7/26/2017 1 3.0 EHS ACTIVITIES(DETAIL) 3.1 Change Management 3.2 Chemical Management a. Operation Control b. SDS Registration System c. Chemical Exposure System d. Physical Exposure System e. Hazardous Sign f. PPE Management 3.3 Contractor Management 3.4 EHS Training(Including License) 3.5 Reporting System

3.0 EHS ACTIVITIES(DETAIL) - 愛知県のスター …. Detail of EHS...To BRM Estimation Create Spec. Budgeted Acquistion of PO-No Reference Purchase Order 購買業務処置規則

Embed Size (px)

Citation preview

7/26/2017

1

3.0 EHS ACTIVITIES(DETAIL)

3.1 Change Management

3.2 Chemical Management

a. Operation Control

b. SDS Registration System

c. Chemical Exposure System

d. Physical Exposure System

e. Hazardous Sign

f. PPE Management

3.3 Contractor Management

3.4 EHS Training(Including License)

3.5 Reporting System

3.1. CHANGE MANAGEMENT

Requirements of Safety & Health Law requirements

Article 88 (Notification of plans, etc.) New tools, installation, changes

Article 28-2 (Investigation, etc. to Be Carried Out by Employer) “best effort clause” since 2005

Guideline for safety/health measures on non-routine activities at chemical equipment (enacted in 2008)

OHSAS18001 Requirements

4.3.1(2.1) Identify Planning for Hazard Identification, Risk Assessment & Risk Control

4.4.6(3.5) Operational Control

Establish comprehensive management system for installation, change, relocation or disposal. Submit a Form from SharePoint site.

Report to Labor Standard office

Design Review

EHS section conducts risk evaluation.

Evaluate hazard and risk and determine control measures

before the change

3.1.A TOOL INSTALLATION FLOW(1)

Stage Planner Purchase EHS Finance Remarks

Desig

n S

tag

e

Requirement of New Tool

Production Capacity Study Introduction

Layout Draft Layout Design

Review 1st Design Review

RegistrationRegistration SPEC.

Apply MSDS

To BRM

Estimation

Create Spec.Budgeted

Acquistion of PO-No ReferencePurchase

Order

購買業務処置規則Genaral Equipment

Requirements (DOC1)引合及び購入仕様書作成

規則

Order Order 装置の安全衛生規則

Reference 新規原材料使用申請

Submit Lobar STD Office

Create Documents

LSD 2nd Design Review

労基申請

SDS RegistrationSystem

Change Management System

3.1.B INSTALLATION FLOW(2)

Stage Planner Purchase EHS Finance Remarks

Ex

ecu

tio

n S

tag

e

HOOK up Create Material

Preparation of Installation

Confirmation 装置搬入・搬出作業手順

HOOK up Comfirmation Meeting Comfirmation 3rd Design Review

Preparation of Installation

Request Preparation of Installation

Confirmation of Open Area

Preparation of Installation

SAP RegistrationRegistration Work

Maintenance Online Help

Maintenance Procedure.doc

SAP MACH Internal Order登録申請Form

Installation System Construction Completed

Contractor Vendor Training

IDカード登録サイト(教育申請)

Start-Up CompletedFacilitation Form Facilitation Form

Commissioning

& Verification Work Environment C/Rパーティクル管理基準

Inspection 4th Design Review

Online Test Release SPC運用規則

IdentificationECN運用規則

Next Page

Facility Project Management

3.1.C TOOL INSTALLATION FLOW(3)

Stage Planner Purchase EHS Finance Remarks

Acce

pta

nce

Sta

ge

acceptance inspection & Capital Asset Registration MSC

Registration

ET PM Event Code set upConfirmation of Acceptance

GeRM set upMeeting

Acceptance Munite

MTSPC set upFinal

Acceptance Duration ofGuarantee

SAP

固定資産管理規則

Depreciation Start

3.1.D TOOL INSTALLATION CHECK FLOW

NO

Latest model/platform?

