    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL OF QUANTITIES

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    2/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL #1

    GENERAL REQUIREMENTS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    3/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 2

    SITE WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    4/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 3

    SUB-STRUCTURE

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    5/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    SUPER STRUCTURE

    BILL # 4

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    6/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 5

    THERMAL & MOISTURE PROTECTION

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    7/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 6

    METAL WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    8/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 7

    WOODEN & JOINERY WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    9/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 8

    FINISHES

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    10/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 9

    WATER SUPPLY WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    11/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    DRAINAGE WORKS

    BILL # 10

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    12/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 11

    HVAC WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    13/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 12

    LPG WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    14/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 13

    ELECTRICAL WORKS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    15/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 14

    EXTERNAL WORKS WITHIN PLOT LIMIT

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    16/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    BILL # 15

    PROVISIONAL SUMS

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    17/103

    EMSQUARE 3 No. B + G + 1 Vill

    on Plot No. 323-45

    GRAND SUMMARY

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    18/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    GENERAL REQUIREMENTS

    General

    These General Requirements are applicable to the

    whole of the works. If the Tenderer wishes to price of

    the items contained herein then each such item, clause

    or sub-clause must be individually priced. The

    Tenderer shall not enter any lump-sums covering more

    than one or all items, clauses or sub-clauses. Where

    any item, clause or sub-clause of the Preliminaries has

    not been priced, it will be deemed that the value of such

    item, clause or sub-clause is included in the rates for

    measured items elsewhere in the Bills of Quantities.

    Form of Tender

    A The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Form of Tender

    and Appendices for which he has not allowed

    elsewhere and wishes to price separately

    Form of Agreement

    B The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Form of

    Agreement and Appendices for which he has not

    allowed elsewhere and wishes to price separately

    Conditions of Contract

    C The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Conditions of

    Contract (Part I & II) for which he has not allowed

    elsewhere and wishes to price separately

    Specifications

    D The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Specifications

    for which he has not allowed elsewhere and wishes to

    price separately

    Total Carried To Collection -

    Bill No. 1 GENERAL REQUIREMENTS

    1/18

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    19/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Preambles

    A The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Preambles for

    which he has not allowed elsewhere and wishes to

    price separately

    Bill of Quantities

    B The Contractor shall describe and list below and price 1.00 Item Included

    herein any obligation contained in the Bill of Quantities

    for which he has not allowed elsewhere and wishes to

    price separately

    Provisional Sums

    C The Contractor shall be deemed to have allowed here 1.00 Item Included

    for any other special preliminaries requirements not

    specifically stated in relation to all works listed under

    Provisional Sum section of the Contract

    Performance Bond

    D The Contractor should allow for the provision of the Not Applicable

    performance bond in accordance with the

    requirements of the Contract

    Insurances

    E The Contractor should allow for the provision of the 1.00 Item 5,000.00

    insurances in accordance with the requirements of the

    Contract

    Total Carried To Collection 5,000.00

    1/19

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    20/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Construction Plant and Tools

    A The Contractor shall provide all constructional plant, 1.00 Item 134,500.00

    lifting equipment, transport facilities, tools and

    services required for the proper execution of the Works.

    The facilities shall include the provision of protective

    clothing and safety equipment complete. The

    Contractor shall be responsible for delivery to the site

    of all constructional plant, which he needs to carry out

    the Works. This responsibility shall include shipment,

    customs clearance, off-loading, loading and handling

    and all transportation to site and the removal of all

    redundant plant on completion of the Works.

    Building Permits and Statutory Approvals

    B The Contractor shall be responsible for obtaining all 1.00 Item Included

    approvals necessary for the Government Departments,

    the Police, Local Service Authorities (ie. Dubai

    Electricity and Water Authority. Etisalat / EITC, Civil

    Defence, etc) as required in the performance of this

    Contract, and for coordinating approvals and the like

    with requirements of the master plan developer and

    his representatives necessary for the works to proceed.

    Site Boundary Demarcation Certificate

    C The Contractor shall be responsible for obtaining the 1.00 Item Included

    Site Boundary Demarcation Certificate form the

    relevant Section of JAFZA, agree the location of the Site

    Boundary markers with the Survey Section and to

    carry out permanent demarcations. The Contractor

    shall provide the Engineer with a copy of the certificate.

    The Contractor shall be responsible for liaising with

    JAFZA.

    Total Carried To Collection 134,500.00

    1/20

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    21/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Programme and Progress of Works

    A In accordance with clause 14 of the Conditions of 1.00 Item Included

    Contract the Contractor shall prepare a comprehensive

    construction programme setting out the schedule for

    completion of the works including that of all

    sub-contractors and identifying all critical activities

    and milestone dates and interrelationships of various

    elements of works.

    Quality Control Procedure

    B As Built Drawings & Operation and Maintenance 1.00 Item Included

    instruction manual

    Allow for providing copy of each as-built drawing in

    the form and numbers instructed time to time by the

    Engineer

    Quality Control Programme

    C Provide and maintain an effective quality control 1.00 Item Included

    programme for all items of work including those of

    sub- contractors to ensure compliance with contract

    document

    Temporary Works

    D The Contractor is responsible for the design, 1.00 Item Included

    construction, maintenance and removal of all

    temporary works. The Contractor to submit to the

    Engineer his proposals for all temporary works for

    approval. The Engineer's approval will no way relieve

    the Contractor of his responsibility for the safety of the

    Works, operatives, adjoining property, structure or

    services and compliance with specifications,

    appropriate regulations and Codes of Practice.

    Total Carried To Collection

    1/21

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    22/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Temporary Utilities

    A The Contractor shall provide proper and adequate 1.00 Item Included

    temporary utilities for his own use and for the use of

    his own subcontractors

    Existing Services

    B The Contractor is to take particular care to avoid 1.00 Item Included

    damage to existing service during the course of the

    work. The Contractor shall be responsible for the

    protection of all existing services within the site and

    shall make good any damage to existing services

    resulting from his carrying out of the works to the

    satisfaction of the Engineer and relevant authority.

    Electrical Power and Lighting

    C The Contractor shall arrange and provide adequate 1.00 Item 91,500.00

    temporary supply of all necessary electrical power and

    lighting for the Works including paying all charges for

    consumption of electricity or supplying, operating and

    maintaining generators at his own expense including

    final testing and commissioning and until final

    handing over for the Works.

    Water

    D The Contractor shall arrange for a temporary supply of 1.00 Item Included

    water for the Works, suitable for all purpose through

    out the duration of the project and including final

    testing and commissioning and until final handing

    over. Furthermore, the Contractor shall pay all charges

    for the consumption of water used. Portable water for

    the project will be arranged by the contractor for the

    entire duration of the project

    Total Carried To Collection 91,500.00

    1/22

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    23/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Temporary Telephones & Internet

    A The Contractor is to provide and maintain temporary 1.00 Item 8,000.00

    telephone system & internet facility for his own, the

    Engineer's and Employer's use. He is to allow in his

    Tender for the costs of installation, hire and removal

    and for all call charges

    Temporary Drainage

    B The Contractor is to allow for keeping the site dry at all 1.00 Item Included

    times. The Contractor shall provide and maintain

    temporary drainage installation as may be necessary

    during the period of construction in a manner

    approved by the Engineer and in accordance with the

    local authorities regulation and direction. At

    completion of work Engineer may direct to remove all

    temporary drainage installation and make good

    existing to Engineer's satisfaction

    Fire Hazards

    C The Contractor shall be responsible for ensuring that 1.00 Item Included

    proper precautions are taken to protect the temporary

    buildings and it's contents where naked flame is used.

    He shall ensure that the extinguishers are available in

    areas where such hazards exist.

    Temporary Fire Fighting Services and Precautions

    D Provide and maintain efficient fire fighting facilities 1.00 Item Included

    and equipment together with personnel trained in its

    use as detailed in the specification

    Living Quarters / Accommodation

    E No temporary living, accommodation will be 1.00 Item 18,000.00

    permitted on the site. It is the Contractor'sresponsibility to make any necessary arrangements for

    suitable temporary housing of workers.

    Total Carried To Collection 26,000.00

    1/23

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    24/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Facilities for the Contractor

    A The Contractor shall provide temporary sheds, offices, 1.00 Item Included

    mess rooms, sanitary accommodation, welfare

    facilities, and like for the use of his agent and site staff

    and such office shall be open at all reasonable hours to

    receive instructions, notices or other communications

    and clear away on completion of the Contract

    Facilities for the Engineer & Employer

    B The Contractor shall provide and maintain proper 1.00 Item Included

    office facilities on site for the sole use of the Employer,

    Engineer and their staff complete with furniture and

    equipment in accordance with the specification, all as

    instructed by the Engineer.

