Draft PresentationPresented by a consortium of:
Voyants Solutions Pvt. Ltd & Alchemy Urban SystemsPvt. Ltd
8/3/2019 A&N - Draft Presentation V2
2/34
8/3/2019 A&N - Draft Presentation V2
3/34
Scope of the draft presentation
Revised population projection
Draft development plan
Broad infrastructure requirements and costing Phasing and implementation strategy
8/3/2019 A&N - Draft Presentation V2
4/34
8/3/2019 A&N - Draft Presentation V2
5/34
The scope of the draft report includes:
Formulation of sectoral vision and strategies
Culminating the sectoral strategies into developmental
strategies for the delineated region
Based on the developmental strategies and potential of theregion, projecting the population for the project horizon year
2036
Estimating the broad infrastructure requirements and costing
and phasing for the same Strategizing the institutional framework and implementation
strategy
8/3/2019 A&N - Draft Presentation V2
6/34
The population projections have beenearlier covered under the Interim Stageof the Twin City Development Plan butit is observed that with theimplementation of the proposedgrowth strategies, the growth patterns
of different towns/villages would bedifferent in the future and thereforethe population projections have beenrevised.
8/3/2019 A&N - Draft Presentation V2
7/34
Anand UrbanAgglomeration
Nadiad Municipal Area
The towns Chaklasi,
Karamsad & Mogri villagehave been analyzed
separately
Villages around Anand and
Villages around Nadiad Villages on the eastern side
of the expressway
8/3/2019 A&N - Draft Presentation V2
8/34
Past Population Trends of the Overall Planning Area
Influence of Proposed Growth Pattern on Projections
Population projections have been carried out using thefollowing methods :
Arithmetic increase
Incremental increase
Geometric increase
Exponential, Logarithmic and Graphical methods
Natural increase and migration method
8/3/2019 A&N - Draft Presentation V2
9/34
Name of the settlement Projected Population2011 2021 2031 2041
Anand (M) 201255 275719 330863 343843
Karamsad(M) 39089 53552 66940 73329
VitthalUdyognagar(INA) 6072 8259 9910 10720
VallabhVidyanagar (M) 36429 42986 48144 50033
Bakrol (V) 33945 48542 65531 72678Mogri (V) 3810 4496 5170 5472
Villages around Anand 54898 63682 73234 78535
Nadiad (M) 214133 241971 263748 271545
Chaklasi (M) 40433 44476 48479 50381
Villages around Nadiad 61503 67653 73065 75579
Villages on the Eastern Side of
Expressway 47811 49724 51215 51725
TOTAL PROJECTED POPULATION 739378 901060 1036299 1083840
Growth Rates within the Delineated Area
8/3/2019 A&N - Draft Presentation V2
10/34
Land suitability analysis
Disaster zoning and vulnerability
Sectoral vision
Growth strategy & vision
Development Scenario Construction
Concept Draft Development PlanDraft Development Plan
Infrastructure estimation, costing &
phasing
Implementation strategy
8/3/2019 A&N - Draft Presentation V2
11/34
Methodology for landsuitability analysis
Parameters for analysis
Project area divided into agrid of 1km x 1km
Various parameters were
mapped and overlayed
Scoring of the various grids Individual parameters are
assigned multiplying factors
High rank for a grid implied
greater suitability for urbandevelopment.
Macro parameters: Number of Agricultural
Workers
Existing un-irrigated
agricultural land
Micro parameters:
Accessibility
Existing environmental
features
Existing settlement
8/3/2019 A&N - Draft Presentation V2
12/34
The darker areas depictareas that need to
safeguarded, whereas
the light areas depict
areas which are pro-
development
8/3/2019 A&N - Draft Presentation V2
13/34
8/3/2019 A&N - Draft Presentation V2
14/34
SR.
NO.
SECTOR VISION
1 Sprawl development
within the delineated
region
Create harmonious development
Retain the identity as an environmentally sound
habitat
Enhancing the vibrant character of the delineated
regionProvide paramount quality of life.