Install new equipment or convert equipment

Discuss basic safety requirements w/ supplierComplete Check Sheet

Supplier

Corporate safety

Corporate Purchase

Micron Risk Analysis

Legal requirementsHazard – mid or highYES

Design Review

NO

YES

・Equipment installation, relocation and change notice・Equipment safety inspection form・Equipment Layout(include safety features)

Submit to Safety personnel

Risk Assessment conducted?

Conduct Risk Assessment

YES

NO

Install equipment

Installation or modification complete

Equipment Safety Inspection

InspectionMake Checklist

Issue inspection certificate

Significant failure

No minor findings

40 days before the install

Project leader must notify BRM of the completion and arrange the inspection date.

Provide project leader with results in the Checklist.Project leader needs to report to BRM after correcting the findings.

Apply to the Labour Standard Office

• EHS SV’s attend pre-kick-off meeting for the

new tool installation or tool modification and

review the legal requirements.

• EHS & Dpt SC’s inspect the tool before release

MFG on safety & health standpoint.

Design & Construction • Operation Group conducts periodical inspection

for PV & Boiler system and Electricity system..

• 1st class PV & boiler system are inspected & confirmed

by the external institution.

• 2nd class PV’s are inspected by internal inspectors.

• Extra-high voltage system are inspected & confirmed

by the external institution.

• Sub-stations are inspected by internal inspectors.

Operation & Maintenance

Process , 1st & 2nd PV, Electrical System

3.2 CHEMICAL MANAGEMENT

3.2.1 OPERATION CONTROL

Create documents by business activity

Company-wide General Rule Engineering control, safety/health measures, Gas/Chemical, health

Specific Rule Sub-general rule (28 documents)

Department Detailed Rule Operation procedures used at each department

Restructure systems

□ Safety/health management system – clarify roles and responsibilities of the positionsSafety/health officer, safety officer, health officer and PPE supervisor of the department

□ Review work environment

Review workplace that needs environmental measurement for (non) routine activities.

□ Review displays and signs (GHS)

All tools except SEMI addresses the rules of Dec 2008

□ Increase safety patrol efforts

Safety personnel in the department Every day

Department manager Every other week

General Safety/Health Supervisor Once a month

Health Officer/Industrial doctor Once a week

A-1. 化学薬品管理

関連文書(EHSS規定及び規則)

Business Category; Operation Safety, Gas & Chemical Handling

原材料/危険・有害物質関連ページ

1.安全衛生対策 【Operation Safety】2.薬液・ガス 【Gas/ Chemical】3.危険・有害物質安全確認4.作業(外注工事含む)安全管理5.ヒ素・アルシン取扱い6.安全衛生標識・表示規則

関連部署:

チェック項目 自己判定 ガイドライン

1. 化学薬品管理のための訓練を受けたシステムオーナーが存在するか?

はい X いいえ サイトには化学物質管理責任者、衛生管理者など化学物質の管理責任者が存在する。

2. 化学薬品管理は文書化されているか? はい X いいえ 文書化されるとは例として以下を意味する。トレーニング要件、職場危機評価に関連した防止策、プログラム職掌規定、業者に対する危険性の説明、従業員に対する潜在的危険に関する情報提供、曝露防止のための予防措置を含むシステム。

3. 化学薬品のラベリングは運転要件を満たしているか?GHSラベル(FAC) SEMI危険表示(PE)

はい X いいえ 運転要件を満たすとは例として以下を意味する。ラベルには薬品名、危険性の記述、又は危険性のコード/レーティング、ラベルに記載される担当会社/部門/組織名。容器を抜き出し検査し、ラベルが正しく記載されていることを確認する。

4. 化学薬品在庫目録には各薬品のサプライヤー名が記載されており、法規に従って保管されているか?

はい X いいえ 薬品在庫目録には例えば、すべてのプロセス、保守、クリーニング、ラボケミカルが含まれている。

5. 化学薬品管理のトレーニングには従業員が取り扱う可能性のある化学薬品の危険性についての説明が含まれているか?

