PRODUCT DATA
® U.S. Registered Trademark© 2004 Honeywell International Inc. All Rights Reserved 65-02703
V4730A/V8730A, V4750A/V8750A Double Block
Safety Shutoff Valves
APPLICATIONThe V4730A/V8730A, V4750A/V8750A Double Block Valves are used for control of gaseous fuels in gas-fired power burners, atmospheric gas boilers, ovens, furnaces, incinerators, roof-top units, makeup air units and other gas consuming appliances.
FEATURES Double block safety shutoff valves for control of
gaseous fuels in gas consuming appliances in accordance with international standards.
Main body with two single-seat shutoff valves. Provides for mounting optional flanged pressure
switches. Closing time: < 1 second. Coils suitable for permanent energization. Fine mesh screen (strainer) between inlet flange and
main body. Various pressure tap points at main body available,
when no additional valves or pressure switches are used.
Plug connector according to DIN 43650, included. Adjustable maximum flow rate limiter (all models). Adjustable step opening pressure (V4750A/V8750A
only). Replaceable pipe flange adapters included. First and second internal shutoffs can be
independently energized for intermittent pilot applications.
Position indication lamp for each valve stage.
V4730A/V8730A
V4750A/V8750A
ContentsApplication ........................................................................ 1Features ........................................................................... 1Specifications ................................................................... 2Ordering Information ........................................................ 2Installation ........................................................................ 4Adjustments and Final Checkout ...................................... 5Operation .......................................................................... 7Troubleshooting ................................................................ 10Service Information .......................................................... 10
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
65-02703 2
ORDERING INFORMATIONWhen purchasing replacement and modernization products from your TRADELINE® wholesaler or distributor, refer to the TRADELINE® Catalog or price sheets for complete ordering number.
If you have additional questions, need further information, or would like to comment on our products or services, please write or phone:
1. Your local Honeywell Automation and Control Products Sales Office (check white pages of your phone directory).2. Honeywell Customer Care
1885 Douglas Drive NorthMinneapolis, Minnesota 55422-4386
In CanadaHoneywell Limited/Honeywell Limitée, 35 Dynamic Drive, Scarborough, Ontario M1V 4Z9.International Sales and Service Offices in all principal cities of the world. Manufacturing in Australia, Canada, Finland, France, Germany, Japan, Mexico, Netherlands, Spain, Taiwan, United Kingdom, U.S.A.
SPECIFICATIONSThe specifications in this section are related to the main valve. The valve must be used in combination with a burner control.
Models: See Table 1.
Table 1. Model Number and Specifications.
Maximum Operating Pressure (UL):2.9 psi (200 mBar), except for 1-1/4 in. size, which has maximum operating pressure of 1.45 psi (100 mBar)120V model and 1 psi (70 mbar)24V model
NOTE: CSA Certification to 1/2 psi.
Maximum Operating Pressure (CSA):All valves are rated for 1/2 psi (35 mbar).
Connections:1/8 in. (3 mm) pressure taps at inlet and outlet flanges. Eight
flange connections are provided at the main body to mount either a pressure switch (low or high) or a Valve Proving System (VPS).
Torsion and Bending Stress: Pipe connections meet EN161, Group 2, requirements.
Electrical Equipment: Dc coils with combined rectifier inside the cover.
Electrical Connection: Standard DIN plug connector with 36 in. (914 mm) leadwires, included.
Valve Position Indicator Lamps:Inboard (closest to the valve body)V1.OutboardV2.
Ambient Temperature Range: 5°F to 140°F (-15°C to +60°C).
Model NumberPipe Size (in.
