CONTRATISTAS Obra Centro Automotor AQP CONSTRATISTA CONTRATISTA Ubicacion : AREQUIPA - AREQUIPA - PARQUE INDUSTRIAL FECHA 15/07/2011 Item Descripción 01.00.00 OBRAS PROVISIONALES 01.00.01 OFICINA Y CASETA DE GUARDIANIA 01.00.01 COMEDOR , VESTIDORES Y SSHH DE OBRA 01.00.01 ILUMINACION DE CAMPO DE TRABAJO EN OBRA 01.00.01 INSTALACION DE ENERGIA TRIFASICA PARA OBRA 01.00.02 CERCO PERIMETRICO 02.00.00 OBRAS PRELIMINARES 02.00.01 LIMPIEZA MANUAL DE TERRENO 02.00.02 TRAZO DE NIVELES Y REPLANTEO 02.00.02 DEMOLICION DE CERCO PERIMETRICO (Columnas y Pared). 02.00.02 DEMOLICION DE CIMENTACION Y ZAPATA (1.20X1.20) c/equipo 02.00.02 RETIRO DE REJA DE FIERRO (Tubo Cuadrado 1"x1" - corte c/equipo) 03.00.00 MOVIMIENTO DE TIERRAS 03.00.01 CORTE Y PERFILADO DEL TERRENO e=0.20 m. Manual 03.00.02 EXCAVACION DE ZANJAS H=0.90 c/equipo Retroexcavadora 03.00.02 EXCAVACION MANUAL DE ZANJAS H=0.90 03.00.02 EXCAVACION MANUAL DE ZANJAS H=0.30 A 0.70 DRENAJES 03.00.01 PERFILADO DE ZANJAS 0.90x0.80x0.90 Manual 03.00.01 PERFILADO DE CISTERNA 6.40X4.90 Manual 03.00.03 RELLENO COMPACTADO - MATERIAL PRESTAMO H=25CM 03.00.03 RELLENO COMPACTADO - MATERIAL PRESTAMO H=30CM 03.00.03 COMPACTADO - MATERIAL PROPIO H=15 CM Manual c/EQUIPO 03.00.03 COMPACTADO - MATERIAL PRESTAMO H=30CM c/equipo 03.00.04 ELIMINACION DE MATERIAL EXCEDENTE D= 100 m Carguio Manual 03.00.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 15 KM Volquete 15 m3 ESTRUCTURAS 04.00.00 CONCRETO SIMPLE 04.00.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON E=4" f'c=100 Kg/cm2 04.00.01 CONCRETO f'c=100 Kg/cm2 SUBZAPATAS 04.00.01 CONCRETO f'c=210 Kg/cm2 DRENAJES (Parcial) 04.00.01 CONCRETO f'c=175 Kg/cm2 Buzon de Energia Electrica 04.00.01 CONCRETO f'c=175 Kg/cm2 Ducto Electricidad 05.00.00 CONCRETO ARMADO 05.01.00 CANAL DE DRENAJE 05.01.01 CONCRETO EN CAJA f'c=210 KG/CM2 05.01.02 ENCOFRADO Y DESENCOFRADO DE CAJA 05.01.03 ACERO FY=4200 KG/CM2 Gº60

60658719 Analisis de Costos Unitarios

Embed Size (px)

