DETNORSKE VERITASVeritasveien 1, N-1322 Hvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11
CERTIFICATION NOTES
No. 2.9
Type Approval Programme No. 4-732.10-1
TYPE APPROVAL PROGRAMME FOR GAS TURBINES
JUNE 1997
8/3/2019 4-732-10-1
2/6
Det Norske Veritas AS 1997
Data processed and typeset by Division Technology and Products, Det Norske Veritas AS
Printed in Norway by Det Norske Veritas AS
01.11.01 15:21 - 4-732-10-1.doc
6.97.2000
It is agreed that save as provided below Det Norske Veritas, its subsidiaries, bodies, officers, directors, employees and agents shall have no liability for anyloss, damage or expense allegedly caused directly or indirectly by their mistake or negligence, breach of warranty, or any other act, omission or error by
them, including gross negligence or wilful misconduct by any such person with the exception of gross negligence or wilful misconduct by the governingbodies or senior executive officers of Det Norske Veritas. This applies regardless of whether the loss, damage or expense has affected anyone with whom DetNorske Veritas has a contract or a third party who has acted or relied on decisions made or information given by or on behalf of Det Norske Veritas. *However, if any person uses the services of Det Norske Veritas or its subsidiaries or relies on any decision made or information given by or on behalf of themand in consequence suffers a loss, damage or expense proved to be due to their negligence, omission or default, then Det Norske Veritas will pay by way ofcompensation to such person a sum representing his proved loss. * In the event Det Norske Veritas or its subsidiaries may be held liable in accordance withthe sections above, the amount of compensation shall under no circumstances exceed the amount of the fee, if any, charged for that particular service,decision, advice or information. * Under no circumstances whatsoever shall the individual or individuals who have personally caused the loss, damage orexpense be held liable. * In the event that any provision in this section shall be invalid under the law of any jurisdiction, the validity of the remainingprovisions shall not in any way be affected.
FOREWORD
DETNORSKE VERITAS (DNV) is an autonomous and independent Foundation with the object of safeguarding life, property and
the environment at sea and ashore.
DET NORSKE VERITAS AS (DNV AS), a fully owned subsidiary Society of the Foundation, undertakes classification and
certification and ensures the quality of ships, mobile offshore units, fixed offshore structures, facilities and systems, and carriesout research in connection with these functions. The Society operates a world-wide network of survey stations and is authorised
by more than 120 national administrations to carry out surveys and, in most cases, issue certificates on their behalf.
Certification Notes
Certification Notes are publications which contain principles, acceptance criteria and practical information related to the
Society's consideration of objects, personnel, organisations, services and operations, in connection with issuance of certificates
or declarations, which are not necessarily related to classification.
An updated list of Certification Notes is available on request. The list is also given in the latest edition of the Introduction-
booklets to the Rules for Classification of Ships, the Rules for Classification of Mobile Offshore Units and the Rules for
Classification of High Speed and Light Craft.
In Rules for Classification of Fixed Offshore Installations, only those Certification Notes which are relevant for this type of
structure have been listed.
8/3/2019 4-732-10-1
3/6
DETNORSKE VERITAS
CONTENTS
1. Scope ................................................................. ................4
2. Conformity Assessment of Design of Product Type......4
2.1 Procedure.........................................................................4
2.2 Conditions........................................................................4
2.3 Document to be submitted ............................................... 4
2.4 Material requirements......................................................4
2.5 Design requirements ....................................................... .4
2.6 Requirements to dentification of product type with
certificate.................................................. ............................. 4
2.7 Elements of Type Approval ............................................ 4
3. Conformity Assessment of Manufactured Products
(Production)........................................................ ................. 5
3.1 Product Certificates.................. ....................................... 5
3.2 Inspection and testing in the certification process:.......... 6
8/3/2019 4-732-10-1
4/6
4 Certification Notes- No. 2.9
Type Approval Programme No. 4-732.10-1
June 1997
DETNORSKE VERITAS
1. ScopeType Approval is a procedure for certifying that the design of
a product type is in conformity with a set of predetermined
requirements.