NPT, Nominal)Voltage Rating(Vac, 50/60 Hz)
Current Rating in Amperes (A)Capacity (cfh), Natural Gas (1 in.
w.c., delta P)V1 V2 V1 + V2 With Screen Without Screen
V4730A1000 1/2 120 0.16 0.16 0.32 221 225V4730A1018 3/4 359 362V4730A1026 1 0.25 0.25 0.50 546 567V4730A1034 1-1/4 582 634V8730A1001 1/2 24 0.78 0.78 1.56 221 225V8730A1019 3/4 359 362V8730A1027 1 0.86 0.86 1.72 546 567V8730A1035 1-1/4 582 634V4750A1005 1/2 120 0.16 0.16 0.32 221 225V4750A1013 3/4 359 362V4750A1021 1 0.25 0.25 0.50 546 567V4750A1039 1-1/4 582 634V8750A1006 1/2 24 0.78 0.78 1.56 221 225V8750A1014 3/4 359 362V8750A1022 1 0.86 0.86 1.72 546 567V8750A1030 1-1/4 582 634
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
3 65-02703
Coil Insulation Solenoid Valves: Class H insulation system.
Enclosure: IP 54 (NEMA 2).
Body Material: Aluminum alloy, die cast.
Strainer: Fine mesh screen (.0135 in. [0.34 mm] diameter), AISI 303 steel, serviceable after removing inlet flange screws. Meets EN 161 requirements for strainers.
Seals and Gaskets: Hydrocarbon resistant NBR and Viton rubber types.
Flange Kit: Consists of one flange with sealing plug, 1 O-ring and four screws.
Opening Time:Dead time maximum: 1 second.First valve opening: < 1 second.Second valve opening: < 1 second.
Maximum Allowable Leakage:Outerwall: 3 cu. in./hr (50 cm3/h) at test pressure of 0.087 psi
(6 mbar) and 7.83 psi (540 mbar).First valve: 2.4 cu. in./hr, (40 cm3/h) at test pressure of 0.087
psi (6 mbar) and 7.83 psi (540 mbar).Second valve: 2.4 cu. in./hr (40 cm3/h) at test pressure of
0.087 psi (6 mbar) and 7.83 psi (540 mbar).
High Pressure Test: In the Off condition, the valve will withstand 21.75 psi (1.5 bar) inlet pressure without damage.
NOTE: Attempts to operate the valve while in this condition will not cause damage.
Closing Time: Less than 1 second for all valves.
Maximum Working Frequency: One cycle per minute.
Duty Cycle: Coil suitable for permanent energization in cooperation with ignition controller.
Operational Voltage Range: The combination gas valve will function satisfactorily between 85% and 110% of the rated voltage.
Design Life: 500,000 cycles.
Dimensions: See Fig. 1-4.
Approvals:Gas Appliance Directive 90.396/EEC.PIN: 0063AT1198.Low Voltage Directive: 73/23/EEC.Electro Magnetic Compatibility Directive: 89/336/EEC.CSA: File: Certificate Number: 158158-1227192.Underwriters Laboratories, Inc. (UL): MH18476.Accessories:
32006652-001 Flange for 1/2 in. valve.32006652-002 Flange for 3/4 in. valve.
32006652-003 Flange for 1 in. valve.32006652-004 Flange for 1-1/4 in. valve.
Fig. 1. Approximate dimensions of V4730A/V8730A (1/2 in. and 3/4 in. pipe size) in in. (mm).
Fig. 2. Approximate dimensions of V4730A/V8730A (1 in. and 1-1/4 in. pipe size) in in. (mm).
M21009C
7-7/32 (185)
1-27/32(48)
4-7/32(107)
5-1/4 (133)
6-1/2 (166)
2 (51)
2-1/32(52)
3-7/8 (98)1-11/16(43)
PRESSURE SWITCH
OPTIONAL
M21008C
7-7/32 (185)
1-27/32(48)
4-7/32(107)
5-1/4 (133)
7-5/16 (240)
2 (51)
2-1/32(52)
3-7/8 (98)1-11/16(43)
PRESSURE SWITCH
OPTIONAL
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
65-02703 4
Fig. 3. Approximate dimensions of V4750A/V8750A (1/2 in. and 3/4 in. pipe size) in in. (mm).
