TIN.SC.H —
1 moz.zozo
6)1rr1flu.ni' -'LII 191. li)
( Old S.F.No. 107pt, , IOLA io, Itï, 1 2,TJ9pt, 12i)pt, Iil, 1?2, '3, IZ4pt - -5.07.78
Type, A, B, 131- C-6i) + 5'NNURM 3384
6)JtmrJLJt-ti) G +3 —fi) 2176 —Gy,rn-irurra,.
l. Iba,ir ObtA)600T11Jir, rebl--enngi6D&.lb.a,. 6T6biT 23541/2019/61Lî, rebff6û.06.01.2020.
2. (Gum), Ca.rruti)L1bô1Tir.916)Jira.6Tf16iT
DT6iT.13.12.2019.3. IDOJY»rrrJiJ rbliJ6)jrro GurrrjI(LJT6TTir,
6)JrrrfllLILô,016JirŒ61f16ir ry,rr6ir. 7.08.2019.4. Lair 2fUJ6DIDiJL4 465)6bOTU-Jir, 016i1irŒ6rf16iT
6T60iT 4367/201962611 2 !brr6ir.31.10.2019.5. L'ir 2AfJ6DIDi.JL1 46DmUJir,(bé). 9585/2010/8115) !bff6fr.3.11.2010.
2—bM6u;
1-061,S.F.N0. 107pt, 108pt, 109, 110, 111, 112, 113pt, 114pt, 119pt, 120pt, 121, 122,123, 124pt- 6.07.28
( OldOlib1D6D651uf16t
Type, A, B, Bl- C-6t 5 Y)6TT1b 6)J6DIJ
JNNURM Scheme-6òT
euomu-Jir, Gbrruî16t
5-60
1
INJijq
0.072O.VIS.S.V
No.! A -2008 (lixisting)
I loots -
Plinth Area Unit
"A" Unit. 96 in 18 Blocks
"B" Unit - 64 in I Blocks
Unit - 48 in I BlocksNo of Units
27.61 Sqm G)18 x 96
I x 64
Ix48
1728
6448
1840
Appmu•d t}pe Design No.! IFA — 1/2015 (Proposed)No.of Floors — G+ 3
Plinth Area Per Unit — Type APlinth Area Per Unit — Type CPlinth Area Per Unit — Type B
37.54 sqm 64 x 337.60 sqm 32 x 338.24 48x3'
No of unitsTotal No.0fUnits : 1840 +336 = 2176
Block -1Floor Details
Ground FloorFirst FloorSecond Floor'Ibird FloorIotalBLOCK -2 3Ground FloorFirst FloorSecond FloorThird FloorTotal
Total Built Up Area S m
491.41491.41491.41491.411965.64
322.53322.53322.53322.53
1290.12
Deduction
32.5732.5732.5732.57130.28
21.7221.7221.7221.7286.88
192 Nos96 Nos.48 Nos.
336 Nos.
Net Area
458.84458.84458.84458.841835.36
300.81300.81300.81300.811203. 4
2
07 02.202092,000/-
02 S
torjJdJlti)
3. (2—6dT6DID Yb6i))11)6D6N1filL-M16i)
4. yrT6öTIDrTéb GlurjJIUJ6
G6ff6iT6TJ C6iJ6öj1(D1b.
5. GyrT1f16i) LJÜLJ AOJLDD/$ILL-
.946TfliJLJY6ir cymü) 6flØ81tmüuyrryrflö1 (Burflå) 2—6iT6TT
Gyrr#) LJi-LJ / DLL 46flüL.JYlj)O
(ÆlDJU-JÜUb$lrJ1b,
ub%Lb, uL1—rT, yrrØTüub$lJ1b, GurTö1 él$l$rrry ub$llJ1b (BLD@JLb LJ6Ü)
6f165irøuri.JL.J"TJiJ 6U6TTiJ&61 Q—rflowu-16i16TIYTT
6urrrüJ6 6flutbL_11b !bUULb,
GdA6iT6TT
urrClJ0Jtb "f) !bLJiJ L_rf16DLD (Ba»rrf16ötrrå) 016MiJ{b6iT
(_!P6i1 biJÅuå»GUT6i16T16üfTü).
PfJMJ6DIDiJ14b 0165)LDiJL4 016206i).
Q&liJtu 2—f16DLD 2—6iT6nyrT
GyrTb$68T 2—6iT6TT
(BLD@JLb
Gl&1iJILJ !b$iJ
6. The Provisions in the G.O.(Ms). No. 17, H & UI) (UD 4(3), Department, dated05.02.2016, relating to installation and use of Solar energy system, should befollowed.
3
2019-661/11-96iltJt9
\ and structural aspects. The Registered
and Structural Engineer on record as the case may
defects desigyn.
used.and of building.
licenses clearance required for the site or premises or
laws.
1.
1971 35-1972)-
1. 49#b$j06i1
(ii) &LLÜUIQDLL
4. (i) 616061.138 6ill$166i)
S. CUüU 6.
uGbÄ.n.JLCQlö1G1b.
7. (i)
8. 616561.341 3.11.2004-681019
9.016)1i1tb6i1
10.
(ii) Wash Basin 61$16AfiJGUTTUbyÜUL
(Solar Water Heating System) C6'd6iG1ö.Fly Ash Bricks & Materials
rb6T)6Ü
(ii) CID6i)$106übGBTC-19 1.DrjD11b
yGüL1 QurTUbyÜLJL Gyn_jutræ 5161.6
25 (Water Act) -681019
(Yt9$iJU Trap in the septic tank design
Glul)üut— Cö165j1@j1b.(Utqrf)iJ
6106N$iJ 56fujrriJ
Q&6ü6f16i)
(iii)
(Consent)
C6M6jG1b.