This Type Approval Programme contains the requirementson which Det Norske Veritas normally bases its Type
Approval ofgas turbines used in propulsion or auxiliary
plants on board ships, and on offshore installations or in
industrial plants as generator or compressor driver.
The requirements are based on the Rules for Classification of
Ships and Mobile Offshore Units.
The procedure for assessment of conformity of manufactured
products (production) is not part of the scope for the Type
Approval Programme.
2. Conformity Assessment of Design ofProduct Type
2.1 ProcedureThe type approval procedure consists mainly of the following
steps:
- Design assessment- Type testing- Certificate retention survey2.2 ConditionsA manufacturer applying for type approval of a gas turbine
model is to have a quality system (QS) according to ISO
9001. Equivalent systems will be specially considered.
2.3 Document to be submittedDocumentation shall be submitted in triplicate in connection
with the design assessment. For a complete list of the
documentation that are to be submitted, reference is made to
DNV Rules Pt.4, Ch.2. The extract below indicates the most
important issues.
- plans showing the general arrangement and description ofthe design features.
- drawings of the rotating parts as well as other highlystressed parts.
- schematic drawing of the lube oil and fuel oil systems.- particulars regarding stress- and temperature levels of
critical components, by means of finite element analysis.
- results of vibrational analysis of the gas turbine, givingboth rotor dynamics and blade natural frequencies.
- design specification for the control system superior to thegas turbine control system.
2.4 Material requirementsMaterial certificates are required for blades, shafts, disks,
interstage couplings (tie bolts) and combustors. Normally,
DNV accept all international standards on (gas turbine
intended) material as a basis for the type approval. National
standards, internal codes etc. will be individually accepted.
Properties of materials and also the material certificates are
to be available through the manufacturers quality system.
2.5 Design requirementsThe design will be evaluated with respect to the applicable
DNV requirements as given in the Rules Pt.4 Ch.1 and 2.
The objective of the design assessment is to assure DNVC
that the engine meets the requirements, and to establish any
limitations to operation.
The assessment will mainly focus on the engine safety withrespect to operating personel and ship/installation site, and
engine reliability. Hence, areas of great importance are
component strength and lifetimes, control system parameters
and engine system interfaces. The manufacturers own
calculations will form a basis in the assessment procedure, as
well as any documentation on the reliability and availability
of the engine in question.
2.6 Requirements to dentification of product typewith certificate
The product is to be provided with visible marking, giving at
least the following information :
- Manufacturers name or trade mark- Technical data necessary for the application- Type designation under which the product is type
approved
The marking is to be carried out in such a way that it is
visible, legible and indelible throughout the anticipated life
of the product, and that the marks can be traced back to the
Type Approval Certificate.
2.7 Elements of Type Approval2.7.1 Design assessmentThe design assessment is carried out to assess that the design
of the product type is in conformity with given design
requirements stated in 2.5.
2.7.2 Type testingThe scope of a type test is to verify the ability of a product to
meet specified requirements.
In particular, the main objective of the Type Testing of gas
turbines is to verify the products performance, and to verify
computer calculated properties, e.g. natural frequencies andvibration levels. The type testing will to the extent possible
be conducted in conjunction with the manufacturers own
testing.
8/3/2019 4-732-10-1
5/6
Certification Notes- No. 2.9 5
Type Approval Programme No. 4-732.10-1
June 1997
DETNORSKE VERITAS
The testing should be performed in accordance with an
appropriate Test Code. The actual code shall be agreed upon
by the client and DNV prior to the commencement of the
testing. Preferred Codes are:
- ISO 2314 - Gas Turbine Acceptance Tests.- ANSI/ASME PTC 22 - Performance Test CodesThe testing is to include a start test, a mechanical running test
and a performance test as outlined below.
Start test: The start test shall include 5 starts from
standstill, and also restarts after being shut down from full
power.
Mechanical running test: The mechanical running test is
performed in order to assure that no damage occurs to the
engine and that tested functions and operating limits are
within specified limits. Vibration levels are also to be
measured and shall not exceed the pre-set requirements
agreed on by the parties.
