alemco-2012

Embed Size (px)

Citation preview

  • 8/16/2019 alemco-2012

    1/29

  • 8/16/2019 alemco-2012

    2/29

    SHANGRILA QARYA AL BERIABU DHABI

    ALEMCO is the Mechanical, Electrical and Plumbing business unit within Al

     Jaber L.E.G.. Engineering & Contracting (ALEC) LLC, a premium engineering

    and general contracting company. It provides the skill, expertise, experience and

    resources essential to meet the demands of today’s fast track projects.

    Since its inception in 2006, ALEMCO has provided fully engineered

    electromechanical and building service solutions to construction projects.

    Its track record includes some of Abu Dhabi and Dubai’s most prestigiousdevelopments, from hotels, resort spas and retail, to cinema, leisure and

    exhibition spaces.

    Te key services that ALEMCO provides to clients include turnkey

    electromechanical construction services and planning; f acilities management

    including contract work, full maintenance and call-out facilities management

    services; and energy optimization, which helps to reduce operational costs and

    prolong plant life. Tis latter is achieved through a mixture of energy audits and

    advanced energy saving methods. Additionally, Project Quantity Surveying and

    Budget and BOQ production are services offered.

    Furthering its belief in the value of bringing the best and most innovative

    technology, systems designs and equipment to bear on every project, ALEMCO

    sees its large, reliable workforce as its greatest asset. It is fully committed toenhancing its people’s skills and personal development through a programme

    of technical and soft skills training at its own MEP echnical raining and

    Development Department.

    Whatever your project needs, ALEMCO will ensure that it is delivered on time,

    within budget and to the highest standards.

  • 8/16/2019 alemco-2012

    3/29

    SHANGRILA QARYAT AL BERI

    Tis award winning design and construct project includes a luxury hotel,

    serviced apartments and deluxe villas, complemented by dining, entertainment,

    retail and recreational facilities. It faces a 1,000 metre long private beach. Te 214

    guestrooms, 161 studio to four bedroom serviced apartments and 7 four to six

    bedroom deluxe villas all feature water views.

    Built Up Area 103 000m2 

    Contract Period 42 months

    Contract Value AED 135 000 000 (US$ 36 800 000)

    Location Umm Al Narr, Abu Dhabi

    Client Obaid Al Jaber

    Client Representative Roya International

    Architect / Engineer KEO International

    Interior Designer Wilson Associates & Simon Black

    Hotel Operator Shangri-La

  • 8/16/2019 alemco-2012

    4/29

    RADERS HOELABU DHABI

  • 8/16/2019 alemco-2012

    5/29

    TRADERS HOTEL

    Adjacent to the Shangri-La Qaryat Al Beri, raders Hotel is a contemporary

    luxury hotel located on a private beach yet just minutes away from the

    airport and city centre. ALEMCO was responsible for all MEP operations

    during the design and construction of this 300 bedroom 4 star hotel.

    Built Up Area 27 000m2 

    Contract Period 19 months

    Contract Value AED 89 000 000 (US$ 24 300 000)

    Location Umm Al Narr, Abu Dhabi

    Client Obaid Al Jaber

    Client Representative Roya International

    Architect / Engineer KEO International

    Interior Designer Wilson Associates & Simon Black

    Hotel Operator Shangri-La

  • 8/16/2019 alemco-2012

    6/29

    ROYAL MIRAGEDUBAI

  • 8/16/2019 alemco-2012

    7/29

    ROYAL MIRAGE

    REFURBISHMENT PHASE 1

    Te complete revamp of 111 rooms at this renowned, distinctive hotel,

    including 11 suites, and consisted of all MEP, as well as demolitions, civil

    works, and the Fit Out.

    Contract Period 4 months

    Contract Value AED 10 000 000 (US$ 2 700 000)

    Location Jumeriah, Dubai

    Client One & Only

    Project Managers Mirage Mille

    Electrical Consultant CKR

    Interior Designer WAI

    Mechanical Consultant RPW

    ROYAL MIRAGE

    REFURBISHMENT PHASE 2

    & BEACH LOUNGE

    otal refurbishment of 100 deluxe rooms, 19 executive suites, 2 royal suites

    and club lounge, as well as a luxury beach lounge and drinks reception area.

