SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 1 of 26
287-50-SS-PE-EL-SP-008-D3
SPECIFICATION
FOR
MV & LV SQUIRREL CAGE INDUCTION MOTORS287-50-SS-PE-EL-SP-008
Revision Index
Revision RevisionSheet
No. 0 1 2 3 4
Sheet
No. 0 1 2 3 41 X 21 X2 X 22 X
3 X 23 X
4 X 24 X
5 X 25 X
6 X X 26 X
7 X 27
8 X 28
9 X X 29
10 X X 30
11 X X 31
12 X 32
13 X X 33
14 X 34
15 X 35
16 X X 36
17 X X 37
18 X 38
19 X 39
20 X 40
3 Approved for Construction MA FRS AA 16.06.07
2 Issued for Approval MA FRS AA 27.05.07
1 Revised as Per Client Comments MA FRS AA 07.05.070 First Issue MA FRS AA 25.02.07
Rev. Description Prepared Checked Approved Date
7/29/2019 287-50-SS-PE-EL-SP-008-D3
2/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 2 of 26
287-50-SS-PE-EL-SP-008-D3
TABLE OF CONTENTS
1. SCOPE
2. SITE CONDITIONS
3. STANDARDS AND CODES
4. RESPONSIBILITIES
5. DOCUMENT PRIORITY
6. DESIGN AND CONSTRUCTION
7. ENCLOSURES
8. INSULATION SYSTEMS
9. ROTOR (SQUIRREL CAGE)
10. STATOR WINDINGS
11. AIR GAP
12. COOLING METHOD
13. FANS
14. BALANCING, VIBRATION AND NOISE LEVEL
15. BEARINGS AND LUBE OIL SYSTEM
16. ANTI-CONDENSATION REQUIREMENTS
17. RESISTANCE TEMPERATURE DETECTORS
18. MOTOR DIFFERENTIAL PROTECTION
19. SURGE PROTECTION
20. TERMINAL BOXES MOTOR AND ACCESSORIES
21. SURFACE COATING & PAINT
22. TEST AND INSPECTION
23. NAMEPLATE
24. INFORMATION TO BE SUPPLIED AT TIME OF QUOTATION
25. SPARE PARTS
26. DRAWINGS& TECHNICAL DOCUMENTS
27. PREPARATION FOR SHIPMENT27. GUARANTEE
7/29/2019 287-50-SS-PE-EL-SP-008-D3
3/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 3 of 26
287-50-SS-PE-EL-SP-008-D3
1. SCOPE1.1. This specification covers the general design and testing requirements for
standard MV & LV three/single phase squirrel cage induction motors that
shall be fabricated to drive process & other operational equipment in the South
East Zagross Cluster, Sarvestan and Sadaat Abad Oil Fields Project for
located in Iran.
1.2. Motors shall be made suitable for outdoor installation and continuousoperation under the site conditions of the refinery, as defined in section 2,below, and as specified in the Data Sheets of the relevant motors.
2. SITE CONDITIONSAll electric motors shall be designed and manufactured, to be suitable for their
particular service & operational requirements, under the following site conditions.
a) Site elevation (+/- mean sea level): (+)1560 m
b) High/Low Temperature: (Max.) (+)43C/(Min.) (-)14C
c) Relative Humidity: 85% (Maximum)
d) Atmospheric Condition: Dusty, Humid and Saliferous
3. STANDARDS AND CODES3.1. Motors shall be designed, constructed and tested in accordance with the
pertinent sections of the latest editions of the standards and codes, as noted
below, or elsewhere in this specification.
3.2. Motors shall generally comply with the requirements of Iranian PetroleumStandards (IPS) & International Electrotechnical Commission (IEC)
Standards, with particular reference to the applicable sections of the following
standards:
a) IPS-M-EL-131:
Material and Equipment
Standard For Low Voltage
Induction Motors
b) IPS-M-EL-132:Material and Equipment
Standard For Medium & High
Voltage Induction Motors
c) IEC 60034-1 to IEC 60034-18
or BS 4999:Rotating Electrical Machines
d) IEC 60072-1 & 2: Dimensions & Output Rating ofMotors
e) IEC 60079-0 to IEC 60079-15
or BS 5501:Electrical Apparatus for
Explosive Gas Atmospheres
7/29/2019 287-50-SS-PE-EL-SP-008-D3
4/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 4 of 26
287-50-SS-PE-EL-SP-008-D3
f) IEC 60085:Thermal Evaluation and
Classification of Electrical
Insulation
g) IEC 60529:Degree of Protection Provided by
Enclosures
h) ISO 281: Calculated Bearing Life
3.3. Where reference is made to any standard and codes other than IEC, it isunderstood that the equivalent IEC standard is also acceptable.
4. RESPONSIBILITIES4.1. When motors are furnished with the driven equipment as a package, the torque
characteristics and speeds are the responsibility of the vendor.
4.2. For motor sizing, reference shall be made to the specification of the respectivedriven equipment.
4.3. When motors are directly ordered by the purchaser, the torque characteristicsand speeds will be supplied with the request for quotation and/or purchase
order.
5. DOCUMENT PRIORITYIn the event of any conflict(s) between this specification, data sheet, drawings, codes
and standards, the priority will be given in the following order:
a) Purchase Orderb) Data Sheets and/or Drawingsc) This Specificationd) Codes and Standards.In any case the vendor shall inform purchaser and obtain clarification before
proceeding with any work.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
5/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 5 of 26
287-50-SS-PE-EL-SP-008-D3
6. DESIGN AND CONSTRUCTION6.1. Voltage and Output Rating
If not specified otherwise, the following Low Voltage (LV) & Medium
Voltage (MV) levels shall apply to motors in the categorized ranges of kW
rating:
Rating Voltage Phase
Frequency
(Hz)
Type of
Connection
Less than 0.4 kW
230 V
or
400 V
1
or
3
50
-
or
Delta
0.4 kW to 150 kW 400 V 3 50 Delta
150 kW to 2000 kW 6000 V 3 50 Star
Motor Above 2000 kW60000 V
or *3 50 Star or *
*: To be individually specified
Fractional horsepower motors for critical services (compressor auxiliaries,
lube oil systems, special pumps, etc.,) shall be 400 Volts, 3 phase.
