Upload
ramy-h-omar
View
214
Download
0
Embed Size (px)
Citation preview
8/16/2019 alemco-2012
1/29
8/16/2019 alemco-2012
2/29
SHANGRILA QARYA AL BERIABU DHABI
ALEMCO is the Mechanical, Electrical and Plumbing business unit within Al
Jaber L.E.G.. Engineering & Contracting (ALEC) LLC, a premium engineering
and general contracting company. It provides the skill, expertise, experience and
resources essential to meet the demands of today’s fast track projects.
Since its inception in 2006, ALEMCO has provided fully engineered
electromechanical and building service solutions to construction projects.
Its track record includes some of Abu Dhabi and Dubai’s most prestigiousdevelopments, from hotels, resort spas and retail, to cinema, leisure and
exhibition spaces.
Te key services that ALEMCO provides to clients include turnkey
electromechanical construction services and planning; f acilities management
including contract work, full maintenance and call-out facilities management
services; and energy optimization, which helps to reduce operational costs and
prolong plant life. Tis latter is achieved through a mixture of energy audits and
advanced energy saving methods. Additionally, Project Quantity Surveying and
Budget and BOQ production are services offered.
Furthering its belief in the value of bringing the best and most innovative
technology, systems designs and equipment to bear on every project, ALEMCO
sees its large, reliable workforce as its greatest asset. It is fully committed toenhancing its people’s skills and personal development through a programme
of technical and soft skills training at its own MEP echnical raining and
Development Department.
Whatever your project needs, ALEMCO will ensure that it is delivered on time,
within budget and to the highest standards.
8/16/2019 alemco-2012
3/29
SHANGRILA QARYAT AL BERI
Tis award winning design and construct project includes a luxury hotel,
serviced apartments and deluxe villas, complemented by dining, entertainment,
retail and recreational facilities. It faces a 1,000 metre long private beach. Te 214
guestrooms, 161 studio to four bedroom serviced apartments and 7 four to six
bedroom deluxe villas all feature water views.
Built Up Area 103 000m2
Contract Period 42 months
Contract Value AED 135 000 000 (US$ 36 800 000)
Location Umm Al Narr, Abu Dhabi
Client Obaid Al Jaber
Client Representative Roya International
Architect / Engineer KEO International
Interior Designer Wilson Associates & Simon Black
Hotel Operator Shangri-La
8/16/2019 alemco-2012
4/29
RADERS HOELABU DHABI
8/16/2019 alemco-2012
5/29
TRADERS HOTEL
Adjacent to the Shangri-La Qaryat Al Beri, raders Hotel is a contemporary
luxury hotel located on a private beach yet just minutes away from the
airport and city centre. ALEMCO was responsible for all MEP operations
during the design and construction of this 300 bedroom 4 star hotel.
Built Up Area 27 000m2
Contract Period 19 months
Contract Value AED 89 000 000 (US$ 24 300 000)
Location Umm Al Narr, Abu Dhabi
Client Obaid Al Jaber
Client Representative Roya International
Architect / Engineer KEO International
Interior Designer Wilson Associates & Simon Black
Hotel Operator Shangri-La
8/16/2019 alemco-2012
6/29
ROYAL MIRAGEDUBAI
8/16/2019 alemco-2012
7/29
ROYAL MIRAGE
REFURBISHMENT PHASE 1
Te complete revamp of 111 rooms at this renowned, distinctive hotel,
including 11 suites, and consisted of all MEP, as well as demolitions, civil
works, and the Fit Out.
Contract Period 4 months
Contract Value AED 10 000 000 (US$ 2 700 000)
Location Jumeriah, Dubai
Client One & Only
Project Managers Mirage Mille
Electrical Consultant CKR
Interior Designer WAI
Mechanical Consultant RPW
ROYAL MIRAGE
REFURBISHMENT PHASE 2
& BEACH LOUNGE
otal refurbishment of 100 deluxe rooms, 19 executive suites, 2 royal suites
and club lounge, as well as a luxury beach lounge and drinks reception area.
