    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerr

    EEqquuiippmmeennttCCoo..,,LLttdd

    CATALOGUE

    1. COMPANY PROFILE............................................................................................................... 1

    2. DESIGN AND PROCESS CAPABILITY................................................................................ 6

    3. QUALITY ASSURANCE SYSTEM......................................................................................... 8

    4. MAIN PROCESSING EQUIPMENTS ..................................................

    5.BUSINESS LICENSE ..............................................................................

    6. TAX REGISTRATION CERTIFICATE...............................................

    7. QUALITY MANAGEMENT SYSTEM CERTIFICATE ....................

    8. ACHIEVEMENT TABLE AND CERTIFICATION BY THE USER

    9. DESCRIPTION OF PRODUCTION LICENSE ...................................

    10. MAIN TESTING EQUIPMENTS ........................................................

    11. WORKSHOP12. HYDRAULIC PRODUCTS AND COMPONENTS ............................. 15

    12. HYDRAULIC PRODUCTS AND COMPONENTS ........................................................... 15

    13. HYDRO-GENERATOR UNITS INSTALLED IN THE STATION .

    14. QUALITY CERTIFICATE...................................................................

    15. HI-TECH PRODUCTS CERTIFICATE .............................................

    16. OTHER CERTIFICATES.....................................................................

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    2/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    1

    1. Company Profile

    Guangdong Hongyuan Zhongli Power Equipment Co.,Ltd(Referred to as Zhongli

    Company)is a enterprise which is expert in Electromechanical Equipments with 50 years

    history in manufacturing the Hydraulic Generator Sets since 1958. The registered

    capital of the company is RMB1.1 billion yuan. Annual industrial output value is overRMB3 billion yuan. Pay taxes over RMB10 million yuan. Zhongli Company is a branch of

    Guangdong Hongyuan mechanical Electric Co., Ltd. It is an independent legal entity,

    independent accounting, and autonomous operation of the production subsidiary.

    Zhongli Company is a National High-Tech Enterprise, Governing units of the

    branch of Chinese Hydraulic Equipment, One of the Eight-Enterprise in manufacturing

    in Hydraulic Generator, Leading enterprise in Hydraulic Equipments in Guangdong

    Province, 500 Enterprises in modern industry in Guangdong province, 100 important

    fostering business in equipment manufacturing in Guangdong, Integrity demonstration

    units in Guangdong Province, Business model in information in Guangdong Province.

    Zhongli Company is located in Shiliting, in Shaoguan transportation hub, hasa convenient transportation. Close to the Beijing-Kowloon Railway, Wuhan-Guangzhou

    high-speed railway, Beijing-Hong Kong and Macao Expressway, Shao- Gan highway through

    the city; 323 State Road,105 State Road, 106 State Road, 107 State Road at this

    intersection. Zhongli Company from Shanguan East Railway Station is only 5 kms, There

    is No.2 bus directly to the companys door. Shaoguan is the political, economical

    and cultural centre in northern Guangdong Province. Also is a national outstanding

    tourist cityhas the title of World Natural Heritage and World Geopark Danxiashan.

    There are world-famous Buddhist Zen Buddhism Nanhua Temple; Nearly 30 years old Maba

    Man Site; There are years after the millenenium Meiling Road; Are known as the firstpeak in Guangdong ,the Nanling National Park-shi kang kong. There as the geological

    wonders of the Canton Grand Canyon.

    Zhongli Company covers an area of 236,600 square meters. It has beautiful

    environment, advanced equipments and facilities, advanced management techniques. The

    company invested more than RMB3,500,000 to establish Zhongli ERP Information

    Management System to achieve the management, design, technology, production, and

    procurement, warehousing, finance ,personnel the full range of computer management.

    There are about 800 employees in the company among with 230 engineers including 60

    intermediate grade and senior engineers, accounted for more than 30 percent of the

    employees of the enterprise. Research and development personnel account for 11 percentof the number of workers .75 percent of the workers have gained the senior technical

    certificate.

    The Company is a leading enterprise with hi-tech and advance equipment

    manufacturing in hydraulic generator in southern China, especially in Guangdong

    Province. There are 11 factory workshops with 6,000-12,000 square meters independently,

    more than 700 sets of equipments. The main large heavy equipments are: 16m,12m, 8m,

    7m, 6.3m CNC vertical lathe; 14m,10m,9.3m,8m CNC horizontal lathe; 250, tree-axis

    four-axis CNC boring machine(used in rotor blade processing), 2 sets of German-CNC

    Machining Center,3 CNC gantry milling bed, 100, 80 radial drill, 800T hydraulic

    press, 800T puncher, 100tons and 75 tons cranes, high precision universal grinding

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    3/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    2

    machine, CNC EDM cutting machine, 3m NC length measuring instrument, 11mx7mx4.5m

    annealing furnace and a number of large high-precision and advance equipment.

    In order to expand production capacity, exchange production environment and

    improve production quality, the company invested millions of dollars for a number of

    technology project in recent years, in which has been completed in procurement andinstallation of 7.3m CNC vertical lathe and 10m of large heavy horizontal machine.

