METRADO DE ARQUITECTURA OBRA CLIENTE :EPS GRAU LUGAR : DISTRITO CHULUCANAS FECHA : FEBRERO 2015 01.00.00 MUROS Y TABIQUES DE ALBAÑILERIA 858.386 M2 01.01.00 MURO DE LADRILLO KK ARCILLA 18 HUECOS - SOGA 9 x 13 x 24 UNIDAD M2 DETALLES CANTIDAD LARGO (M) ANCHO (M) ALTURA (M) TOTAL SOTANO EJE A Y EJE D ENTRE EL EJE 4 Y 3 1.00 2.00 4.65 3.00 13.95 13.95 ENTRE EL EJE 3 Y 2 1.00 2.00 4.80 3.00 14.40 14.40 ENTRE EL EJE 2 Y 1 1.00 2.00 4.65 3.00 13.95 13.95 EJE 1 ENTRE EL EJE A Y B 1.00 1.00 4.55 3.00 13.65 13.65 ENTRE EL EJE B Y C 1.00 1.00 4.70 3.00 14.10 14.10 ENTRE EL EJE C Y D 1.00 1.00 4.55 3.00 13.65 13.65 EJE 3 ENTRE EL EJE D Y D' 1.00 1.00 3.00 3.00 9.00 9.00 EJE C ENTRE EL EJE 4 Y 3 2.00 2.00 3.20 3.00 38.40 38.40 1ER PISO EJE A Y EJE D ENTRE EL EJE 4 Y 3 1.00 1.00 4.65 3.00 13.95 13.95 ENTRE EL EJE 3 Y 2 1.00 1.00 4.80 3.00 14.40 14.40 ENTRE EL EJE 2 Y 1 1.00 1.00 4.65 3.00 13.95 13.95 EJE B ENTRE EL EJE 4 Y 3 1.00 1.00 10.10 3.00 30.30 30.30 ENTRE EL EJE 3 Y 2 1.00 1.00 1.68 3.00 5.04 5.04 ENTRE EL EJE 2 Y 1 1.00 1.00 6.70 3.00 20.10 20.10 EJE C ENTRE EL EJE 4 Y 3 1.00 1.00 7.85 3.00 23.55 23.55 ENTRE EL EJE 3 Y 2 1.00 1.00 0.85 3.00 2.55 2.55 ENTRE EL EJE 2 Y 1 1.00 1.00 3.15 3.00 9.45 9.45 EJE 1 ENTRE EL EJE A Y B 1.00 1.00 4.55 3.00 13.65 13.65 ENTRE EL EJE B Y C 1.00 1.00 4.70 3.00 14.10 14.10 ENTRE EL EJE C Y D 1.00 1.00 4.55 3.00 13.65 13.65 EJE 2 ENTRE EL EJE A Y B 1.00 1.00 3.70 3.00 11.10 11.10 ENTRE EL EJE B Y C 1.00 1.00 0.00 3.00 0.00 0.00 ENTRE EL EJE C Y D 1.00 1.00 0.00 3.00 0.00 0.00 EJE 3 ENTRE EL EJE A Y B 1.00 1.00 3.70 3.00 11.10 11.10 "AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO EN LOS ASENTAMIENTOS HUMANOS DE LA LOCALIDAD DE CHULUCANAS , PROVINCIA DE MORROPON Y DEPARTAMENTO DE PIURA" N° DE ELEMENTOS AREA (M2) O VOLUMEN (M3)

