28
Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBR Project Consultant: KEO TAKE-OFF SHEET BOQ Item : 29E.08 600 mm diameter TSE Line (Excavation-Sand Bedding & Pipe Laying) RHS SN Work Item Chainage Work Done Length Start End (m) Km 6+000 Km 6+057 57.00 75% 42.75 RHS Pipe Laying Km 7+460 Km 7+580 120.00 75% 90.00 Km 8+002 Km 8+662 660.00 75% 495.00 RHS Pipe Laying Km 9+080 Km 9+104 24.00 75% 18.00 RHS Pipe Laying Km 11+070 Km 11+365 295.00 75% 221.25 RHS Pipe Laying Km 11+365 Km 11+834 469.00 75% 351.75 Km 11+834 Km 11+870 36.00 75% 27.00 Km 11+870 Km 12+440 570.00 75% 427.50 RHS Pipe Laying Km 12+440 Km 12+786 346.00 75% 259.50 Km 12+786 Km 13+000 214.00 75% 160.50 RHS Pipe Laying Km 13+015 Km 13+255 240.00 75% 180.00 Km 13+350 Km 14+000 650.00 75% 487.50 RHS Pipe Laying Km 14+000 Km 14+065 65.00 75% 48.75 Km 14+065 Km 14+185 120.00 75% 90.00 RHS Pipe Laying Km 38+420 Km 38+780 360.00 75% 270.00 Km 38+784 Km 39+169 385.00 75% 288.75 RHS Pipe Laying Km 39+219 Km 39+541 322.00 75% 241.50 RHS Pipe Laying Km 39+541 Km 39+785 244.00 75% 183.00 RHS Pipe Laying Km 39+793 Km 41+353 1,560.00 75% 1,170.00 RHS Pipe Laying Km 41+353 Km 41+600 247.00 75% 185.25 RHS Pipe Laying Km 41+600 Km 41+660 60.00 75% 45.00 RHS Pipe Laying Km 41+660 Km 42+680 1,020.00 75% 765.00 RHS Pipe Laying Km 42+680 Km 42+789 109.00 75% 81.75 RHS Pipe Laying Km 42+885 Km 43+089 204.00 75% 153.00 RHS Pipe Laying Km 43+114 Km 43+296 182.00 75% 136.50 RHS Pipe Laying Km 43+387 Km 43+471 84.00 75% 63.00 RHS Pipe Laying Km 43+471 Km 45+060 1,589.00 75% 1,191.75 RHS Pipe Laying Km 45+060 Km 45+880 820.00 75% 615.00 RHS Pipe Laying Km 45+880 Km 46+740 860.00 75% 645.00 RHS Pipe Laying Km 46+740 Km 46+750 10.00 75% 7.50 RHS Pipe Laying Km 46+750 Km 46+751 1.00 75% 0.75 RHS Pipe Laying Km 46+751 Km 46+766 15.00 75% 11.25 RHS Pipe Laying Km 46+766 Km 47+065 299.00 75% 224.25 RHS Pipe Laying Km 47+065 Km 47+093 28.00 75% 21.00 Km 47+158 Km 47+182 24.00 75% 18.00 RHS Pipe Laying Km 47+182 Km 47+457 275.00 75% 206.25 Km 47+457 Km 47+485 28.00 75% 21.00 RHS Pipe Laying Km 47+485 Km 47+500 15.00 75% 11.25 RHS Pipe Laying Km 47+500 Km 48+960 1,460.00 75% 1,095.00 RHS Pipe Laying Km 48+960 Km 48+974 14.00 75% 10.50 RHS Pipe Laying Km 48+974 Km 48+982 8.00 75% 6.00 Weight (%) Payable Length (m)

29E.08 600 mm TSE

Embed Size (px)

DESCRIPTION

600 TSE

Citation preview

Page 1: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Excavation-Sand Bedding & Pipe Laying) RHS

SN Work ItemChainage Work Done Length

Start End (m)

Km 6+000 Km 6+057 57.00 75% 42.75

RHS Pipe Laying Km 7+460 Km 7+580 120.00 75% 90.00

Km 8+002 Km 8+662 660.00 75% 495.00

RHS Pipe Laying Km 9+080 Km 9+104 24.00 75% 18.00

RHS Pipe Laying Km 11+070 Km 11+365 295.00 75% 221.25RHS Pipe Laying Km 11+365 Km 11+834 469.00 75% 351.75

Km 11+834 Km 11+870 36.00 75% 27.00Km 11+870 Km 12+440 570.00 75% 427.50

RHS Pipe Laying Km 12+440 Km 12+786 346.00 75% 259.50Km 12+786 Km 13+000 214.00 75% 160.50

RHS Pipe Laying Km 13+015 Km 13+255 240.00 75% 180.00

Km 13+350 Km 14+000 650.00 75% 487.50RHS Pipe Laying Km 14+000 Km 14+065 65.00 75% 48.75

Km 14+065 Km 14+185 120.00 75% 90.00

RHS Pipe Laying Km 38+420 Km 38+780 360.00 75% 270.00

Km 38+784 Km 39+169 385.00 75% 288.75

RHS Pipe Laying Km 39+219 Km 39+541 322.00 75% 241.50RHS Pipe Laying Km 39+541 Km 39+785 244.00 75% 183.00

RHS Pipe Laying Km 39+793 Km 41+353 1,560.00 75% 1,170.00RHS Pipe Laying Km 41+353 Km 41+600 247.00 75% 185.25RHS Pipe Laying Km 41+600 Km 41+660 60.00 75% 45.00RHS Pipe Laying Km 41+660 Km 42+680 1,020.00 75% 765.00RHS Pipe Laying Km 42+680 Km 42+789 109.00 75% 81.75

RHS Pipe Laying Km 42+885 Km 43+089 204.00 75% 153.00

RHS Pipe Laying Km 43+114 Km 43+296 182.00 75% 136.50

RHS Pipe Laying Km 43+387 Km 43+471 84.00 75% 63.00

RHS Pipe Laying Km 43+471 Km 45+060 1,589.00 75% 1,191.75RHS Pipe Laying Km 45+060 Km 45+880 820.00 75% 615.00RHS Pipe Laying Km 45+880 Km 46+740 860.00 75% 645.00RHS Pipe Laying Km 46+740 Km 46+750 10.00 75% 7.50RHS Pipe Laying Km 46+750 Km 46+751 1.00 75% 0.75RHS Pipe Laying Km 46+751 Km 46+766 15.00 75% 11.25RHS Pipe Laying Km 46+766 Km 47+065 299.00 75% 224.25RHS Pipe Laying Km 47+065 Km 47+093 28.00 75% 21.00

Km 47+158 Km 47+182 24.00 75% 18.00RHS Pipe Laying Km 47+182 Km 47+457 275.00 75% 206.25