    The completion of large furnace marks that the large riveting piece of heat treatment

    is more and more easier in the company. The completed projects are:

    Large riveting plant put into operation Heavy rolling machine and put into use large micro-computer-controlled cutting machine production 3.4m high-precision vertical lathe CNC technology upgrade 8.0m CNC vertical lathe transformation 14m CNC horizontal and 12.5m CNC vertical lathe technology upgrade purchased a load of 80t 10m heavy-duty CNC horizontal lathe purchased 7.3m CNC Vertical Lathe purchased DK7732-based 4-axis EDM the purchase of a large face lathe suitable for production unit High-precision three-axis four-axis CNC milling machine and put into use,the turbine rotor blades with a CNC machining Co-operated with Shandong Langchao Software Corporation to develop enterpriseERP system, both inside and outside the enterprise to optimize the allocation of

    resources

    large annealing furnace 11m 7m 4.5m (burning diesel, operating temperatureup to above 650 )

    generator coils clean plant transformation comprehensive green transformation for factory environment, and built a gardenof green plant

    Annual output capacity of the company is over 1,000MW. The company can design

    and manufacture the head of 3 to 600 meters with runner diameter of 0.42 ~ 8.00 m,

    125 ~ 100,000 KW installed capacity of Axial turbines, Francis turbines, Pelton, Turgo,

    tubular shaft and bulb, etc. and hydro-generating unit and its supporting ball valve,

    butterfly valve, hydraulic valve, the SCR magnetic devices, power relay, power plant

    equipment, electrical control equipment. Especially low-head bulb turbine has become

    the main core competitiveness of enterprises and leading products.

    Products of low-head bulb turbine are awarded the "Quality reliable product

    promotion" certificate by China Electrical Equipment Industrial Association. Zhongli

    Company is one of the earliest companies in developing and manufacturing in bulbturbine unit in domestic country. Its technology and production capacity is in advanced

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    4/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    3

    level in domestic country, and is identified in high-tech products and famous

    trademarks in Guangdong Province. The bulb turbine unit has become the competitive

    and leading product s in the company. Cumulative production volume is ranked No.1 in

    this unit. National records of product were created frequently. In 1997, two sets of

    bulb turbine unit were made in the company with the largest runner diameter of 5.8

    meters in China, installed in Meng Zhou Hydropower Station, Shaoguan, Guangdong

    Province. In 2005, two sets of the largest turbine runner diameter of 6.4 meter were

    produced in China, installed in Dongsun hydropower station in Guangxi Province. In

    2008, four second largest turbine unitswith runner diameter of 7.2 meter were produced

    in the company, installed in Chaijiaxia Hydropower Station in Yellow River, Gansu

    Province, which is the first bulb turbine power plant in Gansu. In 2010, the products

    of the company were installed in Seshan Hydroelectric Plant, is also the first bulb

    turbine power station in Vietnam. Our unit run in Kumkoy is also the first bulb turbine

    power station in Turkey in 2011.

    The core of hydro technology is Hydro turbine runner. The company has alwaysfocused on the introduction of the turbine runner technology, through the technology

    transferred with China Institute of Water Resources And Hydropower Research (IWHR),

    TRIED, DEC, HEC and other domestic and foreign companies, the company has hundreds

    of model of runner at present and invested large money to introduce the recent

    development of advanced runner. The runner has high efficiency, small cavitation,

    suitable head range, good stability, representing the domestic advanced level. Since

    2000, with the production of advanced runner, the company won in bids successfully

    in and outside China and the competitive greatly increased.

    Technological progress is the driving force of business development.

    Innovation is the best way to enhance the core competitiveness of enterprises. Based

    on the market demand and hydroelectric power equipment trends, the company sped up

    the pace of technological progress in these years. Through the introduction, digestion

    and absorption of advanced technology, the company has developed more than 30 new

    products and 100 kinds of new processes and new materials. These technological

    achievements have effectively promoted the restructuring of enterprise products,

    which greatly enhanced the product technology and product quality. Especially in the

    last three years, through the efforts of research, completed a total of 17 scientific

    and technological achievements, of which 13 national patents are obtained, the rest

    of the four scientific and technological achievements have also been declared theinvention or utility model patents, and has received national patent offices The

    "notice of acceptance of patent applications."

    Follow the modern enterprise management mode, Zhongli Company carry out the

    Project Management Responsibility. Project managers responsible for the whole project

    process such as contract scheduling, design and manufacturing progress, quality,

    shipping, power plant services, production costs and capital return, etc. Since the

    implementation of this system, contacting with the owners smoothly, each

    implementation of the contract can be reached on time, correctly and completely, and

    gained widespread acclaim by the user.