2.-METRADO DE ARQUITECTURA.xlsx

  • Upload
    bkverab

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

ARQUITECTURAMETRADO DE ARQUITECTURAOBRA"AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO EN LOS ASENTAMIENTOS HUMANOS DE LA LOCALIDAD DE CHULUCANAS , PROVINCIA DE MORROPON Y DEPARTAMENTO DE PIURA"CLIENTE :EPS GRAULUGAR: DISTRITO CHULUCANASFECHA: FEBRERO 201501.00.00MUROS Y TABIQUES DE ALBAILERIA858.386M201.01.00MURO DE LADRILLO KK ARCILLA 18 HUECOS - SOGA 9 x 13 x 24 UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SOTANOEJE A Y EJE DENTRE EL EJE 4 Y 31.002.004.653.0013.9513.953ENTRE EL EJE 3 Y 21.002.004.803.0014.4014.40ENTRE EL EJE 2 Y 11.002.004.653.0013.9513.95EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 3ENTRE EL EJE D Y D'1.001.003.003.009.009.00EJE CENTRE EL EJE 4 Y 32.002.003.203.0038.4038.401ER PISOEJE A Y EJE DENTRE EL EJE 4 Y 31.001.004.653.0013.9513.95ENTRE EL EJE 3 Y 21.001.004.803.0014.4014.40ENTRE EL EJE 2 Y 11.001.004.653.0013.9513.95EJE BENTRE EL EJE 4 Y 31.001.0010.103.0030.3030.30ENTRE EL EJE 3 Y 21.001.001.683.005.045.04ENTRE EL EJE 2 Y 11.001.006.703.0020.1020.10EJE CENTRE EL EJE 4 Y 31.001.007.853.0023.5523.55ENTRE EL EJE 3 Y 21.001.000.853.002.552.55ENTRE EL EJE 2 Y 11.001.003.153.009.459.45EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B1.001.003.703.0011.1011.10ENTRE EL EJE B Y C1.001.000.003.000.000.00ENTRE EL EJE C Y D1.001.000.003.000.000.00EJE 3ENTRE EL EJE A Y B1.001.003.703.0011.1011.10ENTRE EL EJE B Y C1.001.000.003.000.000.00ENTRE EL EJE C Y D1.001.002.203.006.606.60EJE 4ENTRE EL EJE A Y B1.001.001.563.004.684.68ENTRE EL EJE B Y C1.001.000.553.001.651.65ENTRE EL EJE C Y D1.001.000.003.000.000.002DO PISOEJE A Y EJE DENTRE EL EJE 4 Y 31.001.004.653.0013.9513.95ENTRE EL EJE 3 Y 21.001.004.803.0014.4014.40ENTRE EL EJE 2 Y 11.001.004.653.0013.9513.95EJE BENTRE EL EJE 4 Y 31.001.001.903.005.705.70ENTRE EL EJE 3 Y 21.001.002..343.003.003.00ENTRE EL EJE 2 Y 11.001.009.003.0027.0027.00EJE CENTRE EL EJE 4 Y 31.001.007.853.0023.5523.55ENTRE EL EJE 3 Y 21.001.001.903.005.705.70ENTRE EL EJE 2 Y 11.001.002.253.006.756.75EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.063.0012.1812.18ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 3ENTRE EL EJE A Y B1.001.006.553.0019.6519.65ENTRE EL EJE B Y C1.001.000.003.000.000.00ENTRE EL EJE C Y D1.001.000.003.000.000.00EJE 4ENTRE EL EJE A Y B1.001.001.003.003.003.00ENTRE EL EJE B Y C1.001.002.963.008.888.88ENTRE EL EJE C Y D1.001.000.003.000.000.003ER PISOEJE A Y EJE DENTRE EL EJE 4 Y 31.001.004.653.0013.9513.95ENTRE EL EJE 3 Y 21.001.004.803.0014.4014.40ENTRE EL EJE 2 Y 11.001.004.653.0013.9513.95EJE BENTRE EL EJE 4 Y 31.001.000.953.002.852.85ENTRE EL EJE 3 Y 21.001.002.823.008.468.46ENTRE EL EJE 2 Y 11.001.005.103.0015.3015.30EJE CENTRE EL EJE 4 Y 31.001.007.853.0023.5523.55ENTRE EL EJE 3 Y 21.001.001.903.005.705.70ENTRE EL EJE 2 Y 11.001.003.153.009.459.45EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.000.003.000.000.00ENTRE EL EJE C Y D1.001.000.003.000.000.00EJE 3ENTRE EL EJE A Y B1.001.000.003.000.000.00ENTRE EL EJE B Y C1.001.000.003.000.000.00ENTRE EL EJE C Y D1.001.000.003.000.000.00EJE 4ENTRE EL EJE A Y B1.001.001.003.003.003.00ENTRE EL EJE B Y C1.001.002.963.008.888.88ENTRE EL EJE C Y D1.001.000.003.000.000.00AZOTEAEJE A Y EJE DENTRE EL EJE 4 Y 31.001.004.651.205.585.58ENTRE EL EJE 3 Y 21.001.004.801.205.765.76ENTRE EL EJE 2 Y 11.001.004.651.205.585.58EJE 1 Y EJE 4ENTRE EL EJE A Y B1.001.004.551.205.465.46ENTRE EL EJE B Y C1.001.004.701.205.645.64ENTRE EL EJE C Y D1.001.004.551.205.465.46VENTANASSEMISOTANOEJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.001.001.552.503.883.88EJE C ENTRE 4 - 3 ( V-01 , alfeizer H=.70)1.001.001.000.700.700.701ER PISOEJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)1.001.004.001.204.804.80EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)1.001.002.002.505.005.