Citation preview

CONTRATISTAS

Obra Centro Automotor AQP CONSTRATISTA

CONTRATISTA

Ubicacion : AREQUIPA - AREQUIPA - PARQUE INDUSTRIAL FECHA 15/07/2011

Item01.00.00 OBRAS PROVISIONALES 01.00.01 OFICINA Y CASETA DE GUARDIANIA

Descripcin Und.Glb Glb Glb Glb ml

PRESUPUESTO

01.00.01 COMEDOR , VESTIDORES Y SSHH DE OBRA 01.00.01 ILUMINACION DE CAMPO DE TRABAJO EN OBRA 01.00.01 INSTALACION DE ENERGIA TRIFASICA PARA OBRA 01.00.02 CERCO PERIMETRICO 02.00.00 OBRAS PRELIMINARES 02.00.01 LIMPIEZA MANUAL DE TERRENO 02.00.02 TRAZO DE NIVELES Y REPLANTEO 02.00.02 DEMOLICION DE CERCO PERIMETRICO (Columnas y Pared). 02.00.02 DEMOLICION DE CIMENTACION Y ZAPATA (1.20X1.20) c/equipo 02.00.02 RETIRO DE REJA DE FIERRO (Tubo Cuadrado 1"x1" - corte c/equipo) 03.00.00 MOVIMIENTO DE TIERRAS 03.00.01 CORTE Y PERFILADO DEL TERRENO e=0.20 m. Manual 03.00.02 EXCAVACION DE ZANJAS H=0.90 c/equipo Retroexcavadora 03.00.02 EXCAVACION MANUAL DE ZANJAS H=0.90 03.00.02 EXCAVACION MANUAL DE ZANJAS H=0.30 A 0.70 DRENAJES 03.00.01 PERFILADO DE ZANJAS 0.90x0.80x0.90 Manual 03.00.01 PERFILADO DE CISTERNA 6.40X4.90 Manual 03.00.03 RELLENO COMPACTADO - MATERIAL PRESTAMO H=25CM 03.00.03 RELLENO COMPACTADO - MATERIAL PRESTAMO H=30CM 03.00.03 COMPACTADO - MATERIAL PROPIO H=15 CM Manual c/EQUIPO 03.00.03 COMPACTADO - MATERIAL PRESTAMO H=30CM c/equipo 03.00.04 ELIMINACION DE MATERIAL EXCEDENTE D= 100 m Carguio Manual 03.00.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 15 KM Volquete 15 m3

Glb m2 m3 m2 m2

m2 m3 m3 m3 m3 m3 m3 m3 m2 m3 m3 m3

ESTRUCTURAS04.00.00 CONCRETO SIMPLE 04.00.01 SOLADO MEZCLA 1:12 CEMENTO-HORMIGON E=4" f'c=100 Kg/cm2 04.00.01 CONCRETO f'c=100 Kg/cm2 SUBZAPATAS 04.00.01 CONCRETO f'c=210 Kg/cm2 DRENAJES (Parcial) 04.00.01 CONCRETO f'c=175 Kg/cm2 Buzon de Energia Electrica 04.00.01 CONCRETO f'c=175 Kg/cm2 Ducto Electricidad 05.00.00 CONCRETO ARMADO 05.01.00 CANAL DE DRENAJE m3 m2 kg m3 m2 m2 m2 m2

05.01.01 CONCRETO EN CAJA f'c=210 KG/CM2 05.01.02 ENCOFRADO Y DESENCOFRADO DE CAJA 05.01.03 ACERO FY=4200 KG/CM2 G60 05.01.00 COLUMNAS CM MURO INTERMEDIO

05.01.01 CONCRETO EN COLUMNAS f'c=210 KG/CM2

m3

05.01.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS 05.01.03 ACERO FY=4200 KG/CM2 G60 05.01.00 COLUMNAS CM EXPLANADA

m2 kg

05.01.01 CONCRETO EN COLUMNAS f'c=210 KG/CM2 05.01.03 ACERO FY=4200 KG/CM2 G60 06.04.06 Sistema de Anclaje P/ Columnas de Acero Fy=4200 kg/cm2 05.02.00 MURO DE CONTENCION INTERMEDIO

m3 kg

Und.m3 m3 m2 kg

05.02.01 CONCRETO EN LOSA DE CIMENTACION f'c=210 KG/CM2 05.02.01 CONCRETO EN LOSA DE CIMENTACION f'c=210 KG/CM2 05.02.02 ENCOFRADO Y DESENCOFRADO EN LOSA DE CIMENTACION 05.02.03 ACERO FY=4200 KG/CM2 G60 05.03.00 MURO DE CONTENCION SALON EXHIBICION 01 VEHICULOS PESADOS