    C The construction of this office must be sound/water/ 1.00 Item Included

    fireproof and well insulated and the office is to be air

    conditioned, carpeted furnished and equipped all to the

    satisfaction of the Engineer. The office shall be in a good

    state of repair and in any case not more than two years

    old As soon as the Contractor has been given

    instructions to proceed with the Works, he shall

    immediately present to the Engineer location and

    layout plan of the office facilities for the approval and

    arrange for completion within one week of the

    Engineer's approval. The Contractor shall provide all

    stationary Items

    Temporary Latrines and Ablutions

    D The Contractor is to provide and install native pattern 1.00 Item Included

    fly proof latrines and urine pans for his employees

    adjacent to the work, of a type which shall be approved

    by the Local Medical Authorities and Engineer, and

    shall be responsible for properly screening and

    maintaining the site in a clean and sanitary conditionto the satisfaction of the Engineer through out the

    period of the Contract.

    Total Carried To Collection

    1/24

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    25/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Temporary Hoardings

    A The Contractor shall provide temporary fencing, gates, 1.00 Item 10,000.00

    hoardings, fans, flanked footways, guard rails, gantries

    and the like as may be necessary for protecting the

    public or occupants for the proper execution of the

    works

    Site Sign Boards

    B The Contractor to provide and maintain 1 number site 1.00 Item 2,000.00

    sign boards in steel posts painted and fixed in concrete

    foundation and with lighting all as per drawing &

    approval of Engineer

    Security & Safety

    C The Contractor shall be responsible for providing 1.00 Item 44,000.00

    suitable lights, watchmen's hut, watchmen, etc., for the

    protection of the materials and plant etc., as described

    in the Specification

    Protection

    D Adequate protection against any form of damage or 1.00 Item 3,000.00

    deterioration shall be provided for all sections of the

    Works. This shall include protective tapes, casings,

    guard rails and the like, which shall be provided if

    necessary.

    Safety, Health and Welfare of Workmen.

    E The Contractor shall comply with enactments and 1.00 Item Included

    regulations relating to safety, health and welfare of

    workmen and the public at large. The Contractor shall

    provide and maintain first aid facilities on the site to

    the approval of the Engineer

    Total Carried To Collection 59,000.00

    1/25

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    26/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Supervision and Co-ordination of other works

    A The Contractor shall provide all necessary 1.00 Item 221,000.00

    superintendence during the execution of works and as

    long thereafter as Engineer may instruct as per

    specification.

    Clearing away Rubbish

    B Allow for clearing away rubbish at regular intervals 1.00 Item 25,000.00

    during the progress of the work and at the completion

    and for leaving the site and perimeter tidy at

    completion, to the satisfaction of the Engineer.

    Survey Equipment & Setting Out of works

    C The contractor shall be responsible for any 1.00 Item Included

    investigation and checking the accuracy of the existing

    ground and recording. The Contractor shall provide an

    adequate supply of surveying instruments for the

    proper execution of the works. The site setting out to be

    satisfaction of the Engineer

    Traffic Regulations / Temporary traffic arrangement

    D The Contractor is to observe all traffic regulations, 1.00 Item Included

    including those regarding the loading or unloading of

    or waiting by vehicles on the public highway and the

    Contract Sum is deemed to include for strict

    compliance therewith. All access roads are to be

    maintained clean at all times.

    Tests & Samples

    E The Contractor to allow for all tests required by the 1.00 Item 5,000.00

    Specification to be carried out including providing all

    necessary materials and samples. Duplicate final

    approved samples are to be provided for the Engineer,one for office use and one for site. Each sample to be

    properly labelled with the following details name,

    manufacturer's name, date of submission &

    specification reference

    Total Carried To Collection 251,000.00

    1/26

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    27/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Progress Photographs / monthly reports

    A The Contractor shall provide the Engineer each month 1.00 Item 7,000.00

    with thirty coloured photographs showing work in

    progress on the site from viewpoints selected by the

    Engineer. In addition one set in digital format and two

    copies of each progress photograph in post card size

    shall be provided with a description of the viewpoint

    and the sate of taking written or stamped in ink on the

    back. A copy of all the above photographs together

    with the negatives shall be forwarded to the Employer

    at the same time.

    Total Carried To Collection 7,000.00

    1/27

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    28/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 1 GENERAL REQUIREMENTS

    GENERAL REQUIREMENTS (Cont'd.)

    Collection

    From Page 1/1 -

    From Page 1/2 5,000.00

    From Page 1/3 134,500.00

    From Page 1/4 -

    From Page 1/5 91,500.00

    From Page 1/6 26,000.00

    From Page 1/7 -

    From Page 1/8 59,000.00

    From Page 1/9 251,000.00

    From Page 1/10 7,000.00

    Total Bill No.1- Carried To General Summary 574,000.00

    1/28

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    29/103

    EMSQUARE 3 No. B+G+1 VILLA

    CONTRACT BOQ PLOT NO. 323-45

    Item

    No.Description Qty Unit Rate Amount / Dhs

    SITE WORKS

    (Including Servant Block & Guard Room)

    A Site Cleaning including removal of vegetation,

    shrubs, bushes and surface excavation 1 LS 8,316.0

    EARTHWORK SUPPORT

    B Allow for earthwork earthwork support for

    excavation classified shoring design &

    construction to the satisfaction and approval of

    engineer. ( if any) EXCLUDED

    DE-WATERING

    C Design, supply & install and maintain dewatering

    system complete as per the approval and to the

    satisfaction of the engineer (if any) EXCLUDED

    EXCAVATION & EARTHWORKS

    Excavation in any type of a classified soil or hard

    strata as per the site levels and depth

    recommended on drawings and specification.

    D Mass Excavation up to required depth 3497 m3 22.00 76,934.0

    E Extra over excavation of additional thickening along

    retaining wall & footing 109 m3 22.00 2,398.0

    F Excavation for Ground floor footing 320 m3 22.00 7,040.0

    G Excavation for tie beam 25 m3 22.00 550.0

    DISPOSAL

    H Disposal of unsuitable excavated and other

    material from site as per engineers instruction 1 LS Include

    Total Carried To Collection 95,238.0

    Bill No. 2 SITE WORKS

    2/29

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    30/103

    EMSQUARE 3 No. B+G+1 VILLA

    CONTRACT BOQ PLOT NO. 323-45

    Item

    No.Description Qty Unit Rate Amount / Dhs

    Bill No. 2 SITE WORKS

    SITE WORKS (cont'd)

    ANTI TERMITE TREATMENT

    A Anti termite horizontally and vertically for

    foundations floors, joints and all structures

    which is in contact with soil shall be applied

    as per specification. 1 LS 5,895.0

    COMPACTION & BACKFILLING (IMPORTED MATERIAL)

    B Initial compaction of sub stratum to achieve

    minimum 95% of MDD maximum dry density at

    optimum moisture content, and back filling inlayers not more than 250mm thick with watering

    and compaction to attain a minimum 98% of the

    MDD at OMC , backfilling material should be

    imported back fill of approved quality and

    specification. (Subkha) 270 m3 70.00 18,900.0

    Total Carried To Collection 24,795.0

    2/30

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    31/103

    EMSQUARE 3 No. B+G+1 VILLA

    CONTRACT BOQ PLOT NO. 323-45

    Item

    No.Description Qty Unit Rate Amount / Dhs

    Bill No. 2 SITE WORKS

    SITE WORKS (cont'd)

    ADDITIONAL ITEMS

    The tenderer is to detail below any additional

    items with quantities and rates not previously

    included to complete the build up of lumpsum

    tender price for this section of the works. Should

    the tenderer fail to insert any items here, it will

    be deemed that his lumpsum price for the tender

    includes all items and no subsequent claim for

    any additional item will be entertained.

    Total Carried To Collection -

    2/31

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    32/103

    EMSQUARE 3 No. B+G+1 VILLA

    CONTRACT BOQ PLOT NO. 323-45

    Item

    No.Description Qty Unit Rate Amount / Dhs

    Bill No. 2 SITE WORKS

    SITE WORKS (Cont'd.)