Fig. 4. Approximate dimensions of V4750A/V8750A (1 in. and 1-1/4 in. pipe size) in in. (mm).
INSTALLATION
When Installing this Product1. Read these instructions carefully. Failure to follow them
could damage the product or cause a hazardous condition.
2. Check the ratings given in the instructions and on the product to make sure the product is suitable for your application.
3. The installer must be a trained, experienced flame safeguard technician.
4. After installation is complete, check out product operation as provided in these instructions.
WARNINGFire or Explosion Hazard.Can cause serious injury, death or property damage.1. Turn off the gas supply before beginning installation.2. Disconnect power supply to the valve actuator
before beginning installation to prevent electrical shock and damage to the equipment.
3. Do not remove the seal over the valve inlet and outlet until ready to connect piping.
4. The valve must be installed so that the arrow on the valve points in the direction of the gas flow, so that gas pressure helps to close the valve.
Mounting PositionThe gas valve can be mounted plus or minus 90 degrees from the vertical.
Mounting locationsThe distance between the gas valve and the wall/ground must be a minimum of 11-5/16 in. (30 cm).
Main Gas Connection1. Take care that dirt does not enter the gas valve during
handling.2. Remove the flanges from the valves.3. Use new, properly reamed, pipe, free from chips.4. Apply a moderate amount of good quality pipe dope,
resistant to the action of liquid propane (LP) gas only on the pipe threads.
5. Screw the flanges onto the pipes.6. Do not thread pipe too far into flange. Valve distortion or
malfunction can result from excess pipe in the flange.7. Make sure O-ring sealing surfaces are clean. 8. Make sure that the inlet and out flanges are in line and
separated from each other enough to allow the valve to be mounted between the flanges without damaging the O-ring.
9. Using general purpose lithium grease, grease the O-ring.
10. Install the O-ring in the O-ring grooves provided on the valve bodies (one O-ring per groove).
11. Mount the gas valve between the flanges, using the screws removed earlier.
12. Complete the electrical connections as instructed in the Electrical Connection section.
M20581A
7-1/4 (185)
1-27/32(48)
4-7/32(107)
5-1/4 (133)
8-21/32 (220)
2 (51)
2-1/32(52)
1-11/16 (43)
6-1/2(166)
M20582A
7-1/4 (185)
1-27/32(48)
4-7/32(107)
5-1/4 (133)
9-7/16 (240)
2 (51)
2-1/32(52)
1-11/16 (43)
7-5/16(186)
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
5 65-02703
WARNINGFire or Explosion Hazard.Can cause property damage, severe injury or death.Perform a soap and water solution leak test any time work is done on a gas system.
Electrical Connections
WARNINGElectrical Shock Hazard.Can cause serious injury or death.
Disconnect the power supply before beginning wiring to prevent electrical shock.
Wiring1. Use 14, 16 or 18 AWG copper conductor, 600 volt
insulation, moisture-resistant wire for line voltage connections. Recommended part numbers are TTW60C, THW75C or THHN90C.
2. Follow the instructions supplied by the appliance manufacturer. See Fig. 5 and 6 for reference.
Fig. 5. Four-pin electrical plug connector.
Fig. 6. Electrical connection diagram.
ADJUSTMENTS AND FINAL CHECKOUTThe following procedures are related to the adjustments on the main gas valve. For adjustment of the other devices (i.e., pressure switches), refer to the instructions supplied with the applicable device.
WARNINGFire or Explosion Hazard.Can cause serious injury, death or property damage.Only fully qualified, experienced flame safeguard technicians should make adjustments on the valve.
Pressure Tap Points (Fig. 7)The V4730A/V8730A, V4750A/V8750A, have a number of connection points for measuring pressure and/or mounting a pressure switch.