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    5/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    4

    At present, R&D and production planning of Large-scale low-head bulb turbine

    generator has been supported by Shanguan Municipal Government. In order to expand

    the capacity to meet strong market demand, the company is actively implementing the

    "Shaoguan equipment manufacturing restructuring and revitalization plan," plans to

    invest over 8 billion yuan in Guanshao industrial park (Zhenjiang District) to build

    a R&D and production base of large low-head bulb turbine generator. 16 meter vertical

    lathe and 250T cranes and other large special heavy equipment will be in stalled in

    it. The annual production capacity of the company is over 1,500MW, the maximum unit

    capacity is 300MW, and the output value exceeding 10 billion yuan. Taxes turn to the

    State will be over 0.6 billion yuan per year.

    The products of the company have strong competitive with a broad market. In

    1998, the company passed ISO9001 quality system certificate by China Quality

    Certification Centre. The products were elected by China Electrical Equipment

    Industrial Association as quality reliable and credible products for six consecutive

    years, and attested as " AAA Product of China Quality Credit Enterprise " certificationfor five consecutive years by the China Quality Center. The company provided above

    3,000 units to the Users in and abroad in 50 years. All kinds of Products are sold

    to nearly 30 provinces, municipalities and autonomous regions. Zhongli companys unit

    products are installed in More than 1,000 stations in four major rivers in China -

    the Yangtze River, Yellow River, Pearl River and Heilongjiang. More and more products

    were exported to Turkey, Albania, Burma,Vietnam, Philippines, Nepal, Guinea and other

    countries in recent years.

    In recent years, the company won the "Guangdong Outstanding Enterprise",

    "Advanced Enterprise of China Electrical Equipment Industrial Hydropower Equipment

    Section", "Shaoguan contract and keeping promises units", "Shanguan advanced unit in

    striving for famous brand", "Shaoguan outstanding high-tech enterprises "," Shaoguan

    model of corporate tax" Shaoguan AAA level employment law unit "," Shaoguan Garden

    Unit ".

    Zhongli Company can provide customers with the following products:

    Pelton turbine unit of runner diameter in 0.32m-2.75m and the capacity to30MW below.

    Francis turbine unit of runner diameter in 0.42m-5.0m and capacity to 100MWbelow.

    Axial turbine unit of runner diameter in 0.80m-8.0m and the capacity to50MW below

    Tubular turbine unit of runner diameter in 1.80m-8.0m and the capacity to100MW below.

    Auxiliary equipment with the valve unit, excitation devices and metalstructure supporting in use of hydropower station.

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    6/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    5

    The technological transformation of various types of power plant mechanicaland electrical equipment

    Special Note The maximum casting, metal structures production, lifting capacity and otherconditions: the metal structure factory use about 10,000 tons of steel each year,

    the maximum lifting capacity is 100 tons. The stator frame of 140MW unit was made

    in the company and installed in Dongjiang Power Station, Zixing, Hunan province.

    Maximum capacity of heat treatment furnace: Electric furnace with oxygen: 1.8m 2.8m 5.3m (150kW) Annealing furnace: 11m 7m 4.5m (burning diesel,

    operating temperature up to 650 above).

    Address: Shiliting Zhenjiang District,Shaoguan,Guandong Province, PRC

    Website: www.sgzhongli.com

    Marketing manager: Liu dao jun

    Tel: 0086 751 8851209 Fax:+86 751 8852943

    E-mail: [email protected] [email protected]

    Mobile: 15976288198

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    7/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    6

    2. Design and Process Capability

    Brief Introduction of R&D Center, Design Department and Technology Department R & D Center of the company is to develop new products, new processes and

    new materials, and is responsible for the promotion, application and transformationof scientific and technological achievements in projects. R & D center is to complete

    not only the everyday product design, but also responsible for tracking, collecting,

    sorting the new information about the hydroelectric power equipment products around

    the world, to guide new product development direction, organize the projects research

    and development activities. Through research and development of the projects, the

    company can effectively solve the difficulties and problems in technological

    innovation and product development process, improve product technology content and

    technical level, and continue to fill technology gaps and continue to replace imported

    products, to make the company the leading technical level or forefront of the industry

    in domestic industry.R & D Center is set up in Product Design Department, and is in charge by chief

    engineer in Zhongli Company. There are nearly 100 personnel with high level of

    technology in R & D Center, composed by the R & D personnel, technicians and artificer.

    Several project teams (pictured) with nearly 60 technicians are constituted in

    researching and developing in new products, new processes and new materials , while

    more than 10 technicians and 30 enginemen with Middle and senior technical positionsmechanic certificate to participate in R & D work.

    Through transmission from generation to generation, the technicians in design

    and production process department in Zhongli company have the accumulation of design

    experience in designing, more and more innovative design products are manufactured

    in Zhongli company every year. At present, design products of the company cover the

    head from 2m to 600m, rotor diameter from 0.42m to 8.0m, and have thousands of

    sets of unit drawings. Design software of CAD and CAPP's three-dimensional design

    system of Tianhe Company, Tsinghua University is used in companys design. Hehai

    University's "Simulate calculation system of hydropower - mechanical transition in

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    8/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    7

    power station" is used in special calculation software. Through the full realization

    of electronic drawings, the company can send the technical documentation and

    production drawings to each department and factory by companys "ERP" system.

    Pre-production preparation can be done quickly and accurately, shortening the

    production cycle, and satisfying the user in power plant in construction.