Contract Period 4 months
Contract Value AED 14 000 000 (US$ 3 800 000)Location Jumeriah, Dubai
Client One & Only
Project Managers Mirage Mille
Electrical Consultant CKR
Interior Designer WAI
Mechanical Consultant RPW
8/16/2019 alemco-2012
8/29
MIRDIF CIY CENREDUBAI
8/16/2019 alemco-2012
9/29
MIRDIF CITY CENTRE
A super regional centre focused on lifestyle and community facilities, Mirdif
City Centre features approximately 440 outlets in a two-level mall, with
associated parking and energy centre. ALEMCO was responsible for the
supply and installation of all below ground drainage.
Built Up Area 552 000m2
Contract Period 29 months
Contract Value AED 5 000 000 (US$ 1 400 000)
Location Mirdif Emirates Road
Client Majid Al Futtaim Shopping Malls
Project Manager MACE
Architect Holfords Associates
Structural Engineer Mott MacDonald
Interior Designer KCA International
Quantity Surveyors EC Harris
8/16/2019 alemco-2012
10/29
GOLF LINKS CLUB HOUSEYAS ISLAND, ABU DHABI
8/16/2019 alemco-2012
11/29
GOLF LINKS CLUB HOUSE
Te Yas Island Golf Club is a semi-private club designed by Kyle Phillips and situatedagainst dramatic views of the Arabian Gulf. Te design and construction of the Golf
Club House with its infinity pools and steam rooms was carried out by ALEMCO, as
were the eaching Academy, Office/Maintenance Buildings and Pavilions.
Built Up Area 12 000m2
Contract Period 8 months
Contract Value AED 39 000 000 (US$ 10 600 000)
Location Yas Island, Abu Dhabi
Client ALDAR Properties PJSC
Design Architect GHD Global Pty Ltd
Interior Designer Simon J Black Interior Design
Engineers and MEP GHD Global Pty Ltd
Quantity Surveyors Currie & Brown / ALDAR Properties PJSC
8/16/2019 alemco-2012
12/29
SERVICES OFFERED
ALEMCO combines outstanding professional expertise with an active ‘build
better, buy better’ approach designed to give its clients better value. Engaging
with ALEMCO assures clients of an all round engineering solution supported by
a pool of talent with in-depth local market understanding and experience.
ALEMCO offers the following services to our key clients:
Electromechanical Construction Services
We can provide a wide range of turnkey solutions to meet your current and
future needs. o ensure that you receive a solution that is project specific for
your development, ALEMCO supports each stage of the process through
pre-coordination, on-going collaboration, professional engineering and
planning. Our proactive approach has earned ALEMCO a reputation as being
a cooperative flexible engineering company with an impeccable history of
delivering successful projects time after time.
Facilities Management
ALEMCO facilities management is highly flexible, and comprises a portfolio of
approaches designed to provide an optimum return on investment coupled
with efficient cost-focused management. We can offer contracting, full
maintenance and call-out facilities management services, with turn-key solutions
and management methods being applied to suit each individual client’s
requirements.
Energy Optimization Savings
We have a comprehensive range of methods, tools, techniques and technologies
designed to optimize clients’ use of energy. ALEMCO is highly experienced in
implementing energy audits on existing buildings, with the focal point being
long term operational cost savings and plant optimization engineering. We
also use tried and tested energy-saving methods, chosen to reflect our clients’
environment and priorities, coupled with ongoing plant and maintenance
engineering to help create cost effective energy consumption and extension of
plant life-expectancy.
8/16/2019 alemco-2012
13/29
QASR AL SARAB HOEL RESOR & SPAABU DHABI
HIGH END ENGINEERING. TOP END COMMITMENT
8/16/2019 alemco-2012
14/29
QASR AL SARAB
HOTEL RESORT & SPA
A luxury five star Arabian retreat in Abu Dhabi’s Empty Quarter, Qasr Al
Sarab is inspired by glorious Arabian décor amid the charm of the Liwa
Desert. Te development features a five star hotel, a luxury health spa and
conference centre.