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.001.001.051.201.261.26EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.001.001.551.201.861.86EJE 3 ENTRE C - D ( VA-04 , alfeizer H=2.50)1.001.000.802.502.002.00EJE 4 ENTRE A - B ( VA-02 , alfeizer H=2.50)1.001.003.002.507.507.50EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.001.001.552.503.883.882DO PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE B ENTRE 3 - 4 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)1.001.004.001.204.804.80EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)1.001.002.002.505.005.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.001.001.051.201.261.26EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.001.001.551.201.861.86EJE 4 ENTRE B - C ( VA-05 , alfeizer H=1.20)1.001.001.741.202.092.09EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.001.001.552.503.883.883ER PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE B ENTRE 3 - 4 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)1.001.004.001.204.804.80EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)1.001.002.001.202.402.40EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)1.001.002.002.505.005.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.001.001.051.201.261.26EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.001.001.551.201.861.86EJE 4 ENTRE B - C ( VA-05 , alfeizer H=1.20)1.001.001.741.202.092.09EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.001.001.552.503.883.88METRADO TOTAL (M2)858.3902.00.00REVOQUES ENLUCIDOS Y MOLDURAS1943.23TOTAL02.01.00TERRAJEO EN MURO : INTERIOR Y EXTERIORUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SOTANOEJE A Y EJE DENTRE EL EJE 4 Y 32.002.004.653.0055.8055.80ENTRE EL EJE 3 Y 22.002.004.803.0057.6057.60ENTRE EL EJE 2 Y 12.002.004.653.0055.8055.80EJE 1ENTRE EL EJE A Y B2.001.004.553.0027.3027.30ENTRE EL EJE B Y C2.001.004.703.0028.2028.20ENTRE EL EJE C Y D2.001.004.553.0027.3027.30EJE 3ENTRE EL EJE D Y D'2.001.003.003.0018.0018.00EJE 4ENTRE EL EJE A Y B1.001.004.551.105.015.01ENTRE EL EJE B Y C1.001.004.701.105.175.17ENTRE EL EJE C Y D1.001.004.551.105.015.01EJE CENTRE EL EJE 4 Y 32.002.003.203.0038.4038.401ER PISOEJE A Y EJE DENTRE EL EJE 4 Y 32.002.004.653.0055.8055.80ENTRE EL EJE 3 Y 22.002.004.803.0057.6057.60ENTRE EL EJE 2 Y 12.002.004.653.0055.8055.80EJE BENTRE EL EJE 4 Y 32.001.0010.103.0060.6060.60ENTRE EL EJE 3 Y 22.001.001.683.0010.0810.08ENTRE EL EJE 2 Y 12.001.004.903.0029.4029.40EJE CENTRE EL EJE 4 Y 32.001.007.853.0047.1047.10ENTRE EL EJE 3 Y 22.001.000.853.005.105.10ENTRE EL EJE 2 Y 12.001.003.153.0018.9018.90EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B2.001.003.703.0022.2022.20ENTRE EL EJE B Y C2.001.000.003.000.000.00ENTRE EL EJE C Y D2.001.000.003.000.000.00EJE 3ENTRE EL EJE A Y B2.001.003.703.0022.2022.20ENTRE EL EJE B Y C2.001.000.003.000.000.00ENTRE EL EJE C Y D2.001.002.203.0013.2013.20EJE 4ENTRE EL EJE A Y B2.001.001.563.009.369.36ENTRE EL EJE B Y C2.001.000.553.003.303.30ENTRE EL EJE C Y D2.001.000.003.000.000.002DO PISOEJE A Y EJE DENTRE EL EJE 4 Y 32.002.004.653.0055.8055.80ENTRE EL EJE 3 Y 22.002.004.803.0057.6057.60ENTRE EL EJE 2 Y 12.002.004.653.0055.8055.80EJE BENTRE EL EJE 4 Y 32.001.001.903.0011.4011.40ENTRE EL EJE 3 Y 22.001.002..343.006.006.00ENTRE EL EJE 2 Y 12.001.009.003.0054.0054.00EJE CENTRE EL EJE 4 Y 32.001.007.853.0047.1047.10ENTRE EL EJE 3 Y 22.001.001.903.0011.4011.40ENTRE EL EJE 2 Y 12.001.002.253.0013.5013.50EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B2.001.004.553.0027.3027.30ENTRE EL EJE B Y C2.001.004.063.0024.3624.36ENTRE EL EJE C Y D2.001.004.553.0027.3027.30EJE 3ENTRE EL EJE A Y B2.001.006.553.0039.3039.30ENTRE EL EJE B Y C2.001.000.003.000.000.00ENTRE EL EJE C Y D2.001.000.003.000.000.00EJE 4ENTRE EL EJE A Y B2.001.001.003.006.006.00ENTRE EL EJE B Y C2.001.002.963.0017.7617.76ENTRE EL EJE C Y D2.001.000.003.000.000.003ER