    Collection

    From Page 2/1 95,238.0

    From Page 2/2 24,795.0

    From Page 2/3 -

    Total Bill No.2- Carried To Summary 120,033.0

    2/32

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    33/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    SUB STRUCTURE

    (Including Servant Block & Guard Room)

    All works shall be carried out as perspecifications and Drawings and to the

    approval and satisfaction of the Engineer

    CONCRETE

    Plain cement concrete of gradeSRC C20

    including all necessary form work complete as

    required

    A 75 mm thick below raft slab, ramp slab and footings. 1227 m2 50.00 61,350.00

    B 100 mm thick below tie beam and solid block work 65 m2 55.00 3,575.00

    Reinforced cement concrete compressive

    characteristic strength 40 N/mm2 of grade SRC

    including reinforcement & form work as per

    drawings & specification to the approval of

    Engineer

    C Raft Slab 97 m3 1,389.00 134,733.00

    D Column Footings (Additional thickening) 69 m3 1,389.00 95,841.00

    E Retaing wall Footing (Additional thickening) 120 m3 1,389.00 166,680.00

    F Stub columns 4 m3 1,469.00 5,876.00

    G Basement Column 15 m3 1,469.00 22,035.00

    H Ground Floor Footings 58 m3 1,332.00 77,256.00

    J In Ramp Slab 15 m3 1,389.00 20,835.00

    K Extra over thickening of grade slab (wall footing) 9 m3 1,332.00 11,988.00

    Total Carried To Collection 600,169.00

    Bill No. 3 SUB STRUCTURE

    3/33

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    34/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 3 SUB STRUCTURE

    SUB STRUCTURE (cont'd)

    Reinforced cement concrete compressivecharacteristic strength 40 N/mm2 of grade SRC

    including reinforcement & form work as per

    drawings & specification to the approval of

    Engineer

    A Basement Wall 134 m3 1,290.00 172,860.00

    B Tie Beams at Ground Floor level 24 m3 1,212.00 29,088.00

    C Grade slab 150mm thick 68 m3 805.00 54,740.00

    D Suspended slab 250mm thick 175 m3 1,159.00 202,825.00

    E Spiral stair case Base 3 m3 1,113.00 3,339.00

    Total Carried To Collection 462,852.00

    3/34

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    35/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 3 SUB STRUCTURE

    SUB STRUCTURE (cont'd)

    Thermal & Moisture protection

    A 1000 Gauge polythene sheet of approved 1745 m2 2.00 3,490.00

    quality, for PCC bedding in footing & Ground

    slab

    B 2 layer of 4mm thick approved water proofing 1268 m2 66.00 83,688.00

    membrane to foundations, beams & raft slab

    as per drawing and specification

    C Polystyrene 50mm thermal insulation 463 m2 19.00 8,797.00

    perimeter ground beam and retaing wall

    D Damp proof course as per drawings and 108 m2 7.00 756.00

    specification

    E Two coats of approved rubber base bitumen 930 m2 7.00 6,510.00

    paint for Tie beam block works

    F 50mm thick protection screed for Basement raft 624 m2 39.00 24,336.00

    slab and footings (horizontal)

    G Protection board to retaining wall vertical surface 644 m2 21.00 13,524.00

    H 12mm thick Flexcell board with joint filleraround the slab jointing. 1 LS 1,100.00 1,100.00

    Masnory works

    J 200mm thick block wall below the tie beam 144 m2 77.00 11,088.00

    Total Carried To Collection 153,289.00

    3/35

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    36/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 3 SUB STRUCTURE

    SUB STRUCTURE (cont'd)

    ADDITIONAL ITEMS

    The tenderer is to detail below any

    additional items with quantities and rates not

    previously included to complete the build

    up of lumpsum tender price for this section

    of the works. Should the tenderer fail to

    insert any items here, it will be deemed that

    his lumpsum price for the tender includes all

    items and no subsequent claim for any

    additional item will be entertained.

    A Pvc water stop 174 m 242.00 42,108.00

    Total Carried To Collection 42,108.00

    3/36

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    37/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 3 SUB STRUCTURE

    SUB STRUCTURE (cont'd)

    Collection

    From Page 3/1 600,169.00

    From Page 3/2 462,852.00

    From Page 3/3 153,289.00

    From Page 3/4 42,108.00

    Total Bill No. 3- Carried to Summary 1,258,418.00

    3/37

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    38/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    SUPER STRUCTURE

    (Including Servant Block & Guard Rooms)

    Reinforced cement concrete compressive

    characteristic strength 40 N/mm2 with of grade

    OPC type II with necessary Approved

    plasticizer and admixture. Cost inclusive of

    Necessary form work, Reinforcement as per

    the drawings, specifications. etc complete.

    The reinforcement shall comply with relevant

    British Standards.

    A Columns (GF,FF & Roof) 70 m3 1,658.00 116,060.00

    B Beams (GF,FF & Roof) 66 m3 1,400.00 92,400.00

    C 250mm thick Suspended slabs (GF,FF & Roof) 545 m3 1,092.00 595,140.00

    (Including 200mm & 140mm thk)

    D Staircase 25 m3 1,323.00 33,075.00

    E Parapets & Upstands 66 m3 1,439.00 94,974.00

    F Equipment bases 2 m3 1,100.00 2,200.00

    Total Carried To Collection 933,849.00

    Bill No. 4 SUPER STRUCTURE

    4/38

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    39/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 4 SUPER STRUCTURE

    SUPER STRUCTURE (cont'd)

    BLOCK WORK

    Block work shall be with complete accessories

    like Expanded mesh, wall ties, reinforcement

    bars, head restraints, joints, stiffener columns

    and beams etc as per the specifications,

    drawings to engineer's approval, the works

    Shall be protected from rapid drying by

    Approved means. also the blocks shall be

    comply with the B.S.

    External

    A 350mm thick insulated block work 1394 m2 127.00 177,038.00

    (Cavity wall 200mm solid + 50mm

    insulation+100mm solid)

    Internal

    B 200mm thick Solid block work 2298 m2 88.00 202,224.00

    C 100mm thick Solid block work 232 m2 77.00 17,864.00

    Lintel

    D Lintel to the window opening 1 LS 5,500.00 5,500.00

    Total Carried To Collection 402,626.00

    4/39

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    40/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 4 SUPER STRUCTURE

    SUPER STRUCTURE (cont'd)

    ADDITIONAL ITEMS

    The tenderer is to detail below any

    additional items with quantities and rates not

    previously included to complete the build

    up of lumpsum tender price for this section

    of the works. Should the tenderer fail to

    insert any items here, it will be deemed that

    his lumpsum price for the tender includes all

    items and no subsequent claim for any

    additional item will be entertained.

    A Core wall 46 m3 1,131.00 52,026.00

    Total Carried To Collection 52,026.00

    4/40

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    41/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 4 SUPER STRUCTURE

    SUPERSTRUCTURE (cont'd)

    Collection

    From Page 4/1 933,849.00

    From Page 4/2 402,626.00

    From Page 4/3 52,026.00

    Total Bill No. 4- Carried to Summary 1,388,501.00

    4/41

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    42/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    I tem

    No .Desc r ip t ion Qty Un it Rate Amoun t / Dhs.

    THERMAL & MOISTURE PROTECTION

    (Including Servant Block & Guard Room)

    Roofing & Moisture protection

    The Water proofing work shall be carried out By a

    Professional agency. The system and Material shall be tothe approval of the engineer as per drawing and

    specification. Main and subcontractor shall provide

    10years Guarantee against any leakage or Dampness of

    the structure.

    Roofing

    A Flat roof water proofing system as shown in the drawing 1043 m2 94.00 98,042.00

    and specification etc., complete including below roof clay

    tiles

    B 600 x 600 x 50mm reinforced concrete tiles with sulphate

    resisting additives and chamfered top edges laid loose 1043 m2 39.00 40,677.00

    C Extra over for Rainwater outlets 1.00 LS 2,750.00 2,750.00

    Moisture Protection

    D 50mm thick polystyrene insulation at exposed

    concrete surface and connecting area of Masnory and

    concrete as per drawings and specification 1 LS 16,500.00 16,500.00

    Wet Area Waterproofing

    Supply and Apply, liquid applied polyurethane rubber

    waterproofing as per drawing and specifications etc

    complete.

    E Floor 346 m2 28.00 9,688.00

    F To Walls 442 m 28.00 12,376.00

    Sundries

    G Planter wall water proofing as per 40 m2 33.00 1,320.00

    Drawing & specification

    Total Carried To Collection 181,353.00

    Bill No. 5 THERMAL & MOISTURE PROTECTION

    5/42

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    43/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    I tem

    No .Desc r ip t ion Qty Un it Rate Amoun t / Dhs.