6.2. Electrical System VariationsMotors shall be capable of operating continuously with full-load at rated
torque under the ambient conditions stated in section 2.0, at any frequency
between -5% and +2% of the nominal frequency together with a voltage
variation of 5% of the nominal voltage.
6.3. Starting Conditions & Duties6.3.1. All motors, unless otherwise specified, are for coupled service.6.3.2. Method of starting will be Direct-On-Line (DOL), unless otherwise
specified.
6.3.3. Unless otherwise indicated in Data Sheet(s) the duty of the motor shallbe duty type S1, continuous running duty, as defined in IEC 60034-1.
6.3.4. At any voltage between 80% to 100% rated voltage, motors shall becapable of:
a) Three (3) successive starts with the motor initially at maximumambient temperature.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
6/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 6 of 26
287-50-SS-PE-EL-SP-008-D3
b) Two (2) successive starts with the motor at full load operatingtemperature.
6.3.5. A further start shall be possible after a normal motor run out and a re-cooling period of max. 30 minutes. Number of starts shall be indicated
on the motor rating plate.
6.3.6. Motors shall be suitable for 1000 starts per year unless specifiedotherwise.
6.3.7. The starting performance shall generally be design "N" as perIEC 60034-12 for motors up to 150 kW. For loads requiring high
torque and for all loads above 150 kW motors of high starting torque
equivalent to design "H" shall be utilized.
6.3.8. Motors shall have sufficient starting torque and thermal capabilities toovercome the load inertia for starting and accelerating the connected
load to rated speed at 20% reduced voltage, without injurious heating.
6.3.9. The minimum accelerating torque shall be at least 30% more than thetorque required by the load, at starting and pull up stage, when theapplied voltage is 80% of the nominal voltage.
6.3.10.The motor shall be capable of starting and accelerating the connectedload to rated speed at 80% of the nominal voltage.
6.3.11.Starting Characteristica) Starting and acceleration of motors to the rated speed must be
ensured with the starting load inertia and torque.
b) The sizing of the motors versus the driven machines shall
generally be as follows:
For pumps according to API 610. For compressors according to API 617.
c) To ensure successful acceleration, the motor torque speed curve
shall be at least 10% of the rated motor torque higher than the
loaded driven machine torque-speed-curve at all speeds, with
the motor terminal voltage of 80% of the rated voltage, unless
specified otherwise. All possible tolerances to be considered.
2
7/29/2019 287-50-SS-PE-EL-SP-008-D3
7/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 7 of 26
287-50-SS-PE-EL-SP-008-D3
6.3.12.Breakdown/Stalling TorqueThe breakdown/stalling torque shall be higher than 180% of rated
torque at rated voltage. However, motor shall not stall during operation
at full load and a transient system voltage drop to 80% of rated voltage
and frequency variation as specified in data sheets.
6.3.13.Stalling TimeLocked rotor withstand time (stall-time) at hot conditions and at anyvoltage between 80 and 100% of rated voltage shall exceed
acceleration time of motor.
6.4. Construction & Miscellaneous Requirements6.4.1. Motors with horizontal shaft shall not be used in vertical service (e.g.
air-cooled heat exchangers). Where vertical motors of symbol
"IM V*", as per IEC 60034-7, are specified, the following special
precautions shall be taken to preclude water ingress through
mechanical gaps, motor shaft, etc.
a) Flinger ring shall be provided on the motor shaft directly
above the motor housing. The flinger ring shall be installed
with adequate fit to divert water away from the shaft and
bearing enclosure.
b) Grease nipple or bearing cover fixing bolts etc., shall not be
located where there is any possibility of water accumulation.
6.4.2. Generally, the start/stop control stations for motors will be a separateitem supplied by others, and located near or within the sight of the
motor.
7. ENCLOSURES7.1. Electric motors, supplied in accordance with this specification, shall meet the
requirements of the area classification, and enclosure ingress protection, as
defined in the relevant Data Sheet and in compliance with the applicable
sections of the latest edition of the pertinent standards and codes. The motor
enclosure and fan cover material shall be cast or nodular iron, cast steel or
steel plates with proper protective coatings. Any special requirements will be
indicated on the motor Data Sheet.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
8/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 8 of 26
287-50-SS-PE-EL-SP-008-D3
7.2. Motor for Hazardous Areasa) Motors to be used in Zone 0 & 1 (Class 1, Div.1) areas, indoors,
shall be flameproof type (Exd-IIB-T3) according to IEC 60079-1
with IP 55 Protection, per IEC 60034-5. For outdoors use, they shall
have additional degree of protection to IP 55W.
b) Motors to be used in Zone 2 (Class 1, Div.2) areas, indoors, shall be
Totally Enclosed Fan Cooled (TEFC), IP 55 as per IEC 60034-5 and
shall meet the requirements of increased safety (Exe-IIB-T3) or nonsparking (Exn-IIB-T3) in accordance with IEC recommendation
60079-7 or equivalent national standards. For outdoors use they shall
be additionally weatherproof equivalent to IP 55W per IEC 60034-5.