はい X いいえ 基本的なトレーニングでは例として、薬品の種類、物理的な性質(酸性、塩基性、可燃性など)、危険性についてカバーされていること。

6. 化学薬品管理のトレーニングは曝露を避けるために必要な予防策についての説明が含まれているか?

はい X いいえ 予防策には例として特別な手順や身体保護器具装着が含まれる。

7. MSDSを管理するためのシステムが存在するか?

はい X いいえ 管理するとは、例えばすべての化学薬品についてその現物がサイトに到着する以前にMSDSを準備していることを意味する。

8. MSDSはすべての従業員が簡単に参照することができるようなかたちで準備されているか?

はい X いいえ 簡単に参照することができるとは以下を意味する。MSDSは当該サイト従業員が日常使用している言語で作成されている。関わりのある従業員は誰でも1日24時間いつでもMSDSを見ることができる。

9. MSDSを更新し、更新した箇所を従業員に知らせるシステムが存在するか?

はい X いいえ システムには例として、MSDSが正確で最新であることを確実にするためのプロセスが含まれていること。

10. 業者や訪問者がサイトに持ち込む化学薬品を管理するシステムが存在するか?

はい X いいえ 薬品管理のシステムとは例として以下を含む。業者や訪問者が持ち込む化学薬品の認可システムが存在する。業者/訪問者は持ち込んだ化学薬品を退去時に持ち去ること。

「はい」の割合(%) 10 /10= 100 %

Reference3.2.1aCSA Checklist

3.2.2 SDS REGISTRATION SYSTEM

Purpose of the system

Part of the efforts to establish the Chemical Management System

Control status of new materials from introducing to withdrawing and eliminating from the site.

Eliminates troubles caused by paper-based application system

Paper-based application takes long to complete routing for approval. Some application have been lost and some materials have not been applied.

At times information was not communicated to the appropriate individuals or departments.

Accessible from any computer in the company

Allows smooth approval or notification of new entry, revision or withdrawal to departments

Ensure that GHS labels and hazard materials information are available near the equipment.

The application system using Microsoft SharePoint will replace the old system.

Under the new system, CBT training test will be developed for SDS of new raw material. This will be notified to relevant departments that use the material, and only certified members are allowed to handle it.

SharePoint

3.2.2a Chemical Management Flow

Refer to SDS Registration System

Reference

3.2.2B SDS REGISTRATION SITE

3.2.2C SDS REGISTRATION SCREEN

Applier enters necessary information

EHS enters comments

GHS compliant

Engineering Data

Supplier Data

Engineering Data

Withdrawal

Reference

• EHS checks the new chemical using the Tool Change

Management System and SDS Registration System.

• EHS SV attend pre-kick-off meeting for the new tool

installation or tool modification

• EHS & Dpt SC’s Inspect the tool before release to MFG

• EHS checks the new chemical using the Tool Change

Management System and SDS Registration System.

• EHS SV attend pre-kick-off meeting for the new tool

installation or tool modification

• EHS & Dpt SC’s Inspect the tool before release to MFG

Design & Construction Operation & Maintenance

• EHS checks the new tools or machines using the Tool

• Change Management.

• EHS SV attend pre-kick-off meeting for the new tool

installation or tool modification

• EHS & Dpt SC’s Inspect the tool before release to MFG

• EHS checks the new tools or machines using the Tool

• Change Management System.

