CALENDARIO ACELERADO DE AVANCE DE OBRA VALORIZADO CON AMPLIACION DE PLAZO

Presupuesto 0303013 AMPLIACION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA LOS ALGARROBOS DEL AA.HH. LOS ALGARROBOS - DISTRITO DE PIURA

Cliente GOBIERNO REGIONAL PIURA

Contratista CONSORCIO PIURA

Lugar PIURA - PIURA - PIURA

Item Descripción Und. Metrado Precio S/. Parcial S/.1° MES 2° MES 3° MES 4° MES 5° MES 6° MES 7° MES 8° MES 9° MES

ESTRUCTURAS

01 OBRAS PROVISIONALES 21,165.72

01.01 CARTEL PARA LA OBRA DE 7.20X3.60M u 1.00 1,570.29 1,570.29 1570.29 0.00 0.00 0.00 0.0001.02 CONSTRUCCION DE CASETA PARA ALMACEN Y OFICINA DE RESIDENCIA glb 1.00 7,500.00 7,500.00 7500.00 0.00 0.00 0.00 0.0001.03 INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA u 1.00 949.52 949.52 949.52 0.00 0.00 0.00 0.0001.04 AGUA PARA LA CONSTRUCCION mes 8.00 500.00 4,000.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 250.00 250.0001.05 SERVICIOS HIGIENICOS EN OBRA glb 1.00 545.91 545.91 545.91 0.00 0.00 0.00 0.0001.06 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 6,600.00 6,600.00 1980.00 2640.00 1980.00 0.00 0.00 0.00 0.0002 OBRAS PRELIMINARES 43,618.05 0.00 0.00 0.00 0.0002.01 DESMONTAJES DE COBERTURA DE ETERNIT Y ESTRUCTURA DE TECHO m2 839.59 6.49 5,448.94 3269.36 310.94 631.35 1237.29 0.00 0.00 0.00 0.0002.02 DESMONTAJE DE TIJERALES u 14.00 64.89 908.46 908.46 0.00 0.00 0.00 0.0002.03 DESMONTAJE DE PUERTA DE FIERRO m2 40.30 9.87 397.76 258.54 74.03 65.14 0.05 0.00 0.00 0.00 0.0002.04 DESMONTAJE DE PUERTAS DE MADERA m2 6.30 7.40 46.62 46.62 0.00 0.00 0.00 0.0002.05 DESMONTAJE DE VENTANAS Y SOBREVENTANAS DE FIERRO m2 98.24 9.87 969.63 775.70 116.66 77.18 0.08 0.00 0.00 0.00 0.0002.06 DESMONTAJE DE APARATOS SANITARIOS u 7.00 29.61 207.27 207.27 0.00 0.00 0.00 0.0002.07 DESMONTAJE DE SISTEMA ELECTRICO glb 1.00 1,500.00 1,500.00 1200.00 300.00 0.00 0.00 0.00 0.0002.08 REMOCION DE ARBOLES u 20.00 83.77 1,675.40 670.16 1005.24 0.00 0.00 0.00 0.0002.09 DEMOLICION DE MUROS DE LADRILLO KK - SOGA MANUAL m2 367.63 5.54 2,036.67 407.33 322.37 370.79 0.00 936.17 0.00 0.0002.10 DEMOLICION DE MUROS DE LADRILLO K.K. - CABEZA, MANUAL m2 68.74 6.24 428.94 428.94 0.00 0.00 0.00 0.0002.11 DEMOLICION DE SOBRECIMIENTOS DE CONCRETO m3 6.74 134.32 905.32 110.14 181.09 0.00 614.08 0.00 0.0002.12 DEMOLICION DE CIMIENTOS m3 61.69 130.09 8,025.25 1186.42 3440.88 0.00 3397.95 0.00 0.0002.13 DEMOLICION DE COLUMNAS DE CONCRETO m3 10.20 201.47 2,054.99 513.75 89.45 362.65 0.00 1089.15 0.00 0.0002.14 DEMOLICION DE VIGAS DE CONCRETO m3 5.60 183.15 1,025.64 615.38 371.79 38.46 0.00 0.00 0.00 0.0002.15 DEMOLICION DE PISO DE CEMENTO PULIDO, e=0.05m m2 636.73 4.00 2,546.92 1018.77 418.76 1109.39 0.00 0.00 0.00 0.0002.16 DEMOLICION DE FALSO PISO, e = 0.10 m m2 41.03 6.65 272.85 272.85 0.00 0.00 0.00 0.0002.17 DEMOLICION DE VEREDAS DE CONCRETO A PULSO m2 68.36 6.65 454.59 367.08 87.51 0.00 0.00 0.0002.18 DEMOLICION DE URINARIO CORRIDO m3 0.09 39.91 3.59 3.59 0.00 0.00 0.00 0.0002.19 DEMOLICION DE BEBEDERO DE CONCRETO m3 0.48 49.89 23.95 23.95 0.00 0.00 0.00 0.0002.20 ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES, Dp=5 KM m3 274.13 13.95 3,824.11 1107.21 1303.91 0.00 1413.00 0.00 0.0002.21 LIMPIEZA DE TERRENO MANUAL m2 3,031.17 0.83 2,515.87 2515.87 0.00 0.00 0.00 0.00 0.0002.22 TRAZO Y REPLANTEO EN EDIFICACION m2 3,031.17 1.15 3,485.85 522.88 498.12 162.37 1440.01 508.13 43.13 311.22 0.0002.23 TRAZO Y REPLANTEO EN CERCO PERIMETRICO m 727.99 1.16 844.47 0.00 21.61 285.58 537.28 0.0002.24 ENTIBADO PARA EXCAVACION MASIVA m2 289.68 13.86 4,014.96 4014.96 0.00 0.00 0.00 0.0003 MOVIMIENTO DE TIERRAS 374,975.08 0.00 0.00 0.00 0.0003.01 CORTE DE TERRENO NATURAL PARA NIVELACION m3 2,501.03 4.94 12,355.09 2471.02 4942.42 416.84 2470.84 0.00 1437.77 616.21 0.0003.02 CORTE DE TERRENO NATURAL, e= 0.05m m2 363.90 1.25 454.88 176.97 237.45 0.00 0.00 40.46 0.0003.03 CORTE DE TERRENO NATURAL, e = 0.10m m2 130.38 2.49 324.65 0.00 324.65 0.00 0.0003.04 CORTE DE TERRENO NATURAL, e = 0.20m m2 638.88 4.99 3,188.01 3188.01 0.00 0.00 0.00 0.0003.05 CORTE DE TERRENO NATURAL, e = 0.30m m2 141.19 7.98 1,126.70 901.36 0.00 0.00 225.34 0.0003.06 CORTE DE TERRENO NATURAL, e= 0.65m m2 15.19 19.96 303.19 303.19 0.00 0.00 0.0003.07 CORTE DE TERRENO NATURAL, e= 0.75m m2 15.19 19.96 303.19 303.19 0.00 0.00 0.00 0.0003.08 CORTE DE TERRENO NATURAL, e = 0.84m m2 200.38 19.96 3,999.58 1595.80 0.00 2403.78 0.00 0.0003.09 CORTE DE TERRENO NATURAL, e = 1.31m m2 22.00 33.26 731.72 731.72 0.00 0.00 0.00 0.0003.10 EXCAVACION DE ZANJAS PARA ZAPATAS m3 266.89 24.95 6,658.91 4260.96 1676.24 0.00 721.70 0.00 0.0003.11 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS m3 531.75 24.95 13,267.16 663.36 2048.64 5014.08 5541.08 0.00 0.0003.12 EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION m3 16.85 24.95 420.41 420.10 0.31 0.00 0.00 0.00 0.0003.13 EXCAVACION DE MURO DE CONTENCION m3 777.34 24.95 19,394.63 6738.61 2031.28 2392.46 1378.81 6853.48 0.00 0.0003.14 EXCAVACION PARA CISTERNA m3 43.13 24.95 1,076.09 1076.09 0.00 0.00 0.00 0.0003.15 EXCAVACION MASIVA PARA MEJORAMIENTO DE TERRENO m3 2,533.72 6.20 15,709.06 15709.06 0.00 0.00 0.00 0.0003.16 CORTE DE TERRENO NATURAL PARA VEREDAS, e = 0.10 m m2 67.13 2.49 167.15 143.27 0.00 0.00 23.88 0.0003.17 CORTE DE TERRENO NATURAL PARA CIRCULACIÓN, e = 0.20m m2 444.38 4.99 2,217.46 2134.37 0.00 0.00 83.08 0.0003.18 CORTE DE TERRENO NATURAL PARA CIRCULACIÓN, e = 0.25m m2 227.84 6.24 1,421.72 0.00 1421.72 0.00 0.0003.19 CORTE DE TERRENO NATURAL PARA LOSA DEPORTIVA, e = 0.20m m2 613.30 4.99 3,060.37 3060.37 0.00 0.00 0.00 0.00