The increased safety motors shall be suitable for the appropriate gas
groups in Zone 2 (Division 2) areas and hence shall cope with the
limiting temperature groups T1 through T6 as defined in
IEC 60079-7, and specified in the relevant Data Sheets.
c) All single phase motors shall be flameproof (Exd) throughout
process, utility and tankage areas.
7.3. Motors for Non-Hazardous Areasa) Motors to be used in non-hazardous areas, indoors, shall be TEFC
with degree of protection IP 55 according to IEC 60034-5. For
outdoor use they shall be additionally weatherproof equivalent to
IP 55W.
b) All single phase motors outside, process, utility and tank farm areas
shall be standard industrial type with IP 55 degree of protection in
accordance with IEC 60034-5.
7.4. Motors specified as weatherproof shall require an additional protection.Special attention shall be paid to joint gasketing and the provision of shaft
water throwers.
7.5. Medium Voltage motors should be provided with space heaters.7.6. On flameproof motors, means shall be provided for withdrawing end plates
and cartridge housing (where fitted) in a manner, which will avoid damage to
flameproof flanges.
7.7. The type of motor enclosures shall be marked on the motor nameplateaccording to IEC, and for motors installed in Zone 2 (Division 2) area this
statement shall be clearly shown: "Suitable for Zone 2 (Division 2) use".
7/29/2019 287-50-SS-PE-EL-SP-008-D3
9/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 9 of 26
287-50-SS-PE-EL-SP-008-D3
7.8. The manufacturer shall submit certificates issued by recognized certifyingauthorities for motors, which have, flameproof (Exd), increased safety (Exe)
or non sparking (Exn) enclosures.
7.9. The main dimensions and type of construction of motors shall be inaccordance with the IEC 60034.
7.10. Terminal boxes of all motors for outdoor installation should have ingressprotection degree IP 55W.
8. INSULATION SYSTEMS8.1. All motors shall be designed to operate under unusual ambient conditions of
high temperature, high humidity, with fungus, and salt-laden, corrosive
atmosphere.
8.2. Windings shall be adequately braced to prevent any relative movement underoperating conditions, and, in particular the stator windings of direct-on-line
starting squirrel cage motors shall be strongly braced to withstand start-up
shocks.
8.3. Random wound drip-proof motors shall have a sealed insulation systemconsisting of a complete encapsulation in an epoxy resin of the vacuum
impregnated, molded or cast type.
8.4. Form wound motors shall have a sealed insulation system consisting of acomplete encapsulation in an epoxy resin mica compound impervious to
moisture.
8.5. Vacuum impregnated windings shall be free of voids.8.6. Insulation materials shall be class F as defined in IEC 60034-18. The rating of
motor shall be based on class B temperature rise for all parts of the motor.
8.7. Stator windings shall be fully insulated for an ungrounded system.8.8. Adequate insulation shall be provided between coils of different phase, which
are in adjacent positions.
8.9. The winding insulation shall be suitable for restarting of the motorimmediately after power interruption, caused by residual voltage at 40% of the
nominal voltage. The restarting operation should be possible with systemvoltage at 80% of the rated voltage.
2
7/29/2019 287-50-SS-PE-EL-SP-008-D3
10/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 10 of 26
287-50-SS-PE-EL-SP-008-D3
8.10. Motors shall be suitably treated to withstand the service conditions specifiedin section 2 and the pertinent Data Sheet. Where special service conditions are
specified, the motors shall, in addition, be impregnated and finished to
withstand these conditions.
9. ROTOR (SQUIRREL CAGE)9.1. Rotor Cage Built from Conductors Brazed to End Rings
Adequate means should be provided to eliminate the risk of sparking duringstarting and running. Particular attention must be paid to the following points.
a) The rotor cage for LV Electric motor shall be made of cooper or
pressure die cast aluminum as per IPS-M-EL-131 Rev. 1, Item 6.5.3.
b) The rotor cage for MV Electric motor shall be made of copper and the
rings end rings shall be brazed or welded as per IPS-M-EL-132
Rev. 1, Item 6.7.3..
c) The conductors throughout the length of the rotor core shall be
mechanically tight with respect to adjacent stampings.
d) The joints between conductors and short circuiting rings shall be
brazed or welded and compatible materials shall be used to enable
quality joints to be made.
e) The whole rotor construction shall be such as to avoid fracture of
conductors, joints or short circuiting rings throughout the life of the
motor.
f) Where the type of construction employs impregnating varnish to
provide the necessary degree of tightness, the manufacturer must
ensure that full penetration of the varnish has been achieved and that
the grade of varnish is suitable for the design temperature and
operating conditions.
g) The manufacturer shall, upon request by the purchaser, demonstrate
what positive means have been adopted to meet the above
requirements.
9.2. Cast Rotor CageThe soundness of cast rotor cages shall be established by test. The method of
test being subject to agreement between the manufacturer and the purchaser.
Generally, only smaller rotors shall be of die-cast type.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
11/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 11 of 26
287-50-SS-PE-EL-SP-008-D3
9.3. Rotor shall be dynamically balanced (a) with half depth keys or (b) with themotor half-coupling keyed on the shaft.
9.4. The rotor design shall allow for the addition of balancing weights, which shallnot be of lead or similar unstable material.
9.5. The shaft ends shall be provided with a suitably threaded hole or holes tofacilitate the putting on of couplings, etc.
10. STATOR WINDINGS10.1. All insulated windings shall be non-hygroscopic, oil resistant and the materials
shall be resistant to flame propagation. Insulation shall comply with the
requirements of IEC 60085.
10.2. The ground insulation of the slot portion of the 6.0 kV coil shall be of thebounded mica type or equivalent. Internal insulation shall be such that on
sample coils a high voltage test carried out between adjacent turns for one
minute will withstand 3.0 kV on 6.0 kV windings. Random windings are not
acceptable at medium voltage.