    General engineers and Chief engineers in the company have researched and

    designed in hydro generators earlier in domestic country, other designers have

    designed the unit for more than 5 years experience. Through year after year for

    technological innovation, and implementation of the incentive mechanism, any new

    technology and valuable utility patents and suggestion shall be rewarded in design

    and manufacturing. It is greatly mobilized the enthusiasm of technical staff in

    company.

    Technology development of bulb turbine unit in the company has been developed

    since the late 1980s. After two years of technical preparation, the company undertook

    the two power plant equipment supply contract of Renhua, Guangdong province and DayuJiangxi province, the runner diameter is 3m, Bulb turbine production officially

    started. In early 1990s, by Shaoguan key projects - Mengzhou Dam hydropower project

    launched in, a full set of technology and manufacturing processes of Tianjin Power

    Equipment Factory was introduced to Zhongli Company comprehensively to enable

    enterprises of rapid technological development. In these 20 years, Zhongli Company

    from a comprehensive introduction to the digestion and absorption, to continuous

    improvement, unit structure and technology has been developed to the fourth generation,

    a combination of domestic bulb unit's technical advantages. Through the absorption

    of international advanced technology such as Alstom and GE, Zhongli Company has formed

    the bulb unit of product characteristics: full output, high efficiency, low

    temperature, compact body and large interior space, easy maintenance, etc. In the

    settlement of the oil, water leakage in Kaplan units, such as oil head of the operating

    pipeline systems, shaft seal system, it also has its own unique technologies. Product

    design in Zhongli Company has always been implementing the "people-oriented, green"

    concept, and has been widely recognized by customers as the leader in bulb industry

    and a professional manufacturer.

    In recent years, the company has done a lot of technical specification work.

    In company, each product, all parts and components has become the specification. Its

    standardization and the degree of generalization have reached a degree of 30%. Itcreates the conditions for the mass production in the future in the company.

    As for the unit structure in calculation of finite element simulation, the

    engineer in company had been sent to Huazhong University of Science and technology

    for advanced study. The ansys software is introduced to the company and complex

    modeling calculations will be done. While the use of finite element method in the

    company, the key components of fatigue damage and stress is analyzed smoothly. The

    science and economy in design is increasing, and it plays an important role in design

    of the unit.

    Zhongli Company and Langchao Common Software Company developed the ERP

    software system suitable for the characteristics of hydropower production. It can

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    9/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    8

    optimize the management of resources in operation, design, technology, production and

    supply, and it is now in a leading position in the same industry.

    The company design department completely realized the electronic design

    drawings. Design Department, Technology Division has more than one computer and

    large-scale plotter (Hewlett Packard), laser printers and other equipment, network

    full access to the ERP software system.

    In the process, Zhongli Company as the old state-owned enterprises established

    in 1958, from the date of completion of hydropower equipment production, accumulated

    50 years of experience in hydropower equipment manufacturing. Conventional units, the

    bulb turbine units have a standard unit of all components of process guidance document.

    From 200mm thick steel plate forming, welding dissimilar steel has the unique process

    methods, and has a large furnace, heat treatment to ensure the quality of structural

    parts. Zhongli Company has rich experience in machining from the beginning of 70s.

    It has a tool team which is the backbone of the tool team in Shaoguan Mechanical Industry

    System. So there is a set of standardized processing methods in the bulb turbine unitssuch as the large parts machining, stainless steel processing and complex line

    processing, etc., so as to effectively ensure the quality of the product.

    3. Quality Assurance System

    Zhongli Company has passed the ISO quality system certification by CQC Since

    1998. For decades, the company always persisted in customer-centric business

    philosophy and CODE product idea, clearly the company's quality policy: "strict

    management, honor its commitment to ensure quality and customer satisfaction." Throughthe strictly implementation of quality system, the quality of products are ensured

    in effective and satisfy the requirements of users in power stations.

    In the implementation of quality assurance system, the company strengthens

    the responsibility of leadership first. Clearly, general manager is the first person

    in quality management system. Senior manager in the company directly involved in the

    quality management system activities. The company established its quality policy and

    quality manual to control the quality and realize the quality objectives.

    Senior managers timely access to quality through achievement of the goals

    to determine the performance of quality management system, directly participate in

    periodic management reviews to grasp the overall situation of the quality system, andtake measures to the inadequate system timely, to ensure the adequacy of resources

    in the company.

    Secondly, strengthen the quality system construction. The company ensures

    the effective implementation of quality system by related system such as the

    development of quality policy, quality objectives, quality manual and quality system

    of reward and punishment, etc.

    More importantly, the company emphasizes its full participation in

    implementation of the quality system. Clarify the functions and the responsibilities

    of personnel and its relationships, through full participation, the entire qualitysystem can be operated smoothly in all sectors.

