    Rio de JaneiroApril 23-25, 2006

    Busbar protectionREB 670

    Gunnar Stranne

  • 8/12/2019 18 REB 670 IED

    2/41

    2

    ABBP

    owerTechnologiesAB

    2006-04-20 Gunnar Stranne A

  • 8/12/2019 18 REB 670 IED

    3/41

    3

    ABBP

    owerTechnologiesAB

    2006-04-20 Gunnar Stranne A

  • 8/12/2019 18 REB 670 IED

    4/41

    4

    ABBP

    owerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 500 is enabled for use with IEC61850 communication

  • 8/12/2019 18 REB 670 IED

    5/41

    5

    ABBP

    owerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Benefits of REB 670 outstanding features

    Very fast, minimum operating time 10 ms

    Extremely stable for external faults

    Additional sensitive differential protection

    Smart open CT detection

    One or two protection zones and check zone

    Phase segregated

    Very low CT requirements

    Any CT ratio difference can be accommodated

    Settings entered directly in primary amperes

    The I/O is flexible and extendable Easy extension

  • 8/12/2019 18 REB 670 IED

    6/41

    6

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Application Areas for REB 670

    Differential protection, BFR& Non-Dir OC Protectionfor:

    Busbars Meshed corners,

    T-protection

  • 8/12/2019 18 REB 670 IED

    7/41

    7

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Three-phase versions

    REB 670-A20 for 4 bays 2 zones

    REB 670-A31 for 8 bays 2 zones

    Single phase and summationthree-phase versions

    REB 670-B20 for 12 bays 2

    zones REB670-B21 for 12 bays 2

    zones

    REB670-B31 for 24 bays 2

    zones

    Pre-configured REB 670 Ready To Use

  • 8/12/2019 18 REB 670 IED

    8/41

    8

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    3-Phase Version

    Two measuring zone BFR, OC, EnFP & AR

    4 or 8 bays

    1-Phase Version

    Two measuring zones

    BFR, OC, EnFP & AR 12 or 24 bays

    One terminal per phase

    Summation

    REB 670 Preconfigured Versions

  • 8/12/2019 18 REB 670 IED

    9/41

    9

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Application Areas:

    Smaller Buses (up to 8 CTs per zone)

    Single Busbar Stations (with Transfer Bus) 1 Breaker Stations

    Double Busbar Stations (with Transfer Bus)

    Zone Interconnection included in the design

    Three-Phase Terminal - 4-8 Bays - Double Zone

    No switching of CT secondary circuitsNo switching of CT secondary circuits

    REB 670 A31

    2 Zones (A & B);8 Bays

  • 8/12/2019 18 REB 670 IED

    10/41

    10

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Capacitor Reactor

    REB 670 3-Phase - Basic applications Diff & CBF

    M/G

    Generator/MotorAuto-Transformer

  • 8/12/2019 18 REB 670 IED

    11/41

    11

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 3- Phase - BBP, BFP & EnFP for single buses

    Single Bus with bus tie CBup to 3/7 feeder bays on each side

    ZA ZB

    ZA

    Single Busbarup to 4/8 feeder bays

    T connections

    ZA

    ZB

    Alternative CT Location

    H type station with bus-section CBor sectionalizing disconnector

    ZA ZB

  • 8/12/2019 18 REB 670 IED

    12/41

    12

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 3- Phase - BBP, BFP, EnFP for 1 CB stations

    1 Breaker Stationsup to 4 diameters

    ZA

    ZB

    1 Breaker Stationsup to 8 diameters

    ZA

    ZB

    .. .

  • 8/12/2019 18 REB 670 IED

    13/41

    13

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 3- Phase - BBP, BFP & EnFP for Double CB stations

    Alternative CT Location

    Double Breaker Station

    up to 8 feeders

    ZA

    ZB

    .. .

  • 8/12/2019 18 REB 670 IED

    14/41

    14

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1- Phase - BBP, BFP & EnFP for double buses

    Isolator replica in REB 670*1.0

    by configuration

    Double Bus with bus-coupler CBand up to 6/7 feeder bays

    ZB

    ZA

    .. .

    Optional Measuring Point

    Double Busbars with bus coupler CB and Transfer Busup to 6/7 feeder bays

    ZB

    ZA

    Transfer Bus

    Transfer Bay

    .. ... .