10.3. The windings, particularly in case of medium voltage motor shall be of form-wound copper and shall withstand an external three phase bolted fault at full-
load and 110% of rated voltage.
10.4. Low voltage motors rated below 75 kW may have random wound coils.11. AIR GAP
Taking into consideration all causes of eccentric positioning of the rotor in the stator
bore (bearing clearance, clearances between bearing bracket spigots, deflection of
shaft due to rotor weight and loading external to the shaft), and the deflection of the
shaft due to the unbalanced magnetic pull resulting from this eccentricity, allowing
for the permissible reduction of the nominal gap to 90% of the calculated value, the
final minimum radial air gap for ball and for roller bearing motors shall be not less
than 0.2 mm and for sleeve bearings not less than 0.3 mm. The manufacturer shall
upon request by the purchaser, make available calculations establishing these limits.
12. COOLING METHOD12.1. The low voltage motors shall be totally enclosed fan cooled designated by
characteristic numerals IC 4A1A1 (or simplified IC411) as defined inIEC 60034-6 second edition. Internal and external cooling fans shall be
provided.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
12/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 12 of 26
287-50-SS-PE-EL-SP-008-D3
12.2. For small motors where the temperature rise is within the acceptable value, thecooling type IC4A1A0 (or simplified IC410) is acceptable.
12.3. The medium voltage motors up to and including 1000 kW shall be totallyenclosed fan cooled designated by characteristic numerals IC 4A1A1 (or
simplified IC411) as defined in IEC 60034-6 second edition. Internal and
external cooling fans shall be provided.
12.4. The cooling method for motors above 1000 kW can be selected as IC 411,IC 511 or IC 611 as defined in IEC 60034-6 second edition, and shall beapproved by company representative prior to manufacturing. Other cooling
methods can be adopted based on prior agreement with company
representative.
13. FANS13.1. Fans shall be inherently balanced and shall be located so that it is impossible
to assemble them incorrectly. They shall force the cooling air in the direction
of the driving end and preferably be suitable for rotation in either direction.
13.2. In the case of motors supplied with unidirectional fans it is essential that themanufacturers state this fact in their tender. In such cases the direction of
rotation for which the motor is arranged shall be clearly indicated by means of
a permanent arrow on the non-driving end, preferably on the stator body and
not on a removable end shield. A painted arrow only is not acceptable.
13.3. Fans for motors shall be made of Brass, Bronze or Aluminum material.Aluminum Alloy Fans shall not contain more than 0.2% copper. Fans shall be
balanced before assembly on shaft.
13.4. Plastic, fiberglass or other non-metallic fans are acceptable as per as perIEC 60034-5 and shall meet the requirements of increased safety (Exe) or non
sparking (Exn) in accordance with IEC recommendation 60079-7 or
equivalent national standards..
13.5. Fans for low voltage motors shall be bi-directional.13.6. Fan clearance shall not be less than 6 mm radial and 4 mm axial. Radial
clearance between the fans and adjacent stationary material may be reduced to
3 mm in those cases where both adjacent surfaces are machined.
13.7.
Fan cover (cowl) material shall be cast or nodular iron, cast steel or steel plate,adequately protected with coatings of anti-corrosion and finish paints.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
13/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 13 of 26
287-50-SS-PE-EL-SP-008-D3
14. BALANCING, VIBRATION AND NOISE LEVEL14.1. Motors shall be dynamically balanced. The use of solder or similar deposits
for balancing is not acceptable. Parent metal removal to achieve balance shall
be carried out in such a way as not to affect the structural strength of the
rotating element.
14.2. Vibrations shall be measured on the bearings along the three axis, and shallnot exceed the limits specified in IEC 60034-14.
14.3. Noise level shall be in accordance with the requirements stated in Data Sheet;but, in the event of no requirement made, the noise level shall not exceed
85 dB(a).
14.4. For motors rated 1500 kW and above vibration monitoring system shall beprovided together with non-contacting vibration probes at each bearing of the
motor in accordance with API 670.
15. BEARINGS AND LUBE OIL SYSTEM15.1. General
15.1.1.Bearings shall be of the anti-friction, sleeve or thrust type as requiredand approved for the application. They shall be in metric sizes with
maximum interchangeability and shall comply with ISO
recommendations.
15.1.2.Roller bearings should have machined yellow metal cages. Ballbearings may be supplied with pressed steel cages. Special attention
shall be paid to ensure that the dismantling of bearings shall be simple
and free from risk of damage.
15.1.3.Grease lubricated integral horsepower motors shall have bearinghousings supplied with threaded fill and drain openings. Openings
shall be plugged. Grease type bearing housing shall be equipped with
fittings so that old grease will be forced out of the bearing as new
grease is added. Grease nipples or plugs shall be provided.
15.1.4.Pre-lubricated ball bearings are acceptable, provided that the servicelife is guaranteed to be not less than 40,000 working hours without
regreasing.
15.1.5.Grease lubricated ball bearings shall be supplied with inside end capsto prevent grease from migrating into the motor.
2
7/29/2019 287-50-SS-PE-EL-SP-008-D3
14/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 14 of 26
287-50-SS-PE-EL-SP-008-D3
15.1.6.Oil lubricated bearings shall be provided with oil lubricators withconstant level reservoir(s), or a gear driven oil pump (fitted with device
indicating oil flow) if such is preferred by the manufacturers. Oil
throwers or seals of suitable design shall be provided to prevent the
escape of oil from the bearing housing.
15.2. Ball & Roller BearingsThe calculated life for ball and roller bearings ("90% survival" under the
estimated bearing loads) should comply with the following requirements.
