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Absence or failure/poor detailing of the waterproofing provisions to the southern external

    faade within the fire stairwell adjoining the affected area.2. Failure/poor detailing of the cavity flashing to the southern external faade within the fire

    stairwell adjoining the affected area.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Protect adjoining surfaces.2. Remove the stone pavers to the southern external fire stairwell;3. Expose the substrate by adequately preparing the surface of the reinforced concrete

    staircase;4. Remove three courses of brickwork in three stepped sections along the southern faade

    along the line of the reinforced concrete staircase;

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 26

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    27/197

    ITEM COMMENTARY PHOTOGRAPH

    5. Clean out the cavity and remove any remnants of previous cavity flashings;6. Supply and install new Alcor or 20.0kg/m lead cavity flashings along the entire length of the

    southern faade ensuring all laps and joins are appropriately sealed and detailed;7. Ensure that the overlap between upper and lower levels of the stepped cavity flashings is at

    least 460mm (two bricks)8. Reinstate the brickwork to match existing providing weepholes every third perpend joint;9. Supply and apply a suitable, liquid-applied waterproof membrane to the exposed surface of

    the reinforced concrete staircase in accordance with the manufacturers recommendations;10.Detail the new waterproof membrane appropriately including provision of a 100mm (or

    similar) upturn;

    11. Reinstate the stone pavers to the southern external fire stairwell using an appropriatecementitious adhesive;

    12. Suitably prepare any water-damaged internal wall finishes including removal of sections ofblistering and flaking paint and delaminating set plaster;

    13.Remove the swollen and water damaged timber skirting boards and replace to matchexisting;

    14. Supply and apply an appropriate mix of set plaster to the affected walls and trowel/finishflush with existing adjacent surfaces;

    15.Supply and apply a suitable paint for the conditions of service in accordance with themanufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 27

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    28/197

    ITEM COMMENTARY PHOTOGRAPH

    14 PAVILION 2 | UNIT 1.02A Location and description

    KitchenEvidence of previous water penetration in the form of minor staining/discolouration to thesuspended plasterboard ceiling lining.

    B Background

    1. This item is considered to be a common propertydefect.2. The occupant advised at the time of inspection of previous instances of water penetration

    affecting the suspended plasterboard ceiling lining.

    C Cause1. Failure of the Contractor to return to site to repair the consequential damage caused by a

    previous building defect.

    D Breach(es)Under Section 18B (a) and (d) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and within the time stipulated in the contract, or if no time isstipulated, within a reasonable time.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 28

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    29/197

    ITEM COMMENTARY PHOTOGRAPH

    E Recommended scope of works/method of repair1. Suitably prepare the water-damaged suspended plasterboard ceiling lining;2. Supply and apply a suitable interior paint system to the affected areas in accordance with

    the manufacturers recommendations.

    F Cost (excl. GST)$

    15 PAVILION 2 | UNIT 1.02 (contd)A Location and description

    Living roomThe occupant advised at the time of inspection of previous instances of water penetrationaffecting the suspended plasterboard ceiling lining. There was no visible evidence of same at thetime of inspection.

    B Background1. The unit was repainted approximately eight months prior to our inspection.

    C Cause1. Possible previous leaking service pipe contained within the void concealed by the suspended

    plasterboard ceiling lining.

    D Breach(es)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 29

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    30/197

    ITEM COMMENTARY PHOTOGRAPH

    Not considered a building defect:

    1. Unable to attribute this item to defective workmanship on behalf of the builder.2. A justifiable building defect was not observed at the time of inspection.

    E Recommended scope of works/method of repairn/a

    F Cost (excl. GST)$

    16 PAVILION 2 | UNIT 4.04A Location and description

    Eastern balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling and

    blistering powder-coating to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 30

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    31/197

    ITEM COMMENTARY PHOTOGRAPH

    3. Inappropriate powder-coat product for the conditions of service applied to the aluminiumbalustrades.

    4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    imbedded balusters from the reinforced concrete balcony hob;

    2. Balustrades shall be recycled at an appropriate recycling-depot;3. Supply and install new powder-coated aluminium balustrades to match existing featuring anappropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;

    4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.Trowel flush with existing adjacent surfaces;

    5. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    17 PAVILION 2 | UNIT 4.05 (contd)A Location and description

    Living roomEvidence of water penetration in the form of staining to the suspended plasterboard ceiling liningin the north-eastern corner and streaming staining to the northern plasterboard-clad walladjacent same.