    Contract Period 4 months

    Contract Value AED 14 000 000 (US$ 3 800 000)Location Jumeriah, Dubai

    Client One & Only

    Project Managers Mirage Mille

    Electrical Consultant CKR

    Interior Designer WAI

    Mechanical Consultant RPW

  • 8/16/2019 alemco-2012

    8/29

    MIRDIF CIY CENREDUBAI

  • 8/16/2019 alemco-2012

    9/29

    MIRDIF CITY CENTRE

    A super regional centre focused on lifestyle and community facilities, Mirdif

    City Centre features approximately 440 outlets in a two-level mall, with

    associated parking and energy centre. ALEMCO was responsible for the

    supply and installation of all below ground drainage.

    Built Up Area 552 000m2

    Contract Period 29 months

    Contract Value AED 5 000 000 (US$ 1 400 000)

    Location Mirdif Emirates Road

    Client Majid Al Futtaim Shopping Malls

    Project Manager MACE

    Architect Holfords Associates

    Structural Engineer Mott MacDonald

    Interior Designer KCA International

    Quantity Surveyors EC Harris

  • 8/16/2019 alemco-2012

    10/29

    GOLF LINKS CLUB HOUSEYAS ISLAND, ABU DHABI

  • 8/16/2019 alemco-2012

    11/29

    GOLF LINKS CLUB HOUSE

    Te Yas Island Golf Club is a semi-private club designed by Kyle Phillips and situatedagainst dramatic views of the Arabian Gulf. Te design and construction of the Golf

    Club House with its infinity pools and steam rooms was carried out by ALEMCO, as

    were the eaching Academy, Office/Maintenance Buildings and Pavilions.

    Built Up Area 12 000m2

    Contract Period 8 months

    Contract Value AED 39 000 000 (US$ 10 600 000)

    Location Yas Island, Abu Dhabi

    Client ALDAR Properties PJSC

    Design Architect GHD Global Pty Ltd

    Interior Designer Simon J Black Interior Design

    Engineers and MEP GHD Global Pty Ltd

    Quantity Surveyors Currie & Brown / ALDAR Properties PJSC

  • 8/16/2019 alemco-2012

    12/29

    SERVICES OFFERED

    ALEMCO combines outstanding professional expertise with an active ‘build

    better, buy better’ approach designed to give its clients better value. Engaging

    with ALEMCO assures clients of an all round engineering solution supported by

    a pool of talent with in-depth local market understanding and experience.

    ALEMCO offers the following services to our key clients:

    Electromechanical Construction Services

    We can provide a wide range of turnkey solutions to meet your current and

    future needs. o ensure that you receive a solution that is project specific for

    your development, ALEMCO supports each stage of the process through

    pre-coordination, on-going collaboration, professional engineering and

    planning. Our proactive approach has earned ALEMCO a reputation as being

    a cooperative flexible engineering company with an impeccable history of

    delivering successful projects time after time.

    Facilities Management

    ALEMCO facilities management is highly flexible, and comprises a portfolio of

    approaches designed to provide an optimum return on investment coupled

    with efficient cost-focused management. We can offer contracting, full

    maintenance and call-out facilities management services, with turn-key solutions

    and management methods being applied to suit each individual client’s

    requirements.

    Energy Optimization Savings

    We have a comprehensive range of methods, tools, techniques and technologies

    designed to optimize clients’ use of energy. ALEMCO is highly experienced in

    implementing energy audits on existing buildings, with the focal point being

    long term operational cost savings and plant optimization engineering. We

    also use tried and tested energy-saving methods, chosen to reflect our clients’

    environment and priorities, coupled with ongoing plant and maintenance

    engineering to help create cost effective energy consumption and extension of

    plant life-expectancy.

  • 8/16/2019 alemco-2012

    13/29

    QASR AL SARAB HOEL RESOR & SPAABU DHABI

    HIGH END ENGINEERING. TOP END COMMITMENT

  • 8/16/2019 alemco-2012

    14/29

    QASR AL SARAB

    HOTEL RESORT & SPA

    A luxury five star Arabian retreat in Abu Dhabi’s Empty Quarter, Qasr Al

    Sarab is inspired by glorious Arabian décor amid the charm of the Liwa

    Desert. Te development features a five star hotel, a luxury health spa and

    conference centre.