DEL 12 AL 31 MARZO 2013

DEL 01 AL 30 ABRIL 2013

DEL 01 AL 31 MAYO 2013

DEL 01 AL 30 JUNIO 2013

DEL 01 AL 31 JULIO 2013

DEL 01 AL 31 AGOSTO 2013

DEL 01 AL 30 SETIEMBRE 2013

DEL 01 AL 31 OCTUBRE 2013

DEL 01 AL 19 NOVIEMBRE 2013

Page 2: ACELERADO - AMPL1

03.20 EXCAVACION PARA CUNETA PLUVIAL m3 64.68 33.26 2,151.26 196.90 0.00 0.00 1954.3603.21 EXCAVACION PARA SARDINEL, e = 0.20m m 59.31 1.42 84.22 0.00 0.00 0.00 84.2203.22 EXCAVACION PARA SARDINEL, e = 0.24m m 112.10 1.42 159.18 129.31 0.00 0.00 29.8803.23 EXCAVACION PARA SARDINEL, e = 0.30m m 86.44 1.53 132.25 0.00 0.00 0.00 132.2503.24 EXCAVACION PARA SARDINEL ARMADO m3 22.32 22.18 495.06 0.00 494.95 0.10 0.0003.25 RELLENO CON MATERIAL DE PRESTAMO (AFIRMADO) m3 23.49 58.37 1,371.11 0.00 0.00 1371.11 0.0003.26 RELLENO CON MATERIAL PROPIO (AFIRMADO) m3 161.74 15.97 2,582.99 652.87 425.76 938.98 253.25 312.13 0.0003.27 RELLENO CON MATERIAL PROPIO (SP) m3 575.42 15.97 9,189.46 43.82 661.24 1856.96 202.63 1032.05 5392.76 0.0003.28 RELLENO PARA MEJORAMIENTO DE TERRENO (OVER SIDE) m3 445.69 63.10 28,123.04 28123.04 0.00 0.00 0.00 0.0003.29 RELLENO PARA MEJORAMIENTO DE TERRENO (AFIRMADO) m3 1,741.36 53.30 92,814.49 92814.49 0.00 0.00 0.00 0.0003.30 RELLENO PARA MEJORAMIENTO DE TERRENO (HORMIGON) m3 211.34 53.82 11,374.32 11374.32 0.00 0.00 0.00 0.0003.31 RELLENO CON HORMIGON m3 154.93 73.10 11,325.38 719.85 5462.76 0.00 5142.7703.32 BASE DE FALSO PISO CON HORMIGON, e = 0.05 m m2 286.13 9.22 2,638.12 1245.44 1228.93 163.75 0.00 0.00 0.0003.33 BASE DE FALSO PISO CON HORMIGON, e = 0.10 m m2 114.26 18.43 2,105.81 493.83 696.47 0.00 915.51 0.0003.34 CAPA DE GRAVA DE 3/4", e=0.10m m2 50.99 12.69 647.06 0.00 647.06 0.00 0.0003.35 CAPA DE HORMIGON, e=0.20m m3 98.86 65.04 6,429.85 791.86 772.19 867.58 1681.80 0.00 2316.42 0.0003.36 CAPA DE AFIRMADO, e=0.20m m3 98.86 64.42 6,368.56 784.31 764.83 859.31 1665.90 0.00 2294.21 0.0003.37 ELIMINACION DE MATERIAL EXCEDENTE (AFIRMADO) m3 374.14 13.18 4,931.17 4282.97 250.26 0.00 397.94 0.0003.38 ELIMINACION DE MATERIAL EXCEDENTE (SP) m3 8,032.76 13.18 105,871.78 42348.71 17193.71 6584.79 4930.67 17950.26 2745.39 10168.59 3949.66 0.0004 OBRAS DE CONCRETO SIMPLE 335,223.80 0.00 0.00 0.00 0.0004.01 SOLADOS 11,684.97 0.00 0.00 0.00 0.0004.01.01 SOLADO PARA ZAPATAS, h=0.10m Mezcla 1:10 m2 204.71 23.04 4,716.52 2083.97 1144.17 0.00 1190.71 0.00 0.00 0.00 297.6804.01.02 SOLADO PARA MURO DE CONTENCION, h = 0.10m, Mezcla 1:10 m2 302.45 23.04 6,968.45 1402.56 753.70 1895.96 0.00 684.75 0.00 2231.4804.02 CIMIENTO CORRIDO DE CONCRETO CICLOPEO 1:10 + 30% P.M. 6" m3 285.87 162.03 46,319.52 7216.45 2378.87 15708.81 12692.90 0.00 8322.4904.03 SOBRECIMIENTO 2,991.81 0.00 0.00 0.00 0.0004.03.01 CONCRETO CICLOPEO 1:8 + 25% P.M. 3" PARA SOBRECIMIENTOS m3 6.33 234.82 1,486.41 780.69 0.00 705.72 0.0004.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 42.67 35.28 1,505.40 1113.26 0.00 392.14 0.0004.04 FALSO PISO, MEZCLA 1:8, e = 4" m2 1,398.59 33.10 46,293.33 9467.26 6724.10 1752.31 1176.37 0.00 27173.2804.05 VEREDAS DE CONCRETO 16,585.57 0.00 0.00 0.00 0.0004.05.01 VEREDA, e=4" CONCRETO f'c=140 Kg/cm2, una uña. m2 367.92 44.42 16,343.01 0.00 0.00 3268.60 13074.4104.05.02 JUNTAS DE DILATACION CADA TRES METROS, e = 1" m 113.88 2.13 242.56 0.00 0.00 48.51 194.0504.06 RAMPAS DE CONCRETO 14,553.36 0.00 0.00 0.00 0.0004.06.01 BASE DE AFIRMADO PARA RAMPAS, e=10 cm. m2 84.93 10.33 877.33 0.00 0.00 0.00 877.3304.06.02 RAMPA, e=4" CONCRETO f'c=140 Kg/cm2 m2 307.88 44.42 13,676.03 0.00 6767.83 0.00 6908.2004.07 CUNETA PLUVIAL DE CONCRETO 31,277.23 0.00 0.00 0.00 0.0004.07.01 CUNETA DE CONCRETO f'c=140 Kg/cm2 m 336.68 43.17 14,534.48 1346.04 0.00 5275.37 7913.0604.07.02 ENCOFRADO Y DESENCOFRADO EN CUNETA PLUVIAL DE CONCRETO m2 571.62 29.29 16,742.75 1205.51 0.00 6214.90 9322.3504.08 CIMENTACION DE ESCALERA, CONCRETO f'c=175 Kg/cm2 m3 11.51 273.38 3,146.60 1189.20 1230.21 0.00 727.1904.09 CIRCULACION 46,629.07 0.00 0.00 0.00 0.0004.09.01 SUB BASE DE AFIRMADO PARA CIRCULACIÓN, e = 0.10 m m2 955.29 10.90 10,412.66 4662.26 0.00 0.00 0.00 5750.4004.09.02 BASE DE HORMIGON PARA CIRCULACIÓN, e=10 cm. m2 955.29 10.96 10,469.98 4687.92 0.00 0.00 0.00 5782.0604.09.03 CIRCULACIÓN, e=4" CONCRETO f'c=140 Kg/cm2, una uña. m2 534.26 44.42 23,731.83 6183.26 0.00 0.00 0.00 17548.5704.09.04 JUNTA ASFALTICA EN CIRCULACION CADA TRES METROS, e=1" m 945.82 2.13 2,014.60 0.00 0.00 0.00 2014.6004.10 LOSA DEPORTIVA 46,021.96 0.00 0.00 0.00 0.0004.10.01 BASE DE HORMIGON PARA LOSA DEPORTIVA, e=0.15 m. m2 613.30 14.73 9,033.91 9033.91 0.00 0.00 0.00 0.0004.10.02 LOSA DEPORTIVA, e=0.15m. CONCRETO f'c=175 Kg/cm2, una uña. m2 613.30 59.65 36,583.35 36583.35 0.00 0.00 0.00 0.0004.10.03 JUNTA ASFALTICA EN LOSA DEPORTIVA CADA CINCO METROS, e=1" m 190.00 2.13 404.70 0.00 0.00 0.00 404.7004.11 PATIO 58,132.60 0.00 0.00 0.00 0.0004.11.01 BASE DE HORMIGON PARA PATIO, e=0.15m. m2 780.07 13.59 10,601.15 8682.38 0.00 0.00 767.51 1151.2604.11.02 PATIO, e=0.15m. CONCRETO f'c=175 Kg/cm2 m2 780.07 59.65 46,531.18 0.00 0.00 18612.47 27918.7104.11.03 JUNTA ASFALTICA EN PATIO CADA TRES METROS, e=1" m 469.61 2.13 1,000.27 0.00 0.00 400.11 600.1604.12 SARDINEL 10,037.78 0.00 0.00 0.00 0.0004.12.01 SARDINEL DE h=0.50m., CONCRETO f'c=140 Kg/cm2 m 94.80 24.13 2,287.52 0.00 0.00 0.00 2287.5204.12.02 SARDINEL DE h=0.30m., CONCRETO f'c=140 Kg/cm2 m 155.61 19.02 2,959.70 1065.12 0.00 0.00 1894.5804.12.03 ENCOFRADO Y DESENCOFRADO PARA SARDINEL m2 165.42 28.96 4,790.56 743.26 0.00 0.00 4047.3004.13 CALZADURAS EN EDIFICACION glb 1.00 1,550.00 1,550.00 0.00 0.00 0.00 1550.0005 OBRAS DE CONCRETO ARMADO 869,851.11 0.00 0.00 0.00 0.0005.01 ZAPATAS 43,995.62 0.00 0.00 0.00 0.00| CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 115.08 305.34 35,138.53 15389.14 15099.67 4649.72 0.00 0.00 0.00 0.0005.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,708.59 3.27 8,857.09 141.79 7945.95 769.35 0.00 0.00 0.00 0.0005.02 SOBRECIMIENTO ARMADO 56,131.54 0.00 0.00 0.00 0.0005.02.01 CONCRETO PARA SOBRECIMIENTO ARMADO f'c=175 kg/cm2 m3 61.46 307.30 18,886.66 5078.48 4887.20 4731.19 0.00 4189.7905.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 531.76 35.28 18,760.49 6709.52 4211.20 4345.37 0.00 3494.41

Page 3: ACELERADO - AMPL1

05.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 5,652.72 3.27 18,484.39 865.67 5192.89 3756.53 6549.52 0.00 2119.7905.03 SARDINEL ARMADO 30,443.00 0.00 0.00 0.00 0.0005.03.01 SARDINEL DE CONCRETO f'c=175 Kg/cm2 m3 44.90 307.30 13,797.77 2728.32 3265.53 0.00 7803.9205.03.02 ENCOFRADO Y DESENCOFRADO PARA SARDINEL m2 379.99 28.96 11,004.51 3428.23 2207.38 0.00 5368.9105.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,724.99 3.27 5,640.72 2081.39 2074.07 0.00 1485.2605.04 VIGAS DE CIMENTACION 15,703.69 0.00 0.00 0.00 0.0005.04.01 CONCRETO PARA VIGA DE CIMENTACION f'c=210 kg/cm2 m3 14.34 326.79 4,686.17 4129.40 556.77 0.00 0.00 0.00 0.0005.04.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION m2 114.74 50.33 5,774.86 5774.86 0.00 0.00 0.00 0.0005.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,603.26 3.27 5,242.66 5242.66 0.00 0.00 0.00 0.0005.05 MUROS DE CONTENCION 182,888.16 0.00 0.00 0.00 0.0005.05.01 CONCRETO PARA MURO DE CONTENCION f'c=175 kg/cm2 m3 260.45 316.92 82,541.81 17726.96 28938.23 12603.51 10961.22 0.00 12311.9005.05.02 ENCOFRADO Y DESENCOFRADO PARA MUROS DE CONTENCION m2 1,209.82 41.76 50,522.08 8645.78 11555.83 9132.70 16725.46 0.00 4462.3105.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 15,236.78 3.27 49,824.27 1788.86 5569.37 15957.96 10656.12 13746.88 0.00 2105.0805.06 GRADERIAS 9,070.64 0.00 0.00 0.00 0.0005.06.01 GRADERIAS, CONCRETO f'c=175 Kg/cm2 m3 9.70 340.50 3,302.85 0.00 3302.85 0.00 0.0005.06.02 ENCOFRADO Y DESENCOFRADO EN GRADERIAS m2 38.25 54.89 2,099.54 0.00 2099.54 0.00 0.0005.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,121.79 3.27 3,668.25 268.56 3399.69 0.00 0.0005.07 COLUMNAS 146,875.01 0.00 0.00 0.00 0.0005.07.01 CONCRETO PARA COLUMNAS, f'c = 210 kg/cm2 m3 113.54 380.12 43,158.82 13200.14 615.79 19458.34 5741.41 2015.24 0.00 2127.8905.07.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1,240.18 40.28 49,954.45 13184.05 1468.21 20267.69 8159.64 2244.12 4630.75 0.0005.07.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 16,440.90 3.27 53,761.74 12619.94 35570.07 2663.46 0.00 2908.27 0.00