4
the ! icenseqjI the des eloptnent shall ensure that developrncntq
tv adequate safety ntensttres are taken during the process
Seistnic Zone - Ill LJMlu51Go
6iT6Ttrri-Æl(Bt1J
Gur%DJiJurruti)
2—6iT6nrrd-f1IS.
tbÜ-UiJLJÜl— / tD6D6J1üL51rf16i1uaQiT6ifi16&1utg Lb{bir 1971
SO 57 6JLJ6urræb (B6iJ6dT(b1b
LD6DØTUflt_b$lÖT19.6u€na,uf16i) Lamination G5ü-JöJ (Display)
C6UÆiT(3Ü).
$li_L_ 6uwrüJ(Y1bLJ19
GET6iT6TTüuGElD3.
6fl$166f168TÆÉ) 51bU$>ÜLJÜL_
2—6iT6TTLäU'L-Lb Gl.Jj)DJå G)UT6iT6TT C6iJ6d1G1b.
&11J6ÜiTC) 2—6iTUiT
(B5TILJLbL4%1TiT - 12.
(YbØnyuf11.-ZL- GJØ)TJLJLID - 2
QLJU>ir
11)rry.yrrC-61,C6rruJIDL_4børrir.
!b66i.) (2—6irarrri-61 QJIDUJ(T6)
Executive Engineer, EXECUTIVE ENGINEEaTamilNadu Slum Clearance Board, JeN.s.c.B. CBECoimbatore Division,397 A, North Housing Unit,Selvapuram, Coimbatore — 26.
5
Proceedings of the CommissionerCoimbatore Municipal Corporation, Coimbatore.
I've-sent: .1..Srasan Kutnnr,IAS.
Online Application No. 0278/20/S
B.A NO. BA/0304/2020/MH4/S B.L No.
ROC No PP NoBuilding License
Date : 26/6/2020
BL/0350/2020/MH4/S
Sub : Building License - Coitnbatorc City Municipal Corporation Construction of New Constructed
Building in Approved Layout With LPADTP No / Regularised layout No.: Jpa No.24/2020 Dated 14-02-2020,
SF 107, 108Pt, 109, 1 10,1 1 12,1 13Pt, 1 14Pt, 1 19Pt, 120Pt, 121, 122, 123,124Pt, TS No.: 3Pt, T.S.Ward
No.42, Block No. 1 7, in Coimbatorc Town Village/!gcality, Ukkadam to pullukadu Road Street, , Coimbatore —
approval of Building Plan License issue regarding.'Ref: l. Application of Thiru/Tmt. Executive Engineer dated 7/3/2020
2. Technical Approval Date : 2006.2020
ORDER
Building Permission is granted 'to to construct New Constructed Building inApproved Layout With LPARTPSoU Regulariéedaayoggyo.: IpæNo.24/2020 Dated14-02-2020, SF No.: 107,108Pt, 109, 1 10,1 1 No. 17, in Coimbatore Toyn approved plan for Five years
Number of Dwelling =
Budget Code= 1203.24(SqM ) PINCbde of the
1019
1043
1045/3
1054
1045
4020 (1)1019(1)
Charges Head Amount
License Fees
Fees331200.00
pplicabon Fee85.00
Attested copy fees450.00
Other
10000Secunty Depostt
1,017.75000Scrutiny Fees
27, 148 00
TS No.: 3Pt, T.S.Ward No.42, Block.RoaWStreet, , Coimbatore per
subJect to the condition as detailed below
1 Groühd+3 Height of the Building= 12.8i(Mtr)= 641001
Challan Pald Date
29/6/2020
29/6/2020
29/6/2020
of Nan 'of owner
c ontrnc.tor who executor o! the work. in white
to enable to Ond out easily at entrance
ova"abie at the premtses, for inspection of the Authont•es
the assessment of property tax, (or the constructed building as per
Comora"on Act '98 along with a copy of the approved plan. wgthin 15 Days, from
c' date of occupation which ever is earlier
• / unauthorized construction is liable for the levy and collection Of penalty of Rs.
r, thereof per ha" year under section 283 of Corporation act,
be only tn accordance With the approved plan No electricity and Water Supply
for the deviated/ unauthorized construction of buildings.
approved plan is required, a revised plan should be submitted for approval and construction
only after a fresh license is obtained prosecution Will be launched against the defaulters, under
of Corporation Act or unauthorized construqtibn Will be demolished by the office under section 296 OfCorpora.on Act
bcense should bc renewed on expiry of the license period/ duly applyingün the prescribed form and remittingdue
e Eiectnoty Semce connection if any should be removed, before the commencement of the construction, incase of reconstruction of existing buiidih
should not be occu$led, unlessorderis obtained from!hecorporation under section 26, 33he Pubbc Health Act.
10 No debns should be dumped on the.Pyblic Streets-11. planting should be done in the12 Ran Water Harvesting should be prOVi$ed on thé Buildin13 Solar Water Heater should be erected omcompletion of the Building14 Mosquito breeding should
NS. 1000/ will be imposed byIS, Segregation of garbage for disposal should be Cone by the occupancies, if not a fine of Rs. 100/ will be imposed by
Ene : Approved plan
To.
Tturu Executive Engineer
Address: Tarn,lnadu Slum Clearance Board, Coimbatore Division, 397A, Nort Ho unit, selv uram,Phone No. : 9994380267
copy : l. Assistant Executive - Planning, ( SOUTH ) zone.2. Assistant Revenue officer.
P<ECUTIVET.N.S.C.B