05.03.01 CONCRETO F'C=210 KG/CM2 EN MUROS 05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE MUROS 05.03.03 ACERO FY=4200 KG/CM2 G60 05.03.00 MURO DE CONTENCION SALON EXHIBICION 02 VEHICULOS PESADOS

m3 m2 kg

05.03.01 CONCRETO F'C=210 KG/CM2 EN MUROS 05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE MUROS 05.03.03 ACERO FY=4200 KG/CM2 G60 05.04.00 VIGAS CERCO PERIMETRICO EXISTENTE (Muro de Sillar)

m3 m2 kg

05.04.01 CONCRETO DE f'c=175 KG/CM2 EN VIGAS 05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 05.04.03 ACERO FY=4200 KG/CM2 G60 05.05.00 LOSA MACIZA EN CISTERNA (incluye viga collar)

m3 m2 kg

05.05.01 CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA 05.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA 05.05.03 ACERO FY=4200 KG/CM2 G60 05.05.00 MURO, BASE Y FONDO DE LOSA CONCRETO ARMADO CISTERNA

m3 m2 kg

05.05.01 CONCRETO F'C=210 KG/CM2 EN MUROS 05.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA 05.05.03 ACERO FY=4200 KG/CM2 G60 06.00.00 REVOQUES ENLUCIDOS Y MOLDURAS 06.00.01 SOLAQUEADO FROTACHADO EN MUROS E=1.5 CM 06.00.02 TARRAJEO EN MURO DE CONTENCION 07.00.00 PISOS Y PAVIMENTOS 06.00.02 PERFILADO DE TERRENO PARA ADOQUINADO DE CONCRETO (20X10X0.8) 06.00.02 ADOQUINADO DE CONCRETO (20X10X0.8) e=0.02 m. A.G. / Plataforma 1 06.00.02 ADOQUINADO DE CONCRETO (20X10X0.8) e=0.02 m. A.G. / Plataforma 2 06.00.02 ADOQUINADO DE CONCRETO (20X10X0.8) e=0.02 m. A.G. / Sala Exhibicion 03 06.00.02 ADOQUINADO DE CONCRETO (20X10X0.8) e=0.02 m. A.G. / Sala Exhibicion 04 06.00.02 SARDINEL Y CARTAGONEADO ADOQUIN (20X10X0.8) e=0.02 m. A.G. / Plataforma 2 06.00.02 COMPACTACION DE ADOQUIN DE CONCRETO (20X10X0.8) c/equipo 06.00.02 PISO CEMENTO PULIDO C/BRUA - Rampas de acceso e intermedia 07.00.01 CONTRAPISO DE 48 mm

m3 m2 kg

m2 m2

m2 m2 m2 m2 m2 ml m2 m2 m2

INSTALACIONES ELECTRICAS Y SANITARIAS17.00.00 INSTALACIONES ELECTRICAS Y SANITARIAS 17.04.01 SUMIDEROS DE 2" 17.04.02 REGISTRO ROSCADO DE BRONCE 2" 17.04.03 REGISTRO ROSCADO DE BRONCE DE 4" 17.04.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2"

17.04.05 GRIFO PARA RIEGO DE BRONCE DE 1/2" 19.04.01 CAJA DE REGISTRO 12"X24" 20.05.01 CAJA DE PASE 150X150X100 20.05.02 CABLE THW 1X16 MM 20.05.03 CABLE THW 1X10 MM 20.05.04 CABLE TW 1X4 MM 20.05.05 CABLE TW 1X2.5 MM 21.00.00 SISTEMA DE COMUNICACION

CARPINTERIA METALICA17.00.00 Rejilla 17.04.01 Rejilla de Drenaje 17.04.02 Columna Metalicas Tipo 1 CM 17.04.03 Doblado de Parantes Acero 17.04.04 Armado de Columnas de acero 17.04.05 Armado de Columnas de acero ml ml Und Und Und Und

21.00.01 TUBERIA PARA TELEFONO 21.00.02 TUBERIA PARA TV-CABLE

COSTO DIRECTO

TOTAL DE PRESUPUESTO

VALORIZACION N 03

Area Construida 11896.40 m2

PRESUPUESTOMetrado1.00 1.00 1.00 1.00 301.08

MANO DE OBRAParcial S/.600.00 1,760.00 6,800.00 1,950.00 3,932.10 35,157.58

Precio S/.600.00 1,760.00 6,800.00 1,950.00 13.06

Total S/.15,042.10

Metrado1.00 1.00 1.00 1.00 301.08

Precio Unit S/.600.00 1,760.00 6,800.00 1,950.00 13.06

Parcial S/.600.00 1,760.00 6,800.00 1,950.00 3,932.10

1.00 11,387.09 121.04 53.42 285.60

2,500.00 2.14 45.00 40.00 2.47

2,500.00 24,368.37 5,446.98 2,136.80 705.43 131,109.92

1.00 11,387.09 121.04 53.42 285.60

2,500.00 1.47 45.00 40.00 2.47

2,500.00 16,739.02 5,446.80 2,136.80 705.43

7,498.80 702.08 325.00 142.19 63.40 14.60 663.67 1,451.80 396.50 98.52 168.10 1,874.59