PISOEJE A Y EJE DENTRE EL EJE 4 Y 32.002.004.653.0055.8055.80ENTRE EL EJE 3 Y 22.002.004.803.0057.6057.60ENTRE EL EJE 2 Y 12.002.004.653.0055.8055.80EJE BENTRE EL EJE 4 Y 32.001.000.953.005.705.70ENTRE EL EJE 3 Y 22.001.002.823.0016.9216.92ENTRE EL EJE 2 Y 12.001.005.103.0030.6030.60EJE C0.00ENTRE EL EJE 4 Y 32.001.007.853.0047.1047.10ENTRE EL EJE 3 Y 22.001.001.903.0011.4011.40ENTRE EL EJE 2 Y 12.001.003.153.0018.9018.90EJE 1ENTRE EL EJE A Y B1.001.004.553.0013.6513.65ENTRE EL EJE B Y C1.001.004.703.0014.1014.10ENTRE EL EJE C Y D1.001.004.553.0013.6513.65EJE 2ENTRE EL EJE A Y B2.001.004.553.0027.3027.30ENTRE EL EJE B Y C2.001.000.003.000.000.00ENTRE EL EJE C Y D2.001.000.003.000.000.00EJE 3ENTRE EL EJE A Y B2.001.000.003.000.000.00ENTRE EL EJE B Y C2.001.000.003.000.000.00ENTRE EL EJE C Y D2.001.000.003.000.000.00EJE 4ENTRE EL EJE A Y B2.001.001.003.006.006.00ENTRE EL EJE B Y C2.001.002.963.0017.7617.76ENTRE EL EJE C Y D1.001.000.153.000.450.45AZOTEAEJE A Y EJE DENTRE EL EJE 4 Y 32.002.004.651.2022.3222.32ENTRE EL EJE 3 Y 22.002.004.801.2023.0423.04ENTRE EL EJE 2 Y 12.002.004.651.2022.3222.32EJE 1 Y EJE 4ENTRE EL EJE A Y B3.001.004.551.2016.3816.38ENTRE EL EJE B Y C3.001.004.701.2016.9216.92ENTRE EL EJE C Y D3.001.004.551.2016.3816.38VENTANASSEMISOTANOEJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.001.001.552.503.883.88EJE C ENTRE 4 - 3 ( V-01 , alfeizer H=.70)1.001.001.000.700.700.701ER PISOEJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)2.001.004.001.209.609.60EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)2.001.002.002.5010.0010.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)2.001.001.051.202.522.52EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)2.001.001.551.203.723.72EJE 3 ENTRE C - D ( VA-04 , alfeizer H=2.50)2.001.000.802.504.004.00EJE 4 ENTRE A - B ( VA-02 , alfeizer H=2.50)2.001.003.002.5015.0015.00EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)2.001.001.552.507.757.752DO PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE B ENTRE 3 - 4 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)2.001.004.001.209.609.60EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)2.001.002.002.5010.0010.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)2.001.001.051.202.522.52EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)2.001.001.551.203.723.72EJE 4 ENTRE B - C ( VA-05 , alfeizer H=1.20)2.001.001.741.204.184.18EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)2.001.001.552.507.757.753ER PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE B ENTRE 3 - 4 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)2.001.004.001.209.609.60EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)2.001.002.001.204.804.80EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)2.001.002.002.5010.0010.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)2.001.001.051.202.522.52EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)2.001.001.551.203.723.72EJE 4 ENTRE B - C ( VA-05 , alfeizer H=1.20)2.001.001.741.204.184.18EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)2.001.001.552.507.757.75METRADO TOTAL (M2)1943.23285.12TOTAL02.02.00TARRAJEO DE COLUMNASUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMI SOTANOEJE 11.004.001.203.0014.4014.40EJE 21.004.001.203.0014.4014.40EJE 31.006.001.203.0021.6021.60EJE 41.004.001.203.0014.4014.40PRIMER PISOEJE 11.004.001.203.0014.4014.40EJE 21.004.001.203.0014.4014.40EJE 31.006.001.203.0021.6021.60EJE 41.004.001.203.0014.4014.40SEGUNDO PISOEJE 11.004.001.203.0014.4014.40EJE 21.004.001.203.0014.4014.40EJE 31.006.001.203.0021.6021.60EJE 41.004.001.203.0014.4014.40TERCER PISOEJE 11.004.001.203.0014.4014.40EJE 21.004.001.203.0014.4014.40EJE 31.006.001.203.0021.6021.60EJE 41.004.001.203.0014.4014.40AZOTEAEJE 11.004.001.201.205.765.76EJE 21.004.001.201.205.765.76EJE 31.006.001.201.208.648.64EJE 41.004.001.201.205.765.76METRADO TOTAL (M2)285.12