    B Background1. This item is considered to be a common propertydefect.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 31

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    32/197

    ITEM COMMENTARY PHOTOGRAPH

    2. The occupant advised at the time of inspection that the leak (identified as a poorly detailedharness anchor point penetration) has since been rectified; however the consequentialdamage to the internal finishes was not repaired when these works were undertaken.

    C Cause1. Failure of the Contractor to return to site to repair the consequential damage caused by a

    previous building defect.

    D Breach(es)Under Section 18B (a) and (d) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and within the time stipulated in the contract, or if no time isstipulated, within a reasonable time.

    E Recommended scope of works/method of repair1. Suitably prepare any water-damaged internal ceiling and wall finishes including removal of

    sections of blistering and flaking paint and delaminating set plaster;2. Supply and apply an appropriate mix of set plaster to the affected areas and trowel/finish

    flush with existing adjacent surfaces;3. Supply and apply a suitable interior paint for the conditions of service in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    18 PAVILION 2 | UNIT 4.05 (contd)A Location and description

    Eastern balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling and

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 32

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    33/197

    ITEM COMMENTARY PHOTOGRAPH

    blistering powder-coating to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.

    5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    imbedded balusters from the reinforced concrete balcony hob;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.

    Trowel flush with existing adjacent surfaces;6. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 33

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    34/197

    ITEM COMMENTARY PHOTOGRAPH

    19 PAVILION 3 | UNIT 2.01A Location and description

    Southern entry balconyBlistering and flaking paint and deterioration of the set fibre-cement (FC) sheet soffit lining in thesouth-western corner.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.

    2. Absence of appropriate weatherproofing provisions at the interface of the face brickworkfacades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 34

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    35/197

    ITEM COMMENTARY PHOTOGRAPH

    $

    20 PAVILION 3 | UNIT 2.01 (contd)A Location and description

    North-western courtyardPremature deterioration of the aluminium-framed balustrades in the form of bubbling andblistering powder-coating to the bottom rail surfaces.

    B Background

    This item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in a

    proper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    imbedded balusters from the reinforced concrete balcony hob;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 35

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    36/197

    ITEM COMMENTARY PHOTOGRAPH

    Trowel flush with existing adjacent surfaces;5. Appropriately prepare the substrate;6. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    21 PAVILION 3 | UNIT 2.06A Location and description

    North-eastern courtyardPremature deterioration of the aluminium-framed balustrades in the form of bubbling and

    blistering powder-coating throughout, particularly to the bottom rail surfaces along the easternreturn.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.

    5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 36

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    37/197

    ITEM COMMENTARY PHOTOGRAPH

    imbedded balusters from the reinforced concrete balcony hob;2. Balustrades shall be recycled at an appropriate recycling-depot;

    3. Supply and install new powder-coated aluminium balustrades to match existing featuring anappropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;

    4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.Trowel flush with existing adjacent surfaces;

    5. Appropriately prepare the substrate;6. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    22 PAVILION 3 | UNIT 3.01A Location and description

    Southern entry balconyBlistering and flaking paint and deterioration of the set fibre-cement (FC) sheet soffit lining at thesouthern end adjacent to the external facade.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.