5.08 COLUMNAS DE CONFINAMIENTO 25,944.52 0.00 0.00 0.00 0.0005.08.01 CONCRETO PARA COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2 m3 22.34 300.12 6,704.68 639.26 313.78 4039.32 1265.01 447.32 0.0005.08.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS DE CONFINAMIENTO m2 321.78 31.79 10,229.39 970.55 1501.92 6157.23 994.71 604.98 0.0005.08.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,755.49 3.27 9,010.45 4324.90 3156.58 628.14 900.84 0.00 0.0005.09 COLUMNAS DE CERCO PERIMETRICO 13,886.08 0.00 0.00 0.00 0.0005.09.01 CONCRETO PARA COLUMNAS, f'c=175 kg/cm2 m3 13.72 300.12 4,117.65 0.00 4117.65 0.00 0.0005.09.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 143.37 40.28 5,774.94 0.00 5774.94 0.00 0.0005.09.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,221.25 3.27 3,993.49 0.00 3557.88 435.61 0.0005.10 VIGAS 132,555.69 0.00 0.00 0.00 0.0005.10.01 CONCRETO PARA VIGAS, f'c = 210 kg/cm2 m3 129.76 325.93 42,292.68 3331.00 10007.68 15235.33 9204.58 4514.08 0.00 0.0005.10.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1,026.18 35.55 36,480.70 3527.98 4253.20 5510.87 12887.75 4340.12 3201.63 2759.14 0.0005.10.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 16,447.19 3.27 53,782.31 2333.67 19556.00 20312.04 6785.86 4369.70 425.04 0.0005.11 VIGAS DE CONFINAMIENTO 6,701.58 0.00 0.00 0.00 0.0005.11.01 CONCRETO PARA VIGAS DE CONFINAMIENTO f'c=175 kg/cm2 m3 7.23 300.12 2,169.87 155.99 1050.98 962.90 0.00 0.0005.11.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO m2 75.20 31.79 2,390.61 220.30 1274.49 560.90 334.91 0.0005.11.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 654.77 3.27 2,141.10 187.09 1954.01 0.00 0.00 0.0005.12 VIGAS DE CERCO PERIMETRICO 4,222.90 0.00 0.00 0.00 0.0005.12.01 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 3.96 300.12 1,188.48 0.00 1188.48 0.00 0.0005.12.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 39.64 35.55 1,409.20 0.00 1409.20 0.00 0.0005.12.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 497.01 3.27 1,625.22 0.00 1625.22 0.00 0.0005.13 LOSA ALIGERADA 142,201.74 0.00 0.00 0.00 0.0005.13.01 CONCRETO PARA LOSA ALIGERADA, f'c = 210 kg/cm2 m3 122.34 309.69 37,887.47 9990.79 16181.68 8259.69 2669.01 0.00 786.3005.13.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2 1,397.04 39.24 54,819.85 6340.99 12530.66 25743.45 2982.83 3864.94 0.00 3356.9805.13.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 7,341.65 3.27 24,007.20 6140.20 14482.02 1289.56 1735.62 0.00 359.8105.13.04 LADRILLO PARA TECHO 15 x 30 x 30 cm u 11,638.00 2.19 25,487.22 6718.45 15052.57 1386.81 1796.81 0.00 532.5705.14 LOSA MACIZA 8,413.42 0.00 0.00 0.00 0.0005.14.01 CONCRETO PARA LOSA MACIZA, f'c = 210 kg/cm2 m3 10.46 314.63 3,291.03 2535.92 0.00 0.00 755.1105.14.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 58.40 46.79 2,732.54 1885.64 0.00 0.00 846.9005.14.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 730.84 3.27 2,389.85 1890.53 0.00 0.00 499.3205.15 ESCALERAS 36,424.85 0.00 0.00 0.00 0.0005.15.01 CONCRETO PARA ESCALERA, f'c = 210 kg/cm2 m3 42.76 360.03 15,394.88 2001.77 723.66 0.00 12669.4505.15.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m2 227.51 57.30 13,036.32 1971.12 709.95 0.00 10355.2505.15.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,444.54 3.27 7,993.65 1622.29 0.00 0.00 6371.3605.16 CISTERNA 9,273.69 0.00 0.00 0.00 0.0005.16.01 CONCRETO PARA CISTERNA, f'c = 210 kg/cm2 m3 12.08 346.37 4,184.15 3553.76 630.39 0.00 0.00 0.0005.16.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 39.78 40.41 1,607.51 1200.18 407.33 0.00 0.00 0.0005.16.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,064.84 3.27 3,482.03 3208.36 265.78 7.89 0.00 0.0005.17 TANQUE ELEVADO 5,118.98 0.00 0.00 0.00 0.0005.17.01 CONCRETO PARA TANQUE ELEVADO, f'c = 210 kg/cm2 m3 4.45 398.29 1,772.39 0.00 315.45 0.00 1456.9405.17.02 ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO m2 29.09 56.92 1,655.80 0.00 300.54 0.00 1355.2605.17.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 517.06 3.27 1,690.79 0.00 204.22 0.00 1486.5706 ESTRUCTURAS METALICAS 231,021.06 0.00 0.00 0.00 0.00

Page 4: ACELERADO - AMPL1

06.01 ESTRUCTURA METALICA EN BLOQUES EXISTENTES 129,072.62 0.00 0.00 0.00 0.0006.01.01 CORREAS 50mm x 70mm x 1.5mm m 475.20 68.51 32,555.95 31113.13 1442.82 0.00 0.00 0.00 0.0006.01.02 TIJERAL DE METAL 01 + ANCLAJES u 15.00 2,741.87 41,128.05 41128.05 0.00 0.00 0.00 0.0006.01.03 TIJERAL DE METAL 02 + ANCLAJES u 7.00 2,705.30 18,937.10 8115.90 10821.20 0.00 0.00 0.00 0.0006.01.04 TIJERAL DE METAL 03 + ANCLAJES u 10.00 2,718.50 27,185.00 27185.00 0.00 0.00 0.00 0.0006.01.05 ARRIOSTRES DE METAL m 298.92 31.00 9,266.52 5659.98 0.00 0.00 0.00 3606.5406.02 ESTRUCTURA METALICA EN PATIO 01 62,629.31 0.00 0.00 0.00 0.0006.02.01 TIJERAL PARABOLICO + ANCLAJES u 8.00 2,840.39 22,723.12 18178.50 2272.31 0.00 2272.3106.02.02 VIGUETA METALICA m 261.45 55.12 14,411.12 12352.39 0.00 0.00 2058.7306.02.03 TEMPLADORE DE Fº LISO 3/8" m 328.44 19.99 6,565.52 0.00 0.00 0.00 6565.5206.02.04 TEMPLADORE DE Fº LISO 1/2" m 145.60 21.08 3,069.25 0.00 0.00 0.00 3069.2506.02.05 SUMINISTRO Y COLOCACION DE VIGAS DE RIGIDEZ m 149.40 106.16 15,860.30 0.00 0.00 15860.30 0.0006.03 ESTRUCTURA METALICA EN TRIBUNA DE LOSA DEPORTIVA 29,127.36 0.00 0.00 0.00 0.0006.03.01 TIJERAL SUSPENDIDO + ANCLAJES u 10.00 1,405.94 14,059.40 0.00 0.00 0.00 14059.4006.03.02 CORREAS 100mmx100mm, e=4mm m 92.81 81.51 7,564.94 0.00 0.00 0.00 7564.9406.03.03 CORREAS 50mmx100m, e=4mm m 98.31 76.32 7,503.02 0.00 0.00 0.00 7503.0206.04 ESTRUCTURA METALICA EN ESCENARIO 10,191.77 0.00 0.00 0.00 0.0006.04.01 TIJERAL PARABOLICO + ANCLAJES u 2.00 1,907.62 3,815.24 0.00 0.00 0.00 3815.2406.04.02 VIGUETA METALICA m 87.50 55.12 4,823.00 0.00 0.00 0.00 4823.0006.04.03 TEMPLADORE DE Fº LISO 3/8" m 45.32 19.99 905.95 0.00 0.00 0.00 905.9506.04.04 TEMPLADORE DE Fº LISO 1/2" m 30.72 21.08 647.58 0.00 0.00 0.00 647.5807 SISTEMA DE EVACUACION DE LLUVIAS 2,475.07 0.00 0.00 0.00 0.0007.01 CANALETA GALVANIZADA Ø 6" PARA TECHO m 78.60 19.08 1,499.69 0.00 0.00 0.00 1499.6907.02 CANALETA PLUVIAL TIPO CALAMINÓN, e=4mm. m 87.40 11.16 975.38 0.00 0.00 0.00 975.38

ARQUITECTURA 0.00 0.00 0.00 0.0001 MUROS Y TABIQUES DE ALBAÑILERIA 82,683.57

01.01 MUROS DE LADRILLO KK MAQUINADO ASENTADO DE SOGA m2 1,009.81 39.21 39,594.65 1992.75 3118.60 17142.49 14402.41 2938.40 0.0001.02 MUROS DE LADRILLO KK MAQUINADO ASENTADO DE CABEZA m2 558.74 73.27 40,938.88 6273.93 5414.10 12032.40 9689.68 3400.24 4128.53 0.0001.03 ALAMBRE Nº 8, REFUERZO HORIZONTAL EN MUROS kg 565.80 3.80 2,150.04 218.88 271.32 709.84 524.40 123.12 302.48 0.0002 REVOQUES Y ENLUCIDOS 180,263.10

02.01 TARRAJEO EN INTERIORES, e = 1.5 cm, Mezcla 1:5 m2 1,469.73 16.98 24,956.02 8397.19 6513.20 10045.63 0.0002.02 TARRAJEO EN EXTERIORES, e = 1.5 cm, Mezcla 1:5 m2 1,730.27 19.86 34,363.16 3115.60 7168.62 24078.94 0.0002.03 TARRAJEO PRIMARIO RAYADO, e = 1.5 c m m2 252.15 16.23 4,092.39 57.99 1613.78 2420.62 0.0002.04 TARRAJEO DE COLUMNAS, e = 1.5 cm, Mezcla 1:5 m2 1,079.64 23.70 25,587.47 7470.06 4882.32 13235.09 0.0002.05 TARRAJEO DE VIGAS, e = 1.5 cm, Mezcla 1:5 m2 1,019.15 23.70 24,153.86 2064.98 9883.75 3197.76 9007.37 0.0002.06 TARRAJEO DE CIELO RASO, e = 1.5 cm, Mezcla = 1:5 m2 1,460.03 24.04 35,099.12 17769.86 5953.78 11375.47 0.0002.07 TARRAJEO DE MUROS DE CONTENCIÓN, e = 1.5 c m, Mezcla 1:5 m2 409.08 20.48 8,377.96 0.00 0.00 8377.96 0.0002.08 TARRAJEO PULIDO EN GRADERIAS m2 162.78 24.36 3,965.32 0.00 0.00 0.00 3965.3202.09 TARRAJEO CON IMPERMEABILIZANTE m2 62.08 22.41 1,391.21 696.50 325.73 0.00 368.9802.10 VESTIDURA EN FONDO DE ESCALERAS CON MEZCLA C:A, 1:5 m2 106.61 31.94 3,405.12 0.00 201.22 0.00 3203.9002.11 VESTIDURA DE DERRAMES m 1,347.04 9.36 12,608.29 3716.67 0.00 3820.00 0.00 5071.6202.12 BRUÑAS m 361.53 6.26 2,263.18 0.00 810.04 0.00 1453.1303 PISOS Y PAVIMENTOS 157,883.91