127.86TOTAL02.03.00TARRAJEO DE VIGASUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMI SOTANO - 1ER PISOEJE A Y D (VP - 100)ENTRE EJE 1 Y 2 2.001.004.650.403.723.72ENTRE EJE 2 Y 32.001.004.800.403.843.84ENTRE EJE 3 Y 42.001.004.650.403.723.72EJE B (VP - 100)ENTRE EJE 1 Y 2 1.001.004.650.803.723.72ENTRE EJE 2 Y 31.001.004.800.803.843.84ENTRE EJE 3 Y 41.001.004.650.803.723.72EJE C (VP - 100)ENTRE EJE 1 Y 2 0.000.000.000.800.000.00ENTRE EJE 2 Y 31.001.004.800.803.843.84ENTRE EJE 3 Y 41.001.004.650.803.723.72EJE 1 (VS - 100)ENTRE EJE A Y B1.001.004.550.351.591.59ENTRE EJE B Y C1.001.004.700.351.651.65ENTRE EJE C Y D1.001.004.550.351.591.59EJE 4 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19EJE 2 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19EJE 3 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19

2DO - 3ER PISOEJE A Y D (VP - 100)ENTRE EJE 1 Y 2 2.001.004.650.403.723.72ENTRE EJE 2 Y 32.001.004.800.403.843.84ENTRE EJE 3 Y 42.001.004.650.403.723.72EJE B (VP - 100)ENTRE EJE 1 Y 2 1.001.004.650.803.723.72ENTRE EJE 2 Y 31.001.004.800.803.843.84ENTRE EJE 3 Y 41.001.004.650.803.723.72EJE C (VP - 100)ENTRE EJE 1 Y 2 0.000.000.000.800.000.00ENTRE EJE 2 Y 31.001.004.800.803.843.84ENTRE EJE 3 Y 41.001.004.650.803.723.72EJE 1 (VS - 100)ENTRE EJE A Y B1.001.004.550.351.591.59ENTRE EJE B Y C1.001.004.700.351.651.65ENTRE EJE C Y D1.001.004.550.351.591.59EJE 4 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19EJE 2 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19EJE 3 (VS - 100)ENTRE EJE A Y B1.001.004.550.703.193.19ENTRE EJE B Y C1.001.004.700.703.293.29ENTRE EJE C Y D1.001.004.550.703.193.19METRADO TOTAL (M2)127.86

181.08TOTAL02.04.00VESTIDURA DE DERRAMES 1:5UNIDADMDETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

VENTANASSEMISOTANOEJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.002.001.550.504.104.10EJE C ENTRE 4 - 3 ( V-01 , alfeizer H=.70)1.002.001.001.004.004.001ER PISOEJE C ENTRE 1 - 2 ( V-03 , E= 0.15 M)1.002.004.001.6011.2011.20EJE 2 ENTRE A - B ( VA-03 , E= 0.15)2.002.002.000.5010.0010.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.002.001.050.503.10EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.002.001.551.606.306.30EJE 3 ENTRE C - D ( VA-04 , alfeizer H=2.50)1.002.000.800.502.602.60EJE 4 ENTRE A - B ( VA-02 , alfeizer H=2.50)1.002.003.000.507.007.00EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.002.001.550.504.102DO PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE B ENTRE 3 - 4 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)2.002.002.000.5010.0010.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.002.001.051.605.305.30EJE 2 ENTRE B - C ( V-06 , alfeizer H=1.20)1.002.003.001.609.209.20EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.002.001.551.606.306.30EJE 4 ENTRE B - C ( V-05 , alfeizer H=1.20)1.002.001.741.606.686.68EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.002.001.550.504.104.103ER PISOEJE B ENTRE 2 - 3 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE C ENTRE 1 - 2 ( V-03 , alfeizer H=1.20)2.002.004.001.6022.4022.40EJE C ENTRE 3 - 2 ( V-03 , alfeizer H=1.20)1.002.002.001.607.207.20EJE 2 ENTRE A - B ( VA-03 , alfeizer H=2.50)2.002.001.000.506.006.00EJE 2 ENTRE C - D ( V-04 , alfeizer H=1.20)1.002.001.051.605.305.30EJE 3 ENTRE C - D ( V-02 , alfeizer H=1.20)1.002.001.551.606.306.30EJE 4 ENTRE A - B ( VA-02 , alfeizer H=1.20)1.002.003.000.507.007.00EJE 4 ENTRE C - D ( VA-01 , alfeizer H=2.50)1.002.001.550.504.104.10METRADO TOTAL (M)181.08

11.70TOTAL02.05.00BRUAS E = 2''UNIDADMDETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

EN FACHADAENTRE EJE A Y B1.007.000.785.465.46ENTRE EJE C Y D1.008.000.786.246.24

METRADO TOTAL (M)11.70

03.00.00CIELO RASO481.43TOTAL03.01.00CIELO RASO CON MEZCLA 1:5UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMISOTANOENTRE EJE 3-41.001.0058.3858.38ENTRE EJE 3-21.001.0069.1169.11ENTRE EJE 2-11.001.0063.4963.491ER PISOFACTURACION1.001.0021.1621.16CATASTRO1.001.0017.6017.60SS.HH. DAMAS / CABALLEROS1.001.007.537.53SS.HH. PUBLICO1.001.002.422.42ATENCION AL CLIENTE1.001.0038.3038.30CAJA REGISTRADORA1.001.0034.6534.65PASADIZO1.001.0029.6529.652DO PISOJEFE ZONAL1.001.0033.2933.29SECRETARIA1.001.0023.9423.94SS.HH. DAMAS / CABALLEROS1.001.007.537.53TECNICO ADMINISTRATIVO1.001.0013.1913.19COORDINADOR DE OPERACIONES1.001.0018.7018.70COORDINADOR COMERCIAL1.001.0021.9021.90PASADIZO1.001.0041.5841.583ER PISOSALA DE REUNIONES1.001.0042.9742.97SS.HH. DAMAS / CABALLEROS1.001.007.537.53CONTROL DE SISTEMA AUTOMATIZADO1.001.0040.5240.52CAFETIN1.001.0011.8111.81PASADIZO1.001.0067.1667.16METRADO TOTAL (M2)481.4362.82TOTAL03.02.00VESTIDURA EN FONDO DE ESCALERAUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SOTANO A 1ER PISO3.132.257.047.041ER PISO A 2DO PISO3.132.257.047.042DO PISO A 3ER PISO3.132.257.047.043ER PISO A AZOTEA3.132.257.047.04RAMPA PARA ACCESO DE ESTACIONAMIENTO11.003.1534.6534.65

METRADO TOTAL (M2)62.8204.00.00PISOS Y PAVIMENTOS211.47TOTAL04.01.00CONTRAPISO E=30 MM.UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMISOTANO - ESTACIONAMIENTOESTACIONAMIENTO Y ALMACEN1.001.00211.47211.47

METRADO TOTAL (M2)211.47506.37TOTAL04.02.00PISO DE PORCELANATO DE 45 X 45UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

