    GlassEnclosurewithPyramidRoofDiagram

    Figure:

    Q9

    18.0m

    clearspan

    SECTIONACROSSBUILDING

    Areacoveredby

    glazedroof

    inequalglazed

    segments.

    Glazedpyramid.

    6.0m Ground

    Level

    18.0m

    9.0m

    PLANOFBUILDING18.0m clearspan

    Thevoid withinthesupportingwalls

    androofistoremainclearofany

    structure.

    6.0m wideby4.0mhigh

    removableglazingforaccess

    StructureZone

  • 7/27/2019 7d74d5f6-4d44-4bb5-9f85-18dd113cae02

    2/3

    Question9: GlassEnclosurewithPyramidRoofClientsrequirements1. Anexhibitionhallistohaveafeatureglassroofandcladdingsurroundingadisplayarea. Thiscomprisesa

    glazedpyramidsupportedonfourglazedwallsformingasquare. A6.0mby6.0mareainthemiddleofonewallisrequiredtobedemountableforaccess. SeeFigureQ9

    2. Theglazingcomprisescavityglassunits30.5mmthick,weighing0.30kN/m2. Allglasselementshaveamaximum

    size

    of

    1.5

    m

    by

    1.5

    m.

    The

    glass

    units

    and

    panes

    may

    be

    supported

    by

    partial

    or

    complete

    framingorbepointfixed. Mountingmustbearrangedthatanyglassunitcanbeindependentlyremovedformaintenance.

    3. Theclientrequiresastructuralframeandglasssupportsystemfortheglasswhichhasaminimumofinterruptiontothelightandenhancesthevisualaspectoftheenclosure. Thesupportsystemmustbeentirelyontheinsidefaceoftheglass,andisrestrictedtothestructurezoneindicatedinthediagram,suchthatthevoidwithinthebuildingremainsclearofanystructure.

    4. Thedesignshallincorporateadescriptionofanappropriatefoundationscheme,butdetaileddesignofthefoundationsisnotrequired.

    Imposedloading5. Imposedloadonroof: 0.6kN/m2,6. Amaintenancepointloadof0.5kNappliednormaltotheglassanywhereonthesupportsystem.Siteconditions7. Thesiteislocated2kmintoatown,over100kmfromthecoast. Basicwindvelocityis46m/sbasedona

    3secondgust;theequivalentmeanhourlyspeedis23m/s.

    8. Groundconditions:Groundlevel 0.9m Madeground0.9m1.5m Sandandgravel,Nvariesbetween3and5.Below1.5m Sandstone,allowablebearingpressure1,000kN/m

    2

    Groundwaterwasencounteredat2.5mbelowgroundlevel.

    Omitfrom

    consideration

    9. Detaileddesignoftheglasspanes.

    Detaileddesignofthefoundations.

    SECTION1 (50marks)a. Prepareadesignappraisalwithappropriatesketchesindicatingtwodistinctandviablesolutionstothe

    proposedstructure. Indicateclearlythefunctionalframing,loadtransferandstabilityaspectsofeachscheme. Identifythesolutionyourecommend,givingreasonsforyourchoice. (40marks)

    b. Afteryourdesigniscomplete,theClientwritesthatalatermoredetailedsoilinvestigationrevealsthattherearetheremainsofaburiedrivervalleyacrossthecornerofthebuildingarea. Writealettertoyourclientadvisinghimoftheimplicationsofthisandhowtheeffectscanbemitigated. (10marks)

    SECTION2 (50marks)ForthechosensolutioninSection1(a):

    c. Preparesufficientdesigncalculationstoestablishtheformandsizeofalltheprincipalstructuralelementsandconnections. (20marks)

    d. Preparegeneralarrangementplans,sectionsandelevationstoshowthedimensions,layoutanddispositionofthestructuralelementsandcriticaldetailsforestimatingpurposes,includingdetailsofhowtheglassunitsaretobesupported. (20marks)

    e. Prepareadetailedmethodstatementforthesafeconstructionofthebuildingandanoutlineconstructionprogramme. (10marks)

  • 7/27/2019 7d74d5f6-4d44-4bb5-9f85-18dd113cae02

    3/3

    Question9: GlassEnclosurewithPyramidRoofExaminersappreciationThisquestionwillbebestansweredbythosewhohaveexperienceinenvelopedesign,especiallyinvolving

    glass,thoughtheobviousstructuralaspectsmayattractothercandidates. Whilefoundationsareomitted,

    greaterattentiontothedetailsandstructuralisexpectedofthecandidate. Solutionsthatdonotmeetthe

    clientsrequirementsthatthestructureenhancesthevisualaspectoftheenclosurewillbepenalised.

