30
Reefer Innovations

4PL - Reefers

Embed Size (px)

Citation preview

Page 1: 4PL - Reefers

Reefer Innovations

Page 2: 4PL - Reefers

Reefer Logistics in Egypt

(Fresh Produce)

Page 3: 4PL - Reefers

Egypt is a strong player in Global market in

producing and exporting a huge quantities

(More than 15,000 Reefer containers) of

finest fresh fruits and vegetables along the

year.

Page 4: 4PL - Reefers

Main Fresh Products in Egypt

Page 5: 4PL - Reefers
Page 6: 4PL - Reefers

Main Reefer Services

Page 7: 4PL - Reefers

Serving the logistics chain across main

ports (SCCT/PS/DMT/ Sokhna/Alex)

for main points of loadings in (Cairo

Alex Desert Road);

Page 8: 4PL - Reefers

1. Ports Directions ( Normal Cycle)

Empty Containers from Port

Point of loading in

Desert Road

Full container returned to

the port

Page 9: 4PL - Reefers

Key Players in New Reefer Cycle

Page 10: 4PL - Reefers

4P

Logistics

3PL/Agents/ Forwarders

Shipper Carrier

PTI Genset Trucking

Page 11: 4PL - Reefers

Port Said East (SCCT), Port Said (PS)

& Damietta (DMT)

Page 12: 4PL - Reefers

1. Ports Directions ( Cycle by 4PL)

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container returned to

the Ports

Full container

to the port

1

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container to 6 Oct

2

Page 13: 4PL - Reefers

Empty container to 6 Oct

1. SCCT Directions ( Cycle by 4PL)

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container to 6 Oct (STORAGE

AREA)

Full container

to the port

3

Empty Containers

from import

Point of loading in

Desert Road

Full container to 6 Oct

4

Full container to

the port

Page 14: 4PL - Reefers

Alexandria (ALY)

Page 15: 4PL - Reefers

1. ALY Directions ( Cycle by 4PL)

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container to ALY

Full container to

SCCT/PS/ DMT

1

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container to 6 Oct

2

Page 16: 4PL - Reefers

Full container to 6 Oct

1. SCCT Directions ( Cycle by 4PL)

Empty Containers from 6 Oct

Point of loading in

Desert Road

Full container to 6 Oct (STORAGE

AREA)

Full container

to ALY

3

Empty Containers from ALY

Point of loading in Ismailia Rd

Full container to 6 Oct

4

Full container

to ALY

Page 17: 4PL - Reefers

Standard Reefer Export Cycle

Page 18: 4PL - Reefers

Booking

PTI

Genset

loading

Reefer Trucking

form port to

loading

Loading

Plugging

Genset

offloading

Geshni/Agri

Customs

Clearance

Reefer trucking from

loading to port

Containers

on board

8-24 Hr

4-6 Hr

8-24 Hr

1-8 Hr

8-15 Hr

1 Hr

1-3 Hr

8-17 Hr

1-5 Hr

Page 19: 4PL - Reefers

• Minimum total hours = 40 for

the whole process starting of

booking confirmation until

keeping the container on

yard.

• Those hours might record

higher level in the peak

seasons (Grapes) and reach

103 hours.

Page 20: 4PL - Reefers

Optimum Reefer Export cycle by

4PL (6 Oct)

Page 21: 4PL - Reefers

Plugging

Booking

PTI 6 Oct

Genset loading

6 Oct

Reefer Trucking

form 6 Oct to

loading

Loading Container to the

port

Genset offloading

Geshni/Agri 6 Oct

Customs Clearance 6 Oct

Reefer trucking from loading to 6 Oct

(SCCT/DMT/PS/SK)

Containers on board

0.5-1Hr

1-2 Hr

1-2 Hr

1-8 Hr

1 Hr

1 Hr

1-3 Hr

4-6 Hr

8-15 Hr

1-3 Hr

Page 22: 4PL - Reefers

• Using 4P Logistics for

leading the time frame of

certain process as well as

supply chain effectiveness.

• Value added by 4P Logistics,

total hours became within

wide range of 19.5 – 40

hours

Page 23: 4PL - Reefers

Values added by 4P Logistics

Page 24: 4PL - Reefers

As shown previously, perfect

leading of time by using 4P

Logistics services as the time frame

of export logistics process has been

down to be 26 – 48 hours Vs 44 –

144 hours in Standard process.

4P Logistics – Leading Cycle Time (LCT)

Page 25: 4PL - Reefers

Process Original range

of Time

Time by adding

4PL Service

Booking - PTI 8-24 Hours 0.5 – 1 Hour

PTI – Genset Loading 4-6 Hours 1-2 Hour

Genset Loading – Ready to go to

shipper 8-24 Hours 1-2 Hour

Trucking from port to shipper 8-17 Hours 4-6 Hour

Refeer Container loading 1-8 Hours 1-8 Hour

From loading point to port 8-15 Hours 1 Hour

Genset offloading 1 Hour 1 Hour

Agri inspection/Geshni 1-5 Hours 8-15 Hour

Customs Clearance 3-3 Hours 1-3 Hour

Total Operating Time 40-103 Hours 19.5 – 40 Hours

Time deduction in Export process (SCCT)

Page 26: 4PL - Reefers

• Effective utilization for trucks

• Less Solar

• Less Risk on road

• Less operation at ports in gating out.

• Best usage of Import/Export from the

same location.

• Professional team handling of all process.

• Effective solutions for SCCT and

hard/long operation/Agri

inspection/Geshni.

Page 27: 4PL - Reefers

Key benefits to involved parties

Page 28: 4PL - Reefers

1. Flexible operation.

2. Less problems.

3. Effective utilization of trucking and Gensets.

4. Professional leading of Time.

5. Reefer Storage for earlier loading.

6. Yard for Empty containers

7. Customs Committee.

8. Agri inspection.

1. 3PL – Freight Forwarders

Page 29: 4PL - Reefers

1. Higher responsiveness.

2. Less problems.

3. Shorter time in getting the empty container.

4. Less process in Opening Form 13 and customs

procedure.

5. Reefer Storage for earlier loading until the time

of Vessels Cut off.

6. Agri inspection.

2. Shipper

Page 30: 4PL - Reefers

Thank You