1.43 9.20 17.00 28.00 17.00 18.00 35.00 35.00 9.00 13.14 10.00 12.00

10,723.28 6,459.14 5,525.00 3,981.32 1,077.80 262.80 23,228.45 50,813.00 3,568.50 1,294.55 1,681.00 22,495.08

7,498.80

1.43

10,723.28

325.00 142.19 63.40 14.60 663.67 1,451.80 396.50 98.52 168.10 6,355.90

15.00 26.00 15.00 18.00 35.00 816.86 7.69 7.69 10.00 12.00

4,875.00 3,696.94 951.00 262.80 23,228.45 1,185,919.15 3,049.09 757.62 1,681.00 76,270.80

64,509.18 30.59 37.60 15.20 956.40 956.40 13.49 13.49 13.49 13.49 13.49 12,901.84 12,901.84 12,901.84 12,901.84 12,901.84 956.40 956.40 956.40 956.40 956.40 13.49 13.49 13.49 13.49 13.49 12,901.84 12,901.84 12,901.84 12,901.84 12,901.84

86,965.44 17.24 36.90 2,007.65 289.83 19.09 3.43 31,103.70 4,892.29 50,969.46 86,965.44 3.60 289.83 31,103.70 111.38 289.83 31,103.70 32.88 36.90 14,859.90 289.83 19.09 3.43 31,103.70 4,892.29 50,969.46

13.44 202.08

20.89 3.43

4,892.29 50,969.46 82,194.65

256.28 14,859.90

20.89 3.43

4,892.29 50,969.46

12.47 444.62

289.83 20.89

31,103.70 50,969.46

50.00 0.80 30.00 110,606.78 50.00

5,568.75 11,887.92 40.00 10,755.00

5,568.75 11,887.92 121.50 10,755.00

30.005.02 5.02 45.23 13,105.76

4.05289.83 289.83 27.82 3.76

121.5060,070.98 60,070.98 1,258.16 49,277.64 663,208.93

9.00 0.80

407.03 10,484.60

407.03 10,484.60

734.58 13,454.78 50,602.50

289.83 17.90 4.05

217,428.33 240,840.47 204,940.13 663,208.93

734.58 13,454.78 50,602.50

289.83 17.90 4.05

217,428.33 240,840.47 204,940.13

734.58 13,454.78 50,602.50

289.83 17.90 4.05

217,428.33 240,840.47 204,940.13 205,855.83

734.58 13,454.78 50,602.50

289.83 17.90 4.05

217,428.33 240,840.47 204,940.13

90.48 198.88 26,417.60

269.68 18.09 3.76

102,927.92 3,597.74 99,330.18

90.48 198.88 26,417.60

269.68 18.09 3.76

102,927.92 3,597.74 99,330.18

6.27 31.36 441.34

289.83 20.89 0.90

1,817.23 655.11 397.21 293,373.30

6.27 31.36 441.34

289.83 20.89 0.90

1,817.23 655.11 397.21

17.89 171.84 1,724.69

269.81 20.89 4.09

91,465.59 58,967.61 142,940.10 95,478.98

17.89 171.84 1,724.69 2.00 12.00

269.81 20.89 4.09 21,767.58 46,272.74

91,465.59 58,967.61 142,940.10 21,767.58 46,272.74

10,883.79 3,856.06

3.32 15.39

36,134.18 59,344.79 91,041.95

268.79 4,839.32 2,654.66 332.62 473.00 3,856.06 8,299.60 373.84 373.84

9.00 9.00 9.00 9.00 9.00 12.00 1.00 15.39 15.74

2,419.11 43,553.88 23,891.94 2,993.58 4,257.00 46,272.74 8,299.60 5,753.40 5,884.24

268.79 4,839.32 2,654.66 332.62 473.00 3,856.06 8,299.60 373.84 373.84

9.00 9.00 9.00 9.00 9.00 12.00 1.00 15.39 15.74

2,419.11 43,553.88 23,891.94 2,993.58 4,257.00 46,272.74 8,299.60 5,753.40 5,884.24