    Bill No. 5 THERMAL & MOISTURE PROTECTION

    THERMAL & MOISTURE PROTECTION (Cont'd )

    ADDITIONAL ITEMS

    The tenderer is to detail below any additional items with

    quantities and rates not previously included to complete

    the build up of lumpsum tender price for this section of the

    works. Should the tenderer fail to insert any items here, it

    will be deemed that his lumpsum price for the tender

    includes all items and no subsequent claim for any

    additional item will be entertained.

    A Waterproofing to upstands / Parapets 509 m 39.00 19,851.00

    B Skirting to upstands /Parapets 509 m 22.00 11,198.00

    Total Carried To Collection 31,049.00

    5/43

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    44/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    I tem

    No .Desc r ip t ion Qty Un it Rate Amoun t / Dhs.

    Bill No. 5 THERMAL & MOISTURE PROTECTION

    THERMAL & MOISTURE PROTECTION (Cont'd )

    Collection

    From page 5/1 181,353.00

    From page 5/2 31,049.00

    Total Bill No.5- Carried to Summary 212,402.00

    5/44

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    45/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    METAL WORKS

    (Including Servant Block & Guard Room)

    ALUMINIUM DOORS AND WINDOWS

    Supply & Installation of complete Aluminium and glazing

    works including all accessories, fittings, hardware,

    architraves and ironmongery, signage , all as per the

    drawings, specifications and to the approval of Engineer.

    A Double Leaf - W/01

    size 1700x2220 mm high 2 No. 4,015.00 8,030.00

    B Full height fixed with Automatic Sliding Door

    Size (3167+1415+5830+3000+1790) 2220mm high

    Door Size-3000x2220mm high (Automatic) W/02 1 No. 40,673.00 40,673.00

    C Fixed Panel with Automatic sliding Door

    Size 6700x2220 mm high

    Door Size-3000x2220mm high (Automatic) W/03 1 No. 24,173.00 24,173.00

    D Double leaf Swing Door-W/05

    Size 2000x2200 high (o/A size-2000x2800mm (h)) 1 No. 5,467.00 5,467.00

    E Fixed Panel with sliding Door

    O/A Size 4000x2700 mm high - W/10

    Door Size-2000x2200mm high 2 No. 6,798.00 13,596.00

    F Fixed panel with 2 nos Sliding Door

    O/A Size 5400x2800 - W/14

    Door Size 1700x2200mm high- 2 Nos. 2 No. 9,416.00 18,832.00

    G Top Fixed Panel with sliding Door

    O/A Size 2600x2800 mm high - W/15

    Door Size-2600x2200mm high 1 No. 3,894.00 3,894.00

    H Top Fixed Panel with sliding Door

    O/A Size 2400x2800 mm high - W/16

    Door Size-2400x2200mm high 1 No. 3,691.00 3,691.00

    J Top Fixed Panel with sliding Door

    O/A Size 3000x2800 mm high - W/18

    Door Size-3000x2200mm high 1 No. 2,849.00 2,849.00

    Total Carried To Collection 121,205.00

    Bill No. 6 METAL WORKS

    6/45

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    46/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ALUMINIUM DOORS AND WINDOWS (Cont'd).

    Supply & Installation of complete Aluminium and glazing

    works including all accessories, fittings, hardware,

    architraves and ironmongery, signage , all as per the

    drawings, specifications and to the approval of Engineer.

    A Top Fixed Panel with sliding Door

    O/A Size 1450x2800 mm high - W/19

    Door Size-1450x2200mm high 1 No. 2,486.00 2,486.00

    B Top Fixed Panel with sliding DoorO/A Size 3900x2800 mm high - W/20

    Door Size-3900x2200mm high 2 No. 5,885.00 11,770.00

    C Top Fixed Panel with sliding Door

    O/A Size 2200x2800 mm high - W/22

    Door Size-2200x2200mm high 2 No. 3,652.00 7,304.00

    D Top Fixed Panel with sliding Door

    O/A Size 2200x2500 mm high - W/23

    Door Size-2200x2050mm high 2 No. 3,278.00 6,556.00

    E Top Fixed Panel with sliding Door

    O/A Size 2700x2800 mm high - W/26

    Door Size-2200x2200mm high 1 No. 4,081.00 4,081.00

    F Top Fixed Panel with Single leaf swing Door

    O/A Size 1000x2800 mm high - W/06C

    Door Size-1000x2200mm high 5 No. 1,914.00 9,570.00

    G Top Fixed Panel with Sliding Door

    O/A Size 1600x2800 mm high - W/31

    Door Size-1600x2200mm high 2 No. 2,662.00 5,324.00

    H Top Fixed Panel with Sliding Door

    O/A Size 1750x2800 mm high - W/32Door Size-1750x2200mm high 4 No. 2,783.00 11,132.00

    J Top Fixed Panel with Sliding Door

    O/A Size 3600x2800 mm high - W/21A

    Door Size-3600x2200mm high 2 No. 4,477.00 8,954.00

    Total Carried To Collection 67,177.00

    6/46

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    47/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ALUMINIUM DOORS AND WINDOWS (Cont'd).

    Supply & Installation of complete Aluminium and glazing

    works including all accessories, fittings, hardware,

    architraves and ironmongery, signage , all as per the

    drawings, specifications and to the approval of Engineer.

    A Window W/04

    Size 5000x400mmhigh 2 No. 1,397.00 2,794.00

    B Window W/06

    Size 1000x2700mmhigh 13 No. 1,188.00 15,444.00

    C Window W/07

    Size 1200x2700mmhigh 12 No. 2,063.00 24,756.00

    D Window W/07A

    Size 1200x2800mmhigh 4 No. 2,063.00 8,252.00

    E Window W/08

    Size 1500x2700mmhigh 4 No. 1,562.00 6,248.00

    F Window W/09

    Size 1200x1800mmhigh 6 No. 1,562.00 9,372.00

    G Window W/10

    Size 1500x2700mmhigh 2 No. 6,798.00 13,596.00

    H Window W/11

    Size 1500x2700mmhigh 7 No. 2,541.00 17,787.00

    J Window W/12

    Size 950x2700mmhigh 5 No. 1,925.00 9,625.00

    K Window W/13

    Size 1800x2700mmhigh 7 No. 2,750.00 19,250.00

    Total Carried To Collection 127,124.00

    6/47

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    48/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ALUMINIUM DOORS AND WINDOWS (Cont'd).

    Supply & Installation of complete Aluminium and glazing

    works including all accessories, fittings, hardware,

    architraves and ironmongery, signage , all as per the

    drawings, specifications and to the approval of Engineer.

    A Window W/17

    Size 800x1800mmhigh 3 No. 1,155.00 3,465.00

    B Window W/21Size 3000x2700mmhigh 4 No. 4,978.00 19,912.00

    C Window W/25

    Size 5000x1800mmhigh 1 No. 5,324.00 5,324.00

    D Window W/07B

    Size 950x2700mmhigh 1 No. 1,782.00 1,782.00

    E Window W/27

    Size 2200x2800mmhigh(Fixed) 1 No. 2,409.00 2,409.00

    F Window W/28

    Size 3100x2700mmhigh 2 No. 4,422.00 8,844.00

    G Window W/29

    Size 3300x2700mmhigh 2 No. 4,703.00 9,406.00

    H Window W/30

    Size 3800x2700mmhigh 2 No. 5,357.00 10,714.00

    J Window W/11F

    Size 3800x2700mmhigh 2 No.2,519.00 5,038.00

    Total Carried To Collection 66,894.00

    6/48

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    49/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ALUMINIUM DOORS AND WINDOWS (Cont'd).

    Supply & Installation of complete Aluminium and glazing

    works including all accessories, fittings, hardware,

    architraves and ironmongery, signage , all as per the

    drawings, specifications and to the approval of Engineer.

    A Window W/06B

    Size 1000x1900mmhigh 8 No. 908.00 7,264.00

    B Window W/022A

    2200x2700mm high 4 No. 3,658.00 14,632.00

    C Window W/07FW

    Size 1200x1900mmhigh 2 No. 1,056.00 2,112.00

    D Window W/08FW

    Size 1500x1900mmhigh 1 No. 1,254.00 1,254.00

    E Window W/08B

    Size 1600x1800mm high 1 No. 1,898.00 1,898.00

    F Window W/08C

    Size 1150x1800mmhigh 3 No. 1,513.00 4,539.00

    G Window W/07C

    Size 1200x2200mmhigh 2 No. 1,826.00 3,652.00

    H Window W/08D

    Size 1500x2200mm high 1 No. 2,013.00 2,013.00

    J Window W/08E

    Size 1200x1800mmhigh 5 No. 1,562.00 7,810.00

    K Window W/06FW

    Size 1000x2700mmhigh 2 No. 1,463.00 2,926.00

    L Window W24,

    Size 2250x2700mmhigh 1 No. 2,673.00 2,673.00

    Total Carried To Collection 50,773.00

    6/49

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    50/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ALUMINIUM DOORS AND WINDOWS (Cont'd).