The following pressures can be measured:
1. Inlet pressuretap on inlet flange and on side of valve body (1,2).
2. Interim pressurepressure between the two shutoff valves (3).
3. Outlet pressuretap from flange (4).The corresponding numbers (2, 3) can be found on the side of the valve.
NOTE: To mount the C6097 Pressure Switch, refer to instructions in form 65-0237, furnished with the switch.
Fig. 7. Pressure tap points.
Second Valve, Fast Opening (V4730A/V8730A)To adjust the flow rate:
1. Remove the flat, round cap from the cover.2. Using a 3 mm (7/64 in.) hex wrench, turn the adjustment
screw counterclockwise to increase or clockwise to decrease the flow rate.
3. Snap the cap back on the cover.
V1(BLACK) 2 1
3
L2
M20583
(YELLOW)
(GREEN)
V2(BLUE)
1
1 FOR CONNECTION TO 1/2 INCH FLEXIBLE ELECTRICAL CONDUIT ONLY. MAXIMUM TORQUE 65 INCH-POUNDS.
V1
1
3
V2
M20584
2
BLACK BLUE
YELLOW
41
2 3
3
2
M17985C
OPTIONALC6097PRESSURESWITCH
P
P
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
65-02703 6
Second Valve, Slow Opening (V4750A/V8750A)Both the flow rate and the step pressure can be adjusted.
IMPORTANTTo ensure a satisfactory setting of the valve, the pressure drop over the valve should be at least 10% of the supply pressure or 1 in. w.c. (2.5 mBar), whichever is greater.
To adjust the flow rate (Fig. 8 and 9):
1. Remove the cap from the top of the coil by loosening both screws.
2. Place a wrench on the adjustment nut.3. Turn the wrench counterclockwise to increase or
clockwise to decrease the flow rate.
Fig. 8. Removing the cap.
Fig. 9. Turning the adjustment nut.
To adjust the step pressure (FIg. 8 and 10):
1. Remove the cap from the top of the coil by loosening both screws.
2. Place a screwdriver in the slot of the adjustment screw, located in the center of the top of the valve.
3. Turn the screwdriver counterclockwise to increase or clockwise to decrease step pressure.
4. Replace the cap on top of the coil.
Fig. 10. Turning the step pressure adjustment screw.
Opening Speed AdjustmentOpening speed can be adjusted between one second minimum and 90 second maximum (Fig. 11 and 12).
Fig. 11. Opening speed adjustment screw.
Fig. 12. Characterized opening.
M17979A
M17980A
M17981A
M17982B
SLOWEROPENING
FASTEROPENING
FLOW REGULATION
OPENING SPEED REGULATION
TIME M17983C
100% FLOW
0% FLOW
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
7 65-02703
Final Checkout of the InstallationSet the system in operation after any adjustment is completed and observe several complete cycles to ensure that all burner components function correctly.
OPERATIONThe V4730A/V8730A, V4750A/V8750A are normally closed valves. The valves open when energized and close when the power is removed.
WARNINGExplosion Hazard and Electrical Shock Hazard.Can cause explosion, serious injury or death.1. Do not put the system into service until you have
satisfactorily completed the Valve Leak Test, all applicable tests described in the Checkout section of the instructions for the flame safeguard control and any other tests required by the burner manufacturer.
2. All test must be performed by a trained, experienced flame safeguard technician.
3. Close all manual fuel shutoff valves immediately if trouble occurs.
After the installation is complete, cycle the valve several times with the manual fuel shutoff cock closed. Make sure the valve functions properly. Also, perform the Valve Leak Test before putting the valve into service.
Fig. 13 through 16 show the capacity of the valves with inlet screens in place.
Fig. 13. Capacity of V4730A/V8730A; V4750A/V8750A 1/2 in. valves, with inlet screen.
100
CFH NATURAL GAS
PRESSURE
DROP
INCHES
W.C.
M19528
10 50 1000500 100005000
0.1
1
10
100
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
65-02703 8
Fig. 14. Capacity of V4730A/V8730A; V4750A/V8750A 3/4 in. valves, with inlet screen.