    2. Absence of appropriate weatherproofing provisions at the interface of the face brickworkfacades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 37

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    38/197

    ITEM COMMENTARY PHOTOGRAPH

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    23 PAVILION 3 | UNIT 3.01 (contd)A Location and description

    North-western balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling andblistering powder-coating throughout, particularly to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C CauseInadequate surface preparation prior to application of the powder-coat finish to the aluminium

    balustrades.1. Inadequate powder-coat film thicknesses achieved.2. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.3. Absence of or inadequate maintenance.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 38

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    39/197

    ITEM COMMENTARY PHOTOGRAPH

    4. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    imbedded balusters from the reinforced concrete balcony hob;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;

    4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.Trowel flush with existing adjacent surfaces;5. Appropriately prepare the substrate;6. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    24 PAVILION 3 | UNIT 3.01 (contd)A Location and description

    North-western balconyEvidence of water penetration in the form of blistering and flaking paint, staining and

    deterioration of the set fibre-cement (FC) sheet soffit lining surrounding the Colorbond serviceriser stack at the southern end of the western return.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Failure or poor detailing of the waterproofing provisions to the balcony located over at the

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 39

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    40/197

    ITEM COMMENTARY PHOTOGRAPH

    interface of the stormwater drainage provisions.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Carefully remove a portion of the timber decking to the surface of the balcony located

    immediately above in the area above the water penetration damage;2. Identify the exact location of the leak by means of water/flood testing;3. Suitably prepare the substrate in accordance with the membrane manufacturers

    recommendations;4. Supply and apply a new compatible liquid-applied waterproof membrane to the exposed

    surface of the balcony in accordance with the manufacturers recommendations, detailingthe new waterproof membrane into the existing stormwater drainage provisions in anappropriate manner;

    5. Reinstate the original timber decking including rectification of any inadvertent damage to thefinish of same;

    6. Suitably prepare the water-damaged soffit finishes including removal of sections of blisteringand flaking paint, delaminating set plaster and/or damaged FC sheeting;

    7. Reinstate any damaged FC sheeting and supply and apply an appropriate mix of set plaster.Trowel/finish flush with existing adjacent surfaces;

    8. Supply and apply a suitable exterior paint system to the affected areas in accordance withthe manufacturers recommendations.

    F Cost (excl. GST)$

    25 PAVILION 3 | UNIT 3.04 (contd)A Location and description

    Southern balconyBlistering and flaking paint and deterioration of the set plaster to the fibre-cement (FC) sheetsoffit lining in the south-eastern corner.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 40

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    41/197

    ITEM COMMENTARY PHOTOGRAPH

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.2. Absence of appropriate weatherproofing provisions at the interface of the face brickwork

    facades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    26 PAVILION 3 | UNIT 3.05A Location and description

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 41

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    42/197

    ITEM COMMENTARY PHOTOGRAPH

    Southern entry balconyBlistering and flaking paint and deterioration of the set fibre-cement (FC) sheet soffit lining at thesouthern end adjacent to the external facade.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.2. Absence of appropriate weatherproofing provisions at the interface of the face brickwork

    facades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of set

    plaster. Trowel/finish flush with existing adjacent surfaces;4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 42

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    43/197

    ITEM COMMENTARY PHOTOGRAPH

    27 PAVILION 3 | UNIT 3.05 (contd)A Location and description

    Southern balconyBlistering and flaking paint and deterioration of the set plaster to the fibre-cement (FC) sheetsoffit lining in the south-eastern corner.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.2. Absence of appropriate weatherproofing provisions at the interface of the face brickwork

    facades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistance

    to the ceiling void;2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,

    UV-stable flexible sealant;3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of set

    plaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 43

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    44/197

    ITEM COMMENTARY PHOTOGRAPH

    F Cost (excl. GST)$

    28 PAVILION 3 | UNIT 3.06A Location and description

    EnsuiteEvidence of previous water penetration in the form of blistering and flaking paint and staining tothe suspended plasterboard ceiling lining adjacent to the manhole.

    B Background1. This item is considered to be a lot propertydefect.2. The occupant advised at the time of inspection that the previous instance of water

    penetration affecting the suspended plasterboard ceiling lining occurred approximately twoyears prior and has not occurred since.

    C Cause1. The exact cause of the previous instance of water penetration could not be conclusively

    identified at the time of inspection.2. Possible occupant-caused flood in the wet area located immediately above.