03.01 CONTRAPISO DE 40 mm m2 1,263.98 19.54 24,698.17 5421.76 0.00 10073.16 9203.24 0.0003.02 PISO DE CEMENTO PULIDO, e = 2" , BRUÑADO m2 1,190.80 16.81 20,017.35 0.00 0.00 0.00 20017.3503.03 PISO DE CERAMICA DE 0.40 X 0.40m - ALTO TRANSITO m2 1,165.52 46.94 54,709.51 0.00 0.00 0.00 54709.5103.04 PISO DE CERAMICA DE 0.30 X 0.30m - ALTO TRANSITO m2 139.49 42.82 5,972.96 0.00 0.00 0.00 5972.9603.05 PISOS DE ADOQUIN DE CONCRETO 52,485.92 0.00 0.00 0.00 0.0003.05.01 SUB BASE DE HORMIGON PARA ADOQUIN, e= 20cm m2 420.79 15.64 6,581.16 6581.16 0.00 0.00 0.00 0.0003.05.02 BASE DE AFIRMADO PARA ADOQUIN, e= 18cm m2 420.79 14.23 5,987.84 5987.84 0.00 0.00 0.0003.05.03 BASE DE AFIRMADO PARA ADOQUIN, e= 10cm m2 168.08 9.30 1,563.14 0.00 0.00 0.00 1563.1403.05.04 CAMA DE ARENA PARA ADOQUIN, e= 4cm m2 588.87 6.55 3,857.10 2756.17 0.00 0.00 1100.9203.05.05 ADOQUIN DE CONCRETO, e= 0.06m m2 226.72 47.50 10,769.20 0.00 0.00 0.00 10769.2003.05.06 ADOQUIN DE CONCRETO, e= 0.08m m2 420.70 56.40 23,727.48 23727.48 0.00 0.00 0.0004 CONTRAZOCALOS 23,030.84

04.01 CONTRAZOCALO DE CERAMICA EN INTERIOR, 0.087 x 0.40 m 636.54 27.93 17,778.56 0.00 0.00 0.00 17778.5604.02 CONTRAZOCALO CEMENTO PULIDO EN INTERIOR, h=0.10m, e=1.5cm C:A, 1:5 m 367.72 6.93 2,548.30 0.00 0.00 0.00 2548.3004.03 CONTRAZOCALO CEMENTO PULIDO EN EXTERIOR, h=0.20m, e=1.5cm C:A, 1:5 m 305.19 8.86 2,703.98 0.00 0.00 0.00 2703.9805 ZOCALOS 15,443.34

05.01 ZOCALO DE CERAMICA 0.20x0.30 M. COLOR m2 308.62 50.04 15,443.34 0.00 0.00 0.00 15443.3406 ENCHAPADOS 2,881.27

06.01 ENCHAPADO DE ESTRUCTURA DE APOYO DE OVALINES m2 10.15 58.29 591.64 0.00 0.00 0.00 591.6406.02 ENCHAPADO CON CERAMICA EN MESADA DE CONCRETO m2 22.01 63.11 1,389.05 0.00 0.00 0.00 1389.05

Page 5: ACELERADO - AMPL1

06.03 ENCHAPADO DE BANCAS DE CONCRETO m2 6.27 58.29 365.48 0.00 0.00 0.00 365.4806.04 ENCHAPADO DE BEBEDERO m2 9.18 58.29 535.10 0.00 0.00 0.00 535.1007 REVESTIMIENTO DE GRADAS Y ESCALERAS 2,287.70

07.01 REVESTIMIENTO DE ESCALERA CON CEMENTO PULIDO PASO Y CONTRAPASO m 66.83 25.61 1,711.52 0.00 0.00 0.00 1711.5207.02 REVESTIMIENTO DE DESCANSO CON CEMENTO PULIDO Y BRUÑADO m2 24.56 23.46 576.18 0.00 0.00 0.00 576.1808 COBERTURAS 91,139.31

08.01 CUBIERTA DE MORTERO 1:3 CON IMPERMIABILIZANTE EN POLVO m2 916.97 24.19 22,181.50 0.00 0.00 0.00 22181.5008.02 COBERTURA CON LADRILLO PASTELERO m2 41.92 41.11 1,723.33 0.00 0.00 0.00 1723.3308.03 COBERTURA DE PLANCHA ONDULADA m2 632.16 20.01 12,649.52 12119.26 530.26 0.00 0.00 0.00 0.0008.04 COBERTURA CON CALAMINÓN CU-6 m2 758.96 51.39 39,002.95 0.00 0.00 39002.95 0.0008.05 COBERTURA PLANCHA ONDULADA EN TRIBUNAS m2 109.45 22.42 2,453.87 0.00 0.00 0.00 2453.8708.06 CANALETA A MEDIA CAÑA DE MORTERO EN TECHOS e=0.05 m. m 456.59 15.05 6,871.68 0.00 0.00 0.00 6871.6808.07 GÁRGOLAS DE CONCRETO u 58.00 107.87 6,256.46 323.61 4099.06 0.00 1833.7909 CARPINTERIA DE MADERA 54,684.47

09.01 PUERTAS DE MADERA 52,509.36

09.01.01 PUERTA APANELADA MAD. CEDRO P-01 (1.50 x 2.10 m) CON FRESQUILLA DE 0.65m - 02 u 5.00 824.92 4,124.60 0.00 412.46 3712.14 0.0009.01.02 PUERTA APANELADA MAD. CEDRO P-02 (0.90 x 2.10 m) CON FRESQUILLA DE 0.75m - 01 u 2.00 681.95 1,363.90 0.00 136.39 1227.51 0.0009.01.03 PUERTA APANELADA MAD. CEDRO P-03 (0.90 x 2.10 m) SIN FRESQUILLA - 01 HOJA u 11.00 618.88 6,807.68 0.00 680.77 6126.91 0.0009.01.04 PUERTA APANELADA MAD. CEDRO P-04 (0.60 x 1.50 m) SIN FRESQUILLA - 01 HOJA u 29.00 380.17 11,024.93 0.00 1102.49 9922.44 0.0009.01.05 PUERTA APANELADA MAD. CEDRO P-05 (1.10 x 2.10 m) CON FRESQUILLA DE 0.65m - 01 u 8.00 694.16 5,553.28 0.00 555.33 4997.95 0.0009.01.06 PUERTA APANELADA MAD. CEDRO P-06 (0.90 x 2.10 m) CON FRESQUILLA DE 0.80m - 01 u 2.00 682.27 1,364.54 0.00 136.45 1228.09 0.0009.01.07 PUERTA APANELADA MAD. CEDRO P-07 (0.90 x 2.10 m) CON FRESQUILLA DE 0.50m - 01 u 2.00 665.54 1,331.08 0.00 133.11 1197.97 0.0009.01.08 PUERTA APANELADA MAD. CEDRO P-08 (0.80 x 2.10 m) CON FRESQUILLA DE 0.60m - 01 u 2.00 594.09 1,188.18 0.00 118.82 1069.36 0.0009.01.09 PUERTA APANELADA MAD. CEDRO P-09 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01 u 2.00 681.57 1,363.14 0.00 136.31 1226.83 0.0009.01.10 PUERTA APANELADA MAD. CEDRO P-10 (0.90 x 2.30 m) SIN FRESQUILLA - 01 HOJA u 4.00 645.36 2,581.44 0.00 258.14 2323.30 0.0009.01.11 PUERTA APANELADA MAD. CEDRO P-11 (0.70 x 2.10 m) CON FRESQUILLA DE 0.40m - 01 u 1.00 602.37 602.37 0.00 60.24 542.13 0.0009.01.12 PUERTA APANELADA MAD. CEDRO P-12 (1.10 x 2.10 m) CON FRESQUILLA DE 0.90m - 01 u 1.00 699.38 699.38 0.00 69.94 629.44 0.0009.01.13 PUERTA APANELADA MAD. CEDRO P-13 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01 u 1.00 695.64 695.64 0.00 69.56 626.08 0.0009.01.14 PUERTA APANELADA MAD. CEDRO P-14 (0.90 x 2.10 m) CON FRESQUILLA DE 0.90m - 01 u 1.00 693.67 693.67 0.00 69.37 624.30 0.0009.01.15 PUERTA APANELADA MAD. CEDRO P-15 (0.70 x 2.10 m) CON FRESQUILLA DE 0.70m - 01 u 1.00 640.55 640.55 0.00 64.06 576.50 0.0009.01.16 PUERTA APANELADA MAD. CEDRO P-16 (1.00 x 2.10 m) CON FRESQUILLA DE 0.50m - 01 u 7.00 665.05 4,655.35 0.00 465.54 4189.82 0.0009.01.17 PUERTA APANELADA MAD. CEDRO P-17 (0.90 x 2.10 m) CON FRESQUILLA DE 0.40mVARIA u 1.00 654.51 654.51 0.00 65.45 589.06 0.0009.01.18 PUERTA APANELADA MAD. CEDRO P-18 (0.84 x 2.10 m) CON FRESQUILLA DE 0.40m - 01 u 1.00 642.15 642.15 0.00 64.22 577.94 0.0009.01.19 PUERTA APANELADA MAD. CEDRO P-19 (1.00 x 2.10 m) CON FRESQUILLA DE 0.70m - 01 u 2.00 695.64 1,391.28 0.00 139.13 1252.15 0.0009.01.20 PUERTA CONTRAPLACADA P-20 (0.90 x 2.00 m) SIN FRESQUILLA - 01 HOJA u 6.00 511.03 3,066.18 0.00 306.62 2759.56 0.0009.01.21 PUERTA APANELADA MAD. CEDRO P-21 (1.00 x 2.10 m) CON FRESQUILLA DE 0.60m - 01 u 2.00 686.01 1,372.02 0.00 137.20 1234.82 0.0009.01.22 PUERTA APANELADA MAD. CEDRO P-22 (1.05 x 2.10 m) CON FRESQUILLA DE 0.60m - 01 u 1.00 693.49 693.49 0.00 69.35 624.14 0.0009.02 TABIQUE DE MELAMINE e= 15mm u 10.00 51.67 516.70 0.00 0.00 0.00 516.7009.03 TICERO DE MADERA TORNILLO L=4.8 m, BARNIZADO u 13.00 127.57 1,658.41 0.00 0.00 0.00 1658.4110 CARPINTERIA METALICA 90,919.92