26,417.60

206.20 100.00 92.00 9,200.00

8.00 8.00 8.00

300.00 380.00 320.00

2,400.00 3,040.00 14,640.00

COSTO DIRECTOSUBTOTAL IGV 19% TOTAL DE PRESUPUESTOAREA CONSTRUIDA

504,828.83 504,828.83 95,917.48

600,746.31

RIZACION N 03

AVANCE ANTERIOR METRADO MONTO

AVANCE ACTUAL METRADO MONTO

AVANCE ACUMULADO METRADO MONTO

SALDO MONTO

1.00

200.00 1.00 1.00 1,384.00 1,950.00

1.00

200.00 1,384.00

67% 21% 100% 0% 84% 0% 37% 93% 100% 67% 85% 89% 99% 65% 83% 13% 2% 100% 92% 100% 67% 95% #DIV/0! #DIV/0! 100%

1.00 161.84 1.00

1,950.00 647.36 2,500.00 10,467.14 400.50 235.14 1,556.66 726.80 28.35 1,309.10 158.70 228.06 22,764.00 816.86 241.16 547.90 3,982.20

161.84 1.00 2,450.00 8.90 95.20 655.80 79.00 1.89 52.19 6.70 650.40 204.22 486.10 54.79 265.48

647.36 2,500.00 3,601.50 400.50 8.87 235.14 937.79 9.20 28.35 1,356.94 100.50 22,764.00 816.86 31.36 3,738.11 547.90 3,982.20 0.00 241.16 50.35 3.88 12.67 1,309.10 58.20 228.06 432.77 618.86 354.80 4,670.50 6,865.64

7,120.50 8.90 8.87 95.20 1,088.57 79.00 1.89 50.35 10.58 12.67 650.40 204.22 31.36 54.79 265.48

956.40

11,476.80

0.00

956.40

11,476.80

11% 100% 100% 100% #DIV/0! #DIV/0! 100% 100% 100% #DIV/0!

100% 100% #DIV/0! 111.38 14,859.90 5,568.75 11,887.92 0.00 0.00 0.00 0.00 0.00 111.38 14,859.90 215.10 45.23 13,105.76 5,568.75 11,887.92 10,755.00 407.03 10,484.60 0% 0% 100% 215.10 10,755.00 0% 0% 0% #DIV/0! #DIV/0! 100% 100% 100% #DIV/0! 100% 100% 100% #DIV/0! 100% 100% 100% #DIV/0! 6.27 1,817.23 6.27 1,817.23 0% 100% 100% #DIV/0! 100% 100% 100% 100% 100% #DIV/0! #DIV/0! 100% 100% 100% 100% 100% 100% 100% 100% 100%

45.23 13,105.76

407.03 10,484.60

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

74,263.08 74,263.08 14,109.98 88,373.06

9,026.68 9,026.68 1,715.07 10,741.74

83,289.75 83,289.75 15,825.05 99,114.80

ANALISIS DE COSTOS UNITARIOSPartida

OFICINA CASETA DE GUARDINIA GLB Descripcin Recurso Sub contrato OFICINA CASETA DE GUARDINIA GLB 1.0000 5.00 1.0000 Unidad EQ. 1.0000 Cuadrilla Costo unitario directo por : GLB. Cantidad Precio Unitario

Rendimiento Cdigo

Partida

COMEDOR VESTIDOR Y SSHH DE OBRA GLB Descripcin Recurso Sub contrato COMEDOR VESTIDOR Y SSHH DE OBRA GLB 1.0000 5.00 1.0000 Unidad EQ. 1.0000 Cuadrilla Costo unitario directo por : GLB. Cantidad Precio Unitario

Rendimiento Cdigo

Partida

ILUMINACION DE CAMPO DE TRABAJO EN OBRA GLB Descripcin Recurso Sub contrato ILUMINACION DE CAMPO DE TRABAJO EN OBRA GLB 1.0000 5.00 1.0000 Unidad EQ. 1.0000 Cuadrilla Costo unitario directo por : GLB. Cantidad Precio Unitario