Up to 75 kW 15,000 hrs
75 kW to 250 kW 25,000 hrs
250 kW and over 50,000 hrs
15.3. Sleeve BearingsMotors with sleeve bearings shall have provision for testing the air gap at each
end of the motor, and in case of flameproof motors the gland gap at each end
of the motor shaft.
15.3.1.Oil lubricated bearings shall have reservoirs of generous capacityeffectively covered so no dust or other foreign materials can enter the
bearing. Oil slingers and catchers shall be designed to prevent the
escape of oil from the bearing and creepage along the shaft. Reservoirs
shall be provided with drains, tapped fill openings and separate level
gauge glasses. A permanent indication of proper oil level shall be
provided. For sleeve bearings the end floats shall be within the limits
specified in the latest edition of NEMA MG-1-20.81.
15.3.2.Sleeve bearings shall normally be fitted with oil rings, discs or othersuitable means of lubrication. Alternatively, lubrication may be
provided directly by a gear driven pump. In all cases a transparent oil
indicator or a device indicating oil flow shall be fitted.
15.3.3.100 mm Dial type temperature indicator should be provided to indicatebearing oil temperature on each bearing, at a visible level, with
mechanical protection at motor frame opposite cable connection box.
15.3.4.The design of thrust bearings for vertical motors shall be submitted forpurchasers approval. Vertical motors shall have thrust bearings
suitable for thrust load imposed by the driven equipment. Bearingsshall be rated for a minimum 1 year (5 years average) life, according to
ISO 281.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
15/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 15 of 26
287-50-SS-PE-EL-SP-008-D3
15.3.5.Motors shall be equipped with suitable seals to prevent moisture fromentering through the shaft opening.
15.4. Forced Feed Lubrication MotorsForced feed lubrication systems shall be provided on motors only when it is
the motor Vendors recommendation and standard practice. When a forced
feed lubrication system is furnished, complete information and details shall be
furnished with the quotation. Oil pressure lubrication system for bearings shall
conform with the following minimum requirements:
15.4.1.The main lube oil pump may be driven from the motor shaft. Auxiliarylube oil pump and electric motor shall be interlocked to assure
adequate oil pressure to the motor bearings for start up, coastdown or
emergency.
15.4.2.Lube oil systems shall be arranged with dual oil filters, switch overvalves and oil pressure gauges to indicate pressure differential across
the filter.
15.4.3.Oil filters shall be replaceable while motor is in service.15.4.4.A pressure switch shall be installed in the lube oil pump discharge for
alarm and control functions. Contacts shall be separate for each
function.
15.4.5.If bearings are insulated, the motor vendor shall furnish insulatingfittings in the oil supply connections to prevent the oil supply lines
from bypassing the bearing insulation.
15.5. Non-Forced Feed Lubrication MotorsThe bearing housing of motors with non-forced feed oil lubrication shall have
oil reservoirs of sufficient depth to serve as settling chambers. Housings, shall
each be fitted with an adjustable constant level, and with sight feed oiler or a
sight gauge, mounted on the housing and marked with the proper oil level. The
oil system shall meet the following requirements:
a) The oiler bottle shall be of plastic or pyrex glass. Plastic bottles shall be of a
plastic inhibited against sunlight attack.
b) The oil system shall have sufficient surge capacity to absorb withoutoverflowing oil from the bearing, when motor is stopped.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
16/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 16 of 26
287-50-SS-PE-EL-SP-008-D3
c) Bearing housing shall be provided with fill and drain openings accessible
from outside the motor enclosure, necessary slingers, equalizers, vents, or
other devices to prevent loss of lubricant.
15.6. LubricantsLubricants which will be used on site will be the subject of agreement between
the manufacturer and the purchaser, and grease lubricated bearings shall be
packed with the agreed lubricant before the motor is dispatched.
Suitable monitoring devices such as a pressure switch in the lube oil pump
discharge, if any, shall be provided to initiate an alarm in case of malfunction
of the lube oil system.
Dial type temperature indicator shall be provided for each sleeve bearing to
indicate the bearing oil temperature.
15.7. End Thrusta) Where motors are supplied without thrust or location bearing, it is essential
that motor manufacturers shall state this fact in their tender and on theirdrawings and indicate also the permissible amount of end float in order that
a suitable coupling may be supplied to keep the float within the specified
limits. End float shall be per NEMA MG1-72 or equivalent. Vertical motors
shall include suitable bearings to withstand the thrust of motor rotor. Where
the motor is to be subjected, to external thrusts, in addition, e.g. from the
driven machine, then full particulars of these external forces shall be
supplied by the purchaser.
b) The design of thrust bearing for vertical motors shall be submitted for
purchasers approval.
16. ANTI-CONDENSATION REQUIREMENTS16.1. All totally enclosed motors should be provided with adequate protections to
prevent the accumulation of moisture inside the motor enclosure.
16.2. All medium voltage motors shall be equipped with completely wired anti-condensation space heaters.
16.3. Space heater voltages will be as follows:a) 3000 Watts or less 230 Volts, single phase
b) Over 3000 Watts 400 Volts, three phase
2
2
7/29/2019 287-50-SS-PE-EL-SP-008-D3
17/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 17 of 26
287-50-SS-PE-EL-SP-008-D3
16.4. The maximum sheath temperature of anti-condensation space heaters shall notexceed 200C, and it shall be less than the maximum temperature of the
respective temperature class as specified in the Data Sheet of the relevant
motor.
16.5. Space heater leads shall be brought out to a junction box separate from themain power terminal box or the junction boxes of other auxiliary devices.
17. RESISTANCE TEMPERATURE DETECTORS17.1. Motors 150 kW and larger shall have at least six (2 per phase,
1 for Alarm+1 for Trip), 100 ohm at 20C platinum, Positive Temperature
Coefficient (PTC) or Resistance Temperature Detectors (RTD) in the stator
windings.