• EHS SV attend pre-kick-off meeting for the new tool

installation or tool modification

• EHS & Dpt SC’s inspect the tool before release to MFG

Design & Construction Operation & Maintenance

Introduce New

Tool/Tool Modification

1. SharePoint Site InputHazordous /Design Review

BRMApproval

CompleteTool

Installation

Conduct Tool Inspection &

Confirm how to use Red Flag

Tool Release

9.Energy Isolation Level-2 Map

Trigger Event Concluding Event

Confirm Red Flag Training

Request Red Flag Training

BRM Confirm Record

Yes

NoCheckListで赤旗取

り付け用フック確認

及び赤旗教育確認

同じ機器で過去実

施している場合は

その機器名を聞く

Micronで初めて入

れた機器に関してそ

の機器特有のエネ

ルギー遮断を確認

労基に設置申請を忘れない事

労基は特にEMOなどのエネル

ギー遮断について聞く

申請時にエネルギー遮

断の配置及びインター

ロックの配置確認する事

②.Tool Change Mgtと同じであるが特にエネル

ギー遮断のプロセスを作った。(特に重要な為

EHS & Dpt SC’s check & confirm the Energy Isplation location

& Training at tool Inspection.

Design & Construction

Training ( CBT & OJT) is provided for

Technician every year.

Operation & Maintenance

Introduce New Tool/Tool Modification

BRMApproval

Tool Release

10.Fall Protection & Prevention Level-2 Map

Trigger Event Concluding Event

Yes

No

1. SharePoint Site InputHazordous /Design Review

CompleteTool

Installation

Conduct Tool Inspection

Confirm the fall

protection equipment &

Procedure

Taken C/A

②.Tool Change Mgtと同じであるが特に転落防

止を作った。(特に重要な為

機器や架台などに手摺

(H>850mm)及びラダー等の

設置確認また工事用足場な

どのコメントを入れる。

設計時通りに手摺、

架台、転落防止装

置が付いているか

確認。また、手順

書の確認も要

• EHS SV’s attend pre-kick-off meeting for the new

tool installation or tool modification.

• EHS & Dpt SC’s Inspect the tool before release.

• Constructors or maintenance persons conduct

the TBM or KYT before work.

• contact person has the meeting with contractor

before work.

• ALL contractors & vendors are trained before work.

Design & Construction Operation & Maintenance

• Dpt SC checks un-safe behavior at the safety patrol during the construction work.

Monitoring

3.2.3 HAZARD SIGN (GHS) PROCESS

Review displays and signs (GHS) Legal Requirement

⇒ All tools except SEMI addresses the rules of Dec 2008

Conform it at tool inspection

On-going

3.2.4 PPE MANAGEMENT

Legal requires to inspect respirator periodically.

BRM provides the site PPE Program Document including PPE Matrix.

Each department creates the own PPE matrix based on BRM

Document.

EHS Health SV Dpt Health Officer

Dpt PPE Manager

Shift Worker Check

Using Check Sheet

Internal Audit

3.3 CONTRACTOR MANAGEMENT

3.3 CONTRACTOR MANAGEMENT

Manage 3 types of Card (V card, Yellow card, Pink card)

Conduct the vendor Survey for Construction Vendor & Operation

Contractor. (including Waste Vendor)

Provides the Vendor Training on Web Site and Guard House

(before the work or earlier)

Check the Un-safety behavior by Dpt SCs.

Report Vendor Survey & Un-safe Behavior Result to MRM

Purchasing person requests the Un-safe behavior company to submit

the countermeasures .

Each Department holds the Safety Meeting periodically.

Construction vendors conduct safety patrol for their work area.

3.3.1 CONTRACTOR

MANAGEMENT

Card Type Definition Training Works Vendor Survey Escort

VisitorExpiration ;1 day

•1 Page S&H Guidance • sales•Spectator

Meeting at Entrance

NO YES

•Construction & Tool VendorExpiration ;1 Year

•Vendor Training•Contractor in-house Training

•Maintenance Vendor•Inspection Vendor•Construction Vendor•Tool Vendor

YES Yes No PictureNO Picture

•In-House Contractor

Expiration ;Permanence

•S&H Basic Trainingor Vendor Training•Contractor In-house Training

•Operation supports•Engineering Supports•Cafeteria work•House keeping work

YES •NO

V

3.3.1 CONTRACTOR MANAGEMENT

3.3.2 Contractor Management

評価対象の物品・サービス : 材料関係(ウエハー・ターゲット・ガス・ケミカル・レジスト・スラリー・梱包材料)・半導体製造設備・ユーティリティー設備・部品洗浄・産業廃棄物