10.01 PUERTAS DE METAL 5,558.23

10.01.01 PORTÓN METALICO P-01 (3.00x3.00) - 02 HOJAS u 1.00 1,683.07 1,683.07 0.00 0.00 0.00 1683.0710.01.02 PUERTA METALICA P-02 (1.00x3.00) - 01 HOJAS u 1.00 852.66 852.66 0.00 0.00 0.00 852.6610.01.03 PORTÓN METALICO P-03 (4.00x3.50) - 02 HOJAS u 1.00 2,514.03 2,514.03 0.00 0.00 0.00 2514.0310.01.04 PUERTA DE FIERRO P-M1 (0.80 x2.10m) CON FRESQUILLA DE 0.50m u 1.00 508.47 508.47 0.00 0.00 0.00 508.4710.02 VENTANA DE METAL 423.72 0.00 0.00 0.00 0.0010.02.01 VENTANA DE FIERRO V-CM (0.80 x 1.00m) u 1.00 423.72 423.72 0.00 0.00 0.00 423.7210.03 PROTECTOR METALICO 18,929.05 0.00 0.00 0.00 0.0010.03.01 PROTECTOR METALICO EN GUARDIANIA DE 0.70X0.80m u 1.00 482.29 482.29 0.00 0.00 0.00 482.2910.03.02 REJA METALICA EN FACHADA DE 2.77x1.35m u 2.00 1,455.36 2,910.72 0.00 0.00 0.00 2910.7210.03.03 REJA METALICA EN FACHADA DE 2.80x1.35m u 2.00 1,457.70 2,915.40 0.00 0.00 0.00 2915.4010.03.04 CERCO METALICO CON TUBO DE FIERRO Y MALLA COCADA m2 48.00 262.93 12,620.64 0.00 2524.13 0.00 10096.5110.04 AGARRADERA PARA IMPEDIDOS FISICOS m 3.42 36.74 125.65 0.00 0.00 0.00 125.6510.05 REJILLA PARA CUNETA PLUVIAL m 336.68 108.19 36,425.41 0.00 7285.08 0.00 29140.3310.06 CANTONERAS CON PERFILES DE PLANCHA ESTRIADA m 80.00 16.00 1,280.00 0.00 0.00 0.00 1280.0010.07 PASAMANOS DE METAL 2,097.16 0.00 0.00 0.00 0.0010.07.01 PASAMANOS DE METAL TIPO I m 43.60 48.10 2,097.16 0.00 0.00 0.00 2097.1610.08 BARANDA METALICA DE TUBO, SEGÚN DISEÑO m 308.36 81.30 25,069.67 0.00 0.00 0.00 25069.6710.09 ESCALERA DE GATO u 1.00 779.01 779.01 0.00 0.00 0.00 779.0110.10 TAPA DE FIERRO FUNDIDO DE 0.60x0.60 u 2.00 116.01 232.02 0.00 0.00 0.00 232.0211 VIDRIOS, CRISTALES Y SIMILARES 27,992.37 0.00 0.00 0.00 0.0011.01 VENTANAS CON MARCO DE ALUMINIO EN VIDRIO DOBLE LAMINADO m2 313.64 89.25 27,992.37 0.00 5598.47 0.00 22393.9012 PINTURA 70,770.14 0.00 0.00 0.00 0.00

Page 6: ACELERADO - AMPL1

12.01 PINTURA LATEX 2 MANOS EN MUROS m2 3,962.66 7.98 31,622.03 1825.87 0.00 0.00 20857.31 8938.8512.02 PINTURA LATEX 2 MANOS EN COLUMNAS m2 1,183.76 8.30 9,825.21 0.00 0.00 5895.12 3930.0812.03 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.10m m 367.72 1.61 592.03 0.00 0.00 0.00 592.0312.04 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.20m m 305.19 2.06 628.69 0.00 0.00 0.00 628.6912.05 PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO H=0.30m m 97.35 2.66 258.95 0.00 0.00 0.00 258.9512.06 PINTURA LATEX 2 MANOS EN VIGAS. m2 1,019.15 7.98 8,132.82 0.00 0.00 0.00 8132.8212.07 PINTURA LATEX 2 MANOS EN CIELO RASO m2 1,460.03 7.87 11,490.44 0.00 0.00 11490.44 0.0012.08 PINTURA LATEX 2 MANOS EN MUROS DE CONTENCIÓN m2 446.56 7.98 3,563.55 0.00 0.00 0.00 3563.5512.09 PINTURA PARA DEMARCACION DE LOSA DEPORTIVA u 1.00 390.55 390.55 0.00 0.00 0.00 390.5512.10 BARNIZ PARA PUERTAS m2 261.71 16.30 4,265.87 0.00 0.00 0.00 4265.8713 VARIOS 42,908.80 0.00 0.00 0.00 0.0013.01 JUNTA DE DILATACION 1"(ESPUMA PLASTIFICANTE + JEBE MICROPOROSO) m 590.58 14.63 8,640.19 0.00 0.00 0.00 8640.1913.02 TAPAJUNTA METALICA EN TECHOS DE BLOQUES m 19.20 42.59 817.73 0.00 0.00 0.00 817.7313.03 ESTRUCTURA DE APOYO PARA OVALINES m2 8.00 123.66 989.28 0.00 0.00 0.00 989.2813.04 COLOCACION DE PIZARRAS ACRILICAS DE 1.20 x 2.44 m u 2.00 172.39 344.78 0.00 0.00 0.00 344.7813.05 PIZARRA DE CEMENTO 4.8m x 1.2m SIN TIZERO u 13.00 45.05 585.65 0.00 0.00 585.65 0.0013.06 ESPEJO BISELADO EMPOTRADO(2.60x0.70) u 2.00 141.06 282.12 0.00 0.00 0.00 282.1213.07 ESPEJO BISELADO EMPOTRADO(0.50x0.80) u 6.00 73.26 439.56 0.00 0.00 0.00 439.5613.08 ESPEJO BISELADO EMPOTRADO(0.45x0.80) u 4.00 73.26 293.04 0.00 0.00 0.00 293.0413.09 ESPEJO BISELADO EMPOTRADO(2.50x0.70) u 2.00 141.06 282.12 0.00 0.00 0.00 282.1213.10 TUBOS DE VOLEY, INC. RED Y DADOS DE CONCRETO jgo 1.00 332.07 332.07 0.00 0.00 0.00 332.0713.11 ARCO Y TABLERO FULBITO Y BASKET (MADERA Y METAL) jgo 1.00 2,214.98 2,214.98 0.00 0.00 0.00 2214.9813.12 ASTA DE BANDERA pza 2.00 950.53 1,901.06 0.00 0.00 0.00 1901.0613.13 TABIQUERIA PREBAFRICADA DE DRYWALL m2 10.65 54.55 580.96 0.00 0.00 0.00 580.9613.14 PINTADO DE TEXTO EN PORTADA u 38.77 51.36 1,991.23 0.00 0.00 0.00 1991.2313.15 CERRAMIENTO PLANCHA DE FIBROCEMENTO DE e=8mm m2 192.42 37.09 7,136.86 3238.33 0.00 0.00 0.00 3898.5313.16 MESADA DE LABORATORIO 2,731.62 0.00 0.00 0.00 0.0013.16.01 CONCRETO PARA MESADA f'c=175 kg/cm2 m3 2.06 273.38 563.16 0.00 0.00 563.16 0.0013.16.02 ENCOFRADO Y DESENCOFRADO EN MESADA m2 33.81 51.61 1,744.93 0.00 0.00 1744.93 0.0013.16.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 129.52 3.27 423.53 0.00 0.00 423.53 0.0013.17 SEMBRADO DE GRASS m2 287.44 27.96 8,036.82 0.00 0.00 8036.82 0.0013.18 SEMBRADO DE PLANTONES u 88.00 9.27 815.76 0.00 0.00 0.00 815.7613.19 BANCAS DE CONCRETO 4,132.98 0.00 0.00 0.00 0.0013.19.01 BANCAS DE CONCRETO f'c= 175 Kg/cm2 m3 2.65 272.46 722.02 0.00 0.00 722.02 0.0013.19.02 ENCOFRADO Y DESENCOFRADO EN BANCAS m2 50.01 25.78 1,289.26 0.00 0.00 1289.26 0.0013.19.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 169.09 3.27 552.92 0.00 0.00 552.92 0.0013.19.04 TARRAJEO PULIDO DE BANCAS m2 64.40 24.36 1,568.78 0.00 0.00 1568.78 0.0013.20 BEBEDERO DE CONCRETO 359.99 0.00 0.00 0.00 0.0013.20.01 BEBEDERO DE CONCRETO f'c= 175 Kg/cm2 m3 0.47 272.46 128.06 0.00 0.00 0.00 128.0613.20.02 ENCOFRADO Y DESENCOFRADO EN BEBEDERO m2 4.59 25.78 118.33 0.00 0.00 0.00 118.3313.20.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 34.74 3.27 113.60 0.00 0.00 0.00 113.6001 INSTALACIONES SANITARIAS 61,758.48 0.00 0.00 0.00 0.0001.01 TRABAJOS PRELIMINARES 393.70 0.00 0.00 0.00 0.0001.01.01 TRAZO DE NIVELES Y REPLANTEO m 351.52 1.12 393.70 6.82 68.23 38.27 47.68 0.00 232.70 0.0001.02 RED DE DESAGUE 26,671.85 0.00 0.00 0.00 0.0001.02.01 SALIDA DE PVC SAL PARA DESAGÜE DE Ø 4" pto 24.00 56.74 1,361.76 680.88 680.88 0.00 0.00 0.00 0.0001.02.02 SALIDA DE PVC SAL PARA DESAGÜE DE Ø 2" pto 50.00 56.89 2,844.50 1649.81 967.13 227.56 0.00 0.00 0.0001.02.03 SALIDA DE PVC SAL PARA VENTILACIÓN DE 2" pto 20.00 52.65 1,053.00 368.55 473.85 210.60 0.00 0.00 0.00 0.0001.02.04 TUBERIA Y ACCESORIOS DE REBOSE Y LIMPIEZA DE TANQUE ELEVADO glb 1.00 938.44 938.44 0.00 0.00 938.44 0.0001.02.05 EXCAVACION DE ZANJAS, TUBERIA 2" - 4", H PROMED. 0.90m m 353.75 10.67 3,774.51 307.51 795.88 454.22 0.00 2216.90 0.0001.02.06 RELLENO Y COMPACTACION DE ZANJAS m3 84.25 21.91 1,845.92 261.48 498.01 149.23 0.00 937.19 0.0001.02.07 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGÜE DE 4" m 269.15 10.95 2,947.19 170.82 313.50 121.11 0.00 2341.76 0.0001.02.08 SUMINISTRO E INSTALACION DE TUBERIAS DESAGÜE 2" m 126.17 9.26 1,168.33 681.17 192.14 295.02 0.00 0.00 0.0001.02.09 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE m 348.14 2.19 762.43 196.49 14.67 82.91 0.00 468.35 0.0001.02.10 SUMIN. E INSTALACION SUMIDEROS DE BRONCE DE 2" u 21.00 11.05 232.05 0.00 0.00 232.05 0.0001.02.11 SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 4" u 10.00 17.42 174.20 0.00 0.00 0.00 174.2001.02.12 SUMIN. E INSTALACION REGISTROS ROSCADOS DE BRONCE DE 2" u 10.00 14.45 144.50 0.00 0.00 0.00 144.5001.02.13 CODO PVC SAL DE 4" x 45° u 1.00 18.29 18.29 18.29 0.00 0.00 0.00 0.0001.02.14 CODO PVC SAL DE 2" x 45° u 11.00 13.63 149.93 81.78 27.26 40.89 0.00 0.00 0.0001.02.15 YEE PVC SAL DE 2" u 49.00 15.75 771.75 456.75 141.75 173.25 0.00 0.00 0.0001.02.16 YEE PVC SAL DE 4" u 26.00 20.83 541.58 229.13 270.79 41.66 0.00 0.00 0.0001.02.17 YEE PVC SAL DE 4" A 2" u 14.00 20.83 291.62 41.66 62.49 187.47 0.00 0.00 0.0001.02.18 CODO PVC SAL DE 4" x 2" u 21.00 18.29 384.09 201.19 128.03 54.87 0.00 0.00 0.00