Fig. 15. Capacity of V473A0/V873A0; V4750A/V8750A 1 in. valves, with inlet screen.
100
CFH NATURAL GAS
PRESSURE
DROP
INCHES
W.C.
M19529
10 50 1000500 100005000
0.1
1
10
100
100
CFH NATURAL GAS
PRESSURE
DROP
INCHES
W.C.
M19530
10 50 1000500 100005000
0.1
1
10
100
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
9 65-02703
Fig. 16. Capacity of V4730A/V8730A; V4750A/V8750A 1-1/4 in. valves, with inlet screen.
Valve Leak Test (Fig. 17)This is a test for checking the closure tightness of the gas shutoff valve. It should be performed only by trained, experienced flame safeguard technicians during the initial startup of the burner system or whenever the valve is replaced. It is recommended that this test also be included in the scheduled inspection and maintenance procedures. For a periodic inspection test, follow steps 1, 3, 4, 5, 8, 9, 10, 12, 13, 16 and 17.
1. De-energize the control system to make sure no power goes to the valve (C, Fig. 10).
2. Close the upstream manual gas cock (A).3. Make sure the manual test petcock (F) is closed in the
leak test tap assembly (D).4. Remove the leak test tap plug and connect the test
apparatus to the leak test tap (D).5. Close the downstream manual gas cock (E).6. Open the upstream manual gas cock (A).7. Run the valve to its open position (through the safety
system); then immediately de-energize the system to close the valve.
8. Immerse an 1/4 in. (6 mm) tube vertically 1/2 in. (13 mm) into a jar of water.
9. Slowly open the manual test petcock (F).10. When the rate of bubbles coming through the water
stabilizes, count the number of bubbles appearing during a ten-second period. Each bubble appearing during a 10 second period represents a flow rate of 0.001 cfh (28 cch).
11. Close the upstream manual gas cock (A).
12. Remove the leak test tap from the valve body.13. Using a small amount of pipe sealant on the 1/8 in.
(3 mm) NPT plug, reinstall the plug in pressure tap point P.
14. To test the second SSOV, remove the 1/8 in. (3mm) NPT plug from the flange pressure tap point 4.
15. Install the leak test tap into pressure tap point 4.16. Close the downstream manual gas cock E.17. Immerse the 1/4 in. (6 mm) tube vertically 1/2 in.
(13 mm) into a jar of water.18. Slowly open the manual test petcock (F).19. When the rate of bubbles coming through the water
stabilizes, count the number of bubbles appearing during a ten-second period. Each bubble appearing represents a flow rate of 0.001 cfh (28 cch). See Table 3.
20. Remove the leak test tap from the valve body.21. Using a small amount of pipe sealant on the 1/8 in.
(3 mm) NPT plug, reinstall the plug in pressure tap point 4.
Table 2. Maximum Bubbles per Pipe Size.
100
CFH NATURAL GAS
PRESSURE
DROP
INCHES
W.C.
M19531
10 50 1000500 100005000
0.1
1
10
100
Pipe Size (in. NPT)
Maximum Seat Leakage (UL)
Maximum Number of Bubbles in 10
seconds1/2 - 3/4 235 cch 61 275 cch 71-1/4 340 cch 8
V4730A/V8730A, V4750A/V8750A DOUBLE BLOCK SAFETY SHUTOFF VALVES
65-02703 10
Fig. 17. Valve leak test.
After the Test1. Close the upstream manual gas cock (A).2. Close the manual test petcock (F), remove the test
apparatus, and close the leak test tap (D).3. Make sure the downstream manual gas cock (E) is
closed.4. Open the upstream manual gas cock (A) and energize
the valve through the safety system.5. Test with rich soap and water solution to make sure
there is no leak at the test tap (D) or any pipe adapter/valve mating surfaces.