    Supplying & Fixing of Powder coated Aluminium

    heavy duty lower panels and framed panel as per

    the drawing.

    A AL-01 Size; 4800x2100mm high 1 No. 10,175.00 10,175.00

    B AL-02 Size; 4100x2100mm high 1 No. 9,548.00 9,548.00

    C AL-03 Size; 2750x2100mm high 1 No. 5,115.00 5,115.00

    D AL-04 Size; 1600x1400mm high 2 No. 2,079.00 4,158.00

    Wrought Iron Hand railing

    Supplying & Fixing of floor mounted wrought iron

    railing/balustrade as per drawing

    (PC supply and fix rate Dhs. 1500/- per Rm)

    E Stair Case Railing (Including Skylight void railing) 115 m EXCLUDED

    F Balcony Railing 166 m 1,650.00 273,900.00

    G Roof Railing 74 m 1,650.00 122,100.00

    G.I Railing

    H Supply and fix 60mm dia GI pipe railing, painted finish in 8 m 660.00 5,280.00

    roof

    Spiral StaircaseJ 02 No of Supply & installation of Galvanised steel spiral

    stair case as per the drawing - Provisional Sum -

    Dhs.22,000.00 Including 10% Overheads & Profit.1 PS 22,000.00

    Total Carried To Collection 452,276.00

    6/50

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    51/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    Steel Doors

    Supply & fixing of fire resistance, smoke proof &

    self closing steel door with stell fame and 6mm

    thick wired glass panel as per drawing.

    A SD1a-1000x2200mm 4 No. 3,080.00 12,320.00

    B SD1b-1100x2200mm 7 No. 3,520.00 24,640.00

    C SD2-1000x2200mm 8 No. 3,300.00 26,400.00

    D SD3-2000x2200mm 1 No. 6,820.00 6,820.00

    Miscellaneous

    E Supplying & Fixing of 38mm thick Galvanized steel cat

    ladder as per the drawings 3 No. 3,025.00 9,075.00

    F Supply and installation of Double glazed sky Refer Prov. Sum

    light as per drawings

    G Supply and fix MS epoxy painted access platform in OTS Not Applicable

    H Supply and fix security grills for windows around OTS Not Applicable

    J Supply and fix wrought iron grill to basement window 11 m 770.00 8,470.00

    (PC supply and fix rate Dhs. 700/- per Rm)

    Total Carried To Collection 87,725.00

    6/51

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    52/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    ADDITIONAL ITEMS

    The tenderer is to detail below any additional items with

    quantities and rates not previously included to complete

    the build up of lumpsum tender price for this section of

    the works. Should the tenderer fail to insert any items

    here, it will be deemed that his lumpsum price for the

    tender includes all items and no subsequent claim for any

    additional item will be entertained.

    Servant Block & Guard Room

    A W/34 1 No. 2,057.00 2,057.00

    B W35 6 No. 479.00 2,874.00

    C W36 2 No. 1,403.00 2,806.00

    D W37 2 No. 1,056.00 2,112.00

    Total Carried To Collection 9,849.00

    6/52

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    53/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 6 METAL WORKS

    METAL WORKS (Cont'd).

    Collection

    From Page 6/1 121,205.00

    From Page 6/2 67,177.00

    From Page 6/3 127,124.00

    From Page 6/4 66,894.00

    From Page 6/5 50,773.00

    From Page 6/6 452,276.00

    From Page 6/7 87,725.00

    From Page 6/8 9,849.00

    Total Bill No. 6- Carried To Summary 983,023.00

    6/53

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    54/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    WOODEN & JOINERY WORKS

    (Including Servant Block & Guard Room)

    Supply and fixing of 45mm thick semi solid wooden

    door frame with flush shutter including all necessaryhardware, ironmongery, HW lippings, Architraves,

    signage, sub frames, fire rating with appropriate

    smoke seal & intumescent strips to door and meranti

    finish/ polished/ painted/ Laminated as specified and

    shown in the drawing's and specification, engineers

    approval complete. All fire proofing shall be as per

    the ID details/ civil defence /authority requirements

    A 45mm thick semi solid core single leaf flush door with cherry

    wood in laqured finish frames and Architraves as per

    eng approval (Shutter External - Cherry wood finish.

    Internal Cherry Wood Stained/polished finish)

    (PC Rate Dhs. 3000/No)

    D4-800x2200mm high 26 No. - -

    D5-900x2200mm high 7 No. - -

    D6-1000x2200mm high 19 No. - -

    D7-600x2200mm high 4 No. - -

    B 45mm thick semi solid core flush double leaf door with

    cherry wood in laqured finish frames and Architraves with

    6mm thick wire transon glass panel and fixed glass at the top

    as per eng approval (Shutter External - Cherry wood finish.

    Internal Cherry Wood Stained/polished finish)

    (PC Supply and Fix Rate Dhs. 4000/No)

    D3-1550x2200mm high - nil

    D8-1000x2200mm high 5 No.- -D10-1100x2800mm high 2 No. - -

    EXCLUDED

    C 45mm thick semi solid core flush double leaf door with cherry

    wood in laqured finish frames and Architraves as per eng

    approval (Shutter External - Cherry wood finish. Internal Cherry

    Wood Stained/polished finish)

    (PC Supply and Fix Rate Dhs. 4000/No)

    D9-1700x2200mm high 1 No. - -

    D 54 mm thick solid core fire rated flush door with intumesent

    sealing strips round, frames and Architraves as per eng approval

    (Shutter External - Cherry wood finish. Internal Cherry Wood

    Stained/polished finish) as per the drawing(PC Supply and Fix Rate Dhs. 5000/No)

    D2-1300x2200mm high 4 No. - -

    Total Carried To Collection -

    Bill No. 7 WOODEN & JOINERY WORKS

    7/54

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    55/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 7 WOODEN & JOINERY WORKS

    WOOD WORKS & JOINERY (cont'd)

    WARDROBES

    Supply and install wardrobes with all accessories as per

    drawing & specification

    A Wooden Wardrobes 106 m - -

    (PC Supply and Fix Rate Dhs.1500/m)

    VANITY CABINETS

    Supply and Install vanity cabinets with Marble Top as

    per Drawing & specification

    B Vanity Counter with marble Top 29 m - -(PC Supply and Fix Rate Dhs.2000/m)

    SHELVES

    EXCLUDED

    Supplying and fixing of shelves As per Drawing & specification

    C Shelves for Store (Villa 2) 9 m - -

    D Shelves for Store (Villa 3) 5 m - -

    E Shelves for Library (Villa 2) 6 m - -

    TIMBER PERGOLA

    F Supply and fixing of hardwood pergola in balcony/terraces 9 m2 - -

    (PC Supply and Fix Rate Dhs.1000/m2)

    Total Carried To Collection -

    7/55

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    56/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 7 WOODEN & JOINERY WORKS

    WOODEN & JOINERY WORKS (Cont'd.)

    ADDITIONAL ITEMS

    The tenderer is to detail below any additional items with

    quantities and rates not previously included to complete the

    build up of lumpsum tender price for this section of the works.

    Should the tenderer fail to insert any items here, it will be

    deemed that his lumpsum price for the tender includes all

    items and no subsequent claim for any additional item will be

    entertained.

    Total Carried To Collection -

    7/56

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    57/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 7 WOODEN & JOINERY WORKS

    WOODEN & JOINERY WORKS (Cont'd.)

    Collection

    From Page 7/1 -

    From Page 7/2 -

    From Page 7/3

    Total Bill No. 7- Carried To Summary -

    7/57

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    58/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    FINISHES(Including Servant Block & Guard Room)

    All the finishing items shall be as per theschedule of finishes. The floor and wall tiles

    Shall be fixed using approved epoxy adhesive

    and epoxy grout Colour matching to the tiles,

    and to approval. All the curved joint shall be

    cut with water jet cutting as per drawing and

    specification. (The material and workmanship

    shall be to the approval of The engineer.)