Km 47+457 Km 47+485 28.00 75% 21.00RHS Pipe Laying Km 47+485 Km 47+500 15.00 75% 11.25RHS Pipe Laying Km 47+500 Km 48+960 1,460.00 75% 1,095.00RHS Pipe Laying Km 48+960 Km 48+974 14.00 75% 10.50RHS Pipe Laying Km 48+974 Km 48+982 8.00 75% 6.00

Weight (%)

Payable Length (m)

Page 2: 29E.08  600 mm TSE

RHS Pipe Laying Km 48+982 Km 49+007 25.00 75% 18.75RHS Pipe Laying Km 49+007 Km 49+016 9.00 75% 6.75RHS Pipe Laying Km 49+016 Km 49+053 37.00 75% 27.75RHS Pipe Laying Km 49+053 Km 49+060 7.00 75% 5.25RHS Pipe Laying Km 49+060 Km 49+277 217.00 75% 162.75RHS Pipe Laying Km 49+277 Km 49+287 10.00 75% 7.50RHS Pipe Laying Km 49+287 Km 49+323 36.00 75% 27.00RHS Pipe Laying Km 49+323 Km 49+332 9.00 75% 6.75RHS Pipe Laying Km 49+332 Km 49+340 8.00 75% 6.00RHS Pipe Laying Km 49+340 Km 49+820 480.00 75% 360.00RHS Pipe Laying Km 49+820 Km 51+320 1,500.00 75% 1,125.00RHS Pipe Laying Km 51+320 Km 52+337 1,017.00 75% 762.75RHS Pipe Laying Km 52+337 Km 52+420 83.00 75% 62.25RHS Pipe Laying Km 52+420 Km 52+660 240.00 75% 180.00RHS Pipe Laying Km 52+660 Km 52+740 80.00 75% 60.00RHS Pipe Laying Km 52+740 Km 52+760 20.00 75% 15.00RHS Pipe Laying Km 52+760 Km 52+960 200.00 75% 150.00

Km 52+960 Km 53+000 40.00 75% 30.00RHS Pipe Laying Km 53+000 Km 53+446 446.00 75% 334.50

Km 53+509 Km 53+553 44.00 75% 33.00RHS Pipe Laying Km 53+553 Km 54+013 460.00 75% 345.00

Km 54+013 Km 54+020 7.00 75% 5.25RHS Pipe Laying Km 54+020 Km 55+800 1,780.00 75% 1,335.00RHS Pipe Laying Km 55+800 Km 57+756 1,956.00 75% 1,467.00

RHS Pipe Laying Km 57+785 Km 58+060 275.00 75% 206.25

RHS Pipe Laying Km 58+108 Km 58+222 114.00 75% 85.50RHS Pipe Laying Km 58+222 Km 58+246 24.00 75% 18.00

RHS Pipe Laying Km 58+285 Km 58+307 22.00 75% 16.50RHS Pipe Laying Km 58+307 Km 58+388 81.00 75% 60.75

RHS Pipe Laying Km 58+500 Km 58+511 11.00 75% 8.25

RHS Pipe Laying Km 58+522 Km 58+574 52.00 75% 39.00RHS Pipe Laying Km 58+574 Km 58+581 7.00 75% 5.25

RHS Pipe Laying Km 58+626 Km 58+812 186.00 75% 139.50RHS Pipe Laying Km 58+812 Km 58+828 16.00 75% 12.00

RHS Pipe Laying Km 58+867 Km 59+180 313.00 75% 234.75RHS Pipe LayingRHS Pipe Laying Km 59+188 Km 60+800 1,612.00 75% 1,209.00RHS Pipe Laying Km 60+800 Km 62+283 1,483.00 75% 1,112.25RHS Pipe Laying Km 62+283 Km 62+540 257.00 75% 192.75RHS Pipe Laying Km 62+540 Km 63+200 660.00 75% 495.00RHS Pipe Laying Km 63+200 Km 63+229 29.00 75% 21.75

RHS Pipe Laying Km 63+306 Km 63+969 663.00 75% 497.25

RHS Pipe Laying Km 64+003 Km 64+027 24.00 75% 18.00RHS Pipe Laying Km 64+027 Km 65+000 973.00 75% 729.75

RHS Pipe Laying Km 66+042 Km 67+400 1,358.00 75% 1,018.50RHS Pipe Laying Km 67+400 Km 68+900 1,500.00 75% 1,125.00RHS Pipe Laying Km 68+900 Km 68+909 9.00 75% 6.75RHS Pipe Laying Km 68+909 Km 68+915 6.00 75% 4.50RHS Pipe Laying Km 68+915 Km 68+952 37.00 75% 27.75RHS Pipe Laying Km 68+952 Km 68+958 6.00 75% 4.50RHS Pipe Laying Km 68+958 Km 68+971 13.00 75% 9.75RHS Pipe Laying Km 68+971 Km 68+976 5.00 75% 3.75RHS Pipe Laying Km 68+976 Km 68+989 13.00 75% 9.75RHS Pipe Laying Km 68+989 Km 68+996 7.00 75% 5.25RHS Pipe Laying Km 68+996 Km 69+040 44.00 75% 33.00RHS Pipe Laying Km 69+040 Km 69+121 81.00 75% 60.75RHS Pipe Laying Km 69+121 Km 70+740 1,619.00 75% 1,214.25RHS Pipe Laying Km 70+740 Km 71+695 955.00 75% 716.25RHS Pipe Laying Km 71+695 Km 71+769 74.00 75% 55.50

RHS Pipe Laying Km 71+880 Km 72+125 245.00 75% 183.75

Page 3: 29E.08  600 mm TSE

RHS Pipe Laying Km 72+150 Km 72+507 357.00 75% 267.75

Km 72+547 Km 72+674 127.00 75% 95.25

RHS Pipe Laying Km 72+680 Km 73+600 920.00 75% 690.00RHS Pipe Laying Km 73+600 Km 75+246 1,646.00 75% 1,234.50RHS Pipe Laying Km 75+246 Km 75+288 42.00 75% 31.50

Km 75+288 Km 75+300 12.00 75% 9.00RHS Pipe Laying Km 75+300 Km 76+260 960.00 75% 720.00

Km 76+260 Km 76+280 20.00 75% 15.00RHS Pipe Laying Km 76+280 Km 77+860 1,580.00 75% 1,185.00RHS Pipe Laying Km 77+860 Km 77+938 78.00 75% 58.50

Km 77+938 Km 78+025 87.00 75% 65.25

Km 78+086 Km 78+113 27.00 75% 20.25Km 78+113 Km 78+380 267.00 75% 200.25

Km 78+402 Km 78+716 314.00 75% 235.50

Km 78+781 Km 79+120 339.00 75% 254.25

RHS Pipe Laying Km 79+120 Km 79+450 330.00 75% 247.50

RHS Pipe Laying Km 79+460 Km 81+320 1,860.00 75% 1,395.00RHS Pipe Laying Km 81+320 Km 81+360 40.00 75% 30.00