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    10/17

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    11/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    10

    Head(m)

    No.Station

    NameAddress

    Capacit

    y

    (MW)Hmax Hr

    Turbine Type Generator TypeDeliver

    y Year

    0

    24 Jaqiaosi Yingde,GD 33.2 4.08 3.52 GZ1250a-WP-420 SFWG3200-68/4700

    2005

    25 Changshan Lechang,GD 34 6.23 4.5 GZTF08-WP-410SFWG4000-60/450

    02001

    26 Keguang2 Jianyou,Sicuan 26.3 8.3 6.4 GZ1250b-WP-400SFWG6300-48/432

    02012

    27 Niulangou Yanjing,Yunnan 212.4 15.2 12.3 GZ995a-WP-380 SFWG12.4-40/4320 2010

    28 Batou Meizhou,GD 36 8.85 6.7 GZTF08-WP-380 SFWG6000-44/4160 2000

    29 Baolingsi Pingwu,Sichuan 214 19.0 14.0 GZ995a-WP-360 SFWG14-36/4320 2006

    30 Chaotouping Sanjian,GX 214 15.5 13.5 GZ995-WP-360 SFWG14-36/4320 2002

    31 Nanba Pingwu,Sichuan 212 13.5 12.0 GZ995-WP-360 SFWG12-36/4340 2012

    32 Keguang3 Jiangyou,SC 211 12.76 10.8 GZ995-WP-360 SFWG11-40/4320 2010

    33 Keguang1 Jiangyou,SC 210 11.92 10.6 GZ995-WP-360 SFWG10-40/4340 2012

    34 Binqiaowang Minxian,Gansu 26.5 10.14 8.1 GZ995-WP-360 SFWG6500-44/4320 2008

    35 Pailou Huaihua,HN 36.3 9.9 7.8 GZ995-WP-360 SFWG6300-44/4320 2005

    36 Yinghua Yingde,GD 16.3 7.5 6.8 GZ995-WP-360 SFWG6300-44/4320 2004

    37 Jiedi Chebi,Hubei 25 7.5 6.0 GZ995-WP-360 SFWG5000-44/4320 2009

    38 Yangba Mabian,Sichuan 211 13.7 10.2 GZ995a-WP-350 SFWG11-36/4320 2012

    39 Xingzhuang Qujiang,GD 34 8.2 5.5 GZ1250a-WP-350 SFWG4000-48/3700 2005

    40 Heqiao Yongdeng,Gansu 14.5 6.8 6.0 GZ1250a-WP-350 SFWG4500-48/3700 2008

    41 Longyuan Longnan,JX 24 7.0 5.1 GZ1250a-WP-350 SFWG4000-48/3700 2006

    42 Jiangkou Shixin,GD 34 6.46 5.1 GZ1250a-WP-350 SFWG4000-48/3700 2003

    43 Zhoutian Renhua,GD 34 6.2 5.1 GZ1250a-WP-350 SFWG4000-48/3700 2012

    44 Qixingdun Ruyuan,GD 33.9 7.69 5.0 GZ1250a-WP-350 SFWG3900-48/3700 2004

    45 Guanxie Shaxian,FJ 33.2 5.2 4.7 GZTF08-WP-350 SFWG3200-48/3700 2000

    46 Hengdan Wenxian,Gansu 212.5 19.0 17.2 GZ995a-WP-330 SFWG12.5-30/4050 2007

    47 Longtoutan Longnan,JX 210 14.5 12.5 GZ995-WP-330 SFWG10-32/4050 2006

    48 Qijiaping Lintao,Gansu 35.5 9.66 8.2 GZ995-WP-330 SFWG5500-40/3700 2009

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    12/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    11

    Head(m)

