 07/07/2015  ANALISIS DE PRECIO UNIT ARIO CLAVE DESCRIPCION  Mortero cal-arena 1:4 UNIDAD  m3 CANTIDAD  100.00 CLAVE CONCEPTO UNIDAD CANTIDAD PRECIO IMPORTE  material cal hidra ton 0.21 850.00 175.10  arena m3 1.18 90.00 106.20  agua m3 0.27 0.10 0.03 0.00 0.00 0.00 0.00 0.00 0.00 total material 281.33 m. obra  peon meclando !or 0.48 125.00 60.00 0.00 0.00 0.00 total m.obra 6. hta. herramienta " 0.03 60.00 1.80  0.00 0.00 0.00 total !ta. 1.8  precio directo 3"3.13 co#to indirecto 51.47  utilidad 27.45  $inancianmiento total #re$io "22.%  

Acabado s

Embed Size (px)

DESCRIPTION

HOJAS DE CALCULO

Citation preview

MORTEROSANALISIS DE PRECIO UNITARIOCLAVEDESCRIPCIONMortero cal-arena 1:4UNIDADm3CANTIDAD100.00CLAVECONCEPTOUNIDADCANTIDADPRECIOIMPORTEmaterialcal hidraton0.21850.00175.10arenam31.1890.00106.20aguam30.270.100.030.000.000.000.000.000.00total material281.33m. obrapeon mezclandojor0.48125.0060.000.000.000.00total m.obra60.00hta.herramienta%0.0360.001.800.000.000.00total hta.1.80precio directo343.13costo indirecto51.47utilidad27.45financianmientototal precio422.05

&C&D

CONCRETOSANALISIS DE PRECIO UNITARIOCLAVEDESCRIPCIONConcreto f'c 100 fg/cm2UNIDADm3CANTIDAD100.00CLAVECONCEPTOUNIDADCANTIDADPRECIOIMPORTEmaterialcementoton0.001,500.000.00arenam30.0090.000.00gravam30.00125.000.00aguam30.000.100.000.000.000.000.000.00total material0.00m. obrapeon mezclandojor0.48125.0060.000.000.000.00total m.obra60.00hta.herramienta%0.0360.001.800.000.000.00total hta.1.80precio directo61.80costo indirecto9.27utilidad4.94financianmientototal precio76.01

&C&D