RHS Pipe Laying Km 81+369 Km 82+110 741.00 75% 555.75Km 82+110 Km 82+312 202.00 75% 151.50

RHS Pipe Laying Km 82+420 Km 82+672 252.00 75% 189.00

RHS Pipe Laying Km 82+700 Km 82+952 252.00 75% 189.00

RHS Pipe Laying Km 83+063 Km 83+300 237.00 75% 177.75

RHS Pipe Laying Km 83+320 Km 84+590 1,270.00 75% 952.50RHS Pipe Laying Km 84+590 Km 84+600 10.00 75% 7.50RHS Pipe Laying Km 84+600 Km 86+100 1,500.00 75% 1,125.00RHS Pipe Laying Km 86+100 Km 86+576 476.00 75% 357.00RHS Pipe Laying Km 86+576 Km 86+669 93.00 75% 69.75

RHS Km 86+760 Km 87+050 290.00 75% 217.50

RHS Pipe Laying Km 87+073 Km 87+368 295.00 75% 221.25RHSRHS Pipe Laying Km 87+455 Km 87+623 168.00 75% 126.00RHS Pipe Laying Km 87+623 Km 88+300 677.00 75% 507.75RHS Pipe Laying Km 88+300 Km 89+640 1,340.00 75% 1,005.00RHS Pipe Laying Km 89+640 Km 90+600 960.00 75% 720.00RHS Pipe Laying Km 90+600 Km 90+861 261.00 75% 195.75RHS Pipe Laying Km 90+861 Km 92+060 1,199.00 75% 899.25RHS Pipe Laying Km 92+060 Km 92+114 54.00 75% 40.50RHS Pipe Laying Km 92+114 Km 92+245 131.00 75% 98.25RHSRHS Pipe Laying Km 92+335 Km 92+565 230.00 75% 172.50RHSRHS Pipe Laying Km 92+589 Km 92+831 242.00 75% 181.50RHSRHS Pipe Laying Km 92+932 Km 93+110 178.00 75% 133.50RHSRHS Pipe Laying Km 93+110 Km 94+680 1,570.00 75% 1,177.50RHS Pipe Laying Km 94+680 Km 96+100 1,420.00 75% 1,065.00RHS Pipe Laying Km 96+100 Km 96+977 877.00 75% 657.75

Km 0+075 Km 0+155 80.00 75% 60.00Umm Birkah Pipe Laying Km 0+155 Km 0+292 137.00 75% 102.75Umm Birkah Pipe Laying Km 0+292 Km 1+460 1,168.00 75% 876.00Umm Birkah Pipe Laying Km 1+460 Km 1+900 440.00 75% 330.00

Km 2+000 Km 2+160 160.00 75% 120.00

Page 4: 29E.08  600 mm TSE

Umm Birkah Pipe Laying Km 2+164 Km 2+218 54.00 75% 40.50Km 2+218 Km 3+040 822.00 75% 616.50Km 3+040 Km 3+522 482.00 75% 361.50

Work Item Weight %

Excavation-Bedding-Installation Pipe 75%

Testing 10%Backfilling 15%Total % 100%

Cumulative Total 62,848.00 47,136.00

Page 5: 29E.08  600 mm TSE

TAKE-OFF SHEET

IR Reference Remarks

GS/10152 IPC 38

GS/12619 IPC 46

GS/9573 IPC 36

GS/13948 B IPC 50

GS/14344 IPA 52 GS/12609 IPC 46 GS/11698 IPC 40GS/11907 IPC 40

GS/12563 IPC 46 GS/9668 IPC 36

GS/12564 IPC 46

GS/11886 IPC 40 GS/12751 IPC 46 GS/11949 IPC 43

Km 37+965 Km 38+044 98.50Km 38+049 Km 38+148 77.92Km 38+153 Km 38+249 96.49

GS/2408

GS/7416Km 39+168 Km 39+219 51.00

GS/7627 IPC 33GS/7628 IPC 33

GS/1854 GS/1955 & 2017

GS/2193 GS/1918

GS/13064 IPC 46

GS/13039 IPC 46 Km 43+090 Km 43+114 23.98

GS/13040 IPC 46

GS/13065 IPC 46

GS/2209 GS/2108 GS/2164 GS/2742 IPC 34 GS/7807 IPC 34GS/7326 GS/4112 IPC 25GS/7326

Km 47+093 Km 47+156 63.00GS/7326 GS/4113 IPC 25GS/7326

GS/2792 IPC 34 GS/1978 GS/2200 GS/5020 IPC 26

Page 6: 29E.08  600 mm TSE

GS/2203 GS/5020 IPC 26 GS/2204 GS/5020 IPC 26 GS/2205 GS/5020 IPC 26 GS/2206 GS/5020 IPC 26 GS/2207 GS/2079 GS/2070 GS/2004 GS/2413 GS/1995 GS/2461 GS/5020 IPC 26 GS/1997 GS/7265 GS/4114 IPC 25

Km 53+444 Km 53+507 63.00 63.00 GS/7227 GS/4116 IPC 25 GS/7260 GS/1820 GS/1780

GS/13289 IPC 49 Km 58+060 Km 58+108 48.00 48.00

GS/13291 IPC 49 GS/13338 IPC 49

Km 58+246 Km 58+285 37.88 39.00 GS/13292 IPC 49 GS/13196 IPC 49

Km 58+387 Km 58+502 111.99 115.00 GS/13198 IPC 49

GS/13198 IPC 49 GS/13292 IPC 49

Km 58+581 Km 58+627 45.53 46.00 GS/13200 IPC 49 GS/13322 IPC 49

Km 58+829 Km 58+868 38.86 39.00 GS/13324 IPC 49

GS/1757 GS/1267 GS/4050 IPC 25 GS/1248 GS/4431 IPC 26

Km 63+229 Km 63+307 77.80 78.00 GS/4432 IPC 26

Km 63+970 Km 64+003 33.20 33.00 GS/4433 IPC 26 GS/1249

Km 65+558 Km 65+620 61.47 62.00 GS/1233 GS/1193 GS/2279 GS/2496 GS/2280 GS/2497 GS/2281 GS/2498 GS/2282 GS/2499 GS/2283 GS/2229 GS/1157 GS/1145 GS/7056

Km 71+770 Km 71+881 111.56 111.00 GS/7055

Km 72+125 Km 72+148 23.30 23.00

Page 7: 29E.08  600 mm TSE

GS/6878 Km 72+508 Km 72+547 38.90 39.00

GS/7266

GS/1123 GS/1090 GS/4191 IPC 25 GS/7493 GS/436 (C) GS/7494

GS/473 (B) GS/5174 IPC 27 GS/7185

GS/7205 GS/7184

GS/7184

GS/7187 Km 79+000 22.45

GS/474 (B)