Page 7: ACELERADO - AMPL1

01.02.19 REDUCCION PVC SAL DE 4" A 2" u 2.00 14.56 29.12 14.56 14.56 0.00 0.00 0.0001.02.20 CAJA CIEGA DE CONCRETO 30 x 40 cm u 2.00 176.97 353.94 0.00 0.00 353.94 0.0001.02.21 CAJA DE REGISTRO DE DESAGÜE 30 x 60 cm u 24.00 178.26 4,278.24 0.00 0.00 4278.24 0.0001.02.22 CAJA DE REGISTRO DE DESAGÜE 60 x 60 cm u 6.00 179.77 1,078.62 0.00 0.00 1078.62 0.0001.02.23 CONEXIÓN A RED PUBLICA DE DESAGUE u 1.00 1,527.84 1,527.84 0.00 0.00 1527.84 0.0001.03 SISTEMA DE AGUA 18,139.35 0.00 0.00 0.00 0.0001.03.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC - SAP 1/2" pto 64.00 54.68 3,499.52 437.44 141.62 1913.80 1006.66 0.00 0.00 0.0001.03.02 EXCAVACION DE ZANJAS PARA TUBERIA 0.40 x 0.50 m 390.00 6.24 2,433.60 0.00 0.00 2433.60 0.0001.03.03 RELLENO Y COMPACTACION DE ZANJAS m3 80.62 21.91 1,766.38 0.00 0.00 1766.38 0.0001.03.04 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC - SAP m 94.40 7.11 671.18 0.00 0.00 671.18 0.0001.03.05 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC - SAP m 41.40 7.55 312.57 0.00 0.00 312.57 0.0001.03.06 RED DE DISTRIBUCION TUBERIA DE 1" PVC - SAP m 180.55 9.56 1,726.06 554.00 0.00 0.00 1172.06 0.0001.03.07 RED DE DISTRIBUCION TUBERIA DE 1 1/2" PVC - SAP m 105.60 9.91 1,046.50 0.00 0.00 1046.50 0.0001.03.08 PRUEBA HIDRAULICA Y DESINDECCION m 380.15 4.45 1,691.67 0.00 0.00 1691.67 0.0001.03.09 ACCESORIOS EN RED DE DISTRIBUCION DE AGUA glb 1.00 1,823.53 1,823.53 0.00 0.00 1823.53 0.0001.03.10 VALVULA COMPUERTA DE 1/2" CON NICHO DE MADERA u 19.00 75.55 1,435.45 0.00 0.00 1435.45 0.0001.03.11 VALVULA COMPUERTA DE 3/4" u 1.00 62.07 62.07 0.00 0.00 62.07 0.0001.03.12 VALVULA COMPUERTA DE 1" u 3.00 68.84 206.52 0.00 0.00 206.52 0.0001.03.13 VALVULA COMPUERTA 1 1/2" u 2.00 86.63 173.26 0.00 0.00 173.26 0.0001.03.14 VALVULA CHECK FºGº DE 1" u 2.00 96.15 192.30 0.00 0.00 192.30 0.0001.03.15 ACCESORIOS Y TUBERIA DE AGUA EN CISTERNA Y TANQUE ELEVADO glb 1.00 451.01 451.01 0.00 0.00 0.00 451.0101.03.16 CONEXIÓN DOMICILIARIA Ø 1" A RED DE AGUA EXTERIOR u 1.00 647.73 647.73 0.00 0.00 0.00 647.7301.04 APARATOS SANITARIOS 14,698.56 0.00 0.00 0.00 0.0001.04.01 INODORO TANQUE BAJO BLANCO, INC PAPELERA u 24.00 175.97 4,223.28 0.00 0.00 0.00 4223.2801.04.02 LAVATORIOS DE LOSA BLANCA u 11.00 67.12 738.32 0.00 0.00 0.00 738.3201.04.03 LAVATORIO OVALIN (47.5 X 42.0 CM.) O SIMILAR u 14.00 145.39 2,035.46 0.00 0.00 0.00 2035.4601.04.04 LAVATORIOS DE ACERO INOXIDABLE u 9.00 240.14 2,161.26 0.00 0.00 0.00 2161.2601.04.05 SUM. E INST. DUCHA CROMADA 1 LLAVE INC. ACC Y JABONER u 5.00 86.52 432.60 0.00 0.00 0.00 432.6001.04.06 URINARIO DE LOSA BCO TIPO PICO INC ACC u 8.00 79.15 633.20 0.00 0.00 0.00 633.2001.04.07 GRIFO DE Ø 1/2" TIPO CUELLO DE CISNE u 9.00 84.00 756.00 0.00 0.00 0.00 756.0001.04.08 COLOCACION DE APARATOS SANITARIOS u 66.00 56.34 3,718.44 0.00 0.00 0.00 3718.4401.05 SISTEMA DE EVACUACION DE LLUVIAS 1,855.02 0.00 0.00 0.00 0.0001.05.01 MONTANTE PARA BAJADA DE AGUA DE LLUVIA PVC SAL 4" EN EDIFICACIONES pto 2.00 126.38 252.76 0.00 0.00 252.76 0.0001.05.02 MONTANTE PARA BAJADA DE AGUA DE LLUVIA DE TUBERIA PVC SAL 4" EN PATIO DE pto 8.00 189.46 1,515.68 0.00 0.00 1515.68 0.0001.05.03 DADO DE PROTECCION PARA MONTANTE DE EVACUACION PLUVIAL 4" m3 0.36 240.51 86.58 0.00 0.00 86.58 0.0001 INSTALACIONES ELECTRICAS 200,061.95 0.00 0.00 0.00 0.0001.01 MOVIMIENTO DE TIERRAS 7,776.32 0.00 0.00 0.00 0.0001.01.01 EXCAVACION DE ZANJAS DE 1.25 x 0.84 m 233.70 1.96 458.05 0.00 0.00 458.05 0.0001.01.02 EXCAVACION DE ZANJAS DE 0.70 x 0.50 m 392.20 1.96 768.71 0.00 0.00 768.71 0.0001.01.03 REFINE DE ZANJA m 233.70 1.38 322.51 0.00 0.00 322.51 0.0001.01.04 REFINE DE ZANJA INCLUYE CAMA DE ARENA m 392.20 3.28 1,286.42 0.00 0.00 1286.42 0.0001.01.05 RELLENO Y COMPACTADO DE ZANJA DE 1.25 x 0.84 m 233.70 8.42 1,967.75 0.00 0.00 1967.75 0.0001.01.06 RELLENO Y COMPACTADO MANUAL DE ZANJAS DE 0.70 x 0.50 m 392.20 7.58 2,972.88 0.00 0.00 2972.88 0.0001.02 CONDUCTORES DE ALIMENTACION 61,831.68 0.00 0.00 0.00 0.0001.02.01 CABLE N2XOH-1Kv, 3 -1 x 35 mm2 m 10.40 28.22 293.49 0.00 58.70 234.7901.02.02 CABLE N2XOH-1Kv, 1 x 16 mm2 m 10.40 13.52 140.61 0.00 28.12 112.4901.02.03 CABLE N2XOH-1Kv, 3 -1 x 10 mm2 m 200.70 27.91 5,601.54 0.00 1120.31 4481.2301.02.04 CABLE N2XOH-1Kv, 2 -1 x 10 mm2 m 654.65 18.80 12,307.42 0.00 2461.48 9845.9401.02.05 CABLE N2XOH-1Kv, 2 -1 x 6 mm2 m 1,052.13 11.36 11,952.20 0.00 2390.44 9561.7601.02.06 CABLE N2XOH-1Kv, 2 -1 x 4 mm2 m 79.10 14.12 1,116.89 0.00 223.38 893.5101.02.07 CABLE N2XOH-1Kv, 1 x 6 mm2 m 858.55 5.77 4,953.83 0.00 990.77 3963.0601.02.08 CABLE N2XOH-1Kv, 1 x 4 mm2 m 209.70 6.97 1,461.61 0.00 292.32 1169.2901.02.09 CABLE N2XOH-1Kv, 1 x 2.5 mm2 m 133.20 5.97 795.20 0.00 159.04 636.1601.02.10 CABLE NLT-1Kv, 2 - 1 x 2.5 mm2 m 18.00 9.29 167.22 0.00 33.44 133.7801.02.11 CABLE NH-80-1Kv, 2 - 1 x 6 mm2 m 18.00 9.29 167.22 0.00 33.44 133.7801.02.12 SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 50 MM DIAM m 10.70 6.22 66.55 0.00 0.00 66.5501.02.13 SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 35 MM DIAM m 187.35 5.07 949.86 436.78 0.00 0.00 513.0801.02.14 SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 25 MM DIAM m 476.80 3.91 1,864.29 427.36 0.00 0.00 1436.9301.02.15 SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM m 71.20 3.57 254.18 0.00 0.00 254.1801.02.16 SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE CUATRO VIAS m 285.75 65.36 18,676.62 0.00 0.00 18676.6201.02.17 SUMINISTRO E INSTALACION DE DUCTO DE CONCRETO DE DOS VIAS m 23.70 44.85 1,062.95 359.08 703.8701.03 CABLES Y CONDUCTORES SISTEMA ELECTRICO 13,665.23 0.00 0.00 0.00 0.0001.03.01 SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 6 mm2 UNIPOLAR m 78.80 3.24 255.31 0.00 0.00 255.31 0.00