    Built Up Area 55 000m

    2

    Contract Period 24 months

    Contract Value AED 347 000 000 (US$ 94 500 000)

    Location Empty Quarter, Abu Dhabi

    Client TDIC

    Project Manager Turner and Townsend

    Architect Dubarch

    Structural Engineer Halcrow Yolles

    Interior Designer Hirsch / Bedner Associates

    Quantity Surveyor s Turner and Townsend

    Hotel Operator Anantara

  • 8/16/2019 alemco-2012

    15/29

    MANARA AL SAADIYAABU DHABI

  • 8/16/2019 alemco-2012

    16/29

    MANARAT AL SAADIYAT

    A prestigious and purpose-built exhibition area incorporating several art

    galleries, including ones for use by the Louvre and Guggenheim museums, as

    well as restaurants, retail and an experience centre for DIC.

    Built Up Area 14 000m2

    Contract Period 6 months

    Contract Value AED 140 000 000 (US$ 38 100 000)

    Location Saadiyat Island, Abu Dhabi

    Client TDIC

    Client Representative AECOM

    Architect AEDAS

    Engineer Derby Design / Forman Roberts

    Quantity Surveyors VHS International / Hanscomb

  • 8/16/2019 alemco-2012

    17/29

    REEL CINEMADUBAI

  • 8/16/2019 alemco-2012

    18/29

    REEL CINEMA

    Reel Cinemas is the premier provider of high quality cinema experiences

    and the opening of this six-screen cineplex brought the concept of

    ‘boutique cinemas’ to the UAE. With the design and construction

    following the ‘Hollywood Chic’ concept, it adds to the ambience and

    appeal of these business-class cinemas.

    Built Up Area 3 200m2

    Contract Period 6 months

    Contract Value AED 11 000 000 (US$ 3 000 000)

    Location Dubai Marina Mall

    Client EMAAR Properties

    Client Representative Al Wasl Al Jaleed Consultant

    Quantity Surveyors Omnium International

  • 8/16/2019 alemco-2012

    19/29

     MARINA PLAZADUBAI

  • 8/16/2019 alemco-2012

    20/29

    MARINA PLAZA

    Te 41 floor shell and core commercial office tower Marina Plaza is part of the

    Dubai Marina Mall, a complex which also incorporates a 180-outlet modern

    shopping and entertainment destination, the Dubai Marina Mall Hotel &

    Serviced Apartments, and an eight-storey tower dedicated to restaurants.

    Built Up Area 160 000m2

    Contract Period 22 months

    Contract Value AED125 000 000 (US$34 000 000)

    Location Dubai Marina, Dubai

    Client EMAAR Properties

    Project Manager Hill International

    Architect DP Architects

    Structural Engineer Meinhardt

    Interior Designer KCA International

    Quantity Surveyors DG Jones

  • 8/16/2019 alemco-2012

    21/29

     ABU DHABI AIRPOR ERMINAL 1 REFURBISHMENABU DHABI

  • 8/16/2019 alemco-2012

    22/29

    ABU DHABI AIRPORT

    TERMINAL 1 REFURBISHMENT

    Te scope of work for this comprehensive airport makeover includes

    refurbishment of the existing erminal 1 including the replacement of all

    bathroom fittings, light fittings, an extension to the Check in area and expansion

    of existing ground floor toilets. It also encompasses the refurbishment of the Al

    Ghazal Business lounge and the First and Business class area including kitchen,

    bar, restaurant, lounge and meeting rooms.

    Built Up Area 20 000m2

    Contract Period 10 months

    Contract Value AED 27 000 000 (US$ 7 300 000)

    Location Abu Dhabi

    Client SCADIA / ADAC

    Project Manager Parsons International

    Architect Corgan

    Structural Engineer TYLIN

    Quantity Surveyors Davis Langdon

  • 8/16/2019 alemco-2012

    23/29

    VISION VALUES SRAEGYALEMCO leadership is committed to a well defined and communicated vision, set of values and

    strategy, and takes a highly proactive approach to promoting a “can do” company culture through

    every part of the organisation.

    Vision

    Dedicated to becoming the best construction company in our geographical area of operation.

    Values

    • Integrity

    • Courage

    • Reliability

    • We value our people

    Strategy

    imeously execute select building projects, by utilising proactive management skills with carefully

    selected clients and consultants in order to achieve an optimum return.

  • 8/16/2019 alemco-2012

    24/29

     DUBAI INERNAIONAL AIRPOR EXPANSION AX140DUBAI

    ADVANCED ENERGY SAVING METHODS WORK FOR YOU.