GS/494 (B)GS/1240

GS/580 GS/5946

GS/5854

GS/5855 Km 83+000 27.24

GS/5949

GS/618 GS/5019 IPC 26 GS/634 GS/666

GS/7139

Km 86+675 Km 86+756 81.00 81.00Km 87+000 22.30

GS/9307 IPC 35

GS/6281 Km 87+374 Km 87+449 75.00 75.00

GS/6285 GS/667 GS/709

GS/761 GS/4731 IPC 26 GS/781

GS/6526 GS/6036

Km 92+256 Km 92+327 71.00 71.00 GS/5951

GS/5982 Km 92+844 Km 92+920 75.11 76.00

GS/5953 Km 93+000 22.30

GS/809 GS/840

GS/889 (B)

GS/8849 IPC 35GS/3289

GS/8331 IPC 34 GS/8751 IPC 34

GS/8751 IPC 34

Page 8: 29E.08  600 mm TSE

GS/3672GS/8773 IPC 35GS/8851 IPC 35

1498.78

Page 9: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Pipe Testing) RHS

SN Work ItemChainage

IR ReferenceStart End (m)

RHS Testing Km 6+000 Km 6+057 57.00 10% 5.70 CI/2578

Testing Km 8+002 Km 8+662 660.00 10% 66.00 CI/2361

RHS Testing Km 11+365 Km 12+786 1,421.00 10% 142.10 CI/3040

Testing Km 12+786 Km 13+000 214.00 10% 21.40 CI/2360

Testing Km 13+015 Km 13+255 240.00 10% 24.00 CI/3040

RHS Testing Km 13+350 Km 14+185 835.00 10% 83.50 CI/3023

RHS Testing Km 38+420 Km 38+780 360.00 10% 36.00 CI/1896

RHS Testing Km 38+784 Km 39+169 385.00 10% 38.50 CI/1896

RHS Testing Km 39+219 Km 39+785 566.00 10% 56.60 CI/1896

RHS Testing Km 39+793 Km 42+680 2,887.00 10% 288.70 CI/382

RHS Testing Km 42+885 Km 43+089 204.00 10% 20.40 CI/3123

RHS Testing Km 43+114 Km 43+296 182.00 10% 18.20 CI/3123

RHS Testing Km 43+471 Km 46+750 3,279.00 10% 327.90 CI/498

RHS Testing Km 46+750 Km 47+093 343.00 10% 34.30 CI/1890

RHS Testing Km 47+158 Km 52+960 5,802.00 10% 580.20 CI/1890, CI/524B

RHS Testing Km 52+960 Km 53+446 486.00 10% 48.60 CI/1833

RHS Testing Km 53+509 Km 57+756 4,247.00 10% 424.70 CI/324, 1833

RHS Testing Km 57+785 Km 58+060 275.00 10% 27.50 CI/3240

RHS Testing Km 58+108 Km 58+246 138.00 10% 13.80 CI/3240

RHS Testing Km 58+285 Km 58+388 103.00 10% 10.30 CI/3240

Work Done Length Weight

(%)Payable

Length (m)

Page 10: 29E.08  600 mm TSE

RHS Testing Km 58+500 Km 58+511 11.00 10% 1.10 CI/3240

RHS Testing Km 58+522 Km 58+581 59.00 10% 5.90 CI/3240

RHS Testing Km 58+626 Km 58+828 202.00 10% 20.20 CI/3240

RHS Testing Km 58+867 Km 59+180 313.00 10% 31.30 CI/3240

RHS Testing Km 59+188 Km 63+229 4,041.00 10% 404.10 CI/945

Km 63+306 Km 63+969 663.00 10% 66.30 CI/945

Km 64+003 Km 65+000 997.00 10% 99.70 CI/945

RHS Testing Km 66+042 Km 71+695 5,653.00 10% 565.30 CI/637

RHS Testing Km 71+695 Km 71+769 74.00 10% 7.40 CI/1955

RHS Testing Km 71+880 Km 72+125 245.00 10% 24.50 CI/1955

RHS Testing Km 72+150 Km 72+507 357.00 10% 35.70 CI/1955

RHS Testing Km 72+547 Km 72+674 127.00 10% 12.70 CI/1955

Km 72+680 Km 75+288 2,608.00 10% 260.80 CI/1716

Km 75+300 Km 76+260 960.00 10% 96.00 CI/1716

Km 76+280 Km 77+938 1,658.00 10% 165.80 CI/1716

Km 78+086 Km 78+380 294.00 10% 29.40 CI/2149

Km 78+402 Km 78+716 314.00 10% 31.40 CI/2149

RHS Testing Km 79+120 Km 79+450 330.00 10% 33.00 CI/257

RHS Testing Km 79+460 Km 81+360 1,900.00 10% 190.00 CI/257

RHS Testing Km 81+369 Km 82+110 741.00 10% 74.10 CI/257

Km 82+420 Km 82+672 252.00 10% 25.20 CI/2219

Km 82+700 Km 82+952 252.00 10% 25.20 CI/2219

RHS Testing Km 83+320 Km 86+576 3,256.00 10% 325.60 CI/300 (B)

Km 86+760 Km 87+050 290.00 10% 29.00 CI/2259

Km 87+073 Km 87+368 295.00 10% 29.50 CI/2259

Km 87+455 Km 92+245 4,790.00 10% 479.00 CI/1406

Km 92+335 Km 92+565 230.00 10% 23.00 CI/2273

Km 92+589 Km 92+831 242.00 10% 24.20 CI/2273

Km 92+932 Km 96+977 4,045.00 10% 404.50 CI/1454

Km 0+075 Km 0+155 80.00 10% 8.00 CI/2140Umm Birka Testing Km 0+155 Km 0+292 137.00 10% 13.70 CI/585

Page 11: 29E.08  600 mm TSE

Km 0+292 Km 1+900 1,608.00 10% 160.80 CI/2140

Km 2+000 Km 2+160 160.00 10% 16.00 CI/2140

Umm Birka Testing Km 2+164 Km 2+218 54.00 10% 5.40 CI/680 Km 2+218 Km 3+522 1,304.00 10% 130.40 CI/2140

Work Item Weight %Excavation-Bedding-Installation Pipe 75%

Testing 10%Backfilling 15%Total % 100%

Page 12: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Backfilling) RHS

SN Work ItemChainage

IR ReferenceStart End (m)