Page 8: ACELERADO - AMPL1

01.03.02 SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 4.0 mm2 UNIPOLAR m 1,472.00 2.88 4,239.36 1077.52 172.80 0.00 0.00 2989.04 0.0001.03.03 SUMINISTRO E INSTALACION DE CONDUCTOR TIPO NH-80 2.5 mm2 UNIPOLAR m 4,094.00 2.24 9,170.56 429.79 0.00 0.00 8740.77 0.0001.04 TUBERIAS E INTERRUPTORES ELECTRICOS 20,483.90 0.00 0.00 0.00 0.0001.04.01 PICADO Y RESANE DE MUROS Y PAREDES m 74.00 5.84 432.16 358.58 73.58 0.00 0.00 0.00 0.0001.04.02 SUMINISTRO E INSTALACION DE DUCTO PVC SAP DE 20 MM DIAM m 2,397.00 3.57 8,557.29 650.70 4480.35 0.00 0.00 3426.24 0.0001.04.03 SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T u 155.00 24.78 3,840.90 545.16 0.00 0.00 0.00 3295.74 0.0001.04.04 SUMINISTRO E INSTALACION DE TOMACORRIENTES DOBLES C/T PARA PISO u 155.00 35.14 5,446.70 1932.70 0.00 0.00 3514.00 0.0001.04.05 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE UNIPOLAR u 42.00 23.24 976.08 278.88 0.00 697.20 0.0001.04.06 SUMINISTRO E INSTALACION DE INTERRUPTOR DOBLE UNIPOLAR u 33.00 22.74 750.42 272.88 0.00 0.00 477.54 0.0001.04.07 SUMINISTRO E INSTALACION DE INTERRUPTOR TRIPLE UNIPOLAR u 1.00 40.67 40.67 0.00 0.00 40.67 0.0001.04.08 SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION SIMPLE u 4.00 43.08 172.32 0.00 0.00 172.32 0.0001.04.09 SUMINISTRO E INSTALACION DE INTERRUPTOR DE CONMUTACION DOBLE u 6.00 44.56 267.36 0.00 0.00 267.36 0.0001.05 ARTEFACTOS DE ILUMINACION - LUMINARIAS 54,935.06

01.05.01 ARTEFACTO FLUORESCENTE 2 x 36 w u 86.00 115.89 9,966.54 0.00 2989.96 0.00 6976.5801.05.02 ARTEFACTO FLUORESCENTE 3 x 36 w u 6.00 142.53 855.18 0.00 256.55 0.00 598.6301.05.03 LAMPARA AHORRADORA DE ENERGIA 18 w u 127.00 44.57 5,660.39 0.00 1698.12 0.00 3962.2701.05.04 FAROLA TIPO HONGO MODELO PFH 1 x 70 w, INC SUMINISTRO E IZAJE DE POSTE DE u 26.00 966.14 25,119.64 0.00 7535.89 0.00 17583.7501.05.05 REFLECTOR MODELO ZORUS CON LAMPARA DE 400 W, INC SUMINISTRO E IZAJE DE u 4.00 1,788.26 7,153.04 5364.78 0.00 1788.26 0.00 0.0001.05.06 REFLECTOR CON LAMPARA DE 70 W VAP DE SODIO EN PATIO DE FORMACION u 8.00 383.66 3,069.28 0.00 920.78 0.00 2148.5001.05.07 VENTILADORES DE TECHO u 7.00 300.74 2,105.18 0.00 631.55 0.00 1473.6301.05.08 CONTROLADOR DE VENTILADOR u 7.00 109.63 767.41 0.00 230.22 0.00 537.1901.05.09 TIMBRE PULSADOR u 2.00 119.20 238.40 0.00 0.00 0.00 238.4001.06 VOZ Y DATA 8,780.96

01.06.01 EQUIPO UPS SEGÚN ESPECIFICACIONES u 2.00 2,234.62 4,469.24 0.00 0.00 0.00 4469.2401.06.02 SUMINISTRO E INSTALACION DE CABLE UTP CAT 5E BELDEN m 396.00 2.13 843.48 0.00 0.00 0.00 843.4801.06.03 SUMINISTRO E INSTALACION DE TOMAS DE TELEFONO u 1.00 31.16 31.16 0.00 0.00 0.00 31.1601.06.04 SWITCH PRINCIPAL DE RED DE 8 PUERTOS u 2.00 136.42 272.84 0.00 0.00 0.00 272.8401.06.05 SWITCH SECUNDARIOS DE RED DE 12 PUERTOS u 4.00 164.62 658.48 0.00 0.00 0.00 658.4801.06.06 SUMINISTRO E INSTALACION DE TOMA DE DATA pto 44.00 53.54 2,355.76 0.00 0.00 0.00 2355.7601.06.07 ACOMETIDA EXTERIOR PARA TELEFONO E INTERNET u 1.00 150.00 150.00 0.00 0.00 0.00 150.0001.07 EQUIPOS DE MANIOBRA Y PROTECCION 18,292.52

01.07.01 TABLEROS ELECTRICOS 9,679.56

01.07.01.01 TABLERO GENERAL 380 V, TRIFASICO (TG) u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.02 TABLERO TD-01 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.03 TABLERO TD-02 220 V , MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.04 TABLERO TD-03 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.05 TABLERO TD-04 380 V, TRIFASICO u 1.00 855.61 855.61 0.00 256.68 0.00 598.9301.07.01.06 TABLERO TD-05 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.07 TABLERO TD-06 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.08 TABLERO TD-07 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.09 TABLERO TD-08 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.10 TABLERO TD-09 380 V, TRIFASICO u 1.00 952.24 952.24 0.00 285.67 0.00 666.5701.07.01.11 TABLERO TD-10 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.12 TABLERO TD-11 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.01.13 SUBTABLERO STD-BB 220 V, MONOFASICO u 1.00 715.61 715.61 0.00 214.68 0.00 500.9301.07.02 INTERRUPTORES TERMOMAGNETICOS DE CAJA MOLDEADA 1,870.02

01.07.02.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 100 A, CAJ u 1.00 268.45 268.45 0.00 0.00 0.00 268.4501.07.02.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 40 A, CAJA u 2.00 208.90 417.80 0.00 0.00 0.00 417.8001.07.02.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 3 x 30 A, CAJA u 1.00 208.90 208.90 0.00 0.00 0.00 208.9001.07.02.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 40 A, CAJA u 1.00 98.96 98.96 0.00 0.00 0.00 98.9601.07.02.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 30 A, CAJA u 5.00 78.96 394.80 0.00 0.00 0.00 394.8001.07.02.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO DE 2 x 25 A, CAJA u 3.00 160.37 481.11 0.00 0.00 0.00 481.1101.07.03 INTERRUPTORES TERMOMAGNETICOS DEL TIPO ATORNILLABLES 4,187.36

01.07.03.01 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u 1.00 182.76 182.76 0.00 0.00 0.00 182.7601.07.03.02 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u 1.00 182.76 182.76 0.00 0.00 0.00 182.7601.07.03.03 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 3 u 3.00 162.76 488.28 0.00 0.00 0.00 488.2801.07.03.04 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u 6.00 98.96 593.76 0.00 0.00 0.00 593.7601.07.03.05 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u 7.00 63.96 447.72 0.00 0.00 0.00 447.7201.07.03.06 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u 20.00 58.96 1,179.20 0.00 0.00 0.00 1179.2001.07.03.07 SUMINISTRO E INSTALACION DE INTERRUPTOR TERMOMAGNETICO ATORNILLABLE DE 2 u 24.00 46.37 1,112.88 0.00 0.00 0.00 1112.8801.07.04 INTERRUPTORES DIFERENCIALES 2,287.12

01.07.04.01 SUMINISTRO E INSTALACION DE INTERRUPTOR DIFERENCIAL DE 2 x 20 A u 22.00 103.96 2,287.12 0.00 0.00 0.00 2287.1201.07.05 INTERRUPTORES HORARIOS 268.46

Page 9: ACELERADO - AMPL1

01.07.05.01 SUMINISTRO E INSTALACION DE INTERRUPTOR HORARIO u 2.00 134.23 268.46 0.00 0.00 0.00 268.4601.08 PUESTA A TIERRA 4,795.55

01.08.01 EXCAVACION DE AGUJERO PARA PUESTA A TIERRA u 6.00 53.09 318.54 53.09 0.00 265.45 0.0001.08.02 INSTALACION DEL POZO DE CONEXIÓN A TIERRA TIPO P1 u 1.00 733.19 733.19 0.00 0.00 733.19 0.0001.08.03 INSTALACION DEL POZO DE CONEXIÓN A TIERRA TIPO P2 u 6.00 561.11 3,366.66 0.00 0.00 3366.66 0.0001.08.04 RELLENO COMPACTACION DE LA PUESTA A TIERRA u 7.00 53.88 377.16 0.00 0.00 377.16 0.0001.09 ELECTROBOMBA Y ACCESORIOS 2,665.69

01.09.01 ELECTROBOMBA ALTO RENDIMIENTO 0.75 HP u 2.00 743.50 1,487.00 0.00 0.00 0.00 1487.0001.09.02 TABLERO DE PROTECCION, OPERACIÓN Y MANDO u 1.00 1,178.69 1,178.69 0.00 0.00 0.00 1178.6901.10 ACOMETIDA ELECTRICA INCLUIDO MEDIDOR DE ENERGIA ACTIVA 900.00

01.10.01 ACOMETIDA EXTERIOR DE ENOSA glb 1.00 900.00 900.00 0.00 0.00 0.00 900.0001.11 PRUEBAS Y PUESTA DE SERVICIO 1,000.00

01.11.01 PRUEBA Y PUESTA DE SERVICIO DE LAS INSTALACIONES ELECTRICAS DE BAJA TENSI glb 1.00 1,000.00 1,000.00 0.00 0.00 0.00 1000.0001.12 OTROS 4,935.04

01.12.01 EXCAVACION DE ZANJAS PARA CAJA DE PASE u 16.00 48.44 775.04 0.00 0.00 775.04 0.0001.12.02 CAJAS DE PASO DE CONCRETO ARMADO PARA CABLEADO ELECTRICO u 16.00 260.00 4,160.00 0.00 0.00 4160.00 0.00

COSTO DIRECTO 2,983,039.06 115,070.82 320,984.71 224,934.28 194,362.38 333,818.68 316,294.01 308,654.36 441,829.12 727,090.54

GASTOS GENERALES (10%) 298,303.91 11,507.08 32,098.47 22,493.43 19,436.24 33,381.87 31,629.40 30,865.44 44,182.91 72,709.05

UTILIDAD (10%) 298,303.91 11,507.08 32,098.47 22,493.43 19,436.24 33,381.87 31,629.40 30,865.44 44,182.91 72,709.05

SUB TOTAL 3,579,646.88 138,084.98 385,181.66 269,921.13 233,234.86 400,582.41 379,552.82 370,385.23 530,194.94 872,508.64