    No.Station

    NameAddress

    Capacit

    y

    (MW)Hmax Hr

    Turbine Type Generator TypeDeliver

    y Year

    49 Pingan Lanzhou,Gansu 34 7.2 6.0 GZ995-WP-330 SFWG4000-48/3700 2008

    50 Huanglianxi Jishou,Hunan 23.2 7.0 5.3 GZ1250a-WP-320 SFWG3200-44/3700 2008

    51 Renminqu Dujiangyan,SC 22 5.0 3.8 GZ1250a-WP-320 SFWG2000-44/3700 2009

    52 Kumkoy Turkey 35.75 12.75 9.26 GZ995-WP-300 SFWG5750-36/3500 2009

    53 Daping Leshan,SC 15.8 12.55 9.5 GD995-WP-300 SFWG5800-36/3500 2010

    54 Shizikou Yingde,GD 32 5.9 4.5 GZTF08-WP-300SFWG2000-40/330

    02001

    55 Yaoshan Renhua,GD 23 6.3 5.5 GZTF08-WP-300

    SFWG3000-40/330

    0 1996

    56 Danxia Renhua,GD 23 7.5 6.2 GZ003-WP-300SFWG3000-44/330

    01993

    57 Xiba Leshan,SC 22.5 5.3 4.6 GD1250a-WP-300SFWG2500-48/330

    02008

    58 Tantou Dayu,JX 21.6 6.8 4.5 GZ003-WP-300SFWG1600-48/312

    01993

    59 Wangwu Renhua,GD 21.35 6.5 3.26 GZTF08-WP-300SFWG1350-48/312

    01995

    60 Huanghui Lanzhou,Gansu 35 11.4 9.2 GZ995-WP-280SFWG5000-32/3320

    2009

    61 shuangdong Luoding,GD 32 7.3 6.6 GZ006-WZ-275 SFW2000-36/3250 1995

    62 Shanfeng Nanxiong,GD 21 4.2 3.8 GZ008-WZ-275 SFW1000-44/2860 2002

    63 Longjing Huiyang,GD 30.5 3.1 2.5 GD008-WZ-240 SFW500-52/3250 2003

    64 STWJDanzhou,Hainan

    10.5 2.7 2.4 GD008-WZ-240 SFW500-52/3250 2005

    65 GCFY Wongyuan,GD 30.32 2.2 2.1 GD008-WZ-210 SFW320-44/2150 2001

    66 Kalecik 1 Turkey 22.6 5.5 GZ995-WP-300SFWG2600-44/3300

    2013

    67 Kalecik 2 Turkey23.1

    6.5 GZ995-WP-280SFWG3100-36/330

    02013

    68 Kalecik 3 Turkey23.9

    8.2 GZ995-WP-280SFWG3900-32/3300

    2013

    69 BaThuoc 1 Vietnam 415 13 9 GZ995-WP-480 SFWG15-56/5500 2013

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    13/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    12

    There are 69 power stations and 164 sets of units. The maximum

    diameter of the runner of turbine is 7.2m. The largest capacity of the

    generatorsingle unit is 26 MW.

    Kaplan Type Hydraulic Generator unit

    Head(m)No.

    Station

    NameAddress

    Capacity

    (kW) Hmax Hr

    Turbine Type Generator TypeDeliver

    y year

    1 Shanxin Xingyi,GD 11000 12.6 12 ZD560a-LH-140 SF1000-16/2150 1992

    2 Daxi XinfengGD 31000 13.5 12.8 ZD560a-LH-140 SF1000-14/2150 1994

    3 Kejiao Xinyi,GD 11250 10.5 9.3 ZD560-LH-140 SF1250-16/2150 2000

    4 Kejiao Xinyi,GD 11600 10.5 9.3 ZD560-LH-145 SF1600-16/2600 2000

    5 Pintiang Shixing,GD 3320 4.5 4.2 ZDT03-LH-160 SF320-28/2150 2002

    6 dongguangqi Renhua,GD 2500 6.3 5.8 ZDT03-LH-160 SF500-24/2150 2003

    7 Fengcheng Fengcheng,JX 2630 7.6 7.0 ZD560a-LH-160 SF630-24/2600 1995

    8 Liujiadui Yuanyang,YN 23000 24.4 22.7 ZDJP502-LH-160 SF3000-16/2600 2011

    9 Hehuatang Shixin,GD 3630 6.3 5.9 ZDA324-LH-180 SF630-28/2150 2004

    10 FUshuipei Xinfeng,GD 3500 5.3 4.8 ZDA324-LH-180 SF500-36/2600 1999

    11 Jingwan Gaozhou,GD 31600 11.8 11.2 ZDA324-LH-180 SF1600-24/2860 2005

    12 Dachong Lianshan,GD 23200 18.5 17 ZDJP502-LH-180 SF3200-20/3250 200313 Yuntengdu Hezhou,GX 8400 4.2 3.3 ZDT03-LH-200 SF400-44/2860 2002

    14 shihuichong Lechang,GD 3630 5.7 4.7 ZDA324-LH-200 SF630-36/2600 2001

    15 Xian Renhua,GD 3650 5.1 4.7 ZD760-LH-200 SF650-36/2600 1991

    16 shiji Xishui,Hubei 1800 5.6 5.3 ZD760-LH-200 SF800-28/2600 1990

    17 Huazhu Longmen,GD 4800 5.8 5.3 ZD760-LH-200 SF800-28/2600 1987

    18 Xiakou Dayu,JX 21250 8.4 8.0 ZD760-LH-200 SF1250-28/2600 1986

    19 Hutiao Maoming,GD 22500 13 11.8 ZD560a-LH-225 SF2500-28/3250 1997

    20 Daling Xunyang,SX 26300 21.3 19.3 ZDJP502-LH-232 SF6300-24/3300 200821 Daling, Xunyang,SX 16300 21.3 19.3 ZZ550-LH-240 SF6300-24/3300 2008

    22 Wanglong Xinyi,GD 21250 6.5 6 ZDT03-LH-235 SF1250-36/3300 2003

    23 Zhubaoshi Xinyi,GD 21250 6.2 5.5 ZZA324-LH-250 SF1250-44/3300 2001

    24 W.wanchuan Tonghua,JL 34000 14.2 13.4 ZZ660-LH-250 SF4000-32/3300 2002

    25 Xiangjiaju Wanzhou,CQ 26300 20.6 17.5 ZZ660-LH-250 SF6300-24/3300 2007

    26 Shanyangxi Sangzhi,HN 26300 18.6 15.5 ZZ660-LH-260 SF6300-28/3300 2011

    27 Tiemai Menyuan,QH 21250 6.8 6.2 ZZ660-LH-275 SF1250-44/3600 2009

    28 Guoduwan Baokang,HB 38500 21.8 19.7 ZZ500-LH-275 SF8500-28/4250 1996

    29 Huangmaoxi Yingde,GD 41250 4.8 4.2 ZD760-LH-300 SF1250-48/3250 1988

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    14/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    13

    Head(m)No.