RHS Backfilling Km 6+000 Km 6+057 57.00 15% 8.55 CI/3252 0.00 0.00

RHS Backfilling Km 7+460 Km 7+580 120.00 15% 18.00 CI/30150.00 0.00

Km 8+002 Km 8+662 660.00 15% 99.00 CI/2414

RHS Backfilling Km 9+080 Km 9+104 24.00 15% 3.60 CI/3343

RHS Backfilling Km 11+070 Km 11+365 295.00 15% 44.25 CI/3480 RHS Backfilling Km 11+365 Km 12+000 635.00 15% 95.25 CI/3079RHS Backfilling Km 12+000 Km 12+786 786.00 15% 117.90 CI/3075

Km 12+786 Km 12+972 186.00 15% 27.90 CI/24650.00 0.00

RHS Backfilling Km 13+015 Km 13+255 240.00 15% 36.00 CI/30760.00 0.00

RHS Backfilling Km 13+350 Km 14+185 835.00 15% 125.25 CI/30920.00 0.00

RHS Backfilling Km 38+420 Km 38+780 360.00 15% 54.00 CI/19370.00 0.00

RHS Backfilling Km 38+784 Km 39+164 380.00 15% 57.00 CI/19370.00 0.00

RHS Backfilling Km 39+219 Km 39+785 566.00 15% 84.90 CI/19380.00 0.00

RHS backfill Km 39+793 Km 40+500 707.00 15% 106.05 CI/420 (B)RHS backfill Km 40+500 Km 42+680 2,180.00 15% 327.00 CI/437

0.00 0.00RHS Backfilling Km 42+885 Km 43+089 204.00 15% 30.60 CI/3169

0.00 0.00RHS Backfilling Km 43+114 Km 43+296 182.00 15% 27.30 CI/3170

0.00 0.00RHS backfill Km 43+471 Km 45+700 2,229.00 15% 334.35 CI/517RHS backfill Km 45+700 Km 46+750 1,050.00 15% 157.50 CI/521RHS Backfilling Km 46+750 Km 47+093 343.00 15% 51.45 CI/1920

0.00 0.00RHS Backfilling Km 47+158 Km 47+500 342.00 15% 51.30 CI/1930RHS Backfilling Km 47+500 Km 52+960 5,460.00 15% 819.00 CI/647RHS Backfilling Km 52+960 Km 53+444 484.00 15% 72.60 CI/1895

0.00 0.00RHS Backfilling Km 53+509 Km 54+020 511.00 15% 76.65 CI/1898RHS backfill Km 54+020 Km 57+756 3,736.00 15% 560.40 CI/384

RHS Backfilling Km 57+786 Km 58+060 274.00 15% 41.10 CI/3371

RHS Backfilling Km 58+108 Km 58+246 138.00 15% 20.70 CI/3377

RHS Backfilling Km 58+285 Km 58+388 103.00 15% 15.45 CI/3381

RHS Backfilling Km 58+500 Km 58+511 11.00 15% 1.65 CI/3382

RHS Backfilling Km 58+522 Km 58+581 59.00 15% 8.85

RHS Backfilling Km 58+627 Km 58+828 201.00 15% 30.15 CI/3401

RHS Backfilling Km 58+867 Km 59+180 313.00 15% 46.95 CI/3402 0.00 0.00

RHS backfill Km 59+188 Km 62+500 3,312.00 15% 496.80 CI/983RHS backfill Km 62+500 Km 63+227 727.00 15% 109.05 CI/998

0.00 0.00

Work Done Length Weight

(%)Payable

Length (m)

Page 13: 29E.08  600 mm TSE

RHS backfill Km 63+306 Km 63+969 663.00 15% 99.45 CI/9980.00 0.00

RHS backfill Km 64+003 Km 65+000 997.00 15% 149.55 CI/10170.00 0.00

RHS backfill Km 66+042 Km 66+500 458.00 15% 68.70 CI/724RHS backfill Km 66+500 Km 69+300 2,800.00 15% 420.00 CI/722RHS backfill Km 69+300 Km 70+600 1,300.00 15% 195.00 CI/706RHS backfill Km 70+600 Km 71+695 1,095.00 15% 164.25 CI/695RHS backfill Km 71+695 Km 71+769 74.00 15% 11.10 CI/2029

backfill 0.00 0.00RHS backfill Km 71+881 Km 72+125 244.00 15% 36.60 CI/2030

backfill 0.00 0.00RHS backfill Km 72+150 Km 72+507 357.00 15% 53.55 CI/2031

backfill 0.00 0.00RHS backfill Km 72+547 Km 72+674 127.00 15% 19.05 CI/2032

RHS backfill Km 72+680 Km 75+000 2,320.00 15% 348.00 CI/1232RHS backfill Km 75+000 Km 77+938 2,938.00 15% 440.70 CI/1594

0.00 0.00Km 78+086 Km 78+378 292.00 15% 43.80 CI/2194

0.00 0.00Km 78+402 Km 78+716 314.00 15% 47.10 CI/2200

0.00 0.000.00 0.00

RHS backfill Km 79+120 Km 79+450 330.00 15% 49.50 CI/4280.00 0.00

RHS backfill Km 79+460 Km 81+360 1,900.00 15% 285.00 CI/4280.00 0.00

RHS backfill Km 81+369 Km 82+110 741.00 15% 111.15 CI/4280.00 0.00

Km 82+420 Km 82+672 252.00 15% 37.80 CI/22600.00 0.00

Km 82+700 Km 82+952 252.00 15% 37.80 CI/22610.00 0.000.00 0.00

RHS backfill Km 83+320 Km 86+570 3,250.00 15% 487.50 CI/8750.00 0.00

Km 86+760 Km 87+050 290.00 15% 43.50 CI/22900.00 0.00

Km 87+073 Km 87+368 295.00 15% 44.25 CI/22890.00 0.00

RHS backfill Km 87+455 Km 92+245 4,790.00 15% 718.50 CI/15790.00 0.00

Km 92+335 Km 92+565 230.00 15% 34.50 CI/23130.00 0.00

Km 92+589 Km 92+831 242.00 15% 36.30 CI/23140.00 0.00

RHS backfill Km 92+932 Km 96+977 4,045.00 15% 606.75 CI/15560.00 0.00

Km 0+075 Km 0+155 80.00 15% 12.00 CI/2210Umm Birka backfill Km 0+155 Km 0+191 36.00 15% 5.40 CI/669Umm Birka backfill Km 0+191 Km 0+205 14.00 15% 2.10 CI/611Umm Birka backfill Km 0+205 Km 0+222 17.00 15% 2.55 CI/669Umm Birka backfill Km 0+222 Km 0+242 20.00 15% 3.00 CI/609Umm Birka backfill Km 0+242 Km 0+277 35.00 15% 5.25 CI/669Umm Birka backfill Km 0+277 Km 0+286 9.00 15% 1.35 CI/610Umm Birka backfill Km 0+286 Km 0+292 6.00 15% 0.90 CI/669

Km 0+292 Km 1+900 1,608.00 15% 241.20 CI/22110.00 0.00

Km 2+000 Km 2+160 160.00 15% 24.00 CI/22110.00 0.00

Umm Birkah backfill Km 2+170 Km 2+210 40.00 15% 6.00 CI/735Km 2+210 Km 3+522 1,312.00 15% 196.80 CI/2213

Work Item Weight %Excavation-Bedding-Installation Pipe 75%

Testing 10%

Page 14: 29E.08  600 mm TSE

Backfilling 15%Total % 100%

Page 15: 29E.08  600 mm TSE

TAKE-OFF SHEET

IPC No.