6. De-energize the valve (C).7. Open the downstream manual gas cock (E).8. Restore the system to normal operation.
TROUBLESHOOTING
WARNINGElectrical Shock Hazard.Can cause serious injury or death.Use extreme caution while troubleshooting; line voltage is present.
IMPORTANTDo not replace the valve until all other sources of trouble are eliminated.
Troubleshooting ProcedureIf the valve does not open when the thermostat or controller calls for heat:
1. Check for line voltage at the valve leadwires or terminal block.
2. If there is no voltage at the valve leadwires or terminal block, make sure:a. line voltage power is connected to the master
switch.b. master switch is closed and overload protection
(circuit breaker, fuse or similar device) has not opened the power line.
3. If there is still no voltage at the valve leadwires or terminal block, make sure all appropriate contacts in the thermostat or controller, limits and flame safeguard controls are closed. If one or more are open, determine the cause(s); correct the trouble and proceed.
4. If there is proper voltage at the valve but the valve still does not open, check for normal gas pressure.
5. If the valve still does not open, replace the valve.If the valve does not close when one or more of the appropriate contacts in the thermostat, controller, limits or flame safeguard control is open:
1. Make sure the valve is wired in the correct circuit.2. Open the master switch to remove power from the
valve.3. If the valve closes now, check the wiring for the valve
and correct the wiring as necessary.4. Check for a short in the electrical circuit and repair it as
necessary.
SERVICE INFORMATION
WARNINGExplosion Hazard and Electrical Shock Hazard.Can cause explosion, serious injury or death.Turn off gas supply and disconnect all electrical power to the valve before servicing.
IMPORTANTOnly trained, experienced flame safeguard control technicians should attempt to service or repair flame safeguard controls and burner assemblies.
Scheduled Inspection and MaintenanceSet up and follow a schedule for periodic inspection and maintenance, including the burner, all other controls and the valves. It is recommended that the valve leak test in the Checkout section be included in this schedule. Refer to the instructions for the primary safety control(s) for more inspection and maintenance information.
M9547F
GASSUPPLY
UPSTREAMMANUALGAS COCK
DOWNSTREAMMANUALGAS COCK
BURNER
DA B C E
F
PRV
MANUALTESTPETCOCK
SSOV
1/4 IN. (6 MM) FLEXIBLETUBING
1/4 IN. (6 MM)ALUMINUM OR COPPER PILOT TUBING JAR OR GLASS
WITH WATER
CUT AT45 DEGREEANGLE
CAN ALSO BE A PERMANENT PETCOCK.
PRV = PRESSURE REGULATING VALVE.
SSOV = SAFETY SHUTOFF VALVE.
USE THE DOWNSTREAM TAP ON THE SS0V.
1
2
3
4
4
2 3
1
12
(13 MM)
LEAK TEST TAP
11 65-02703
65-02703 G.R. Rev. 11-04 www.honeywell.com
Automation and Control Solutions Honeywell International Honeywell Europe S.A. Honeywell Latin American Honeywell International Inc. Honeywell Limited-Honeywell Limitée Control Products 3 Avenue du Bourget Region1985 Douglas Drive North 35 Dynamic Drive Honeywell Building 1140 Brussels 480 Sawgrass Corporate ParkwayGolden Valley, MN 55422 Scarborough, Ontario 17 Changi Business Park Central 1 Belgium Suite 200
M1V 4Z9 Singapore 486073 Sunrise FL 33325
ApplicationFeaturesSpecificationsInstallationWhen Installing this Product…Mounting PositionMounting locationsMain Gas ConnectionElectrical Connections
Adjustments and Final CheckoutPressure Tap Points (Fig. 7)Second Valve, Fast Opening (V4730A/V8730A)Second Valve, Slow Opening (V4750A/V8750A)Opening Speed AdjustmentFinal Checkout of the Installation
OperationValve Leak Test (Fig. 17)After the Test
TroubleshootingTroubleshooting Procedure
Service InformationScheduled Inspection and Maintenance