    INTERNAL

    Floor Finishes

    A Powder Floated Epoxy paint finish with sand

    granulated texture floor finish 90 m2 - -

    B Powder Floated concrete with Epoxy paint 280 m2 - -

    C 50mm thick screed with hardner smooth finish 84 m2 - -

    D1 300x300mm 'Graniti tiles' 180 m2 - -

    PC Supply Rate Dhs.75/m2

    D2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 180 m2 - -EXCLUDED

    D3 Main Contractors OHP percentage on D1 & D2 10% % - -

    E1 300x300mm non-slip ceramic tile finish with cemnt

    sand screed (O/A 50mm thick) 132 m2 - -PC Supply Rate Dhs.45/m2

    E2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 132 m2 - -

    E3 Main Contractors OHP percentage on E1 & E2 10% % - -

    Total Carried To Collection

    Bill No. 8 FINISHES

    8/58

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    59/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Floor Finishes (Cont'd).

    A Supply and fix 60mm thick interlock paving tiles on

    cement bed (Basement); colour to approval 111 m2 72.00 7,992.00

    B1 Cut to size polished granite to approved pattern 678 m2 - -PC Supply Rate Dhs.500/m2

    B2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 678 m2 - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    EXCLUDED

    C1 300x300 Granite tile 53 m2 - -PC Supply Rate Dhs.200/m2

    C2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 53 m2 - -

    C3 Main Contractors OHP percentage on C1 & C2 10% % - -

    Total Carried To Collection 7,992.00

    8/59

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    60/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Floor Finishes (Cont'd).

    A1 Fully Vitrified porcelain tiles with to approved 295 m2 - -pattern

    PC Supply Rate Dhs.75/m2

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 295 m2 - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    B1 Non - slip ceramic tiles 93 m2 - -PC Supply Rate Dhs.45/m2

    B2 Main Contractors rate for fixing with all items EXCLUDED

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 93 m2 - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    C1 Non-slip fully Vitrified porcelain ti les 142 m2 - -PC Supply Rate Dhs.75/m2

    C2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 142 m2 - -

    C3 Main Contractors OHP percentage on C1 & C2 10% % - -

    Total Carried To Collection

    8/60

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    61/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Floor Finishes (Cont'd).

    A1 Non-slipCeramic floor tile 53 m2 - -PC Supply Rate Dhs.25/m2

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 53 m2 - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    Non-Slip Procelain tiles Tread & riser with, cement

    sand screed for staircase steps 300mm tread & EXCLUDED

    180mm rise

    B1 Main Stair Case 326 m - -PC Supply Rate Dhs.75/m

    B2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed (O/A 50mm thick)- and wastage factor 326 m - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    C1 Service Stair Case Not ApplicablePC Supply Rate Dhs.65/m

    C2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed Not Applicable

    C3 Main Contractors OHP percentage on C1 & C2 10% Not Applicable

    Non-Slip Procelain tiles for stair case landing with,

    cement sand screed

    D1 Main Staircase 38 m2 - -PC Supply Rate Dhs.50/m2

    D2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand EXCLUDED

    Screed (O/A 50mm thick)- and wastage factor 38 m2 - -

    D3 Main Contractors OHP percentage on D1 & D2 10% % - -

    Total Carried To Collection

    8/61

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    62/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    A1 Service Staircase Not ApplicablePC Supply Rate Dhs.45/m2

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed Not Applicable

    A3 Main Contractors OHP percentage on A1 & A2 10% Not Applicable

    B1 Supply and fixing of high pressurised Laminate

    flooring with necessary under lay as per drawing

    and specfication 523 m2 - -(PC Supply and Fix rate Dhs.100/m2) - Including

    wastage

    B2 Main Contractors OHP percentage on B1 10% % - -

    Skirting

    D 100mm high epoxy paint 70 m - EXCLUDED

    D1 Procelain tile skirting match to the floor 314 m - -(PC Supply Rate Dhs. 15/Rm)

    D2 Main Contractors rate for fixing with all items

    necessary for fixing, etc Including Cement

    mortar/glue and wastage factor 314 m- -

    D3 Main Contractors OHP percentage on D1 & D2 10% % - -

    Total Carried To Collection

    8/62

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    63/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Skirting (Cont'd)

    A1 100mm high Granite Skirting 399 m - -(PC Supply Rate Dhs. 20/Rm)

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc Including Cement

    mortar/glue and wastage factor 399 m - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    B1 100mm high Ceramic tile Skirting 144 m - -(PC Supply Rate Dhs. 10/Rm)

    B2 Main Contractors rate for fixing with all itemsnecessary for fixing, etc Including Cement

    mortar/glue and wastage factor 144 m - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    C1 100mm high ceramic tile skirting for Stair case 145 m - -(Main Staircase - PC Supply Rate Dhs. 15/Rm)

    C2 Main Contractors rate for fixing with all items EXCLUDED

    necessary for fixing, etc Including Cement

    mortar/glue and wastage factor 145 m - -

    C3 Main Contractors OHP percentage on C1 & C2 10% % - -

    D1 Ceramic tile skirting to Toilet 326 m - -(PC Supply Rate Dhs. 15/Rm)

    D2 Main Contractors rate for fixing with all items

    necessary for fixing, etc Including Cement

    mortar/glue and wastage factor 326 m - -

    D3 Main Contractors OHP percentage on D1 & D2 10% % - -

    E1 100mm high pressurised laminate skirting to 400 m - -match floor(PC Supply Rate Dhs. 50/Rm)

    E2 Main Contractors rate for fixing with all items

    necessary for fixing, etc. including wastage factor 400 m - -

    E3 Main Contractors OHP percentage on E1 & E2 10% % - -

    Total Carried To Collection

    8/63

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    64/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Threshold

    A1 350mm wide threshold for doors as per site 30 m - -measurement (PC Supply rate = Dhs. 150/M)

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc Including Cement

    mortar/glue 30 m - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    B1 200mm wide threshold for doors as per site 87 m - -measurement(PC Supply rate = AED 50/M)

    B2 Main Contractors rate for fixing with all items

    necessary for fixing, etc Including Cement EXCLUDED

    mortar/glue 87 m - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    C1 100mm wide threshold for doors as per site 3 m - -measurement(PC Supply rate = AED 50/M)

    C2 Main Contractors rate for all items necessary

    For fixing, etc as described in preambles 3 m - -

    C3 Main Contractors OHP percentage on C1 & C2

    10% % - -

    Total Carried To Collection

    8/64

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    65/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Wall Finishes

    Plastering for the walls shall be including all

    accessories as per drawings / specifications

    The spills shall be cleaned and touch up shall

    be done wherever required.

    A 12mm thick Internal wall plastering 6440 m2 31.00 199,640.00

    B Emulsion Painting 1 coat Primer only for the plastered 4729 m2 3.00 14,187.00

    C Epoxy Coating System1 coat primer only 275 m2 3.00 825.00

    D Oil Paint System1 coat primer only 500 m2 3.00 1,500.00

    E 20mm thick render with matt finish sandtec or 80 m2 33.00 2,640.00

    approved similar

    Porcelain tile / Ceramic tiles / Glossy-Ceramic

    Tiles/ Vitrified Ceramic tile / Marble stone

    wall finishes laying to pattern as per drawing

    & specification, including back ground

    Plaster & adhesives/glue, grouting to approval

    of the Engineer;

    F1 300x300-Glazed ceramic tiles 977 m2 - -

    PC Suply Rate Dhs 30/m2

    F2 Main Contractors rate for fixing with all items EXCLUDED

    necessary For fixing, etc 977 m2 - -Including background plaster

    F3 Main Contractors OHP percentage on F1 & F2 10% % - -

    Total Carried To Collection 218,792.00

    8/65

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    66/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Ceiling finishes

    A 12mm thick Ceiling Plaster 556 m2 - EXCLUDED

    B Complete false ceiling with bulkhead, Cove Refer Provisional Sum

    light, Cornice and curtain box detail

    C Epoxy Paint on Plaster 280 m2 - EXCLUDED

    D Oil Paint on Plaster 179 m2 - EXCLUDED

    E Emulsion Paint on plaster 97 m2 - EXCLUDED

    Total Carried To Collection

    8/66

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    67/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    ACCESSORIES

    Sanitary Fittings

    Supply & Install the following Sanitarywares &

    accessories Complete with Fittings , Taps &

    Mixers, Traps And accessories as per drawing &

    specification

    A1 Bathroom Set (Master bathroom & Secondary 13 Sets - -

    Bedroom Bathroom) including mirrors

    PC Rate.Dhs.7000/Each set

    A2 Main Contractors rate for all items necessary

    For fixing, etc as described in preambles 13 Set - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    B1 Toilets including mirrors 16 No - -