    .. .

  • 8/12/2019 18 REB 670 IED

    15/41

    15

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    EQUIPMENT INCLUDED in the PANEL:

    1 pcs 3 phase, Busbar protection terminal REB 670*1.0

    - two differential zones

    - check zone- eight CB failure relays

    - eight OC feeder backup protection (EnFP)

    - internal disconnector replica logic

    - internal individual bay tripping logic- disconnector status supervision

    700

    ABB

    Scheme Layout for Double Busbar; 2 Zones/7 feeders

  • 8/12/2019 18 REB 670 IED

    16/41

    16

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Application Areas:

    Bigger Buses (up to 12/24 bays per zone)

    Single Busbar Stations (with Transfer Bus)

    1 Breaker Stations

    Double Busbar Stations (with Transfer Bus)

    Load Transfer is included into the design

    3 Terminals required for complete scheme

    LDCM available to share binary IO

    Single-Phase Terminal REB670 B21/B31; 12/24 Bays- Double Zone

    No switching of CT secondary circuitsNo switching of CT secondary circuits

    REB 670; Ph-L32 Zones (A & B);24 Bays

    REB 670; Ph-L22 Zones (A & B);24 Bays

    REB 670; Ph-L12 Zones (A & B);

    24 Bays

  • 8/12/2019 18 REB 670 IED

    17/41

    17

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1- Ph; BBP, BFP & EnFP for single buses

    Single Busup to 12/24 feeder bays

    ZA

    .. .

    Single Bus with bus-section disconnectorup to 12/24 feeder bays (i.e. 12+12; 16+8 etc.)

    ZA ZB

    .. . .. .

    Single Bus with bus-section CBup to 11/23 feeder bays on each side

    ZA ZB

    .. . .. .

    Single Bus with bus-section CB, up to11/23 feeder bays (i.e. 12+11; 10+13 etc.)

    ZA ZB

    .. ... .

  • 8/12/2019 18 REB 670 IED

    18/41

    18

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1- Phase - BBP applications for 1 CB stations

    1 Breaker Stationsup to 12 / 24 diameters

    ZA

    ZB

    .. .

    1 Breaker Stationsup to 6 / 12 diameters

    ZA

    ZB

    .. .

  • 8/12/2019 18 REB 670 IED

    19/41

    19

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1- Phase - BBP, CBF & EnFP for 1 CB Stations!

    Bus Diff, CB Fail & EnFP1 Breaker Stationsup to 4/8 diameters

    ZA

    ZB

    .. .

  • 8/12/2019 18 REB 670 IED

    20/41

    20

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Alternative CT Location

    REB 670 1- Ph; BBP, BFP & EnFP for Double CB stations

    Double Breaker Station

    up to 6 / 12 feeders

    ZA

    ZB

    .. .

    ZA

    ZB

    Double Breaker Station

    up to 12 / 24 feeders

    .. .

  • 8/12/2019 18 REB 670 IED

    21/41

    21

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A Optional Measuring Point

    REB 670 1- Ph; BBP, BFP & EnFP for double buses

    Double Bus with bus-coupler CBup to 22/23 feeder bays

    ZB

    ZA

    .. .

    Isolator replica in REB 670*1.0by CAP 531 Configuration

  • 8/12/2019 18 REB 670 IED

    22/41

    22

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1- Ph; BBP, BFP & EnFP for double bus & transfer

    Double Busbars with Transfer Bus

    up to 22/23 feeder bays

    ZB

    ZA

    Transfer Bus

    Transfer Bay

    .. .

    .. .

    .. .

    Bus-Coupler Bay

    ZB

    ZA

    Transfer Bus

    Combined Bus-Coupler

    & Transfer Bay

    .. .

    .. .

    .. .