    D Breach(es)Not considered a building defect:

    1. Unable to attribute this item to defective workmanship on behalf of the builder.

    2. A justifiable building defect was not observed at the time of inspection.

    E Recommended scope of works/method of repair1. Suitably prepare the substrate and paint in accordance with the general painting

    specification.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 44

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    45/197

    ITEM COMMENTARY PHOTOGRAPH

    F Cost (excl. GST)$

    29 PAVILION 3 | UNIT 4.01A Location and description

    North-western balconyThe fibre-cement (FC) sheet soffit lining has cracked and detached from the balcony soffit aboveat the location of the set join along the northern return.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause

    1. Differential movement between the adjoining sheets of fibre-cement (FC) cladding to thesoffit of the balcony above.

    2. Inadequate or inappropriately installed/secured mechanical fixings or adhesive.3. Poor workmanship during preparation and installation of the FC sheet soffit lining.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Reinstate the detached sections of FC sheeting in accordance with the manufacturers

    recommendations;2. Tape over cracking/joins between the FC sheets using an appropriate exterior-grade material;3. Supply and apply an appropriate mix of set plaster to the affected areas and trowel/finish

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 45

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    46/197

    ITEM COMMENTARY PHOTOGRAPH

    flush with existing adjacent surfaces;4. Suitably prepare the external soffit lining in accordance with the manufacturers

    recommendations;5. Supply and apply a suitable exterior-grade paint for the conditions of service in accordance

    with the manufacturers recommendations.

    F Cost (excl. GST)$

    30 PAVILION 3 | UNIT 4.04A Location and description

    Southern balconyBlistering and flaking paint and deterioration of the set plaster to the fibre-cement (FC) sheetsoffit lining adjacent to the southern faade.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause

    1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining atthe interface of the galvanised steel lintel.

    2. Absence of appropriate weatherproofing provisions at the interface of the face brickworkfacades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 46

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    47/197

    ITEM COMMENTARY PHOTOGRAPH

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    31 PAVILION 3 | UNIT 4.04 (contd)A Location and description

    Southern balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling andblistering powder-coating throughout, particularly to the bottom rail surfaces.

    B Background

    This item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 47

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    48/197

    ITEM COMMENTARY PHOTOGRAPH

    4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    balusters from the balcony surface concealed by the timber decking;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Repair the balcony surface using an appropriate high-strength repair mortar. Trowel flush

    with existing adjacent surfaces;

    4. Supply and install new powder-coated aluminium balustrades to match existing featuring anappropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;

    5. Reinstate the timber decking as required.

    F Cost (excl. GST)$

    32 PAVILION 3 | UNIT 4.05A Location and description

    Southern balcony (off main bedroom)

    Premature deterioration of the aluminium-framed balustrades in the form of bubbling andblistering powder-coating to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 48

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    49/197

    ITEM COMMENTARY PHOTOGRAPH

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    balusters from the balcony surface concealed by the timber decking;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Repair the balcony surface using an appropriate high-strength repair mortar. Trowel flush

    with existing adjacent surfaces;4. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;5. Reinstate the timber decking as required.

    F Cost (excl. GST)$

    33 PAVILION 3 | UNIT 4.05 (contd)A Location and description

    Southern entry balconyBlistering and flaking paint and deterioration of the set plaster to the fibre-cement (FC) sheetsoffit lining adjacent to the southern faade.

    B BackgroundThis item is considered to be a common propertydefect.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 49

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    50/197

    ITEM COMMENTARY PHOTOGRAPH

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.2. Absence of appropriate weatherproofing provisions at the interface of the face brickwork

    facades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;

    4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)

    $

    34 PAVILION 3 | UNIT 4.05 (contd)A Location and description

    Southern entry balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling and

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 50

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    51/197

    ITEM COMMENTARY PHOTOGRAPH

    blistering powder-coating to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    balusters from the balcony surface concealed by the timber decking;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Repair the balcony surface using an appropriate high-strength repair mortar. Trowel flush

    with existing adjacent surfaces;4. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;5. Reinstate the timber decking as required.

