    ANNUAL INVESTMENT PLAN 2012

    Account

    Object of Expenditures Code Appropriation Obligation

    SOCIAL SERVICES

    M.O.O.E.

    Rep. & Maint.- Parks & Plaza 852

    -Rehabilitation of ABC Park Fountain 198,500.00 197,807.40

    Rep. & Maint. - Artesian Wells 854

    -Rehabilitation of existing deep and 200,000.00 196,810.80

    shallow wells

    Rep. & Maint.- Other Structures 815

    -Rep. & Maint. Of Multi-purpose Hall 100,000.00 98,692.74

    at Palangue 2 & 3

    CAPITAL OUTLAY

    Other Structures 215

    -Installation of Traffic Signal Lights 2,443,000.00 2,442,992.83

    -Installation of tiles at multi-purpose 98,000.00 97,386.00

    center at Bancaan

    Artesian Wells,Reservoirs,P. Stations 254

    -Construction of deep well/shallow 500,000.00 496,779.47

    well

    Electrification, Power & Energy Structures 205

    -Electrical Installation of service 80,000.00 72,835.00

    entrance at NNHS-Annex, Ibayo Estacion

    School Buildings 212

    -Construction of 1 classroom bldg. 680,000.00 672,651.95

    at Villa Apolonia

    -Concreting of pavement of Multi- 182,200.00 180,668.55

    Purpose Hall and stage at Mal. Luma ES

    TOTAL, SOCIAL SERVICES 4,481,700.00 4,456,624.74

    ECONOMIC SERVICES

    M.O.O.E.

    Rep. & Maint.- Roads & Bridges 851

    -Imp. of road network (Phase II) of 200,000.00 198,534.30

    dumping site at brgy. Sabang

    Rep. & Maint. - Other Public Infra 860

    -Maintenance of Controlled Landfill 1,045,831.00 1,043,943.50

    CAPITAL OUTLAY

    Land 201

    -Acquisition of Lot-Central Terminal 2,247,500.00 2,237,500.00

    PROGRAMMED APPROPRIATION AND OBLIGATION

    BY OBJECT OF EXPENDITURE

    (January - December, 2012)

  • 7/29/2019 20% IRAUtilization2012

    2/2

    -Partial Payment-Acquisition of Lot 1,000,000.00 1,000,000.00

    Other Structures 215

    -Construction of Motorpool 800,000.00 796,947.75

    -Construction of Impounding Area 200,000.00 197,823.36

    -Fabrication of Dumpsters 200,000.00 198,732.87

    Other Machinery & Equipment 240

    -Purchase of Residual Pulverizer

    Machine 650,000.00 593,200.00

    Motor Vehicles 241

    -Acquisition of Dumptruck 1,585,000.00 1,585,000.00

    Roads, Hiways & Bridges 251

    -Concreting/Construction of Roads

    Brgy. Bucana Sasahan 500,000.00 496,320.30

    Brgy. Muzon Phase 1 300,000.00 297,342.00

    Brgy. Calubcob 350,000.00 346,900.21

    Brgy. Ibayo Estacion 600,000.00 598,604.38Brgy. Bagong Kalsada 200,000.00 198,097.20

    -Construction of pathways at brgy. 100,000.00 98,659.28

    Latoria

    Flood Control 256

    -Construction of Drainage system at 400,000.00 397,191.60

    Brgy. Ibayo Silangan(beside terminal)

    -Construction of Canal Ling at brgy. 100,000.00 99,236.40

    Halang

    -Rehabilitation of Naic Central Eva- 423,300.00 420,081.90

    cuation Center Canal

    Other Public Infrastructure 260

    -Improvement of Balsahan River Bank 140,000.00 135,023.25

    Loans Payable 444

    Loan Amortization-Central Terminal 1,866,666.00 472,222.23

    -Amortization of Loan for heavy equipt. 1,769,388.00 1,538,036.25

    TOTAL, ECONOMIC SERVICES 14,677,685.00 12,949,396.78

    TOTAL, ANNUAL INVESTMENT PLAN 19,159,385.00 17,406,021.52

    Prepared by:

    JULIETA M. API