I.G.V. (18%) 644,336.44 24,855.30 69,332.70 48,585.80 41,982.28 72,104.83 68,319.51 66,669.34 95,435.09 157,051.56

PRESUPUESTO TOTAL 4,223,983.32 162,940.28 454,514.36 318,506.93 275,217.14 472,687.24 447,872.32 437,054.58 625,630.03 1,029,560.20

3.86% 10.76% 7.54% 6.52% 11.19% 10.60% 10.35% 14.81% 24.37%

Item Descripción Und. Metrado Precio S/. Parcial S/.1° MES 2° MES 3° MES 4° MES 5° MES 6° MES 7° MES 8° MES 9° MES

01.00 AMBIENTES PEDAGOGICOS

01.01 AULAS COMUNES

01.01.01 adquisición de carpetas unipersonales de estructura de metálica y tablero de madera revestido pza 400.00 93.22 37,288.14 27,966.10 9,322.0301.01.02 Rehabilitación de carpetas unipersonales de estructura metálica y tablero de madera(2 aulas=4 pza 80.00 55.08 4,406.78 0.00 4,406.7801.01.03 adquisición mobiliario de madera para docentes ( 1pupitre + 1 silla) mod. 12.00 474.58 5,694.92 4,271.19 1,423.7301.02 LABORATORIOS, TALLERES Y BIBLIOTECA 0.0001.02.01 Laboratorio de Química, Biología y Física 0.0001.02.01.01 adquisición de estantes metálicos de angulos ranurados pza 4.00 330.51 1,322.03 991.53 330.5101.02.01.02 Adquisición de mobiliario para alumnos (taburete de estruc. Metálica y asiento de madera) pza 40.00 279.66 11,186.44 8,389.83 2,796.6101.02.01.03 Adquisición mobiliario de madera, para docente ( 1pupitre + 1 silla) mod 1.00 474.58 474.58 355.93 118.6401.02.01.04 Adquisición de armario metálico pza 1.00 508.47 508.47 381.36 127.1201.02.01.05 Equipo de laboratorio de química ( 2 telescopios, 2 balanzas, tubo de ensayo, mechero de gas, glob 1.00 1,525.42 1,525.42 0.00 1,525.4201.02.01.06 Equipo para gas (balón, manguera, válvulas ) glob. 1.00 567.80 567.80 0.00 567.8001.02.02 Sala de Usos Múltiples 0.0001.02.02.01 Adquisición de caballetes de madera, para sesiones de Arte pza 25.00 101.69 2,542.37 0.00 2,542.3701.02.02.02 adquisición de mobiliario de madera para docentes ( 1pupitre + 1 silla) mod 1.00 474.58 474.58 355.93 118.6401.02.02.03 Adquisición de sillas de madera pza 40.00 76.27 3,050.85 2,288.14 762.7101.02.02.04 adquisición de estantes metálicos de angulos ranurados pza 3.00 330.51 991.53 743.64 247.8801.02.02.05 Adquisición de armario metálico pza 2.00 508.47 1,016.95 762.71 254.2401.02.03 Sala de Computo 0.0001.02.03.01 Adquisición de computadora personal unid 41.00 1,211.86 49,686.44 37,264.83 12,421.6101.02.03.02 adquisición de módulos(mueble+silla) de estructura metálica para computadora mod 41.00 398.31 16,330.51 12,247.88 4,082.6301.02.03.03 adquisición de impresora multifuncional unid 1.00 135.59 135.59 101.69 33.9001.02.03.04 Adquisición de mesa chica de madera para impresora multifuncional pza 1.00 211.86 211.86 158.90 52.9701.02.03.05 adquisición de equipo para aire acondicionado unid 2.00 5,074.45 10,148.90 7,611.67 2,537.2301.02.03.06 adquisición de armario metálico pza 1.00 508.47 508.47 381.36 127.1201.02.03.07 Software Windows unid 45.00 355.93 16,016.95 12,012.71 4,004.2401.02.03.08 Software Antivirus Glob 1.00 1,525.42 1,525.42 1,144.07 381.3601.02.04 Sala de Video 0.0001.02.04.01 Adquisición de computadora personal unid 1.00 1,211.86 1,211.86 908.90 302.9701.02.04.02 adquisición de módulos(mueble+silla) de estructura metálica para computadora mod 1.00 398.31 398.31 298.73 99.5801.02.04.03 adquisición de proyector multimedia pza 1.00 1,627.12 1,627.12 0.00 1,627.1201.02.04.04 adquisición de ECRAN pza 1.00 135.59 135.59 0.00 135.5901.02.04.05 adquisición de equipo de sonido unid 1.00 677.12 677.12 0.00 677.1201.02.04.06 adquisición de silla de estructura metálica pza 40.00 76.27 3,050.85 2,288.14 762.7101.02.04.07 adquisición de armario metálico pza 1.00 508.47 508.47 381.36 127.1201.02.05 BIBLIOTECA 0.00 0.0001.02.05.01 Adquisición de mobiliario de madera para lectura (1mesa grande + 6 sillas) mod 6.00 1,033.90 6,203.39 4,652.54 1,550.8501.02.05.02 adquisición de estantes metálicos de angulos ranurados pza 6.00 330.51 1,983.05 1,487.29 495.76

DEL 12 AL 31 MARZO 2013

DEL 01 AL 30 ABRIL 2013

DEL 01 AL 31 MAYO 2013

DEL 01 AL 30 JUNIO 2013

DEL 01 AL 31 JULIO 2013

DEL 01 AL 31 AGOSTO 2013

DEL 01 AL 30 SETIEMBRE 2013

DEL 01 AL 31 OCTUBRE 2013

DEL 01 AL 19 NOVIEMBRE 2013

Page 10: ACELERADO - AMPL1

01.02.05.03 adquisición de armario metálico pza 1.00 508.47 508.47 381.36 127.1201.02.05.04 adquisición de escritorio metálico para auxiliar de biblioteca pza 1.00 398.31 398.31 298.73 99.5801.02.05.05 Adquisición de silla de estructura metálica para escritorio pza 1.00 76.27 76.27 57.20 19.0701.02.05.06 Adquisición de silla de estructura de metálica adicionales para biblioteca pza 3.00 76.27 228.81 171.61 57.2002.00 AMBIENTES COMPLEMENTARIOS 0.00 0.0002.01 OBE, TOPICO Y PSICOLOGÍA , APAFA 0.00 0.0002.01.01 adquisición de escritorio metálico para OBE pza 1.00 398.31 398.31 298.73 99.5802.01.02 Adquisición de silla de estructura metálica para escritorio OBE pza 3.00 76.27 228.81 171.61 57.2002.01.03 Adquisición de camilla para tópico pza 1.00 491.53 491.53 368.64 122.8802.01.04 Adquisición de mesa bipersonal de madera para tópico y psicología pza 2.00 406.78 813.56 610.17 203.3902.01.05 Adquisición de silla de estructura metálica para tópico y psicología pza 6.00 76.27 457.63 343.22 114.4102.01.06 Adquisición de botiquín de madera para tópico pza 1.00 50.85 50.85 0.00 50.8502.01.07 kit de reactivos de primeros auxilios (botiquín) kit 1.00 42.37 42.37 0.00 42.3702.01.08 Adquisición de mueble fijo para lavadero en tópico pza 1.00 203.39 203.39 0.00 203.3902.01.09 Adquisición de armario metálico para psicología pza 1.00 508.47 508.47 381.36 127.1202.01.10 Adquisición de biombo metálico de 2 cuerpos para tópico pza 1.00 194.92 194.92 146.19 48.7302.01.11 Adquisición de escalinata metálica de 2 peldaños para tópico pza 1.00 118.64 118.64 88.98 29.6602.01.12 Adquisición de vitrina de estructura metálica pza 1.00 550.85 550.85 413.14 137.7102.01.13 Adquisición de mesa bipersonal de madera para APAFA pza 1.00 406.78 406.78 305.08 101.6902.01.14 Adquisición de silla de estructura metálica para PAFA pza 2.00 76.27 152.54 114.41 38.1402.02 SALA DE PROFESORES 0.0002.02.01 Adquisición de mobiliario (1mesa grande + 10 sillas) de madera mod 2.00 1,338.98 2,677.97 2,008.47 669.4902.02.02 adquisición de estantes de ángulo ranurados para sala de profesores pza 1.00 330.51 330.51 0.00 330.5102.02.03 adquisición de armario metálico para sala de profesores pza 1.00 508.47 508.47 381.36 127.1203.00 AMBIENTES ADMINISTRATIVOS 0.0003.01 adquisición de escritorio metálico para Dirección, Sub dirección y secretaría pza 3.00 398.31 1,194.92 896.19 298.7303.02 Adquisición de sillas de estructura metálica pza 10.00 76.27 762.71 572.03 190.6803.03 adquisición de equipo de cómputo para secretaria unid 1.00 1,211.86 1,211.86 908.90 302.9703.04 Adq. de módulos(mueble+silla) de estructura metálica para computadora de secretaria mod 1.00 398.31 398.31 298.73 99.5803.05 adquisición de impresora multifuncional pza 1.00 135.59 135.59 101.69 33.9003.06 Adq. estantes de ángulo ranurados para dirección , sub dirección y secretaria pza 3.00 330.51 991.53 743.64 247.8803.07 adquisición de armario metálico para dirección , sub dirección y secretaria pza 3.00 508.47 1,525.42 1,144.07 381.3603.08 Adq. estantes de ángulo ranurados para deposito administrativo pza 3.00 330.51 991.53 743.64 247.8804.00 AMBIENTES DE SERVICIOS 0.0004.01 adquisición de estante metálico de ángulo ranurados para deposito pza 3.00 330.51 991.53 743.64 247.8804.02 Adquisición de mesa grande de estructura de madera para maestranza pza 1.00 576.27 576.27 432.20 144.0704.03 adquisición de estante metálico de ángulo ranurados para maestranza limpieza unid 2.00 330.51 661.02 495.76 165.2504.04 adquisición de mesa bi personal de madera para caseta de guardianía pza 1.00 406.78 406.78 305.08 101.6904.05 adquisición de silla de estructura metálica para caseta de guardianía pza 1.00 76.27 76.27 57.20 19.07

COSTO DIRECTO 200,681.95 141,429.47 59,252.48 0.00

GASTOS GENERALES (1.494903%) 3,000.00 2,114.23 885.77 0.00SUB TOTAL 203,681.95 143,543.71 60,138.25 0.00

IGV (18.00%) 36,662.75 25,837.87 10,824.88 0.00TOTAL PRESUPUESTO 240,344.70 169,381.57 70,963.13 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 70.47% 0.00% 29.53% 0.00%

PROYECTADO DEL MONTO TOTAL (S/. 4'464,328.01) 3.65% 10.18% 7.13% 6.16% 10.59% 13.83% 9.79% 15.60% 23.06%