2 Transportation and
connectivity
development
Provide an integrated network of roads with clear
hierarchy to improve connectivity within the
delineated region
Facilitate the ease of movement for through traffic
as well as the local traffic
Adequately integrating existing roads and
development, while safeguarding ecologically
sensitive areas
Provide a framework for planned urban extension
8/3/2019 A&N - Draft Presentation V2
15/34
SR.
NO.
SECTOR VISION
3 Economic
development
Establish a sustainable economic development
mechanisms based on strategic partnerships within
the delineated region capitalizing on the local
potential and skill-set .
4 Tourism
development
Promote and further augment the several forms of
prevalent tourism modes such as educational, medical
and religious tourism integrated with high-end
tourism infrastructure development
5 Health and
Educational Facility
Development
Promote state supported education and health
facilities with private initiatives to bringing in more
investment in Social Infrastructure facilities to cater all
sects of people across the region.
8/3/2019 A&N - Draft Presentation V2
16/34
SR.
NO.
SECTOR VISION
6 Water supply Facilitate access to safe drinking water to all the
citizens
7 Sanitation and Solid
Waste ManagementFacility Development
Facilitate community driven safe and hygienic
sanitation facilities in Anand
Nadiad region
8 Slums and EWS
housing demand
Ensure safe and serviced residential facilities to the
slum and houseless population through proactive
slum rehabilitation and policy initiatives
8/3/2019 A&N - Draft Presentation V2
17/34
SR.
NO.
SECTOR VISION
9 Water Bodies,
Environment &
Recreation
Protect the environment in terms of land, water and
air
Home based non-polluting industries to be
developed in stipulated areas within the urbanized
zoneOther Industrial areas to be located away from
urbanized zone with requisite buffers
8/3/2019 A&N - Draft Presentation V2
18/34
TO PROMOTE THE DEVELOPMENT OF ANAND NADIAD
TWIN CITY WHICH OFFERS DIVERSIFIED ECONOMIC
OPPORTUNITIES AND SOCIAL FACILITIES IN AN INCLUSIVE
MANNER WITH PLANNED AND SUSTAINABLE URBAN
DEVELOPMENT MANAGED BY AN ABLE ADMINISTRATION
Ribb d l t l
8/3/2019 A&N - Draft Presentation V2
19/34
Scenario-1: No interventionscenario
Ribbon development along
the transport corridors
8/3/2019 A&N - Draft Presentation V2
20/34
Scenario-2: Land zoningoption 1
Urban agricultural pocket
Urban agricultural strips
cutting across the city
Buffered industrialdevelopment in the
south west
8/3/2019 A&N - Draft Presentation V2
21/34
Scenario-3: Land zoningoption 2
Urban agricultural pocket
Mixed use development
on the E-W corridor to
spur development inthat direction
Loop/ring roads to
improves E-W
connectivity
Industrial development
in the south west
8/3/2019 A&N - Draft Presentation V2
22/34
To create a city that integratesthe existing towns of Anand
and Nadiad along with the rural
hinterland and existing villages
The idea is to considerdeveloping an urban area that
is well provided in terms of
facilities, sustainable as a
habitat and convenient in terms
of its layout and connectivity;
8/3/2019 A&N - Draft Presentation V2
23/34
Provide adequate connectivity toallow for easy movement
Provide connectivity along the
high capacity routes;
Develop public transport in orderto encourage transition from
private wheels to public wheels
Land Use zoning and road network
to support road-based publictransport system in order for the
system to function efficiently;
8/3/2019 A&N - Draft Presentation V2
24/34
A green system to be developedto connect these existing water
bodies and channels.
The lowest density farmtype
residential areas have beendesigned as an extension to
these green space systems.
8/3/2019 A&N - Draft Presentation V2
25/34
The area to the East of theExpressway which is presently
cut off from the rest of the
development to the west is
retained as agricultural. Thus the expressway acts as a
feature to preserve/conserve
the existing agricultural lands on
its eastern side.
