 All rights r eserved. No par t of this confidential report may be reproduced in any form or by any means without written permissio n from ITRI. Policy and Promotion of Offshore Wind Power in Taiwan Thousand Wind T urbines Project Ssu-yuan Hu / Office Manager Thousand Wind T urbines Promotion Office operated by Industrial Technology Research Institute supervised by Bureau of Energy, MOEA

140501#130-5b Policy and Promotion of Offshore Wind Power in Taiwan_更新場址&設置量

Embed Size (px)

Citation preview

  • All rights reserved. No part of this confidential report may be reproduced

    in any form or by any means without written permission from ITRI.

    Policy and Promotion ofOffshore Wind Power in Taiwan

    Thousand Wind Turbines Project

    Ssu-yuan Hu / Office Manager

    Thousand Wind Turbines Promotion Office

    operated by Industrial Technology Research Institute

    supervised by Bureau of Energy, MOEA

  • 1 copyright

    2014 ITRI

    Overview

    Wind Resource in Taiwan

    Promotion Target & Strategy

    Demonstration Incentive Program

    Focus of Cooperation

  • 2 copyright

    2014 ITRI

    Taiwan Offshore Wind Potential

    Shallow Water (5-20 m) Area: 1,779.2 km2

    Potential: 9 GW

    Feasible: 1.2 GW

    Deep Water (20-50 m) Area: 6,547 km2

    Potential: 48 GW

    Feasible: 5 GW

    Deeper Water (> 50 m) Potential: 90 GW

    Feasible: 9 GW

    PacificOcean

    Ref. Wind Resource Assessment Handbook, ITRI, 2011

    Contour simulated by NCAR WRF 3.0 model

  • 3 copyright

    2014 ITRI

    Current Status of Wind Development

    Onshore (by the end of Feb. 2014) State-owned: 161 WTs / 287 MW

    Private: 157 WTs / 343 MW

    Total: 318 WTs / 630 MW(16.3 % of all RE)

    2013 Production: 1,574 MWh(14.7 % of all RE)

    Offshore No offshore wind turbine

    has been installed yet.

    4.5 MW (3x)

    3.96 MW (6x)

    6 MW (3x)

    15.1 MW (8x)

    30 MW (20x)

    12 MW (6x)

    34 MW (17x)

    8 MW (4x)

    62 MW (31x)

    23 MW (10x)

    46 MW (23x)

    28 MW (14x)

    5.4 MW (6x)

    4.8 MW (8x)

    4 MW (2x)

    /43.7 MW (19x)

    4.6 MW (2x)

    11.5 MW (5x)

    1.75 MW (1x)

    /14.7 MW (7x)

    34 MW (16x)

    16.1 MW (7x)

    42 MW (21x)

    /75.9 MW (33x)

    /96.6 MW (42x)

    2.64 MW (4x)

    State-owned

    Private

  • 4 copyright

    2014 ITRI

    Target for Wind Energy

    Ref. Bureau of Energy, Ministry of Economic Affairs, TAIWAN

    Thousand Wind Turbines Project Short-term Target: 4 demonstration offshore wind turbines by 2015.

    Mid-term Target: Offshore 320 MW, total 1,520 MW by 2020.

    Long-term Target: Offshore 3,000 MW, total 4,200 MW by 2030.

    0

    200

    400

    600

    800

    1,000

    1,200

    0

    600

    1,200

    1,800

    2,400

    3,000

    3,600

    4,200

    Cap

    acit

    y (M

    W)

    Year 2013 2015 2020 2025 2030MW WTs MW MW MW MW WTs

    Onshore 614 311 814 1,200 1,200 1,200 450Offshore 0 0 15 320 1,520 3,000 600

    Total 614 311 829 1,520 2,720 4,200 1,050

    Inst

    alle

    d C

    apac

    ity

    (MW

    )Tu

    rbin

    es

    1,200

    1,000

    800

    600

    400

    200

    0

    4,200

    3,600

    3,000

    2,400

    1,800

    1,200

    600

    0

    1,050

    311

    Installed Capacity

    Turbines

  • 5 copyright

    2014 ITRI

    Promoting Offshore

    Feed-in Tariff (FIT) Onshore: NT$2.6338 / kWh during 2014

    Offshore: NT$5.6076 / kWh during 2014

    Offshore Demonstration Incentive Program (DIP)

    Officially announced on 3rd July, 2012

    4 Demonstration Turbines by 2015, 3 Demonstration Wind Farms by 2020

    Government provides subsidy for both equipment & developing processes

    Zonal Development Industrial Zone for offshore wind farms (e.g. Round 3 of UK)