17.2. PTC or RTDs shall be wired to a junction box separate from main terminalbox and space heater or other auxiliary equipment junction boxes.
17.3. The temperature detectors shall be spring-loaded, tip-sensitive, 3 wire elementplatinum PTC/RTDs.
17.4. Bearings of motors rated 1000 kW and above, and also the thrust bearings ofall MV and HV vertical motors shall be equipped with Resistance
Temperature Detectors (RTD). The numbers of RTDs for such purpose shall
be agreed by Owner Representative.
18. MOTOR DIFFERENTIAL PROTECTIONMotors above 1000 kW shall have three 50/1 ratio window type current transformers,
supplied and mounted in the main power terminal box, for differential protection of
the motor windings. Motor leads T1 and T4 shall pass through one CT, leads T2 and
T5 through the second CT, and T3 and T6 through the third CT. Lead ends, T4, T5
and T6 are then connected together for the "WYE" point. Each CTs secondary
terminal shall be brought to terminal strip located in the main power leads terminal
box. The differential relay will be at the motor control center.
19. SURGE PROTECTION19.1. Starters for motors rated 150 kW to 1000 kW shall be equipped with vacuum
contactors.
19.2.
Motors rated above 1000 kW shall have starters equipped with vacuum typecircuit breakers.
2
7/29/2019 287-50-SS-PE-EL-SP-008-D3
18/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 18 of 26
287-50-SS-PE-EL-SP-008-D3
19.3. Appropriate surge protection devices, such as suitable capacitors connectedfrom line to earth at machine terminals shall be provided for all medium
voltage motors with high outputs. However, these motors shall be suitable for
operation to withstand lightning and other surges without any surge protection.
20. TERMINAL BOXES AND MOTOR ACCESSORIES20.1. All motors shall be supplied and equipped with terminal boxes for lead
connections & cable terminations. The main power terminal box shall be
positioned on the right hand side, when facing the driving end. For motorsfitted with compound-filled cable terminations, the sealing box shall be
positioned to accommodate cables which rise from the floor.
20.2. Terminal boxes, including removable covers, should be made of steel platesfor motors rated over 150 kW and shall be cast iron for less than 150 kW.
They shall be totally enclosed, and all joints shall be fitted with gaskets of
polychloroprene or equivalent material to prevent the ingress of moisture and
dust.
20.3. The minimum degree of ingress protection of terminal boxes shall be asfollows:
a)IP 55: for Indoors
b) IP 55W: for Outdoors
20.4. The short circuit capability for terminal boxes shall be as per BS 4999.20.5. Ample space shall be provided for cabling and changing connections but the
design must be such that it is impossible for small parts to be dropped into the
interior of the motor.
20.6. Terminal Box Assemblies20.6.1.When connected to an electrical system having a nominal short circuit
kA capacity as specified by the Purchaser, terminal box assemblies
shall withstand the effects of:
a) Through faults
(b) Internal faults in uncompounded compartments, without
disintegration of the outer enclosure and without emission of flame
which could be injurious to personnel in the vicinity of the motor.
20.6.2.Terminal boxes for space heaters, temperature detectors and othersauxiliaries shall be equipped with terminal boards. These boxes shall
7/29/2019 287-50-SS-PE-EL-SP-008-D3
19/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 19 of 26
287-50-SS-PE-EL-SP-008-D3
be rotatable to four fixing positions in 90 degree turns, and shall
generally be located on the opposite side of the main power terminal
box.
20.6.3.The differential protection current transformers and their terminalboards & cable termination should be located in the main terminal box.
20.7. Terminals20.7.1.All terminals shall be substantially designed. Line terminals shall be
thoroughly insulated from the frames with material resistant to
tracking.
20.7.2.Natural rubber insulation shall not be used for terminal leads.20.7.3.Means shall be provided to prevent accidental reduction of clearances
at terminals.
20.7.4.Terminal identifications shall be in clear and permanent markings.20.7.5.A grounding terminal with the same capacity as the line terminals shall
be provided, external to the terminal box, unless otherwise stated.
20.7.6.Motors which are only uni-directional shall have the direction ofrotation clearly indicated on the motor frame, together with the phase
sequence of terminal connections associated with the rotation.
20.7.7.Studs shall be designed & fixed, so as to prevent their turning whennuts are tightened.
20.7.8.Adequate means shall be provided to prevent slackening of terminalconnections due to vibrations. Connections having pinch screws
bearing directly on the cable will not be acceptable.
20.8. Cable Entries20.8.1.Each terminal box shall have cable entry(ies) with threads of ISO form
according to IEC 60423. The number and size of hub on each terminal
box will be indicated on Motor Data Sheet.
20.8.2.For all forms of cable connection it must be possible to remove themotor without breaking or stressing the seal or the cable.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
20/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 20 of 26
287-50-SS-PE-EL-SP-008-D3
20.8.3.Where PVC or rubber insulated and sheathed multi-core cable isspecified a compression gland of acceptable design should be
provided.
20.8.4.Cable glands, suitable for lead covered and armored cable shall be ofthe "stuffing" or similar type to avoid sweated or wiped joints, unless
otherwise specified.
20.8.5.The following types of cables will be employed for power supply andauxiliary circuits of the motors:
a) Power Cables:
Motor Voltage Cable Type
11 kV
Copper conductor, 8.7/15 kV,
XLPE/SWA/PVC or
XLPE/LC/SWA/PVC as per IEC
specification
6 kV
Copper conductor, 3.6/6 kV,XLPE/SWA/PVC or
XLPE/LC/SWA/PVC as per IEC
specification
400 V
Copper conductor, 0.6/1 kV,
XLPE/SWA/PVC or
XLPE/LC/SWA/PVC as per IEC
specification
b) Control and Auxiliary cables shall be multi-core copper
conductors, 0.6/1 kV, PVC/SWA/PVC or PVC/LC/SWA/PVC.