    Isolator replica in REB 670*1.0by CAP 531 Configuration

  • 8/12/2019 18 REB 670 IED

    23/41

    23

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    EQUIPMENT INCLUDED in the PANEL:

    3 pcs 1 phase, Busbar protection terminal REB 670*1.0

    - two differential zones

    - check zone- 24 CB failure relays

    - 24 OC feeder backup protection (EnFP)

    - internal disconnector replica logic

    - internal individual bay tripping logic- disconnector status supervision

    700

    ABB

    Scheme Layout for Double Busbar; 2 Zones/22 feeders

  • 8/12/2019 18 REB 670 IED

    24/41

    24

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 1-Phase version - for double buses

    Four Zone Double Bus with two BC-CBs one BS-CB and one sectionalizingdisconnector with up to 18-20 feeder bays in the whole station

    Optional Measuring Point

    Four Zone Double Bus with two bus-coupler CBs and twobus-section CBs and up to 20/21 feeder bays on each station side.

    BBP, BFP & EnFP included

    Reserve 2

    Main 2

    Reserve 1

    Main 1

    .. ... .

    Reserve 2

    Main 2

    Reserve 1

    Main 1

    .. ... .

  • 8/12/2019 18 REB 670 IED

    25/41

    25

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Buses up to 24 bays per zone

    Single Busbar

    1 Breaker Systems Double Busbar

    Same applications possible as for 1Ph solution

    Software Driven Zone Selection

    Cost effective Solution

    REB 670; 1 Ph

    2 Zones (A & B);

    24 Bays

    + N+ N timestimes

    NN 88

    REB 670 1-phase version summation transformers

  • 8/12/2019 18 REB 670 IED

    26/41

    26

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 Allocation of Software Functionality

    Zone Selection

    Dynamic Software CT switching(i.e. no switching in CT secondarycircuits neither interposing CTs

    are required) Easy adaptation to different

    substation layouts such as: singleor double bus (with transfer bus),one-and-half or double breaker,etc.

    Simple adaptation to buses withonly one set of CTs in the bus-section or bus-coupler bays

    Selective BBP & BFP tripping forevery bay

    Merging of the two differentialzones when required (i.e. duringload transfer in double busbarstations)

    Disconnector and/or circuit

    breaker status supervision

    Differential Zones

    High speed tripping for internalfaults. Typical operating time 12ms

    Complete stability for throughfaults, with heavy CT saturation,and a maximum remanence in theCT core at auto-reclosing

    Low CT requirement, only 2milliseconds to saturation neededfor correct operation

    Intelligent detection for open or

    shorted CT secondary circuits and

    settable blocking of differentialprotection zone

    Sensitive differential protection

    stage for power systems withlimited earth-fault current

  • 8/12/2019 18 REB 670 IED

    27/41

    27

    ABB

    PowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    REB 670 Software Structure / Function Blocks

    Zone Selection

    Primary Switchgear Objects

    Status (i.e. disconnector and

    breakers) Bay

    (Interface towards onePrimary Bay)

    Zone Interconnection(Merging of two zones whenrequired)

    Differential Zones

    Zone A

    (Id>, OCT, Sensitive Id>)

    Zone B(Id>, OCT, Sensitive Id>)

    Check Zone (Id>)

    One BasicFunction in AFL,

    Hiddenconnections exist

  • 8/12/2019 18 REB 670 IED

    28/41

    28

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Very fast, minimum operating time 10 ms

    Extremely stable for external faults

    Completely phase segregated measurement

    Differential algorithm not dependent on the number of connected feeders

    Very low CT requirements, only 2 ms before CT saturation

    Any CT ratio difference can be accommodated

    Settings entered directly in primary amperes

    Differential Protection in REB 670

    Differential protectionoperation characteristic

    Operateregion

    Diff Oper Level

    Id[P

    rimaryAmps]

    Iin

    [Primary Amps]

    s=0.53

    I d=I i

    n

    Sensitive Oper Level

  • 8/12/2019 18 REB 670 IED

    29/41

    29

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Used in low impedance earthed power system or in otherspecial applications

    It has the following characteristics:

    Freely settable characteristic with time delay possibility

    Automatically blocked for heavy ph-to-ph faults

    External release via binary signal (i.e. from open delta

    voltage, transformer neutral point current, etc.)