旧E-KA02 資材購入先管理手順 プロセスマップ

資材

安全衛生

環境

購入先

購買先

調査

購買先

調査

購買先

調査

購買先

評価

判定

判定

購入先

承認

YES

供給購入先

選定

フォロー

アップ

フォロー

アップ

継続アセス

メント計画

策定

継続

アセスメント

継続

アセスメント

判定

判定

継続

契約

継続

供給

NO

NO

継続

承認

継続

承認

YES

YES

NO

NO

1

2

2

2

3

4

4

4'

4'

5

6

7

8

8

9

9

10

10

11

12

6.2.1

6.2.1

6.2.1

6.2.2 6.2.3

6.2.3

6.2.3

6.4

6.4.1

6.4.1 6.5

6.5

Investigation Evaluation Follow-up Assessment

Pur

Supplier

S&H

Env.

Process Map for Vendor or Supplier Selection

Evaluation Sheet

Reference

3.4 EHS TRAINING

3.4 EHS TRAINING

Make an overall review of current S&H Training

Establish the system ensuring training is offered to the correct target audience in a timely manner

Legal requirements

When hired or starting a new position

Leader training (External)

Special training (low-voltage electricity, industrial robot training, etc.)

In-house EHS technical training

Clarify the purpose and appropriate contents

Instructor-led (14 courses), OJT (3 courses)

Training for Construction Vendors & Tool Vendor (before the work or earlier)

Each department has to include training in the EHS plan to monitor the progress and improve.

Reference

Training Standard

Learning Objectives

3.4.1 IN-HOUSE TRAINING SYSTEM

3.4.3 MJP EHSS TRAINING

Training Legal

Requiremen

t

Staff Eng. Tech. Mgr.

& SV

New

TL

Temp.

Employe

e

Remarks

EHS Basic 1 time ○ ○ ○ ○ ○ ○ Legal

Requirement

EHS SV 1 time ○

New Leader 1 time ○ Legal

Requirement

14 Area 1-3y △ △ △ △ △ Incl. Env.

Training

3 OJT 1 time ○ TBM, Red Flag,

RA

Fab Common 1 time ○ ○ ○

Low Voltage

Elect.

1 time ○ △ ○ Legal

Requirement

Industrial Robot 1 time ○ △ ○ Legal

Requirement

ERT Commander 1 time ○

ERT Event Tech. 1 time ○

ERT Event Support 1 time ○ ○

ERT Follow-up annual

ly

Evacuation Drill annual

ly

○ ○ ○ ○ ○ ○ ○ Legal

Requirement

3.4.2 IN-HOUSE TRAINING SYSTEM

3.4.3 LICENCE MANAGEMENT SYSTEM

3.5 REPORTING MANAGEMENT

3.5 EHS REPORTING SYSTEM

Incident Reporting System

Definition

Reporting System (Next Page)

Nonconformity Reporting System(Including Env. Nonconformity)

Reporting System(Next Page)

Traffic Accident Reporting System

It’s same as the Incident Reporting System.

3.5.1 INCIDENT REPORT

Near Miss

Not Incident

Class1 (Un-recordable)

First Aid

Class2 (recordable, report to Corporate)

Hospital treatment but no absent level/Lost

days

Class 3 (recordable, report to Corporate)

Class 2 +1-3days (Lost work day)

Report to Labor Std Office quarterly.

Class4 (recordable, report to Corporate)

Class2+ more than 4days (Lost work day)

Report to Labor Std Office within 24 hr

Class5 (recordable, report to Corporate)

Fatal

Report to Labor Std Office within 24 hr

Class Definition

Event Definition

3.5.2 EHS NONCONFORMITY REPORTING SYSTEM