IPC-50

IPC-45

IPC 38

IPA 52

IPA 52 IPC-45IPC-45IPC 38

IPC-45

IPC 49

IPC 33

IPC 33

IPC 33

IPC 49

IPC 49

IPC 33

IPC 33

IPC 33

IPC 33

IPA 52

IPA 52

IPA 52

IPA 52

IPA 52

IPA 52

IPA 52

IPC 26 IPC 26

Page 16: 29E.08  600 mm TSE

IPC 26

IPC 27

IPC 34

IPC 34

IPC 34

IPC 34

IPC 35

IPC 35

IPC 26

IPC 35 IPC 25 IPC 26 IPC 25 IPC 26 IPC 25 IPC 26 IPC 25 IPC 35

IPC 35

IPC 35

Page 17: 29E.08  600 mm TSE
Page 18: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Excavation-Sand Bedding & Pipe Laying) LHS

SN Work ItemChainage

IR ReferenceStart End (m)

LHS Pipe Laying Km 6+314 Km 6+530 216.00 75% 162.00 GS/8299

Km 6+565 Km 6+688 123.00 75% 92.25 GS/1032

LHS Pipe Laying Km 6+855 Km 6+951 96.00 75% 72.00 GS/13536

LHS Pipe Laying Km 7+028 Km 7+138 110.00 75% 82.50 GS/13555

Km 7+162 Km 7+264 102.00 75% 76.50 GS/12521 LHS Pipe Laying Km 7+264 Km 7+285 21.00 75% 15.75 GS/13822

LHS Pipe Laying Km 7+432 Km 7+600 168.00 75% 126.00 GS/10607 LHS Pipe Laying Km 7+600 Km 8+880 1,280.00 75% 960.00 GS/13797

LHS Pipe Laying Km 8+975 Km 9+070 95.00 75% 71.25 GS/10738

LHS Pipe Laying Km 9+326 Km 9+434 108.00 75% 81.00 GS/12920

LHS Pipe Laying Km 9+473 Km 9+509 36.00 75% 27.00 GS/13043

LHS Pipe Laying Km 9+510 Km 9+585 75.00 75% 56.25 GS/11811

LHS Pipe Laying Km 9+660 Km 9+745 85.00 75% 63.75 GS/11811

LHS Pipe Laying Km 9+776 Km 9+836 60.00 75% 45.00 GS/11811

LHS Pipe Laying Km 9+955 Km 10+712 757.00 75% 567.75 GS/11811 LHS Pipe Laying Km 10+712 Km 10+995 283.00 75% 212.25 GS/8730

Pipe Laying Km 10+995 Km 12+008 1,013.00 75% 759.75 GS/11779 LHS Pipe Laying Km 12+008 Km 12+092 84.00 75% 63.00 GS/11044

Km 12+092 Km 12+840 748.00 75% 561.00 GS/11752 LHS Pipe Laying Km 12+840 Km 12+935 95.00 75% 71.25 GS/10671 LHS Pipe Laying Km 12+935 Km 13+306 371.00 75% 278.25 GS/11005

Km 13+306 Km 13+402 96.00 75% 72.00 GS/9334 Km 13+402 Km 13+438 36.00 75% 27.00 GS/9164 Km 13+438 Km 13+561 123.00 75% 92.25 GS/9334 Km 13+561 Km 13+615 54.00 75% 40.50 GS/10083 Km 13+615 Km 13+644 29.00 75% 21.75 GS/9838 Km 13+644 Km 14+247 603.00 75% 452.25 GS/9386

LHS Pipe Laying Km 57+835 Km 57+940 105.00 75% 78.75 GS/13661 LHS Pipe Laying Km 57+940 Km 58+154 214.00 75% 160.50 GS/13445

LHS Pipe Laying Km 58+199 Km 58+372 173.00 75% 129.75 GS/13415

LHS Pipe Laying Km 58+414 Km 58+501 87.00 75% 65.25 GS/13418

LHS Pipe Laying Km 58+608 Km 58+711 103.00 75% 77.25 GS/13381

LHS Pipe Laying Km 58+746 Km 58+971 225.00 75% 168.75 GS/13383

LHS Pipe Laying Km 59+055 Km 59+162 107.00 75% 80.25 GS/13384 LHS Pipe Laying Km 59+162 Km 60+240 1,078.00 75% 808.50 GS/01676 LHS Pipe Laying Km 60+240 Km 62+300 2,060.00 75% 1,545.00 GS/01699 LHS Pipe Laying Km 62+300 Km 62+557 257.00 75% 192.75 GS/01963 LHS Pipe Laying Km 62+557 Km 63+800 1,243.00 75% 932.25 GS/01656 LHS Pipe Laying Km 63+800 Km 64+998 1,198.00 75% 898.50 GS/01635

Work Done Length Weight

(%)Payable

Length (m)

Page 19: 29E.08  600 mm TSE

LHS Pipe Laying Km 64+998 Km 65+150 152.00 75% 114.00 GS/13731

LHS Pipe Laying Km 65+248 Km 65+554 306.00 75% 229.50 GS/13731

LHS Pipe Laying Km 65+759 Km 65+939 180.00 75% 135.00 GS/5023

LHS Pipe Laying Km 66+102 Km 68+000 1,898.00 75% 1,423.50 GS/01596 LHS Pipe Laying Km 68+000 Km 68+976 976.00 75% 732.00 GS/01558 LHS Pipe Laying Km 68+976 Km 70+112 1,136.00 75% 852.00 GS/4853 LHS Pipe Laying Km 70+112 Km 71+718 1,606.00 75% 1,204.50 GS/01530

Km 71+718 Km 71+745 27.00 75% 20.25 GS/6902

Km 71+845 Km 72+131 286.00 75% 214.50 GS/6903

Km 72+162 Km 72+516 354.00 75% 265.50 GS/6801

Km 72+544 Km 72+584 40.00 75% 30.00 GS/7057 LHS Pipe Laying Km 72+584 Km 73+840 1,256.00 75% 942.00 GS/3641 LHS Pipe Laying Km 73+840 Km 74+300 460.00 75% 345.00 GS/3642 LHS Pipe Laying Km 74+300 Km 75+180 880.00 75% 660.00 GS/2264 LHS Pipe Laying Km 75+180 Km 75+216 36.00 75% 27.00 GS/2862 LHS Pipe Laying Km 75+216 Km 75+247 31.00 75% 23.25 GS/2782 LHS Pipe Laying Km 75+247 Km 76+400 1,153.00 75% 864.75 GS/1315 LHS Pipe Laying Km 76+400 Km 76+480 80.00 75% 60.00 GS/4009 LHS Pipe Laying Km 76+480 Km 76+560 80.00 75% 60.00 GS/4014 LHS Pipe Laying Km 76+560 Km 77+840 1,280.00 75% 960.00 GS/613