    Sensitive Differential Protection in REB 670

    Differential protectionoperation characteristic

    Operateregion

    Diff Oper Level

    Id[P

    rimaryAmps]

    Iin

    [Primary Amps]

    s=0.53

    I d=I i

    n

    Sensitivedifferentialprotection

    en04000260.vsd

    Sensitive Oper Level

  • 8/12/2019 18 REB 670 IED

    30/41

    30

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Differential protectionoperation characteristic

    Operateregion

    Diff Oper Level

    Id[PrimaryAmps]

    Iin

    [Primary Amps]

    s=0.53

    I d=I i

    n

    Sensitivedifferentialprotection

    en04000260.vsd

    Sensitive Oper Level

    Slow and Fast Open CT detection

    Settable influence of slow and fast open CT logic:

    Off (switched off)

    Block (differential protection)

    Supervise (Doesn't block, just increase minimumdifferential operation level as shown below)

    Open CT detection for REB 670

    OCT Logic Supervision Level

  • 8/12/2019 18 REB 670 IED

    31/41

    31

    ABBPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Independent check zone available

    Can be switched off (default setting)

    Freely settable which CTs shall be connected to check zone Provide stability in case of problem with disconnector

    auxiliary contacts ( stuck contacts or wiring problems)

    Check Zone in REB 670

    Oper Level

    s=0.0-0.90 (settable)

    Iout[Primary Amps]

    Id[PrimaryAmps

    ]

    Operateregion

  • 8/12/2019 18 REB 670 IED

    32/41

    32

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Two new types of Diff Zone supervision are available

    Id> traditional supervision of differential current levelwith settable time delay(i.e. can be used as alarm or for

    automatic reset of OCT condition)

    Iin> incoming current supervision, without time delay

    (i.e. can be used to trigger DR for external faults)

    Zone Supervision in REB 670

  • 8/12/2019 18 REB 670 IED

    33/41

    33

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Disconnector/CB supervision & alarming

    For every disconnector/CB status is determined from the

    status of aux contacts (i.e. a & b contacts)

    Two schemes available depending on philosophy, a or b or both

    Position of a disconnector/CB can be forced to OPEN or

    CLOSED by a parameter setting

  • 8/12/2019 18 REB 670 IED

    34/41

    34

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Easy to set, configure, install & use

    Pre-configured for most typical substation layouts

    Bay connection matrix built-in (large HMI)

    Switchgear Status Matrix (large HMI)

    User Features in REB 670 (3-Ph & 1-Ph)

  • 8/12/2019 18 REB 670 IED

    35/41

    35

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Bay-Connections & Switchgear Status Matrices

    UserSettableBay Name

    InternallyUsed BayFB

    Connectionsto internalzones

    User SettableSwitchgear

    Names

    SwitchgearObject

    Status

  • 8/12/2019 18 REB 670 IED

    36/41

    36

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Breaker Failure Protection

    Complete breaker failure protection with:

    1ph and/or 3ph starting

    Re-trip after a set time delay

    Backup trip / bus-strip (i.e. second time delay)

    Short reset time of 15ms

    Trips CBs via busbar disconnector replica

    Integrated station wide trip logic available from Zone Selection

  • 8/12/2019 18 REB 670 IED

    37/41

    E d F lt P t ti

  • 8/12/2019 18 REB 670 IED

    38/41

    38

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    End Fault Protection

    Feeder

    Protection

    Busbar

    Protection

    FeederProtection

    BusbarProtection

    CT=Measuring Boundary

    CB=Clearing Boundary

    When feeder CB isopen, stopmeasuring

    boundary at theopen CB contactsin order to avoid

    over-trip and

    activate fast OC

    protection to tripremote end only

    When feeder CB is

    open, extendmeasuringboundary to theopen CB contactsin order to avoid

    under-trip

    Over-TripZone

    Under-TripZone

  • 8/12/2019 18 REB 670 IED

    39/41

    S REB 670 b b t ti

  • 8/12/2019 18 REB 670 IED

    40/41

    40

    AB

    BPowerTechnologiesAB

    2006-04-20 Gunnar Stranne A

    Summary - REB 670 busbar protection

    Complete and fast differential protection (10-12ms)

    One or two protection zones and check zone

    Extremely stable for external faults

    Additional sensitivity

    Low CT requirements - open CT detection any CT ratio

    Advanced zone selection & integrated zone interconnection

    Disconnector and/or CB position supervision & alarming

    CB failure and 4-stage backup overcurrent protection

    Disturbance and event recording Preconfigured versions with flexible and extendable I/O

    Easy extension

  • 8/12/2019 18 REB 670 IED