    F Cost (excl. GST)$

    35 PAVILION 3 | UNIT 4.07/opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 51

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    52/197

    ITEM COMMENTARY PHOTOGRAPH

    A Location and descriptionSouthern entry balconyBlistering and flaking paint and deterioration of the set plaster to the fibre-cement (FC) sheetsoffit lining adjacent to the southern faade.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Water is permeating between the face brickwork facades and the set FC sheet soffit lining at

    the interface of the galvanised steel lintel.2. Absence of appropriate weatherproofing provisions at the interface of the face brickwork

    facades and the set FC sheet soffit lining resulting in deterioration of building elements.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Supply and install a suitably-sized aluminium angle at the interface of the face brickwork

    facades and the set FC sheet soffit lining to form a drip angle and provide weather resistanceto the ceiling void;

    2. Caulk the interface of the new drip angle and the adjoining building elements with a suitable,UV-stable flexible sealant;

    3. Repair the water-damaged FC sheet soffit lining via application of an appropriate mix of setplaster. Trowel/finish flush with existing adjacent surfaces;4. Appropriately prepare the substrate;5. Supply and apply a suitable exterior paint system to the balcony soffit in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 52

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    53/197

    ITEM COMMENTARY PHOTOGRAPH

    36 PAVILION 3 | UNIT 4.07 (contd)A Location and description

    North-eastern balconyThe fibre-cement (FC) sheet soffit lining has cracked and detached from the balcony soffit aboveat the location of the set join approximately midway along the eastern return and at the northernend of the eastern return.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Differential movement between the adjoining sheets of fibre-cement (FC) cladding to the

    soffit of the balcony above.2. Inadequate or inappropriately installed/secured mechanical fixings or adhesive.3. Poor workmanship during preparation and installation of the FC sheet soffit lining.

    D Breach(es)Under Section 18B (a) of the Home Building Act 1989 (NSW), failure to perform work in a properand workmanlike manner.

    E Recommended scope of works/method of repair1. Reinstate the detached sections of FC sheeting in accordance with the manufacturers

    recommendations;2. Tape over cracking/joins between the FC sheets using an appropriate exterior-grade material;3. Supply and apply an appropriate mix of set plaster to the affected areas and trowel/finish

    flush with existing adjacent surfaces;4. Suitably prepare the external soffit lining in accordance with the manufacturers

    recommendations;5. Supply and apply a suitable exterior-grade paint for the conditions of service in accordance

    with the manufacturers recommendations.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 53

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    54/197

    ITEM COMMENTARY PHOTOGRAPH

    F Cost (excl. GST)$

    37 PAVILION 3 | UNIT 4.07 (contd)A Location and description

    North-eastern balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling and

    blistering powder-coating to the bottom rail surfaces.

    B BackgroundThis item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.4. Absence of or inadequate maintenance.

    5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    balusters from the balcony surface concealed by the timber decking;

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 54

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    55/197

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    56/197

    ITEM COMMENTARY PHOTOGRAPH

    E Recommended scope of works/method of repair1. Reinstate the missing section of plasterboard to match existing adjacent surfaces;2. Suitably prepare the water-damaged suspended plasterboard ceiling lining and wall linings;3. Supply and apply a suitable interior paint system to the affected areas in accordance with

    the manufacturers recommendations.

    F Cost (excl. GST)$

    39 PAVILION 3 | UNIT 5.01 (contd)A Location and description

    North-western balconyPremature deterioration of the aluminium-framed balustrades in the form of bubbling andblistering powder-coating to the bottom rail surfaces at the southern end of the western return.

    B Background

    This item is considered to be a common propertydefect.

    C Cause1. Inadequate surface preparation prior to application of the powder-coat finish to the

    aluminium balustrades.2. Inadequate powder-coat film thicknesses achieved.3. Inappropriate powder-coat product for the conditions of service applied to the aluminium

    balustrades.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 56

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    57/197

    ITEM COMMENTARY PHOTOGRAPH

    4. Absence of or inadequate maintenance.5. Relative exposure to an aggressive marine environment.

    D Breach(es)Under Section 18B (a) and (b) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and materials not fit for purpose.