1ER PISOFACTURACION1.001.0023.4923.49CATASTRO1.001.0019.3919.39ATENCION AL CLIENTE1.001.0042.9642.96CAJA REGISTRADORA1.001.0035.7135.71PASADIZO1.001.0031.2031.202DO PISOJEFE ZONAL1.001.0038.5038.50SECRETARIA1.001.0026.7226.72TECNICO ADMINISTRATIVO1.001.0021.1421.14COORDINADOR DE OPERACIONES1.001.0021.1021.10COORDINADOR COMERCIAL1.001.0024.5324.53PASADIZO1.001.0043.1543.153ER PISOSALA DE REUNIONES1.001.0049.3749.37CONTROL DE SISTEMA AUTOMATIZADO1.001.0046.2046.20CAFETIN1.001.0012.4612.46PASADIZO1.001.0070.4570.45METRADO TOTAL (M2)506.3725.01TOTAL04.03.00PISO DE CERAMICO DE 2030UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

1ER PISOSS.HH. DAMAS / CABALLEROS1.001.007.537.53SS.HH. PUBLICO1.001.002.422.422DO PISOSS.HH. DAMAS / CABALLEROS1.001.007.537.533ER PISOSS.HH. DAMAS / CABALLEROS1.001.007.537.53

METRADO TOTAL (M2)25.01213.15TOTAL04.04.00PISO DE CEMENTO PULIDOUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

AZOTEA1.001.00213.15213.15

METRADO TOTAL (M2)213.1505.00.00ZOCALOS Y CONTRAZOCALOS54.05TOTAL05.01.00ZOCALO DE CERAMICA DE 20X30UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

1ER PISOFACTURACION1.001.0019.300.152.902.90CATASTRO1.001.0017.900.152.692.69ATENCION AL CLIENTE1.001.0037.700.155.665.66CAJA REGISTRADORA1.001.0027.550.154.134.13PASADIZO1.001.0010.700.151.611.612DO PISOJEFE ZONAL1.001.0028.500.154.284.28SECRETARIA1.001.0023.000.153.453.45TECNICO ADMINISTRATIVO1.001.0019.100.152.872.87COORDINADOR DE OPERACIONES1.001.0019.000.152.852.85COORDINADOR COMERCIAL1.001.0019.350.152.902.90PASADIZO1.001.0041.900.156.296.293ER PISOSALA DE REUNIONES1.001.0025.700.153.863.86CONTROL DE SISTEMA AUTOMATIZADO1.001.0026.700.154.014.01CAFETIN1.001.0010.800.151.621.62PASADIZO1.001.0033.100.154.974.97METRADO TOTAL (M2)54.05

76.35TOTAL05.02.00CONTRAZOCALO DE 20X30CMUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

1ER PISOSS.HH. DAMAS / CABALLEROS2.001.007.401.5022.2022.20SS.HH. PUBLICO1.001.006.501.509.759.752DO PISOSS.HH. DAMAS / CABALLEROS2.001.007.401.5022.2022.203ER PISOSS.HH. DAMAS / CABALLEROS2.001.007.401.5022.2022.20

METRADO TOTAL (M2)76.35

06.00.00REVESTIMIENTO DE GRADAS Y ESCALERAS34.04TOTAL06.01.00REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASOUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMISOTANOPASOS1,2,3,4,5,6,7,81.008.001.130.252.252.259,101.002.001.130.250.570.5711,12,13,14,15,16,17,181.008.001.130.252.252.25

CONTRAPASOS1,2,3,4,5,6,7,81.008.001.130.171.531.539,101.002.001.130.170.380.3811,12,13,14,15,16,17,181.008.001.130.171.531.531ER PISOPASOS1,2,3,4,5,6,7,81.008.001.130.252.252.259,101.002.001.130.250.570.5711,12,13,14,15,16,17,181.008.001.130.252.252.25CONTRAPASOS1,2,3,4,5,6,7,81.008.001.130.171.531.539,101.002.001.130.170.380.3811,12,13,14,15,16,17,181.008.001.130.171.531.532DO PISOPASOS1,2,3,4,5,6,7,81.008.001.130.252.252.259,101.002.001.130.250.570.5711,12,13,14,15,16,17,181.008.001.130.252.252.25CONTRAPASOS1,2,3,4,5,6,7,81.008.001.130.171.531.539,101.002.001.130.170.380.3811,12,13,14,15,16,17,181.008.001.130.171.531.533ER PISOPASOS1,2,3,4,5,6,7,81.008.001.130.252.252.259,101.002.001.130.250.570.5711,12,13,14,15,16,17,181.008.001.130.252.252.25CONTRAPASOS1,2,3,4,5,6,7,81.008.001.130.171.531.539,101.002.001.130.170.380.3811,12,13,14,15,16,17,181.008.001.130.171.531.53