  • 8/16/2019 alemco-2012

    25/29

    AL FALAH COMMUNIY DEVELOPMEN ABU DHABI

    DUBAI INTERNATIONAL AIRPORT

    EXPANSION AX140

    As part of the extension programme to accommodate increased passenger

    numbers from the new A380 superjumbo, ALEMCO was appointed to provide

    the design, supply and installation of containment, earthing and small power for

    all of the SAS (Specialist Airport Systems). Te new concourse is located airside

    with passenger connection to erminal 3 provided by people movers. Baggage

    is handled by a utility tunnel that allows vehicle access. It includes 4 and 5 star

    hotels, first and business class lounges, arrival and departure floors and a duty

    free area.

    Built Up Area 580 000m2

    Contract Period 29 months

    Contract Value AED 130 000 000 (US$ 35 400 000)

    Location Dubai

    Client Government of Dubai,

    Department of Civil Aviation

    Architect Dar Al Handasah / ADPI JV

    Structural Engineer Dar Al Handasah / ADPI JV

    Quantity Surveyors TTS

  • 8/16/2019 alemco-2012

    26/29

    BURKAN MILIARY BASE MAINENANCE CONRACABU DHABI

    AL FALAH COMMUNITY

    DEVELOPMENT

    Te new sustainable community for UAE nationals, part of the Plan

    Abu Dhabi 2030 directive, provides around 5,000 homes for middle-income

    UAE families. Its innovative design features five villages with many open

    parks. Each village has its own centre with schools and mosques. Te town

    centre will be the focal point of the entire development and will contain

    civic buildings, a retail mall, a hospital, commercial office space, a hotel and a

    sports and leisure complex.

    BBuilt Up Area 2 752 Villas

    Contract Period 33 months

    Contract Value AED 788 000 000 (US$ 214 800 000)

    Location Abu Dhabi

    Client ALDAR

    Main Contractors El Seif Engineering Contracting

    and SPK Construction

    Consulting Engineers Fluor Engineering

    *in partnership with El Mech

  • 8/16/2019 alemco-2012

    27/29

    TURNKEY SOLUTIONS EXPERTLY TURNED AROUND.

    BURKAN MILITARY BASE

    MAINTENANCE CONTRACT

    Maintenance and systems commissioning on munitions manufacturing facility.

    Contract Period Open Monthly preventative maintenance

    Location Abu Dhabi

    Client Burkan Munitions System LLC

  • 8/16/2019 alemco-2012

    28/29

    In just a few short years, ALEMCO has become recognised as one of the UAE

    ’s leading mechanical, electrical and plumbing companies. Over the course

    of carrying out a comprehensive portfolio of successfully delivered work on

    landmark construction projects, we have built up strong relationships with

    major developers and of course are able to integrate our work with any of our

    sister companies within the ALEC Group.

    Our view however, and that of our clients, is that our success is based on more

    than just close relationships and collaborative working. Our team of highly

    qualified senior managers have a wealth of experience in overseeing building

    projects across a wide range of countries, giving them excellent insight into

    clients’ requirements, and an understanding of what innovative approaches will

    offer the best and most cost-effective results. Tis allows them to add value to

    every project, supported by a committed workforce and a can-do attitude.

    ALEMCO continually strives for improvement in all aspects of its operations. We

    seek to achieve continual growth through delivering outstanding projects on

    time and budget and to the satisfaction of our clients and consultant colleagues

    from other companies.

    We believe that this puts us in prime position to deliver on your projects as well,

    and look forward to the opportunity to discuss them with you.

  • 8/16/2019 alemco-2012

    29/29

    Dubai

    3601 Marina Plaza

    Dubai Marina

    PO Box 27639, Dubai, UAE

    el: +971 (0)4 429 0599

    Fax: +971 (0)4 429 0216

    Abu Dhabi

    Villa 1, Marakash Residence

    Khalifa City A

    PO Box 45336, Abu Dhabi, UAEel: +971 (0)2 556 7540

    Fax: +971 (0)2 556 3446

    Oman

    Villa 1, 76 Al Ilam Street, Madinat Al Ilam

    P.O. Box 198, PC 103, Bareeq Al-Shatti

    Muscat, Sultanate of Oman

    el: +968 (0)2 200 5570

    Fax: +968 (0)2 200 5571

    Qatar

    GRIDCO III Building, Penthouse

    C Ring Road, Al Muntazah Area

    P.O. Box 23007, Doha, Qatarel: +974 (0)4 441 1880

    Fax: +974 (0)4 441 1885