Built Up Area 55 000m
2
Contract Period 24 months
Contract Value AED 347 000 000 (US$ 94 500 000)
Location Empty Quarter, Abu Dhabi
Client TDIC
Project Manager Turner and Townsend
Architect Dubarch
Structural Engineer Halcrow Yolles
Interior Designer Hirsch / Bedner Associates
Quantity Surveyor s Turner and Townsend
Hotel Operator Anantara
8/16/2019 alemco-2012
15/29
MANARA AL SAADIYAABU DHABI
8/16/2019 alemco-2012
16/29
MANARAT AL SAADIYAT
A prestigious and purpose-built exhibition area incorporating several art
galleries, including ones for use by the Louvre and Guggenheim museums, as
well as restaurants, retail and an experience centre for DIC.
Built Up Area 14 000m2
Contract Period 6 months
Contract Value AED 140 000 000 (US$ 38 100 000)
Location Saadiyat Island, Abu Dhabi
Client TDIC
Client Representative AECOM
Architect AEDAS
Engineer Derby Design / Forman Roberts
Quantity Surveyors VHS International / Hanscomb
8/16/2019 alemco-2012
17/29
REEL CINEMADUBAI
8/16/2019 alemco-2012
18/29
REEL CINEMA
Reel Cinemas is the premier provider of high quality cinema experiences
and the opening of this six-screen cineplex brought the concept of
‘boutique cinemas’ to the UAE. With the design and construction
following the ‘Hollywood Chic’ concept, it adds to the ambience and
appeal of these business-class cinemas.
Built Up Area 3 200m2
Contract Period 6 months
Contract Value AED 11 000 000 (US$ 3 000 000)
Location Dubai Marina Mall
Client EMAAR Properties
Client Representative Al Wasl Al Jaleed Consultant
Quantity Surveyors Omnium International
8/16/2019 alemco-2012
19/29
MARINA PLAZADUBAI
8/16/2019 alemco-2012
20/29
MARINA PLAZA
Te 41 floor shell and core commercial office tower Marina Plaza is part of the
Dubai Marina Mall, a complex which also incorporates a 180-outlet modern
shopping and entertainment destination, the Dubai Marina Mall Hotel &
Serviced Apartments, and an eight-storey tower dedicated to restaurants.
Built Up Area 160 000m2
Contract Period 22 months
Contract Value AED125 000 000 (US$34 000 000)
Location Dubai Marina, Dubai
Client EMAAR Properties
Project Manager Hill International
Architect DP Architects
Structural Engineer Meinhardt
Interior Designer KCA International
Quantity Surveyors DG Jones
8/16/2019 alemco-2012
21/29
ABU DHABI AIRPOR ERMINAL 1 REFURBISHMENABU DHABI
8/16/2019 alemco-2012
22/29
ABU DHABI AIRPORT
TERMINAL 1 REFURBISHMENT
Te scope of work for this comprehensive airport makeover includes
refurbishment of the existing erminal 1 including the replacement of all
bathroom fittings, light fittings, an extension to the Check in area and expansion
of existing ground floor toilets. It also encompasses the refurbishment of the Al
Ghazal Business lounge and the First and Business class area including kitchen,
bar, restaurant, lounge and meeting rooms.
Built Up Area 20 000m2
Contract Period 10 months
Contract Value AED 27 000 000 (US$ 7 300 000)
Location Abu Dhabi
Client SCADIA / ADAC
Project Manager Parsons International
Architect Corgan
Structural Engineer TYLIN
Quantity Surveyors Davis Langdon
8/16/2019 alemco-2012
23/29
VISION VALUES SRAEGYALEMCO leadership is committed to a well defined and communicated vision, set of values and
strategy, and takes a highly proactive approach to promoting a “can do” company culture through
every part of the organisation.
Vision
Dedicated to becoming the best construction company in our geographical area of operation.
Values
• Integrity
• Courage
• Reliability
• We value our people
Strategy
imeously execute select building projects, by utilising proactive management skills with carefully
selected clients and consultants in order to achieve an optimum return.
8/16/2019 alemco-2012
24/29
DUBAI INERNAIONAL AIRPOR EXPANSION AX140DUBAI
ADVANCED ENERGY SAVING METHODS WORK FOR YOU.