20.8.6.Lifting lugs shall be provided for each motor weighing more than30 Kg.
20.8.7.All motors shall be equipped with an earthing terminal connection onmotor frames as well as in internal and external surface of each
terminal box.
20.8.8.Motor manufacturer shall provide pertinent cable sealing boxes and/orglands within the scope of supply of each motor. The sealing box
and/or gland shall be suitable for type and size of cable/entry specifiedin the respective Data Sheet.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
21/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 21 of 26
287-50-SS-PE-EL-SP-008-D3
20.8.9.400 Volt motors should have cast iron end shields, cast iron cable box,cast iron or rust proof steel plate fan cover, gaskets between cable box
cover and boxes, neoprene gaskets and lead seal between cables boxes
and motor frame. The rotating shaft seals shall be impervious to liquids
and chemicals.
20.8.10.Where heater or other auxiliary connections are specified, they should
be brought out to a terminal box which is separate from the main
terminal box.
20.9. Where cable sealing and dividing boxes are required, then clearance andcreepage distances shall comply with the relevant IEC specification. Main
terminal box on 11 kV and 6 kV motors shall be made of steel. The
construction of all joints shall be such as to prevent the ingress of moisture and
dust.
20.10. Heater and its terminal box should satisfy the requirements of division 1 forboth division 1 and 2 areas. Hazardous classification certificate number should
be stamped on the nameplate.
20.11. Where conduit entry is employed, a detachable plate incorporating the conduitentry shall be provided. Use of conduit is subject to the purchasers approval.
20.12. Where armored cable entry associated with a sealing box is employed, thelatter shall be of a detachable type.
20.13. Corrosion resistant screens or louvers shall be provided on high voltagemotors.
21. SURFACE COATING & PAINT21.1. Prepared surfaces shall be free from rust, scale, sand, dust, and grease before
painting.
21.2. Finish shall be manufacturers standard type for tropical use, and inaccordance Manufacture Standard on painting. For corrosive environments or
areas subject to chemical spillage, painting shall be suitable for such
applications.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
22/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 22 of 26
287-50-SS-PE-EL-SP-008-D3
22. TEST AND INSPECTION22.1. General
The performance test given below shall be undertaken on the completed
machine. The tests shall, as far as applicable, be carried out in accordance with
IEC-60034, unless otherwise specified.
22.2. Abbreviated Tests1) Measurement of winding resistance (cold).
2) Measurement of no load losses and current.
3) Measurement to allow calculation of locked rotor current.
4) High voltage test plus insulation resistance test.
5) Inspection (at no load) of bearings and mechanical operation of the
motor.
6) Vibration check.
7) High voltage and insulation tests on built in temperature detectors.
8) Direction of rotation and phase sequence checks.
For motors rated above 1000 V:
9) Determination of Polarization Index.
The polarization index is the ratio of the insulation resistance of a
machine winding measured at 1 min. after voltage has been applied
divided into the measurement after 10 min.
22.3. Complete Tests1) Measurement of winding resistance (hot and cold).
2) Measurement of no load losses and current.
3) Measurement to allow calculation of locked rotor current.
4) High voltage test after heat run and insulation resistance before and
after heat run.
5) Inspection (at full load) of bearings and mechanical operation of the
motor.
6) Full load heat run.
7) Measurement of slip at full load.
8) Measurement to allow calculation of pull out torque.
9) Measurement to allow calculation of starting torque characteristic.
10) Momentary overload.11) Measurement to allow calculation of efficiency at full load, three-
quarters, and half load.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
23/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 23 of 26
287-50-SS-PE-EL-SP-008-D3
12) Measurement to allow calculation of power factor at full load, three-
quarters, and half load.
13) Measurement of vibration.
14) Measurement of noise.
15) High voltage and continuity tests on built in temperature detectors with
tests to demonstrate satisfactory operation and compliance with stated
characteristics.
16) Direction of rotation and phase sequence tests.
17) Unless otherwise agreed, for machines above 1000 V, determination of
the polarization Index.
22.4. For motors up to and including 150 kW complete tests will not normally berequired if evidence of type tests on identical machines is produced at the time
of tender. Abbreviated test shall be made on every motor and certified test
reports shall be provided.
22.5. For motors above 150 kW complete tests shall be made on at least one motor,out of a group of identical motors being supplied and these tests will be
witnessed at the discretion of the Purchasers Inspector. Abbreviated tests
shall be made on the remaining motors of each group, and certified reports of
all tests performed shall be provided.
22.6. All testing that requires voltage on the motor shall be carried out using fullmotor voltage.
22.7. For flameproof and (Exe) machines a prototype box with sealing chambershall be tested under fault conditions to demonstrate that the box contains the
explosion without emission of flame, and a test report shall be provided. Phase
separated or phase segregated boxes shall be tested under internal single phase
to ground fault conditions to demonstrate that they do not emit flame and that
a fault is not propagated involving either of the other two phases. Phase
insulated boxes shall be tested under conditions of internal 3 phase fault to
demonstrate that they do not emit flame.
22.8. Certificates of type tests shall be considered as evidence of the compliance ofterminal box assemblies with the requirements of the relevant clauses of this
specification, and the manufacturer shall hold available such certificates,
together with detailed drawings of the terminal box assemblies and a record of
any alterations that have been made in them subsequent to the type tests.
22.9. Purchaser and/or his appointed inspectors reserve the right for inspections atany stage of equipment manufacture, testing or preparation for shipment.