Km 77+880 Km 78+023 143.00 75% 107.25 GS/6400

Km 78+107 Km 78+384 277.00 75% 207.75 GS/7094

Km 78+414 Km 78+692 278.00 75% 208.50 GS/7093

Km 78+780 Km 78+820 40.00 75% 30.00 GS/7249

LHS Pipe Laying Km 78+820 Km 79+514 694.00 75% 520.50 GS/2231 LHS Pipe Laying Km 79+514 Km 80+500 986.00 75% 739.50 GS/1064 LHS Pipe Laying Km 80+500 Km 81+328 828.00 75% 621.00 GS/1041 LHS Pipe Laying Km 81+328 Km 81+637 309.00 75% 231.75 GS/3671 LHS Pipe Laying Km 81+637 Km 82+190 553.00 75% 414.75 GS/01032

Km 82+190 Km 82+335 145.00 75% 108.75 GS/6574

Km 82+431 Km 82+636 205.00 75% 153.75 GS/6576

Km 82+660 Km 82+900 240.00 75% 180.00 GS/6531

Km 82+992 Km 83+195 203.00 75% 152.25 GS/7020B LHS Pipe Laying Km 83+195 Km 84+000 805.00 75% 603.75 GS/1012 LHS Pipe Laying Km 84+000 Km 84+480 480.00 75% 360.00 GS/995

Km 84+480 Km 84+620 140.00 75% 105.00 GS/6904 Km 84+620 Km 84+655 35.00 75% 26.25 GS/6845 Km 84+655 Km 84+716 61.00 75% 45.75 GS/6929

LHS Pipe Laying Km 84+716 Km 85+460 744.00 75% 558.00 GS/996 LHS Pipe Laying Km 85+460 Km 86+538 1,078.00 75% 808.50 GS/980

Km 86+538 Km 86+580 42.00 75% 31.50 GS/7264 Km 86+580 Km 86+635 55.00 75% 41.25 GS/6709 Km 86+635 Km 86+647 12.00 75% 9.00 GS/7019

Km 86+740 Km 86+957 217.00 75% 162.75 GS/6291

Km 86+984 Km 87+310 326.00 75% 244.50 GS/6292

Km 87+365 Km 87+508 143.00 75% 107.25 GS/6010 LHS Pipe Laying Km 87+508 Km 88+800 1,292.00 75% 969.00 GS/953 LHS Pipe Laying Km 88+800 Km 90+000 1,200.00 75% 900.00 GS/932 LHS Pipe Laying Km 90+000 Km 90+460 460.00 75% 345.00 GS/917 LHS Pipe Laying Km 90+460 Km 90+768 308.00 75% 231.00 GS/4678 LHS Pipe Laying Km 90+768 Km 92+018 1,250.00 75% 937.50 GS/914

Km 92+018 Km 92+126 108.00 75% 81.00 GS/5981

Km 92+215 Km 92+458 243.00 75% 182.25 GS/6159

Page 20: 29E.08  600 mm TSE

Km 92+480 Km 92+747 267.00 75% 200.25 GS/6160

Km 92+840 Km 93+060 220.00 75% 165.00 GS/6056 LHS Pipe Laying Km 93+060 Km 94+540 1,480.00 75% 1,110.00 GS/906 LHS Pipe Laying Km 94+540 Km 96+900 2,360.00 75% 1,770.00 GS/890 (B)

Work Item Weight %Excavation-Bedding-Installation Pipe 75%

Testing 10%Backfilling 15%Total % 100%

Page 21: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Pipe Testing) LHS

SN Work ItemChainage

IR ReferenceStart End (m)

LHS Testing Km 6+315 Km 6+530 215.00 10% 21.50 CI/2004

LHS Testing Km 6+565 Km 6+688 123.00 10% 12.30 CI/2562

LHS Testing Km 7+432 Km 7+600 168.00 10% 16.80 CI/2720

LHS Testing Km 7+600 Km 8+880 1,280.00 10% 128.00 CI/3431

LHS Testing Km 9+955 Km 10+712 757.00 10% 75.70 CI/3018

Km 10+712 Km 10+995 283.00 10% 28.30 CI/2096

LHS Testing Km 10+995 Km 13+306 2,311.00 10% 231.10 CI/3018

Km 13+306 Km 14+247 941.00 10% 94.10 CI/2470

LHS Testing Km 57+835 Km 58+154 319.00 10% 31.90 CI/3409 B

LHS Testing Km 58+199 Km 58+372 173.00 10% 17.30 CI/3409 B

LHS Testing Km 58+414 Km 58+501 87.00 10% 8.70 CI/3409 B

LHS Testing Km 58+608 Km 58+711 103.00 10% 10.30 CI/3409 B

LHS Testing Km 58+746 Km 58+971 225.00 10% 22.50 CI/3409 B

LHS Testing Km 59+055 Km 59+162 107.00 10% 10.70 CI/3409 B

LHS Testing Km 59+162 Km 64+998 5,836.00 10% 583.60 CI/369

LHS Testing Km 66+102 Km 71+718 5,616.00 10% 561.60 CI/1056C

LHS Testing Km 71+718 Km 71+745 27.00 10% 2.70 CI/1963

Km 71+845 Km 72+131 286.00 10% 28.60 CI/1963

Km 72+162 Km 72+516 354.00 10% 35.40 CI/1963

LHS Testing Km 72+584 Km 77+840 5,256.00 10% 525.60 CI/911

Km 77+880 Km 77+900 20.00 10% 2.00 CI/911

Km 78+107 Km 78+384 277.00 10% 27.70 CI/2193

Km 78+414 Km 78+692 278.00 10% 27.80 CI/2193

LHS Testing Km 78+820 Km 82+190 3,370.00 10% 337.00 CI/835

Km 82+431 Km 82+636 205.00 10% 20.50 CI/2237

Work Done Length Weight

(%)Payable

Length (m)