8/16/2019 alemco-2012
25/29
AL FALAH COMMUNIY DEVELOPMEN ABU DHABI
DUBAI INTERNATIONAL AIRPORT
EXPANSION AX140
As part of the extension programme to accommodate increased passenger
numbers from the new A380 superjumbo, ALEMCO was appointed to provide
the design, supply and installation of containment, earthing and small power for
all of the SAS (Specialist Airport Systems). Te new concourse is located airside
with passenger connection to erminal 3 provided by people movers. Baggage
is handled by a utility tunnel that allows vehicle access. It includes 4 and 5 star
hotels, first and business class lounges, arrival and departure floors and a duty
free area.
Built Up Area 580 000m2
Contract Period 29 months
Contract Value AED 130 000 000 (US$ 35 400 000)
Location Dubai
Client Government of Dubai,
Department of Civil Aviation
Architect Dar Al Handasah / ADPI JV
Structural Engineer Dar Al Handasah / ADPI JV
Quantity Surveyors TTS
8/16/2019 alemco-2012
26/29
BURKAN MILIARY BASE MAINENANCE CONRACABU DHABI
AL FALAH COMMUNITY
DEVELOPMENT
Te new sustainable community for UAE nationals, part of the Plan
Abu Dhabi 2030 directive, provides around 5,000 homes for middle-income
UAE families. Its innovative design features five villages with many open
parks. Each village has its own centre with schools and mosques. Te town
centre will be the focal point of the entire development and will contain
civic buildings, a retail mall, a hospital, commercial office space, a hotel and a
sports and leisure complex.
BBuilt Up Area 2 752 Villas
Contract Period 33 months
Contract Value AED 788 000 000 (US$ 214 800 000)
Location Abu Dhabi
Client ALDAR
Main Contractors El Seif Engineering Contracting
and SPK Construction
Consulting Engineers Fluor Engineering
*in partnership with El Mech
8/16/2019 alemco-2012
27/29
TURNKEY SOLUTIONS EXPERTLY TURNED AROUND.
BURKAN MILITARY BASE
MAINTENANCE CONTRACT
Maintenance and systems commissioning on munitions manufacturing facility.
Contract Period Open Monthly preventative maintenance
Location Abu Dhabi
Client Burkan Munitions System LLC
8/16/2019 alemco-2012
28/29
In just a few short years, ALEMCO has become recognised as one of the UAE
’s leading mechanical, electrical and plumbing companies. Over the course
of carrying out a comprehensive portfolio of successfully delivered work on
landmark construction projects, we have built up strong relationships with
major developers and of course are able to integrate our work with any of our
sister companies within the ALEC Group.
Our view however, and that of our clients, is that our success is based on more
than just close relationships and collaborative working. Our team of highly
qualified senior managers have a wealth of experience in overseeing building
projects across a wide range of countries, giving them excellent insight into
clients’ requirements, and an understanding of what innovative approaches will
offer the best and most cost-effective results. Tis allows them to add value to
every project, supported by a committed workforce and a can-do attitude.
ALEMCO continually strives for improvement in all aspects of its operations. We
seek to achieve continual growth through delivering outstanding projects on
time and budget and to the satisfaction of our clients and consultant colleagues
from other companies.
We believe that this puts us in prime position to deliver on your projects as well,
and look forward to the opportunity to discuss them with you.
8/16/2019 alemco-2012
29/29
Dubai
3601 Marina Plaza
Dubai Marina
PO Box 27639, Dubai, UAE
el: +971 (0)4 429 0599
Fax: +971 (0)4 429 0216
Abu Dhabi
Villa 1, Marakash Residence
Khalifa City A
PO Box 45336, Abu Dhabi, UAEel: +971 (0)2 556 7540
Fax: +971 (0)2 556 3446
Oman
Villa 1, 76 Al Ilam Street, Madinat Al Ilam
P.O. Box 198, PC 103, Bareeq Al-Shatti
Muscat, Sultanate of Oman
el: +968 (0)2 200 5570
Fax: +968 (0)2 200 5571
Qatar
GRIDCO III Building, Penthouse
C Ring Road, Al Muntazah Area
P.O. Box 23007, Doha, Qatarel: +974 (0)4 441 1880
Fax: +974 (0)4 441 1885