    E Recommended scope of works/method of repair1. Demolish the existing powder-coated aluminium balustrades including removal of the

    imbedded balusters from the reinforced concrete balcony hob;2. Balustrades shall be recycled at an appropriate recycling-depot;3. Supply and install new powder-coated aluminium balustrades to match existing featuring an

    appropriate coastal-grade powder-coat such as DULUX Duratec or similar approved;

    4. Repair the reinforced concrete balcony hob using an appropriate high-strength repair mortar.Trowel flush with existing adjacent surfaces;

    5. Appropriately prepare the substrate;6. Supply and apply a suitable exterior paint system to the balcony hob in accordance with the

    manufacturers recommendations.

    F Cost (excl. GST)$

    40 PAVILION 3 | UNIT 5.04A Location and description

    Main bedroom

    Evidence of minor water penetration in the form of staining to the internal face of the track atthe head of the west-facing aluminium-framed glass sliding door in the north-western and south-western corners. There is a questionable two-piece galvanised steel lintel located externallywhich does not appear to bear on the brickwork on either side of the door aperture.

    B BackgroundThis item is considered to be a common propertydefect.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 57

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    58/197

    ITEM COMMENTARY PHOTOGRAPH

    C Cause1. Absence of or failure/poor detailing of the head flashings to the western faade over thealuminium-framed glass sliding door.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Protect adjoining surfaces;2. Remove three courses of brickwork along the entire length of the aluminium-framed glass

    sliding door at the head of same including the existing two-piece galvanised steel lintel;3. Prop sections of suspended brickwork located over the head of the aluminium-framed glass

    sliding door;

    4. Clean out the cavity and remove any remnants of previous head flashings;5. Supply and install a new one-piece galvanised steel lintel over the door aperture providing

    sufficient bearing on the brickwork on either side of the door aperture in accordance with themanufacturers/engineers specifications;

    6. Supply and install new Alcor or 20.0kg/m lead head flashings along the entire length of thenew lintel ensuring all laps and joins are appropriately sealed and detailed;

    7. Reinstate the brickwork to match existing providing weepholes every third perpend joint;8. Suitably prepare any water-damaged internal wall finishes including removal of sections of

    blistering and flaking paint and delaminating set plaster;9. Supply and apply an appropriate mix of set plaster to the affected walls and trowel/finish

    flush with existing adjacent surfaces;

    10.Supply and apply a suitable paint for the conditions of service in accordance with themanufacturers recommendations.

    F Cost (excl. GST)$

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 58

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    59/197

    ITEM COMMENTARY PHOTOGRAPH

    41 PAVILION 3 | UNIT 5.04 (contd)A Location and description

    Main bedroomEvidence of water penetration in the form of blistering and flaking paint to the plasterboardreveal on the lower LHS and RHS of the west-facing aluminium-framed glass sliding doors.

    /opt/scribd/conversion/tmp/scratch2405/78088289.doc Page 59

  • 8/3/2019 09-2204 240511 DEF RPT V2 CONCISE

    60/197

    ITEM COMMENTARY PHOTOGRAPH

    B Background1. This item is considered to be a common propertydefect.2. The owner has attempted to prevent water ingress into the internal habitable areas by

    installing timber quad mouldings (storm moulds) to the external door reveals. These worksappear unsuccessful.

    C Cause1. Failure and/or poor detailing of the waterproofing provisions to the aluminium-framed glass

    sliding door unit.2. Absence of or failure/poor detailing of the sill flashing.3. Absence of or failure/poor detailing of the end-stops to the sub-sill.4. Poor workmanship during construction and installation of the floor-to-ceiling aluminium-

    framed window.

    D Breach(es)Under Section 18B (a) and (c) of the Home Building Act 1989 (NSW), failure to perform work in aproper and workmanlike manner and breach of Performance Requirement FP1.4 (b) of theBuilding Code of Australia (BCA) 2005.

    E Recommended scope of works/method of repair1. Remove sections of the timber decking in the area immediately adjacent to the affected

    aluminium-framed glass sliding door;2. Remove the existing aluminium-framed glass sliding door and store onsite for reuse;3. Suitably prepare the substrate in accordance with the membrane manufacturers

    recommendations including installation of a saw-cut termination reglet into the reinforcedconcrete slab;4. Supply an