8/3/2019 A&N - Draft Presentation V2
26/34
8/3/2019 A&N - Draft Presentation V2
27/34
DraftDevelopmentPlan
8/3/2019 A&N - Draft Presentation V2
28/34
8/3/2019 A&N - Draft Presentation V2
29/34
Water supply
Demand (MLD)
2011 2021 2031 2036
99.82 121.64 139.9 146.32
Source augmentation = 100.00MLD
Network length
estimation =
530Km
TOTAL COST = 284.63 Cr.
Sewerage network
sewerage generated in MLD:
2011 2021 2031 2036
79.85 97.31 111.92 117.05
Treatment facility requirements = 72.00 MLD
Network length estimation
TOTAL COST = 286.44 Cr.
Storm water drainageLength covered storm water drains = 270 kms
TOTAL COST = 44.55 Cr.
Solid waste managementWaste generated in tonnes per day2011 2021 2031 2036
184.84 225.27 259.07 270.96
TOTAL COST = 57.42 Cr.
Road development and
public transport
Broad new road development = 322 km
TOTAL COST = 1742.88 Cr.
Micro level infrastructure TOTAL COST = 278.04 Cr.
ITEM COSTPhysical Infrastructure 2693.95
Social Infrastructure 2963.07
TOTAL 5657.02
THIS COST SHALL BE SPENT IN 3 PHASES OVER THE NEXT 25 YEARSSr. No PHASES Total Area (ha)
100%
Saleable land (ha)
15%
unit cost /ha
(Cr)
Total cost
(Cr)
1 Phase 1 9211 1381.65 12.9 17823.29
2 Phase 2 4951 742.65 12.9 9580.19
3 Phase 3 11367 1705.05 12.9 21995.154 TOTAL 25529 3829.35 12.9 49398.62
The amount required can be financed through sale of land bankscreated via TP Schemes
8/3/2019 A&N - Draft Presentation V2
30/34
8/3/2019 A&N - Draft Presentation V2
31/34
PHASE-1 PHASE-2 PHASE-3
S
TAGE-1
Notification of the area as
an Area Development
Authority.
Constitute an area
development authority
Review of DP in 2021 Review of DP in 2031
STA
GE-2 Preparation of DP and proposal
of TP Schemes for Phase-1
Proposal of TP Schemes for Phase-
2
Proposal of TP Schemes for
Phase-3
STAGE-3
Action Plan for Infrastructure &
Development projects
Action Plan for Infrastructure &
Development projects
Action Plan for Infrastructure &
Development Projects
Provision of infrastructure
facilities in areas where
development has already
taken place
Project formulation for new
Physical and Social
infrastructure
Project formulation for new
projects to complimenturbanization.
Strategies for O&M
Recommendations for policy
initiatives
Project formulation,
Development &
Implementation strategies for
new development.
Projects for improving existing
infrastructure and to develop
additional infrastructure
facilities, civic amenities and
utilities. Preparation of DPR for each
development Projects &
Infrastructure Projects.
Strategies for O&M
Recommendations for policy
initiatives
Project formulation,
Development &
Implementation strategies
for new development.
Independent projects for
improving existing
infrastructure and to
develop additional
infrastructure facilities, civicamenities and utilities.
Preparation of DPR for each
development Projects &
Infrastructure Projects.
Strategies for O&M
Recommendations for policy
initiatives
8/3/2019 A&N - Draft Presentation V2
32/34
8/3/2019 A&N - Draft Presentation V2
33/34
Considering the current growth pattern, interdependency andsocio-cultural identity of Anand - Nadiad and the neighboringvillages, it is envisaged that the project area has to bedeclared a Special Planning Area for an efficient andsustainable development of the region.
Under the Gujarat Town Planning Act 1976 , a region withinthe state can be declared as Development Area for purposeof securing planned development.
The Area Development Authority would be the apex bodyfor planning and co-ordination of development activities inthe delineated area.
8/3/2019 A&N - Draft Presentation V2
34/34