    Whiledesignoftheglasspanesisomitted,thecandidateisexpectedtodesigntheglasssupportsystemandthe

    mainstructure

    down

    to

    ground

    level,

    including

    all

    necessary

    structure

    for

    load

    support

    and

    stability.

    Ithasbeenleftopenhowtheglassissupported. Thisquestionlendsitselftoeitheredgesupportedorpoint

    fixedglazing. Itmaybethatsomesortofproprietaryglazingframingsystemisincorporatedintothedesignand

    thiswillbeacceptableprovidingthatthestructuralrequirementsforthesystemareshownasmet. Inthis,

    deflectionsareoftenthegoverningcriteria.

    Possiblesolutionsforthestructureinclude:

    EdgesupportedglassonglasscurtainwallframingspanningfromthegutterlinetoRHS/CHS/UB/CUBmainmembersformingthepyramidsupportedinturnonamainstructuretogroundlevel.

    UnframedpointfixedglasssupportedonslenderopenwebgirderssupportedinturnonRHS/CHS/UB/CUBframing

    forming

    the

    pyramid

    supported

    in

    turn

    on

    amain

    structure

    to

    ground

    level.

    Unframedpointfixedglasssupportedontriangularspaceframesformingthepyramidandbuildingwalls.Thereisconsiderableopportunityforcandidatestousetheirimaginationindesigningthestructure. Itis

    acceptedthatitmaybesomecommonalityintheframingforthetwosolutions,butsimilardesignsindifferent

    materialswillnotbeacceptable.

    Candidatesareexpectedtoshowthattheyunderstandtheparticularproblemsoftolerancesandmovement

    thatcanaffectabuildingofthistype. Alsothattheycanprovidedetailsthattaketheseaspectsintoaccount.

    Carewillbeneededinassessingtheloadsinorderthatthemembersaresizedwithintherestrictionsgiven. The

    stabilityoftheroofandthesupportingstructuremustbeconsidered. Thosewithexperienceof3dimensional

    structures(cut

    timber

    roofs,

    for

    example)

    will

    be

    able

    to

    reduce

    the

    size

    of

    the

    main

    members,

    though

    should

    bewareofthehorizontalcomponentsofsupportforces.

    Thenotethatthereisnostructurewithinthepyramidvoidistopreventacandidateusingsimplerstructureto

    bracetheroof. Thestructurezoneisshownnotdimensioned,butcandidatesareexpectedtobereasonablein

    theirinterpretation,thattheirstructuremeetsthisreasonablyandthatnomemberscrossthevoid.

    Whilethoseexperiencedsolelyinenvelopestructureswillnormallyusesomeoneelsesstructureastheir

    foundation,someknowledgeofbuildingfoundationsisexpectedofaCharteredEngineer. Whilenodesignis

    askedfor,thecandidateisexpectedtohavesufficientknowledgetocomplywithClientsbrief4andanswer

    part1b.

    ForthecalculationsIexpectconsiderationofthememberdesignincludingnotonlytheappliedandselfweight

    forcesbut

    proper

    consideration

    of

    element

    stability

    and

    especially

    deflection.

    Thedrawingsshouldshowthegeneralarrangementsasnecessary. However,thereshouldalsobedetails

    showinghowtheglassissupportedandhowthepyramidsarelinkedtothesupportingframe.

    Iwouldexpecttheprogrammetotakeatleast6to9months,butthemethodstatementmustindicatehowthe

    panes(weighingupto140kg)aresafelyhandled.