Rendimiento Cdigo

Partida

INSTALACION DE ENERGIA TRIFASICA GLB Descripcin Recurso Sub contrato INSTALACION DE ENERGIA TRIFASICA GLB 1.0000 5.00 1.0000 Unidad EQ. 1.0000 Cuadrilla Costo unitario directo por : GLB. Cantidad Precio Unitario

Rendimiento Cdigo

Partida

DEMOLICION DE COLUMNAS Y VIGAS m3/DIA Descripcin Recurso Mano de Obra OPERARIO PEON hh hh 2.0000 2.0000 2.6667 2.6667 12.00 11.00 6.0000 Unidad EQ. 6.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Equipos HERRAMIENTAS MANUALES COMPRESORA NEUMATICA MARTILLO NEUMATICO RETROESCAVADORA DE 420 HP %MO hm hm hm 1.0000 1.0000 1.0000 3.0000 1.3333 1.3333 1.3333 1.84 80.00 5.16 95.00

Partida

DEMOLICION DE MUROS DE LADRILLO KK SOGA m2/DIA Descripcin Recurso Mano de Obra OPERARIO PEON Equipos HERRAMIENTAS MANUALES COMPRESORA NEUMATICA MARTILLO NEUMATICO RETROESCAVADORA DE 420 HP %MO hm hm hm 1.0000 1.0000 1.0000 3.0000 0.1600 0.1600 0.1600 0.22 80.00 5.16 95.00 hh hh 2.0000 2.0000 0.3200 0.3200 12.00 11.00 50.0000 Unidad EQ. 50.0000 Cuadrilla Costo unitario directo por : m2 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

DEMOLICION DE CIMENTACION Y ZAPATAS m3/DIA Descripcin Recurso Mano de Obra OPERARIO PEON Equipos HERRAMIENTAS MANUALES COMPRESORA NEUMATICA MARTILLO NEUMATICO RETROESCAVADORA DE 420 HP %MO hm hm hm 1.2500 1.2500 1.2500 3.0000 1.2500 1.2500 1.2500 1.42 80.00 5.16 95.00 hh hh 2.0000 2.0000 2.0000 2.0000 12.00 11.00 8.0000 Unidad EQ. 8.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

RETIRO DE REJA DE FIERRO (TUBO CUADRADO DE 1 x 1 (corte con equipo) GLB. Descripcin Recurso Sub Contrato 1.0000 Unidad EQ. 1.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

RETIRO DE REJA DE FIERRO (TUBO CUADRADO DE 1 x 1 Glb. (corte con equipo)

0.0000

1.0000

350.00

Partida

PERFILADO DE ZANJAS 0.9 x 0.9 x 0.8 MANUAL m3/DIA Descripcin Recurso Mano de Obra PEON Equipos HERRAMIENTAS MANUALES %MO 5.0000 1.82 hh 2.0000 3.3000 11.00 3.0000 Unidad EQ. 3.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

PERFILADO DE CISTERNA DE 6.4 x 4.90 C/EQUIPO m3/DIA Descripcin Recurso Mano de Obra PEON Equipos HERRAMIENTAS MANUALES RETROESCAVADORA DE 420 HP %MO hm 1.0000 5.0000 0.0400 1.76 95.00 hh 4.0000 3.2000 11.00 10.0000 Unidad EQ. 200.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

COMPACTACION DE TERRENO CON M/PRESTADO C/EQUIPO m3/DIA Descripcin Recurso Mano de Obra PEON MATERIALES BASE GRANULAR ARCILLOSA M3 hh 2.0000 0.0400 11.00 400.0000 Unidad EQ. 400.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio S/.

Rendimiento Cdigo

Equipos HERRAMIENTAS MANUALES CISTERNA MOTONIVELADORA RODILLO DE 101 HP %MO HM HM HM 1.0000 1.0000 1.0000 1.0000 0.0200 0.0200 0.0200 0.00 80.00 95.00 114.80

Partida

ELIMINACION DE MATERIAL EXCEDENTE D=100M m3/DIA Descripcin Recurso Mano de Obra PEON Equipos HERRAMIENTAS MANUALES %MO 5.0000 0.44 hh 1.0000 0.8000 11.00 10.0000 Unidad EQ. 10.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

