Industrial Operations
November, 18th 2005 Artur Coutinho
Executive Vice President – Industrial Operations
Embraer Units
BrazilGavião PeixotoEugenio de MeloSão José dos CamposBotucatuELEB
Botucatu - Neiva
Eugênio de MeloGavião Peixoto ELEB – Embraer / Liebherr
São José dos Campos – Faria Lima
5.4 million ft 2 3.0 million ft 2
180 million ft 2 3.7 million ft 2 0.3 million ft 2
Faria Lima Plant
Main Activities- Final assembly
� ERJ 145 family� Legacy� EMBRAER 170/190 family
- Parts manufacturing� Machining� Composites
Main Activities- Final assembly
� ERJ 145 family� Legacy� EMBRAER 170/190 family
- Parts manufacturing� Machining� Composites
Eugênio de Melo Plant
Tooling Tubing shop Harness shop
Main Activities:- Tooling- Tubing- Harness
Main Activities:- Tooling- Tubing- Harness
Previous access
Additional area for growth
Center of Competence for Fuselage Panels
Botucatu Plant
Main Activities:- Structural Assembly
� Fuselage Panels� Doors
- Parts manufacturing� Sheet metal
Main Activities:- Structural Assembly
� Fuselage Panels� Doors
- Parts manufacturing� Sheet metal
Panel Structural Assemblies CNC Riveting Machine
Gavião Peixoto Plant
Main Activities:- Final Assembly for Defense
� ALX� F5BR
- Cabinet Production
Main Activities:- Final Assembly for Defense
� ALX� F5BR
- Cabinet Production
F5BR Final assembly LineALX Final assembly Line
Cabinet Shop
Customer Base
Supplier Base
Supply Strategy
• 4 partners• 350 suppliers
• 16 partners• 22 suppliers
Supply Strategy
GAMESAEmpennages &Rear Fuselage
EMBRAER( LEADER)KAWASAKI / SONACA
Wing, Stub, Control Surfaces& Pylon
EMBRAERWing to Fuselage FairingEMBRAER / AKROS GE
Engine/ Nacelles
HAMILTON
SUNDSTRAND
Tail Cone &APU
LATECOERECenterFuselage III
LATECOERECenter Fuselage
EMBRAER / AKROSCenter Fuselage II
Electrical System
System Partners:System Partners:
HAMILTON SUNDSTRAND
Air Management
PARKER Hydraulics
Flight Controls
Fuel System
C & D Interiors
LIEBHERR Landing Gear
HONEYWELL Avionics
16 Risksharing Partners 22 Suppliers
Forward Fuselage
Supply Strategy
Brazilian Content:
� Faster response time
� Reduced cycles
� Base for exports
Supply Strategy
Global Suppliers are coming to Brazil
Industrial Operations Focus
• Productivity
• The easiest way
• The lower cost
• Flexibility
• The shortest time to market
• The latest product customization
• Quality
• Attitude
• Product reliability
• On time deliveries
• At the right cost
Manufacturing Strategies
Responsiveness
Manufacturing Flexibility
Costs Reduction
Process Capability
delivery
month
LEL
UEL
Obj.
LEL
UEL
Obj.
Mtg. 3 Mtg. 4Mtg. 1 Mtg. 2 Mtg. 4Mtg. 1 Mtg. 4
1º C.C. 2º C.C.
Primary Parts
Structural Assembly
Final Assembly
Postponement:
Time-To-Market: Manufacturing Cycle Reduction
Configuration Cycle
Stock Turn Over M/h Evolution:
4,4
6,7
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
8,0
dez
/01
fev/
02
abr/
02
jun
/02
ago
/02
ou
t/02
dez
/02
fev/
03
abr/
03
jun
/03
ago
/03
ou
t/03
dez
/03
fev/
04
abr/
04
jun
/04
ago
/04
ALMOX. AERON. PROCESSO TOTAL
18
20
23
25
28
30
33
35
38
40
mai se
tja
nm
ar jun
set
jan
mar jun
set
dez
jan
mar jun
set
dez
jan
mar jun
set
dez
jan
mar jun
set
dez
jan
mar jun
set
nov
Ho
ras
(x 1
.000
)
Real MAP
- Meta (média anual 2004) = 23.000 Hh - Real (média out/04) = 21.295 Hh
20001999 2001 2002 20031998 2004
ERJ 145
0
50.000
100.000
150.000
1 2 3 4 5 6 7 8 9 10 1 1 12
13
15
16
23
2 4 25 27 2 8 2 9 30
31
32
33
3 4 35 3 6 3 7 38 3 9 40
41
42
43
44 4 5 46 4 7 4 8 49
50
51
52
53 5 4 5 5 5 6 57 58
59
60
61
62
6 3 64 6 5 66 6 7 68
69
70
71
72 73 7 4 7 5 9 0 110
130
1 50
1 70
180
1 91
2 00
210
3 00
N/S
Hh
Real Plano de Recuper
Real c/ Hh não apontado Projeção
Projeção c/ Hh não apontado MAP
..
0
50.000
100.000
150.000
1 2 3 4 5 6 7 8 9 10 1 1 12
13
15
16
23
2 4 25 27 2 8 2 9 30
31
32
33
3 4 35 3 6 3 7 38 3 9 40
41
42
43
44 4 5 46 4 7 4 8 49
50
51
52
53 5 4 5 5 5 6 57 58
59
60
61
62
6 3 64 6 5 66 6 7 68
69
70
71
72 73 7 4 7 5 9 0 110
130
1 50
1 70
180
1 91
2 00
210
3 00
N/S
Hh
Real Plano de Recuper
Real c/ Hh não apontado Projeção
Projeção c/ Hh não apontado MAP
..
EMBRAER 170
5S KaizenControl
Process
Visual
Management
Empowered
Teams
20002000 TodayToday 20072007
KaizenKaizenKaizen
AFTERAFTERBEFOREBEFORE
Continuous Improvement Program
3,6
4,6
6,5
EMBRAER 170
5,5
5
4,5
3,73,5
3,1
2,6
ERJ-145
8.0
6.0 6.0
1999 2000 2001 2002 2003 2004 20056 1999 2000 2001 2002 2003 2004199 1997 1998
9
8
7
6
5
4
3
2
Mon
th
Production Cycle Improvement
✈ Improvement of production flexibility
✈ Faster response to market demand
EMBRAER 170
EMBRAER 175
EMBRAER 190
EMBRAER 195
EMBRAER 170/190 Family Convertibility
2005 20072006Conv
ertib
ility
(Day
s)Co
nver
tibili
ty (D
ays)
Conv
ertib
ility
(Day
s)
2005 20072006
2005 20072006
EMBRAER 170 – M/h evolution
0
40.000
80.000
120.000
160.000
200.000
1 7 13 21 27 33 39 45 51 57 63 69 75 81 93 108 113 120 126 134 142 150 157 167
Budget
Target
Real
Quality Management
Main certifications:
• ISO 9001 Quality Management System
• AS 9100 Quality Management System –Aerospace Requirements
• OHSAS 18001 Occupational Health and Safety Management System
• ISO 14001 Environmental Management Systems
• FAR Part 21 (Federal Aviation Regulation)