    PC Rate.Dhs.5000/Each Toilet

    B2 Main Contractors rate for all items necessary

    For fixing, etc as described in preambles 16 No - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    EXCLUDED

    C1 Toilet Maid Room including mirrors 5 No - -

    PC Rate.Dhs.1500/Each Toilet

    C2 Main Contractors rate for all items necessary

    For fixing, etc as described in preambles 5 No - -

    C3 Main Contractors OHP percentage on C1 & C2 10% % - -

    D1 Jacuzzi with necessary mixer (Master Bathroom 3 Set - -

    Villa 1,2&3)

    PC Rate Dhs.10,000/set

    D2 Main Contractors rate for all items necessary 3 Set - -

    For fixing, etc as described in preambles

    D3 Main Contractors OHP percentage on D1 & D2 10% % - -

    Total Carried To Collection

    8/67

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    68/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    INTERNAL FINISHES (Cont'd)

    Accessories (Cont'd)

    Sundries

    A Supply and fix corner gaurds, wall guard as per DM

    requirement to basement parking 12 No - -

    B Floor marking to basement parking 1 LS - -

    C Concave mirrors as per requirement for basement 2 Nos - -

    parking

    D Internal signage on staircase doors, landing, 1 LS - EXCLUDEDcorridor, service room etc., as per civil

    Defence/DEWA requirement

    E Garbage Container as per DM requirement 1 LS - -

    F MR Gypsum board ducts for vertical down take pipe. 1 LS - -

    Total Carried To Collection

    8/68

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    69/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    FINISHES (Cont'd)

    EXTERNAL

    External Entrance Finishes

    A1 Supply and fix of granite bushed hammer finish for

    external entrance Ramps 8 m2 - -

    PC Supply Rate Dhs.200/m2

    A2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed 8 m2 - -

    A3 Main Contractors OHP percentage on A1 & A2 10% % - -

    B1 Supply and fix of Polished granite finish for EXCLUDED

    external steps tread & riser 67 m - -

    PC Supply Rate Dhs.300/m

    B2 Main Contractors rate for fixing with all items

    necessary for fixing, etc including Cement Sand

    Screed 67 m - -

    B3 Main Contractors OHP percentage on B1 & B2 10% % - -

    External wall Finishes

    C 20mm thick cement & sand render with

    paint finish. 3075 m2 55.00 169,125.00

    D1 Natural Stone Cladding to the wall 178 m2 200.00 35,600.00

    PC Supply Rate.Dhs.200/m2

    D2 Main Contractors rate for fixing with all items

    necessary For fixing, etc 178 m2 170.00 30,260.00

    D3 Main Contractors OHP percentage on D1 & D2 10% % 65,860.00 6,586.00

    E 50mm Depth Punch Hole Groove in Plaster wall as Included

    per Drawing & Specification

    F Heavy Texture 4 coats solvent based epoxy paint 3075 m2 39.00 119,925.00

    system for all exposed surface

    G Extra over for Grooves in Plaster with 12mm wide x

    10mm deep aluminium channel 1 LS 27,500.00 27,500.00

    Total Carried To Collection 388,996.00

    8/69

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    70/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    EXTERNAL FINISHES (Cont'd)

    EXTERNAL (Cont'd)

    A Supply and install 60mm thick inter lock paver with Refer Provisional Sum

    all necessary base and kerb stone as per the

    drawings

    Pitched Roof

    B1 Clay roof tiles red colour including Eaves, Ridges 135 m2 55.00 7,425.00

    (PC Supply Rate Dhs.55/m2)

    B2 Main Contractors rate for all items necessary 135 m2 100.00 13,500.00For fixing, etc

    B3 Main Contractors OHP percentage on B1 & B2 10% % 20,925.00 2,093.00

    GRC WORKS

    C Supply & Fixing GRC Elements as per drawing and Refer Provisional Sum

    specification.

    Total Carried To Collection 23,018.00

    8/70

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    71/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    EXTERNAL FINISHES (Cont'd)

    ADDITIONAL ITEMS

    The tenderer is to detail below any

    additional items with quantities and rates not

    previously included to complete the build

    up of lumpsum tender price for this section

    of the works. Should the tenderer fail to

    insert any items here, it will be deemed that

    his lumpsum price for the tender includes all

    items and no subsequent claim for any

    additional item will be entertained.

    Finishes to Ponds / Fountain

    A Mosaic tile for ponds/Fountains By Client

    B Mosaic skirting for ponds & fountain By Client

    C WC back wall top as per drawings 1 LS - -

    Total Carried To Collection

    8/71

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    72/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    EXTERNAL FINISHES (Cont'd)

    Collection

    From Page 8/1

    From Page 8/2 7,992.00

    From Page 8/3

    From Page 8/4

    From Page 8/5

    From Page 8/6

    From Page 8/7

    From Page 8/8 218,792.00

    From Page 8/9

    Total Carried To Page 8/15 226,784.00

    8/72

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    73/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 8 FINISHES

    EXTERNAL FINISHES (Cont'd)

    Collection

    From Page 8/15 (B/F) 226,784.00

    From Page 8/10

    From Page 8/11

    From Page 8/12 388,996.00

    From Page 8/13 23,018.00

    From Page 8/14

    Total Bill No. 8- Carried To Summary 638,798.00

    8/73

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    74/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    WATER SUPPLY WORKS

    A Supply & installation of pumps complete with

    accessories ,pressure vessel ,valves, strainers,

    controls, electrical panels, vibration isolators

    as per drawings and specifications 1 LS 242,000.00 242,000.00

    B Supply & installation of water tank complete with

    accessories,valves,vent ,drain,supports,controls,

    float valves as per drawings and specification

    C Supply & installation of water supply pipe

    works with fitting, accessories, supports,

    sleeves as per drawings and specification

    D Supply & installation of water supply

    accessories with fitting, accessories ,sleeves as

    per drawings and specification

    E Supply & installation electric water heaters

    complete with accessories,controls,supports,

    drain piping as per drawings and

    specification

    Included in above Item-A

    F Identification ,protective painting ,labeling

    G Testing and commissioning

    H Builders works during execution of the works

    J Allow for providing shopdrawings, co-ordination

    and as-built drawings

    K Allow for instructing selected employer's

    personnel on all aspects of the operation of

    systems and equipment

    L Allow for the provision of operation and

    maintenance manuals

    Total Carried To Collection 242,000.00

    Bill No. 9 WATER SUPPLY WORKS

    9/74

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    75/103

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    WATER SUPPLY (Cont'd)

    EXTERNAL WORKS

    Supply & installation of external water supply pipe

    works from water meter cabinet to villa with fitting,

    accessories, supports, sleeves as per drawings and

    specification

    A Main water meter connection with accessories, Included in above Item-A, Page 9/1

    valves, meter cabinet (meter by DEWA)

    B ADDITIONAL ITEMS

    The tenderer is to detail below any additional

    Items with quantities and rates not previously

    included to complete the build up of the lump

    sum tender price for this section of the works.

    Should the tenderer fail to insert any items here,

    it will be deemed that his lump sum price for

    the tender includes all items and no subsequent

    claim for additional item will be entertained.

    Total Carried To Collection

    9/75

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    76/103

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    WATER SUPPLY WORKS (Cont'd)

    Collection

    Page 9/1 242,000.00

    Page 9/2

    Total Bill No. 9- Carried To Summary 242,000.00

    9/76

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    77/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    MECHANICAL WORKS

    DRAINAGE WORKS

    A Supply & installation of soil, waste,

    rain water, condensate ,vent piping

    complete with accessories ,insulation,

    supports, coatings as per drawings and

    specification (Underground) 1 LS 236,432.00 236,432.00

    B Supply & installation of soil, waste, rain water

    condensate ,vent piping complete withaccessories, insulation, supports, coatings as

    per drawings and specification (Above ground)

    C Supply, Installation of drainage accessories

    traps, covers sewage pumps, interceptors

    as per drawings and specification

    D Installation of sanitary wares with fixture

    (Sanitary wares supply is included in Bill No.8)

    E Related drainage works for HVAC

    F Identification ,protective painting ,labeling

    Included in above Item-A

    G Testing and commissioning

    H Builders works during execution of the works

    J Allow for providing shop drawings, co-ordination

    and as-built drawings

    K Allow for instructing selected employer's

    personnel on all aspects of the operation ofsystems and equipment

    L Allow for the provision of operation and

    maintenance manuals

    Total Carried To Collection 236,432.00

    Bill No. 10 DRAINAGE WORKS

    10/77

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    78/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 10 DRAINAGE WORKS

    DRAINAGE WORKS (Cont'd)

    EXTERNAL

    A Supply & installation of soil, waste, rain water

    condensate ,vent piping complete with

    accessories ,insulation, supports, coatings as per

    drawings and specification (Under ground -

    outside the villa) Included in above Item-A, Page 10/1

    B Supply & installation of drainage accessories

    traps, manholes, sewage pumps, interceptors

    ADDITIONAL ITEMS

    C The tenderer is to detail below any additional

    Items with quantities and rates not previously

    included to complete the build up of the lump

    sum tender price for this section of the works.