    Station

    NameAddress

    Capacity

    (kW) Hmax Hr

    Turbine Type Generator TypeDeliver

    y year

    30 bianshishan Qujiang,GD 31250 5.2 4.6 ZZA324-LH-300 SF1250-52/3600 1998

    31 Liancheng2 Yongdeng,GS 34000 12.5 9.6 ZZ660-LH-300 SF4000-40/3800 2008

    32 Nanyu Zhouqu,GS 310000 21.6 18.8 ZZ550-LH-315 SF10-32/4250 2012

    33 Hubao Pingle,GX 11600 5.3 4.6 ZD560a-LH-330 SF1600-60/4250 1998

    34 zhenguo ZengchengGD 11600 5.5 4.6 ZD560a-LH-330 SF1600-60/4250 1989

    35 Zhenguo ZengchengGD 21600 5.5 4.6 ZZ560a-LH-330 SF1600-60/4250 1989

    36 Baiyutan Chenzhou,HN 11600 5.8 4.8 ZZ698-LH-335 SF1600-60/4250 1998

    37 Shilong Fusong,JL 235000 37.9 33.9 ZZ550-LH-380 SF35-30/6250 2010

    38 K-K Burma 237000 38.6 36.2 ZZ550-LJ-380 SF37-30/6250 2009

    39 GezhoubaYIchang,Hubei 120000

    27 18.6ZZ500-LH-410 SF20-40/6500 1995

    40 Tianqiao Baode,Shanxi 140000 20.2 19 ZZ660-LH-550 SF40-56/8400 2002

    Maximum turbine runner diameter is5.5m, maximum

    generating unit capacity is up to 40MW.

    Francis Type Hydraulic Generator Units

    Head(m)No.

    Station

    NameAddress

    Capacity

    (kW) Hmax Hr

    TurbineType Generator TypeDelivery

    Year

    1 Shuangyutan Yingde,GD 23200 66.9 59 HLA153-LJ-92 SF3200-10/2600 1999

    2 Longjiang Tengchong,YN 11250 32.5 28 HLA112-LJ-100 SF1250-14/2150 1987

    3 Qixinghe Fengkai,GD 21600 36.6 33.8 HLA112-LJ-100 SF1600-14/2150 1997

    4 Wuzhou Shaoguan,GD 12000 42 38 HLA112-LJ-100 SF2000-14/2150 2000

    5 Heyou Lianping,GD 32500 28.2 24.2 HL220-LJ-100 SF2500-12/2600 1992

    6 Xuetou Pingshan,SC 33200 58.18 52.1 HLA112-LJ-100 SF3200-12/2600 1992

    7 Luowa Zhenning,GZ 23400 60 58 HLA153-LJ-100 SF3400-12/2600 1989

    8 Xiangshui Ledong,Hainan 14000 64 58 HLA112-LJ-100 SF4000-12/2600 1985

    9 Liusahe Jinghong,YN 24000 76 72 HLD06a-LJ-100 SF4000-10/2600 1993

    10Yuangjiangh

    eYongding,FJ 27500 78 76 HLD41-LJ-100 SF7500-10/2600 1994

    11 Maqiao1 Baokang,HB 11600 33 30 HLD74-LJ-110 SF1600-14/2150 1997

    12 Jiulian Lianping,GD 22000 36 32 HLD74-LJ-110 SF2000-14/2150 2004

    13 Nanche Taihe,JX 43200 35 27 HLA244-LJ-110 SF3200-12/2600 1998

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    15/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    14

    Head(m)No.

