    EXCECUTIVE SUMMARY

    CHAPTER-5

    BUILDING PLAN

    BAB 5.PERENCANAAN BANGUNAN

    5.1. SEDIMENT TRAP

    5.1.1. Check Dam

    Plans check dam placed at two locations Tungoi its tributaries upstream, where the two

    creeks flow is a source of sediment transport into Tungoi River. What is planned is at p.140

    !orth "ide Tungoi #reeks$ and P.1%1 & Tungoi #reeks "outh "ide$. The building check

    dams are planned with couples where the calculation of dimensional stone and hidrolisn'a

    refers "( "!) * T * 1+ * 1++1*0% Technical Planning Procedures Retaining "ediment weirs.

    ere is a check dam location planning calculations 1 p.140$, which consists of planning and

    "ub -ain am dam.

    1

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    2/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    esign check dam location / P.1%1&$ accounted for at the planning stage check dam

    location 1. The results of the calculations resume the calculation is as follows

    /

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    3/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    5.2. L!!D C!NTR!L

    5.2.1. Em"a#kme#$ a#% Pa&a'e$

    )n the case of river flooding ngkag, urugan soil embankment is still possible to build

    because there are still land on either side of the e2isting riverbank. &s for the case of a flood

    in the river Tungoi impossible to build because of the condition of the soil embankment

    bantarann'a alread' coincide with the settlements, it is planned for the dike being shaped

    parapet walls made of stone masonr' times.

    Planned flood control embankment on river segments based on the results of running

    ecras 32isting #ondition$ and meggenangi houses and padd' fields. esign plans for river

    levee elevation and Tungoi ngkag further shown in the following table

    Ta"(e 5.1 De)*+# P(a#) E(e,a$*# !#+ka+ La,ee

    Ta"(e 5.2 De)*+# P(a#) E(e,a$*# T/#+* La,ee

    %

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    4/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    *+/&e 5.1 R*,e& Le,ee P(a##*#+ !#+ka+ P. 10

    *+/&e 5.2 P(a##*#+ T/#+* R*,e& Le,ee) Pa&a'e$ P.A

    5.2.2. R*,e& N&ma(*3a$*#

    !ormaliation condition of the river stream is created with a certain width and depth to

    increase the capacit' to be able to drain the flood water so there is no overflow.!ormaliation river watercourses Tungoi planned under 4 m in width, the width of the

    4

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    5/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    variation, the e2cavation of the river 0 s 5 d 0.4 m with a bottom elevation corresponding

    slope planned.

    *+/&e 5.4 S('e T/#+*

    *+/&e 5. S('e De)*+# T/#+* P.4-P.

    *+/&e 5.5 T/#+* N&ma(*3a$*# 6P.507

    5.2.4. Ga"*#

    6abion mattress design is planned with the sie 0.7 2 1 m with a span length of /.0 m. That

    are not easil' washed awa' the mat bro8ong reinforced with piles dolken 5 timber. Placementposition ad8ustable mattress gabion slope cliff following the e2isting stacking shapes as

    shown below.

    7

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    6/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    *+/&e 5.8 Ga"*# ! !#+ka+ 6P.10A7

    *+/&e 5.0 Ga"*# ! T/#+* 6P.997

    5.2.. R*,e& M%e(*#+ De)*+# C#%*$*#)

    -odeling the design conditions is done using the design flood discharge data on 10*'ear

    return period 910th$, so that the plan can be evaluated results on river flood control

    structures that were reviewed have been effective or not.

    :rom the modeling results for the discharge 910th at design conditions are obtained that

    plan design with mounting flood embankment on the river and parafet ngkag Tungoi the

    river is enough to effectivel' reduce flood overflow. "pecial design flood embankment on the

    river ngkag is still sufficient to reduce the flood discharge at the time /7th anniversar'

    9/7th$. To bend of the river and river banks ngkag and retrofitting installed Tungoi flow b'

    installing gabions.

    Ta"(e 5.4 HecRa) M%e((*#+ Re)/($ De)*+# C#%*$*# ! !#+ka+ :*$h ;1$h

    ;

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    7/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    Ta"(e 5. HecRa) M%e((*#+ Re)/($ De)*+# C#%*$*# ! T/#+* :*$h ;1$h

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    8/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    5.2.5. Lca( Sc/&*#+

    To protect the base of the cliff to be secure against scour, the scour depth needs to be

    happening. egan scour depths calculated using the formula =ace' with the calculation as

    follows

    >

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    9/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    ?ased on empirical calculations above, the protection plan on the river bluff with gabions and

    ngkag Tungoi need to be deepened from 1 to 1./ meters below the riverbed.

    5.2.8. G&*#

    )n the segment of the river that frasen'a shaped curve or turn, then grinding the river ma'

    occur in outer corner. River bend area will cause problems with the stabilit' of the outer side

    of the river bank facing the possibilit' of blow energ' of water large enough. )f left

    unchecked, it will further erode the river flow to the outer corner and could harm e2isting

    infrastructure. )t happened outside of river bends gkag especiall' P.1

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    10/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    *+/&e 5. G&*# ! !#+ka+ R*,e&)

    Perhitungan krib

    C#$e#$)

    BAB 5. PERENCANAAN BANGUNAN

    .......................................................................................

    5-1

    5.1. SEDIMENT TRAP

    .............................................................................................................5-1

    5.1.1. Check Dam

    10

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    11/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    ...................................................................................................5-1

    5.2. FLOOD CONTROL.............................................................................................................5-3

    5.2.1. Embankment and Paa!et...................................................................................................5-3

    5.2.2. R"#e N$ma%"&at"$n...................................................................................................5-'

    5.2.3. (ab"$n...................................................................................................5-5

    5.2.'. R"#e M$de%"n) De*")n C$nd"t"$n*

    ...................................................................................................5-+

    5.2.5. L$ca% Sc$,"n)...................................................................................................5-

    5.2.+. ($"n...................................................................................................5-

    F"),e 5.1 R"#e Le#ee P%ann"n) On)ka) P. 1/.....................................................................................................................5-'

    F"),e 5.2 P%ann"n) T,n)$" R"#e Le#ee* Paa!et P.''A.....................................................................................................................5-'

    F"),e 5.3 S%$!e $0 T,n)$".....................................................................................................................5-5

    F"),e 5.' S%$!e De*")n T,n)$" P.3-P......................................................................................................................5-5

    F"),e 5.5 T,n)$" N$ma%"&at"$n P.5.....................................................................................................................5-5

    F"),e 5.+ (ab"$n O0 On)ka) P.1/A.....................................................................................................................5-+

    F"),e 5. (ab"$n O0 T,n)$" P......................................................................................................................5-+

    F"),e 5. ($"n O0 On)ka) R"#e*.....................................................................................................................5-1/

    11

  • 8/10/2019 5. Perenc Bangunan (OK).doc

    12/12

    SID Pengendalian Sedimen Sungai TungoiKabupaten Bolaang Mongondow

    EXCECUTIVE SUMMARY

    Tab%e 5.1 De*")n P%an* E%e#at"$n $0 On)ka) La#ee.....................................................................................................................5-3

    Tab%e 5.2 De*")n P%an* E%e#at"$n $0 T,n)$" La#ee.....................................................................................................................5-'

    Tab%e 5.3 4ecRa* M$de%%"n) Re*,%t De*")n C$nd"t"$n O0 On)ka) "th61/th.....................................................................................................................5-

    Tab%e 5.' 4ecRa* M$de%%"n) Re*,%t De*")n C$nd"t"$n O0 T,n)$" "th 61/th.....................................................................................................................5-

    1/