Birds Eye View of the Site
Jordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
*Jordan Atomic Energy Commission JRTRKhalifeh AbuSaleem
KAERI-Daewoo Consortium
JRTR: In and Out of core facilities Jordan Atomic Energy Commission JRTRKhalifeh AbuSaleem TCST1ST2CNNR
Main activities of the project
The Preliminary Safety Analysis Report (PSAR) has been submitted to JNRC on July 31, 2011. JNRC has thoroughly reviewed the PSAR and recently announced that there are no major concerns that jeopardize the safety of the reactorConstruction of the Nuclear Research and Training Center (NRTC) has started in March 2011Site excavation started in March 2012The NRTC was attacked by a misinformed group of people on July 12, 2012Metrological Tower has been put in operation in August 2012Environmental Impact Assessment (EIA) investigation has started in November 2012. Expected to be concluded in February 2013Construction Permit by the Jordanian Nuclear Regulatory Commission (JNRC) is expected by March 2013 based on two Limited Work Authorizations (LWA) that have been issued (Feb. 2012 and Nov. 2012)An agreement with a Consortium of Consultant Services (NucAdvisor) has been signed in September 2013 to advise JAEC in the construction and operation of JRTRFirst Concrete work (Basemat concrete) is expected in early February 2013
Jordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
RTR will enable a large spectrum of activities governed in the following categorieS:
Education and training;Research and development;Production of medical and industrial radioisotopes (Iodine, Iridium, Molybdenum, etc.)
Since the agreement with the KAERI-Daweoo Consortium (KDC) to construct JRTRThe progress is estimated at 44%.This progress can be categorized into three main activities:-Engineering Discipline where the achievement is around 84%-Procurement Discipline: 37%, and the -Construction Discipline: 21%
Jordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
Research Reactor UtilizationEducation & TrainingNeutron Activation Analysis (NAA)Radioisotope ProductionNeutron RadiographySupporting power reactor programmesNeutron ScatteringMaterial science investigationsFuel testing and qualificationNeutron transmutation doping
Jordan Atomic Energy Commission JRTRKhalifeh AbuSaleem
Radioactive Isotope Production:(at the start our RIPF, equipped to produce):192Ir: sealed source, 100 kCi/year, 4 kCi/batch, one batch biweekly131I: open source, 2 kCi/year, 40 Ci/batch99Mo/99mTc: 1 kCi/year, 20 Ci/batchJordan Atomic Energy Commission JRTRKhalifeh AbuSaleem
Planned neutron experimental setupsFixed-Incident-Energy Triple-Axis SpectrometerNeutron Powder DiffractometerTriple-Axis SpectrometerBoron Neutron Capture Therapy (BNCT)Biological Small-Angle Neutron Scattering Instrument (SANS)Jordan Atomic Energy Commission JRTRKhalifeh AbuSaleem
The Jordanian Subcritical Assembly (JSA)
Completely assembled on siteCommissioning is underway. Expected to be completed by April 2013.Provides for 9+ first principle nuclear experiments for nuclear engineering students Operation and staffing issues are under the auspices of Jordan University for Science and Technology (JUST)
Jordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
Synchrotron-light for Experimental Science and Applications in the Middle East (SESAME)
Jordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
Basic layout of the SynchrotronJordan Atomic Energy Commission Khalifeh AbuSaleem JRTR
Jordan Atomic Energy Commission JRTRKhalifeh AbuSaleem
THANK YOU
**************