    Commercial scale for cost down

    Year 2015 2020 2030Onshore 814 1,200 1,200Offshore 15 320 3,000

    Total 829 1,520 4,200

  • 6 copyright

    2014 ITRI

    Offshore Demonstration Incentive Program

    3 Demonstration Wind Farms Winners (Fuhai, Formosa & TPC) officially announced on 9th January 2013

    Subsidize 50 % cost of the Demonstration Turbines (FIT advances/interest-free loan)

    Subsidize NT$250m for preparatory (wind mast, EIA, etc.) expense

    Year 0(2012)

    Year 1(2013)

    Year 2(2014)

    Year 3(2015)

    Year 4(2016)

    Year 5(2017)

    Year 6(2018)

    Year 7(2019)

    Year 8(2020)

    Year 9(2021)

    Year 10(2022)

    Proposal deadline

    (Oct. 2012)

    Demonstration Turbines

    commissioned(Dec. 2015)

    Demonstration Wind Farms

    commissioned(Dec. 2020)

    Plan initiation(Jul. 2012)

    Proposal review

    complete(Jan. 2013)

    Establishment Permit

    (Dec. 2014)

    Construction Permit

    (Dec. 2018)

    Formosa

    FuhaiTPC

    5 m depth12 nm

    territory

  • 7 copyright

    2014 ITRI

    Specifications & Requirement of DIP

    Met Mast Water depth: 10 m or more

    Height: 70 m or more

    Demonstration Turbines

    Capacity: at least 3 MW each

    Commissioned by 2015

    Demonstration Wind Farm

    Water depth: 5 m or more

    Capacity: 100-200 MW each

    Commissioned by 2020

  • 8 copyright

    2014 ITRI

    Awarded Demonstration Projects

    Fuhai () @Changhua Capacity: 108 MW (30 turbines)

    Distance from Shore: 11 km

    Water Depth: 25-40 m

    Formosa () @Miaoli Capacity: 130 MW (36 turbines)

    Distance from Shore: 1-5 km

    Water Depth: 5-30 m

    TPC () @Changhua Capacity: apprx. 108 MW (22-36 turbines)

    Distance from Shore: 6-8 km

    Water Depth: 15-25 m

  • 9 copyright

    2014 ITRI

    Investment by Developer

    356501

    1205

    3113

    5466

    0

    1000

    2000

    3000

    4000

    5000

    6000

    2013 2015 2020 2025 2030

    MW

    0

    1000

    2000

    3000

    4000

    5000

    6000

    MW

    MW

    Annual Investment2013-2015: 7.3b/yr2016-2020: 14.1b/yr2021-2030: 42.6b/yr

    Offshore (MW)Onshore (MW)Accumulated Investment

    20302025202020152013 NT$546.6bNT$311.3bNT$120.5bNT$50.1bNT$35.6b

    NT$ in

    billio

    n

    Offshore Wind Farm Investment: NT$159m/MW

    Offshore 3,000 MW by 2030 NT$480 billion investment

  • 10

    copyright

    2014 ITRI

    Investment by Service Provider

    Source: DECC

    Manufacture

    Fleet investment

    NT$15-22.5b(100-150m/ship)

    R&D investment

    NT$12b(80m/GW)

    Turbines (component/system/subsystem)Electric System (cable/substation)Foundation/Sub-structure

    Marine Construction & InstallationO&M for Wind TurbinesFleet Supply

    Construction

    Source: DECC

    Foundation

    12.4%

    Turbine

    25%

    O&M

    37.4%

    15.8%

    ConstructionMisc 0.5%

    Planning 2.5%

    Electric System 6.4%

  • 11

    copyright

    2014 ITRI

    Design against Environment Turbine design resistant to typhoons

    Foundation design resistant to earthquakes

    Environmental Impact Assessment Migrating birds & ocean mammals

    Local fishery, navigation and harbor development

    Project Management Risk assessment and mitigation

    Vessel coordination and construction scheduling

    Risk Identifications

    Pictures from: Vergnet, YCPS, Centrica

  • 12

    copyright

    2014 ITRI

    Successful Experiences of Wind Farm Development in Europe Strategy: demonstration vs commercial

    EIA solutions: navigation, fishery, environmental activists

    Onshore Infrastructure: design of onshore base for offshore wind farm industry

    Finance & Insurance: project finance and risk management

    Taiwan Offshore Demonstration Wind Farm Project Developer: general consulting, project management and financial advice

    Equipment: typhoon-proof design technology

    Service: marine construction and O&M

    Offshore Test Wind Farm Offshore test site for new turbine technology (e.g. Hunterston or EOWDC)

    International Interactions of Offshore Wind

  • 13

    copyright

    2014 ITRIAll rights reserved. No part of this confidential report may be reproduced

    in any form or by any means without written permission from ITRI.

    Thousand Wind Turbines Promotion Office

    http://www.twtpo.org.tw