METRADO TOTAL (M2)34.04

07.00.00CARPINTERIA DE MADERA O SIMILARES55.98TOTAL07.01.00PUERTA CONTRAPLACADA DE 35 MM C/MARCOUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

P11.001.302.603.383.38P31.000.852.602.212.21P47.000.702.6012.7412.74P51.003.732.609.709.70P6 (MAMPARA DE VIDRIO)1.003.552.609.239.23P76.000.902.6014.0414.04P81.001.802.604.684.68

METRADO TOTAL (M2)55.98

9.00TOTAL07.02.00MARCO DE PUERTA CON MADERA TORNILLOUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

P2 (MAMPARA DE VIDRIO)1.0033.009.009.00

METRADO TOTAL (9.698)9.0008.00.00CARPINTERIA METALICA32.00TOTAL08.01.00PASAMANO DE TUBO FG DE 2" EN ESCALERAUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

SEMI SOTANO4.002.008.008.001ER PISO4.002.008.008.002DO PISO4.002.008.008.003ER PISO4.002.008.008.00

METRADO TOTAL (M2)32.0009.00.00CERRAJERIA17.00TOTAL09.01.00PERILLA EN BOLAUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

P11.001.001.00P31.001.001.00P47.007.007.00P51.001.001.00P60.000.000.00P76.006.006.00P81.001.001.00

METRADO TOTAL (M2)17.001.00TOTAL09.02.00CHAPA DE 3 GOLPESUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

P2 (MAMPARA DE VIDRIO)1.001.001.00

METRADO TOTAL (1)1.00

10.00.00CERRAJERIA METALICA54.00TOTAL10.01.00BISAGRA ALUMIN. DE 3." PESADA EN PUERTA UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

P11.003.003.00P21.003.003.00P31.003.003.00P47.003.0021.00P51.003.003.00P60.003.000.00P76.003.0018.00P81.003.003.00

METRADO TOTAL (M2)54.0011.00.00VIDRIOS CRISTALES Y SIMILARES67.79TOTAL11.01.00VIDRIO POLARIZADO 8MM (INC. INSTALACION)UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

VA-131.550.52.3252.325VA-2130.51.51.5VA-3610.533VA-410.80.50.40.4V-0111111V-0241.91.612.1612.16V-031021.63232V-0431.051.65.045.04V-0521.741.65.5685.568V-06131.64.84.8

METRADO TOTAL (M2)67.7948.04TOTAL11.02.00VENTANA PROYECTANTE (INC. INSTALACION)UNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

EN FACHADACOLOR CELESTE22.531515COLOR CELESTE23.92.821.8421.84COLOR CHAMPAGNA11.756.411.211.2

METRADO TOTAL (M2)48.043.00TOTAL11.03.00BLOQUETAS DE VIDRIOUNIDADUND.DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

EN FACHADA1333

METRADO TOTAL (UND.)3.0012.00.00PINTURA609.29TOTAL12.01.00PINTURA LATEX 02 MANOS EN CIELO RASO Y VIGASUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

PINTURA DE CIELO RASO = TARREO DE CIELO RASO481.43481.43PINTURA DE VIGAS = TARRAJEO DE VIGAS127.86127.86

METRADO TOTAL (M2)609.29

2259.13TOTAL12.02.00PINTURA LATEX 02 MANOS EN MUROS Y COLUMNASUNIDADM2DETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

PINTURA DE MUROS = TARREO DE MUROS1943.231943.23PINTURA DE COLUMNAS = TARRAJEO DE COLUMNAS285.12285.12PINTURA DE DERRAMES = DERRAMES ANCH PROM181.080.1730.7830.78

METRADO TOTAL (M2)2259.1313.00.00VARIOS, LIMPIEZA Y JARDINERIA1.00TOTAL13.01.00PINTURA LATEX 02 MANOS EN MUROS Y COLUMNASUNIDADGBLDETALLESN DE ELEMENTOSCANTIDADLARGO (M)ANCHO (M)ALTURA (M)AREA (M2) O VOLUMEN (M3)TOTAL

LIMPIEZA PERMANENTE DE LA OBRA1.001.001.00

METRADO TOTAL (GBL)1.00