Performance test: The performance test is conducted
with the object to assure that the engine meets the stated
power output and thermal efficiency, and that the control and
monitoring system works satisfactorily. The engine shall run
for at least 4 hours at stabilised conditions at max. continuos
power.
For details concerning the test procedures, reference is made
to DNV rules for gas turbines Pt.4, Ch.2.
Additional testing: Depending on the gas turbines service
experience, its accumulated in-service hours, and whether theengine has been used for similar operations earlier (similar to
the type approval conditions), DNV may, in addition to the
type testing, require in-service testing.
Gas turbines of novel design will have to accumulate 2500
hours in service before a Type certificate can be issued.
2.7.3 Type Approval CertificateWhen the design assessment and the type testing are
successfully completed a Type Approval Certificate will be
issued to the manufacturer stating conformity of the design of
the product type.
The Certificate is given a validity period of normally 4 years.
2.7.4 Certificate retention surveyThe scope of the certificate retention survey is to verify that
the conditions stipulated for the Type Approval is complied
with and that no alterations are made to the product design or
choice of materials.
If regular DNV product certification of gas turbines takes
place during the validity period of the Type Approval
Certificate, the retention survey can be combined with the
product certification survey.
The main elements of the certificate retention survey are:
- witnessing of tests or inspection of the product, selectedat random from the production line and examination of
the recording given in the internal quality system
documentation.
- review of type approval documentation.- review of possible changes in design, materials and
performance.- ensure traceability between manufacturer's marking and
Type Approval Certificate.
2.7.5 Renewal of Type Approval CertificateAt least three months before the period of validity expires,
the certificate-holder has to apply for renewal of the
certificate.
Upon receipt of the request for renewal, Det Norske Veritas
will perform a renewal survey which has the same content as
the certificate retention survey stated in 2.7.4.
The survey report will constitute the basis for renewal of the
Type Approval and the issuance of a new certificate.
3. Conformity Assessment of ManufacturedProducts (Production)
3.1 Product CertificatesEach gas turbines is to be delivered with a product certificate
when intended for use on board a DNV classed vessel.
For the first Gas Turbine to be delivered, the product cer-
tification will consequently coincide with the issue of thetype approval certificate. The consecutive delivered Gas
Turbines will normally be certified on a less extensive basis
than what is described in this type programme (The
certification process will include inspection and testing
through the manufacturing process, combined with workshop
testing at completion. This product certification, and its
extent, is to be agreed upon in a Manufacturing Survey
Arrangement (MSA) as described below).
Manufacturing Survey Arrangement:
A Manufacturing Survey Arrangement (MSA) shall be set up
by the manufacturer and the local DNV station.
An MSA is a signed agreement between DNV and the
manufacturer with the objective to clarify:
a) The extent of the required inspection and testing forspecific range of material, components and systems, and
the respective acceptance criterias.
b) To which extent and under which conditions themanufacturer may perform all or part of the required in-
spection and testing without the presence of a DNV
surveyor.
The content of an MSA should reflect the complexity of theproduct and the quality system implemented by the
manufacturer to ensure the consistency in quality during
production.
8/3/2019 4-732-10-1
6/6
6 Certification Notes- No. 2.9
Type Approval Programme No. 4-732.10-1
June 1997
DETNORSKE VERITAS
3.2 Inspection and testing in the certificationprocess:
The essential testing during the fabrication phase is as
follows. The presence of a DNV surveyor in all or some of
the mentioned tests, shall - as noted above - be agreed upon
in the MSA.
- test of material properties- pressure testing of pressurised equipment.- surface crack detection, by means of NDT is required for
the following:
- shafts (in way of stress raisers)- hubs (in way of stress raisers)- shrink fit surfaces- welds in power transmitting parts- welds in casing of bearings (min. 10% to be tested)- balancing of rotating elements, both separately and
assembled.
- spin test of compressor and turbine rotors- certification testing of gas turbine (or gas generator
separately). This test will be based on the manufacturers
Factory Acceptance Test.
Reference document:
The following document constitutes the formal basis on
which this type approval programme has been issued:
Certification Notes 1.2