    Should the tenderer fail to insert any items here,

    it will be deemed that his lump sum price for

    the tender includes all items and no subsequent

    claim for additional item will be entertained.

    Total Carried To Collection -

    10/78

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    79/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No.Description Qty Unit Rate Amount / Dhs.

    Bill No. 10 DRAINAGE WORKS

    DRAINAGE WORKS (Cont'd)

    Collection

    Page 10/1 236,432.00

    Page 10/2 -

    Total Bill No. 10 Carried to Summary 236,432.00

    10/79

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    80/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    MECHANICAL WORKS

    HVAC

    Supply and installation of complete HVAC works Refer Provisional

    (excluding related electrical, drainage and Sum

    builders works)

    Total Carried To Collection

    Bill No. 11 HVAC WORKS

    11/80

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    81/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 11 HVAC WORKS

    HVAC (Cont'd)

    Collection

    Page 11/1

    Total Bill No. 11 - Carried To Summary

    11/81

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    82/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    LPG WORKS

    A Supply ,installation of LPG main line

    with accessories,valves,supports ,controls asper

    drawings, specification and local authorities

    requirements - Provisional Sum of Dhs. 44,000/=

    Including MainContractors Overheads & Profit1 PS 44,000.00

    B Identification ,protective painting ,labeling Included in above Provisional Sum Item-A

    C Testing and commissioning

    D Builders works during execution of the works 1 LS 11,000.00 11,000.00

    E Allow for providing shop, co-ordination and

    as-built drawings

    F Allow for instructing selected employer's

    personnel on all aspects of the operation of

    systems and equipment

    G Allow for the provision of operation and

    maintenance manuals

    ADDITIONAL ITEMS Included in above Provisional Sum Item-A

    H The tenderer is to detail below any

    additional Items with quantities and rates not

    previously included to complete the build up

    of the lump sum tender price for this section

    of the works. Should the tenderer fail to

    insert any items here, it will be deemed that

    his lump sum price for the tender includes all

    items and no subsequent claim for additional

    item will be entertained.

    Total Carried To Collection 55,000.00

    Bill No. 12 LPG WORKS

    12/82

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    83/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 12 LPG WORKS

    LPG Works (Cont'd).

    Collection

    From Page 12/1 55,000.00

    Total Bill No. 12 - Carried To Summary 55,000.00

    12/83

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    84/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    ELECTRICAL WORKS

    A Low Voltage Distribution Boards in accordance

    with DEWA standards, drawings and

    specifications. 1 LS 770,000.00 770,000.00

    B Supply, Install, Test & Commission the

    LV Panels complete with necessary enclosures,

    bus bars, circuit breakers, measurement devices,

    selector switches, phase indicators,

    termination, etc. including support frame

    all complete as shown on drawing and as

    specified

    C Power factor correction Capacitor Panel (PFCC)/

    Supply, Install, Test & Commission the Power

    Factor Correction Capacitor Bank complete

    with all necessary, switches, shut off contactors, Included in above Item-

    bus bars, termination, etc. including support

    frame all complete as shown on drawing

    and as specified

    D Final Distribution Board ( DB )

    Supply, Install, Test & Commission the

    Distribution Board complete with all

    necessary circuit breakers, bus bars, protection

    devices, termination, etc. including support

    frame all complete as shown on drawing

    and as specified

    Total Carried To Collection 770,000.0

    Bill No. 13 ELECTRICAL WORKS

    13/84

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    85/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 13 ELECTRICAL WORKS

    ELECTRICAL WORKS (Cont'd)

    Low voltage cables

    A Supply, Install, Test & Commission the Low

    Voltage Cables complete with necessary

    conduits, accessories, supports, terminations

    as specified and as shown on drawings.

    B Install Lighting Fixtures (free issue by Client)

    complete with accessories, supports as specified

    in drawings/specifications and as per the approvalof the Engineer.

    C Supply, install Lighting Fixtures Wiring Points

    complete with conduit, boxes, ceiling rose,

    wires, termination, final connection, accessories, Included in above Item-A, Page 13/

    supports as specified in drawings/specifications

    and as per the approval of the Engineer.

    D Disconnection Switches / Isolators

    in accordance with relevant standards,drawings and specifications.

    Supply and Install Disconnection switches/

    Isolators complete with final sub circuit,

    wiring, conduits, trunking, mounting,

    accessories, supports, hardware's etc.

    Total Carried To Collection

    13/85

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    86/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 13 ELECTRICAL WORKS

    ELECTRICAL WORKS (Cont'd)

    A Lighting Switches in accordance with relevant

    standards, drawings and specifications.

    Supply and Install Lighting switches

    complete with final sub circuit, wiring, boxes,

    conduits, trunking, mounting, accessories,

    supports, hardware's etc.

    B Socket outlets, in accordance with relevant

    standards, drawings and specifications.

    Supply and Install Socket Outlet complete

    with final sub circuit, wiring, boxes, conduits,

    trunking, mounting, accessories, supports,

    hardware's etc.

    C Install Emergency Lighting Fixtures

    complete with lamps, tubes, luminaries, Included in above Item-A, Page 13/

    accessories, supports, as specified in drawings/

    specifications and as per the approval of the

    Engineer.

    ELV SYSTEM

    D Conventional TypeFire Alarm Systemin

    accordance with standard, drawing and

    specifications.

    Supply and install and maintain the Fire Alarm

    and detection system including all necessary

    cables, wiring, conduits, trunking, mounting

    accessories hardware, support etc.

    Total Carried To Collection

    13/86

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    87/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 13 ELECTRICAL WORKS

    ELECTRICAL WORKS (Cont'd)

    ELV SYSTEM (Cont'd)

    A Telephone, Data, Intercom & CATV System Provisional sum

    in accordance with relevant standards, drawings

    and specifications.

    B Supply and install Complete Telephone/Data/

    Intercom CATV System comprising of outlets

    with necessary cables, wiring, conduits,

    trunking, Cable tray mounting accessories

    supports, etc. all as specified in drawing /

    C Home Automation System in accordance Provisional sum

    with relevant standards, drawings, and

    specifications.

    D Supply, install, test & commission Home

    Automation System complete with necessary

    cables, wirings, conduits, supports, accessories,

    hardware's, etc. all as specified in drawing.

    Containment System.

    Included in above Item-A, Page 13/

    E Supply and Install complete containment system

    including cable tray, cable trunking, conduit,

    ladder, covers, fittings, accessories, hardware's,

    supports, etc. all as specified in drawing /

    specification.

    Heavy duty GI cable trays with necessary

    accessories, supports, earthing links etc.

    Total Carried To Collection

    13/87

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    88/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 13 ELECTRICAL WORKS

    ELECTRICAL WORKS (Cont'd)

    Electrical Miscellaneous Work.

    A Electrical Miscellaneous Work complete with

    conduit, manholes, trenches, all required civil

    work as shown on drawing and as specified.

    For B/wall works

    For HVAC works

    For Entrance gates

    For Roof skylights

    For Lifts

    Sundries / General items

    B Allow for inspection associated with the

    electrical installations by utility and statutory Included in above Item-A, Page 13/

    authorities.

    C Allow for all protective painting and cleaning of

    pipes, fittings and equipment

    D Allow for setting out the works, marking

    positions of holes, mortices, chases or the like

    E Allow for testing and commissioning and

    production of test certificates for all systems.

    Total Carried To Collection

    13/88

  • 5/28/2018 3 VILLAS BOQ- (323-459)

    89/103

    EMSQUARE 3 No. B+G+1 VILLAS

    CONTRACT BOQ PLOT NO. 323-459

    Item

    No. Description Qty Unit Rate Amount / Dhs.

    Bill No. 13 ELECTRICAL WORKS

    ELECTRICAL WORKS (Cont'd)

    External Electrical Works.

    Incoming power supply from DEWA in

    accordance with the standards and

    specifications.

    A Supply, install, test and commission the

    Electrical (kwh) meter complete with W/P