ELIMINACION DE MATERIAL EXCEDENTE D=15KM m3/DIA Descripcin Recurso Mano de Obra PEON Equipos HERRAMIENTAS MANUALES VOLQUETE 15M3 %MO HM 1.0000 5.0000 0.1067 0.15 85.00 hh 1.0000 0.2667 11.00 30.0000 Unidad EQ. 75.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio Unitario

Rendimiento Cdigo

Partida

SOLADO MEZCLA C:H 1:12 E=4" F`C=100KG/CM2 m2/DIA Descripcin Recurso Mano de Obra OPERARIO PEON Materiales HORMIGON CEMENTO GASOLINA ACEITE MOTOR GASOLINERO Equipos HERRAMIENTAS MANUALES MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 %MO hm 1.0000 2.0000 0.1333 0.24 14.35 m3 bls gln. gln. 0.1230 0.3600 0.2400 0.0040 22.00 19.80 12.85 47.90 hh hh 2.0000 6.0000 0.2667 0.8000 12.00 11.00 60.0000 Unidad EQ. 60.0000 Cuadrilla Costo unitario directo por : m2 Cantidad Precio S/.

Rendimiento Cdigo

Partida

Concreto f`c= 100kg/cm2 para Zubzapatas m3DIA Descripcin Recurso Mano de Obra OPERARIO PEON Materiales HORMIGON CEMENTO GASOLINA ACEITE MOTOR GASOLINERO Equipos HERRAMIENTAS MANUALES MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 %MO hm 1.0000 2.0000 0.1333 0.24 14.35 m3 bls gln. gln. 0.1230 0.3600 0.2400 0.0040 22.00 19.80 12.85 47.90 hh hh 2.0000 6.0000 0.2667 0.8000 12.00 11.00 60.0000 Unidad EQ. 60.0000 Cuadrilla Costo unitario directo por : m3 Cantidad Precio S/.

Rendimiento Cdigo

5.00

Parcial S/. 5.00

5.00

Parcial S/. 5.00

5.00

Parcial S/. 5.00

5.00

Parcial S/. 5.00

303.39

Parcial S/. 32.00 29.33

61.33 1.84 106.67 6.88 126.67 242.05

36.19

Parcial S/. 3.84 3.52 7.36 0.01 12.80 0.83 15.20 28.83

173.17

Parcial S/. 10.96 36.30 47.26 1.73 100.00 6.45 17.73 125.91

350.00

Parcial S/.

350.00

38.12

Parcial S/. 36.30 36.30 1.82 1.82

40.76

Parcial S/. 35.20 35.20 1.76 3.80 5.56

6.24

Parcial S/. 0.44 0.44

0.00 1.60 1.90 2.30 5.80

9.24

Parcial S/. 8.80 8.80 0.44 0.44

12.15

Parcial S/. 2.93 2.93 0.15 9.07 9.21

27.26

Parcial S/. 3.20 8.80 12.00 2.71 7.13 3.08 0.19 13.11 0.24 1.91 2.15

27.26

Parcial S/. 3.20 8.80 12.00 2.71 7.13 3.08 0.19 13.11 0.24 1.91 2.15

INSUMOSDescripcin Recurso Mano de Obra OPERARIO PEON Sub Contrato RETIRO DE REJA DE FIERRO (TUBO CUADRADO DE 1 x 1 (corte con equipo) OFICINA CASETA DE GUARDINIA COMEDOR VESTIDOR Y SSHH DE OBRA ILUMINACION DE CAMPO DE TRABAJO EN OBRA INSTALACION DE ENERGIA TRIFASICA Materiales HORMIGON CEMENTO GASOLINA ACEITE MOTOR GASOLINERO m3 bls gln. gln. 22.00 19.80 12.85 47.90 Glb. Glb. Glb. Glb. Glb. 350.00 H-H H-H 12.00 11.00 Und. Precio unitario

Equipos HERRAMIENTAS MANUALES COMPRESORA NEUMATICA MARTILLO NEUMATICO CISTERNA RODILLO DE 101 HP AMOLADORA DE 7" MOTONIVELADORA VOLQUETE 15M3 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 RETROESCAVADORA DE 420 HP %MO. H-M H-M H-M H-M H-M H-M H-M H-M H-M 80.00 5.16 80.00 114.80 10.50 95.00 85.00 14.35 95.00

HORMIGON CEMENTO GASOLINA ACEITE MOTOR GASOLINERO

m3 bls gln. gln.