Page 22: 29E.08  600 mm TSE

Km 82+660 Km 82+900 240.00 10% 24.00 CI/2237

Km 82+992 Km 86+647 3,655.00 10% 365.50 CI/1700

Km 86+740 Km 86+957 217.00 10% 21.70 CI/2292

Km 86+984 Km 87+310 326.00 10% 32.60 CI/2292

LHS Testing Km 87+365 Km 92+126 4,761.00 10% 476.10 CI/1316

Km 92+215 Km 92+458 243.00 10% 24.30 CI/2293

Km 92+480 Km 92+747 267.00 10% 26.70 CI/2293

LHS Testing Km 92+840 Km 96+899 4,059.00 10% 405.90 CI/1588

Work Item Weight %

Excavation-Bedding-Installation Pipe 75%

Testing 10%

Backfilling 15%

Total % 100%

Page 23: 29E.08  600 mm TSE
Page 24: 29E.08  600 mm TSE

Project : Design and construct Service Road Enhancement to North Road Corridor Project (P059) Project Manager : KBRProject Consultant: KEO

TAKE-OFF SHEET

BOQ Item : 29E.08 600 mm diameter TSE Line (Pipe Testing) LHS

SN Work ItemChainage

IR ReferenceStart End (m)

LHS Backfilling Km 6+570 Km 6+688 118.00 15% 17.70 CI/2461

LHS Backfilling Km 6+855 Km 6+951 96.00 15% 14.40 CI/3204

LHS Backfilling Km 7+028 Km 7+100 72.00 15% 10.80 CI/3211 LHS Backfilling Km 7+100 Km 7+138 38.00 15% 5.70 CI/3280

LHS Backfilling Km 7+162 Km 7+200 38.00 15% 5.70 CI/3001

Km 7+200 Km 7+264 64.00 15% 9.60 CI/2995

LHS Backfilling Km 7+264 Km 7+285 21.00 15% 3.15 CI/3331

LHS Backfilling Km 7+432 Km 7+600 168.00 15% 25.20 CI/2765

LHS Backfilling Km 7+600 Km 8+880 1,280.00 15% 192.00 CI/3481

LHS Backfilling Km 9+000 Km 9+050 50.00 15% 7.50 CI/2661

LHS Backfilling Km 9+326 Km 9+434 108.00 15% 16.20 CI/3114

LHS Backfilling Km 9+473 Km 9+509 36.00 15% 5.40 CI/3129

LHS Backfilling Km 9+955 Km 10+300 345.00 15% 51.75 CI/3066

LHS Backfilling Km 10+300 Km 10+712 412.00 15% 61.80 CI/3058

Km 10+712 Km 10+822 110.00 15% 16.50 CI/2185

Km 10+822 Km 10+904 82.00 15% 12.30 CI/2254

Km 10+904 Km 10+995 91.00 15% 13.65 CI/2186

LHS Backfilling Km 10+995 Km 11+500 505.00 15% 75.75 CI/3049

LHS Backfilling Km 11+500 Km 12+038 538.00 15% 80.70 CI/3043

LHS Backfilling Km 12+038 Km 12+065 27.00 15% 4.05 CI/2687

LHS Backfilling Km 12+065 Km 12+800 735.00 15% 110.25 CI/3037

LHS Backfilling Km 12+800 Km 13+306 506.00 15% 75.90 CI/3027

Km 13+306 Km 13+505 199.00 15% 29.85 CI/2516

Km 13+505 Km 13+615 110.00 15% 16.50 CI/2534

Km 13+615 Km 14+247 632.00 15% 94.80 CI/2501

LHS Backfilling Km 57+835 Km 58+154 319.00 15% 47.85 CI/3577

LHS Backfilling Km 58+199 Km 58+372 173.00 15% 25.95 CI/3578

LHS Backfilling Km 58+414 Km 58+500 86.00 15% 12.90 CI/3582

LHS Backfilling Km 58+609 Km 58+710 101.00 15% 15.15 CI/3583

Work Done Length Weight

(%)Payable Length

(m)

Page 25: 29E.08  600 mm TSE

LHS Backfilling Km 59+055 Km 59+162 107.00 15% 16.05 CI/3592

LHS Backfilling Km 59+162 Km 62+500 3,338.00 15% 500.70 CI/839

LHS Backfilling Km 62+500 Km 62+557 57.00 15% 8.55 CI/805

LHS Backfilling Km 62+557 Km 64+998 2,441.00 15% 366.15 CI/805

LHS Backfilling Km 65+759 Km 65+920 161.00 15% 24.15 CI/1212

LHS Backfilling Km 66+102 Km 71+718 5,616.00 15% 842.40 CI/1155

LHS Backfilling Km 71+718 Km 71+745 27.00 15% 4.05 CI/2055

LHS Backfilling Km 71+845 Km 72+130 285.00 15% 42.75 CI/2054

LHS Backfilling Km 72+162 Km 72+516 354.00 15% 53.10 CI/2053

LHS Backfilling Km 72+545 Km 72+584 39.00 15% 5.85 CI/2052 LHS Backfilling Km 72+584 Km 76+000 3,416.00 15% 512.40 CI/965LHS Backfilling Km 76+000 Km 77+840 1,840.00 15% 276.00 CI/1412

Km 78+107 Km 78+383 276.00 15% 41.40 CI/2236

Km 78+415 Km 78+692 277.00 15% 41.55 CI/2235

LHS Backfilling Km 78+810 Km 82+191 3,381.00 15% 507.15 CI/916

Km 82+431 Km 82+636 205.00 15% 30.75 CI/2283

Km 82+661 Km 82+900 239.00 15% 35.85 CI/2284

Km 82+992 Km 86+540 3,548.00 15% 532.20 CI/1770LHS Backfilling Km 86+540 Km 86+647 107.00 15% 16.05 CI/1919

Km 86+740 Km 86+957 217.00 15% 32.55 CI/2336

Km 86+984 Km 87+310 326.00 15% 48.90 CI/2335

LHS Backfilling Km 87+365 Km 92+126 4,761.00 15% 714.15 CI/1408

Km 92+215 Km 92+458 243.00 15% 36.45 CI/2321

Km 92+480 Km 92+747 267.00 15% 40.05 CI/2322

Km 92+840 Km 96+899 4,059.00 15% 608.85 CI/1695

Page 26: 29E.08  600 mm TSE

Work Item Weight %Excavation-Bedding-Installation Pipe 75%

Testing 10%Backfilling 15%Total % 100%

Page 27: 29E.08  600 mm TSE

600 mm dia GRP PipeRHS Pipe Laying 62,848.00 75.00%RHS Testing 61,226.00 10.00%RHS Backfilling 61,643.00 15.00%

LHS Pipe Laying 44,161.00 75.00%LHS Testing 42,385.00 10.00%LHS Backfilling 42,647.00 15.00%

Delected Quantity from SI-22

RHS+LHS Pipe 107,009.00 Testing 103,611.00 Backfilling 104,290.00

Page 28: 29E.08  600 mm TSE

600 mm dia GRP Pipe 47,136.00 6,122.60 9,246.45

33,120.75 4,238.50 6,397.05 106,261.35

50,077.85

156,339.20