22.10. Manufacturer shall notify Purchaser to witness test at least 10 days before thedate of test performance.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
24/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 24 of 26
287-50-SS-PE-EL-SP-008-D3
22.11. Inspection by Purchaser shall in no way release the Vendor from guaranteeson the workmanship, materials and performance of the equipment supplied.
23. NAMEPLATE23.1. Nameplates shall be of stainless steel, monel, brass or bronze. They shall be
fixed to a non-removable part of the frame with the same material, and shall
be according to manufacturers standard.
23.2. Minimum information on the nameplate shall be according to IEC 60034-1.23.3. When special features are embodied, a plate showing appropriate instruction
shall be affixed to each motor.
23.4. For space heater terminal boxes on motors a sign shall be included that states"Caution-Space Heater fed from alternative supply".
23.5. Type of oil and instruction for sight oiler adjustment should be indicated on aseparate data plate. Oil specified shall be B.P., EXXON or SHELL.
23.6. Labels for direction of rotation shall be mounted on both ends of the motorframe.
24. INFORMATION TO BE SUPPLIED AT TIME OF QUOTATIONInformation to be supplied by the manufacturer with tender for electric motors shall
be as follows and as required in the Data Sheet of the relevant motor:
1) Rated power (kW)
a) Maximum continuous rating.
b) Short-time rating.
2) Nominal line-line voltage.
3) Nominal frequency.
4) Number of poles.
5) Number of phases.
6) Direction of rotation if unidirectional.
7) Manufacturers standards indication of:
a) Make
b) Type (mounting and enclosure)
c) Frame size
8) Applicable national standard.
9) Maximum rated operating temperature.10) Star or delta wound.
11) Rated current at full load.
12) Torque speed characteristic curve.
7/29/2019 287-50-SS-PE-EL-SP-008-D3
25/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 25 of 26
287-50-SS-PE-EL-SP-008-D3
13) Full load torque at rated speed.
14) Starting torque, in percent of full load current.
15) Starting current, in percent of full load current.
16) Min.-run up torque, in percent of full load torque.
17) Stalling torque, in percent of full load torque.
18) Starting time, uncoupled at full voltage.
19) Efficiency and power factor at:
a) full load
b) 3/4 load
c) 1/2 load20) RPM and slip at full load.
21) Class of insulation.
22) Maximum temperature rise by the thermometer and/or resistance
method.
23) Guaranteed minimum air gap.
24) Bearings
a) Type
b) Make and Size
c) Method of lubrication
25) Terminal box type, fault rating, type test category, mounting
arrangement and cable gland details.26) Heaters voltage and power when applicable.
27) Coupling or pulley details where supplied.
28) Approximate weight.
29) Dimensional sketch, including shaft details, with reference number.
30) Recommended spare parts list, for 2 years operation.
31) Recommended commissioning spares.
25. SPARE PARTS25.1. Spare parts shall be interchangeable, as far as practical, between different
motors and suitable for use in place of the original parts and comply with the
same specification and tests.
25.2. Spare parts shall be marked and numbered for easy identification, andpreserved against damage and deterioration during transport and/or storage in
a damp or humid, tropical atmosphere.
25.3. Adequate commissioning spare parts shall be supplied with each motor.25.4. Recommended lists shall be submitted at the quotation stage for the following
spare parts: a) Commissioning spare parts
b) 2-years operation spares (for separate and later purchase)
7/29/2019 287-50-SS-PE-EL-SP-008-D3
26/26
SOUTH EAST ZAGROSS CLUSTER
SARVESTAN AND SADAAT ABAD OIL FIELDS
PROJECTDocument Title
OIL & ENERGY
INDUSTRIES
DEVELOPMENT
COMPANY
(OEID)Specification for MV & LV Squirrel Cage Induction
Motors
IRAN CENTRAL OIL
FIELD COMPANY
Document No. OD&CC Job No.:Proj. Field Faci. Disc. Type Seq. Rev. Client Job No.:
OIL DESIGN &
CONSTRUCTION
COMPANY
(OD&CC)
287-50 SS PE EL SP 008 D3 Page 26 of 26
26. DRAWINGS & TECHNICAL DOCUMENTS26.1. Vendor shall submit the required drawings and technical documents in
compliance with the Requirement for Documents (RD) for Motors. These
drawings shall be forwarded at the bid stage and at indicated periods after the
Purchase Order, as shown in the relevant RD.
26.2. Motor Data Sheet shall be completed by the Vendor and submitted with thetechnical proposal at the bid stage.
27. PREPARATION FOR SHIPMENT27.1. Electric motors shall be supplied with bearings lubricated.27.2. Silica gel or similar dehydrating compound shall be enclosed in each motor
package. Vents shall be waterproof sealed.
27.3. Preparation for shipment shall be in accordance with Manufacturersstandards, unless otherwise noted on the request for quotation and/or purchase
order. The Manufacturer shall be solely responsible for the adequacy of the
preparation and packaging for the required methods of shipment.
27.4. Rotors shall be locked to protect against damage during shipment.27.5. Instruction shall be provided for lifting large motors and removal of protective
& safety features used for shipment.
28. GUARANTEE28.1. The Vendor guarantees that the motors supplied are free from fault in design,
workmanship and materials are properly sized and suitable for operation under
the specified service conditions.
28.2. The supplier shall repair and/or replace free of charge any damaged equipmentresulting from poor workmanship, material and faulty design. The replacement
of defective equipment, free of charge, shall be the responsibility of the
Vendor for the following cases:
a) Failure of the equipment under pre-commissioning and/or commissioningtests.
b)
Equipment failure under normal operation in the specified service, upto12months after installation or 24 months after shipment, whichever occurs
earlier.