    Station

    NameAddress

    Capacity

    (kW) Hmax Hr

    TurbineType Generator TypeDelivery

    Year

    14 Xiaoyugu Panxian,GZ 26000 80 70 HLD41-LJ-110 SF6000-10/2600 2005

    15 Mazihe Jingping,YN 28000 221 218 HL100-LJ-110 SF8000-8/2600 1995

    16 Gaotang Zhaoqing 312000 156 153 HLD46-LJ-115 SF12-8/2600 1997

    17 Daxiaozuang Xinfeng 22000 35.6 26.5 HLD74-LJ-120 SF2000-18/2600 1999

    18 Yuegui Xinyi,GD 22000 30.2 27 HLA244-LJ-120 SF2000-16/2600 2004

    19 Beifengshan Xingxin,GD 22500 32.2 27 HLA244-LJ-120 SF2500-16/2600 1992

    20 Fucao Xinyi,GD 25000 64 58 HLA153-LJ-120 SF5000-14/2600 1992

    21 Datanhe Ruyuan,GD 25000 62.2 57 HLA153-LJ-120 SF5000-14/2600 1997

    22 Jiujiedai Chenzhou,HN 26300 154.1 143.2 HLA520-LJ-120 SF6300-10/2600 2003

    23chongjianghe

    Diqing,YN 36300 192 183 HL100-LJ-120 SF6300-8/2600 1987

    24 Zhuxijiang Xupu,HUnan 35000 56.7 50.0 HLA743-LJ-130 SF5000-14/2600 2009

    25 Maduhe Yichang,Hubei 38000 92 87 HLA743-LJ-130 SF8000-10/2600 2008

    26 Meifeng A Fengshun,GD 24000 42.0 38.0 HLA551-LJ-135 SF4000-16/2600 2004

    27 Meifeng B Fengshun,GD 26000 58.0 48.0 HLA551-LJ-135 SF6000-14/2600 2004

    28 Bingying Xinyi,GD 22500 29.5 21 HL240-LJ-140 SF2500-24/2860 1987

    29 Yunli Xinyi,GD 22500 26 20.1 HL240-LJ-140 SF2500-24/2860 1987

    30 XiaoguanbaDongfang,HaiN

    16500 52.6 47.5 HL220-LJ-140 SF6500-16/3300 1973

    31Zhangonglo

    ngYangchun,GD 26500 50.3 47.8 HL220-LJ-140 SF6500-16/3300 1973

    32Tiantangsha

    nLongmen,GD 36500 55 47.5 HL220-LJ-140 SF6500-16/3300 1991

    33 Xiongdu Yichang,hubei 36500 58 52.1 HLA112-LJ-140 SF6500-16/3300 1988

    34 Nangao Lufeng,GD 31500 265 255 HL100-LJ-140 SF15-8/2600 1981

    35 Wangjiashan Jiangkou,GZ 21600 20 17.8 HL310-LJ-145 SF1600-24/2860 1986

    36 Baofu Shanghang,FJ 31600 24 22 HLD74-LJ-145 SF1600-24/2860 1996

    37 Dongjiang Shenzhen,GD 41600 21.2 19 HL260-LJ-145 SF1600-28/2860 1992

    38zhangshuwang

    Shixin,GD 22000 23 20.1 HL260-LJ-145 SF1600-28/2860 1985

    39 Danzhu Shenzhen,GD 22000 21.8 18.7 HL260-LJ-145 SF2000-24/2860 1985

    40 Hutouken Quangnan,JX 22000 22 21.3 HL260-LJ-145 SF2000-24/2860 1986

    41 Yunkou Lichuan,Hubei 215000 105 95 HLA630-LJ-145 SF15-12/2600 2008

    42 Maqiao Baokang,Hubei 23200 29 25 HLA112-LJ-160 SF3200-24/3250 1991

    43 Nam Kong 2 Vietnam 322000 109.3 98.8 HLA743-LJ-160 SF22-12/3600 2013

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    16/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    15

    Head(m)No.

    Station

    NameAddress

    Capacity

    (kW) Hmax Hr

    TurbineType Generator TypeDelivery

    Year

    44 Yupaojiang Dayao,Yunnan 28000 46.38 41.37HLA551C-LJ-16

    2SF8000-18/3300 2009

    45 Datanghe Ruyuan,GD 210000 58 50.5 HLD75-LJ-165 SF10-16/3300 1999

    46 Diaoyutai Ruyuan,GD 212500 68.5 62 HLD75-LJ-165 SF12.5-16/3300 1998

    47 Yangxishui Ruyuan,GD 210000 55.8 48.7 HlA551-LJ-170 SF10-18/3300 2002

    48 Hengxi Ruuan,GD 225000 138.6 124 HLA194-LJ-170 SF25-14/3800 2003

    49 Yetang Pingwu,SC 213200 60.5 55.0 HLD267-LJ-186 SF13.2-18/3300 2009

    50 Dahe Yangjiang,GD 215000 45.8 43 HLD74-LJ-225 SF15-24/5500 1995

    51 Liangde Gaozhou,GD 210000 42.5 35.8 HL220-LJ-230 SF10-32/4250 1973

    52 Ytan Zhangjiajie,HN 110000 38 34.6 HL220-LJ-230 SF10-32/4250 1993

    Laolongkou Huichun,Jiling 28000 30.14 23.5 HLD260(B)-LJ-24 SF8000-36/4800 200853

    Laolongkou Huichun,Jiling 13200 30.14 23.5 HLD260(B)-LJ-15 SF3200-24/4250 2008

    54 Jingjiang Renhua,GD 212500 43.2 34.4 HL240-LJ-250 SF12.5-36/4800 1992

    55 Yutan Zhangjiajie,HN 220000 38 34.6 HLA244-LJ-300 SF20-36/5500 1996

    Hydraulic Products and Components

    hydro-generating unit

  • 8/12/2019 6588346-201206290024244fecf5b80d1b0

    17/17

    GGuuaannggddoonnggHHoonnggyyuuaannZZhhoonngglliiPPoowweerrEEqquuiippmmeennttCCoo..,,LLttdd BBrriieeffIInnttrroodduuccttiioonn

    16

    Delivery of hydraulic parts

    Running turbineRotor of hydro generator