14
perpustakaan.uns.ac.id digilib.uns.ac.id commit to user i ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI DAN FAKTOR PENYEBAB PADA 3 PROYEK KELURAHAN DITINJAU BAGIAN PONDASI MENGUNAKAN ROOT CAUSE ANALYSIS (RCA) Analysis and Management for Construction’s Waste Material and Causing Factor in 3 Government’s Project Specially in Pondation Structure Using Root Cause Analysis ( RCA ) Disusun oleh : DERRY HANDOKO PURBA NIM I 0110031 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET SURAKARTA 2015

ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

Embed Size (px)

Citation preview

Page 1: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

i

ANALISIS DAN PENGELOLAAN SISA MATERIAL

KONSTRUKSI DAN FAKTOR PENYEBAB PADA 3 PROYEK

KELURAHAN DITINJAU BAGIAN PONDASI MENGUNAKAN

ROOT CAUSE ANALYSIS (RCA)

Analysis and Management for Construction’s Waste Material

and Causing Factor in 3 Government’s Project Specially in Pondation Structure

Using Root Cause Analysis ( RCA )

Disusun oleh :

DERRY HANDOKO PURBA

NIM I 0110031

JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARET

SURAKARTA

2015

Page 2: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

ii

Page 3: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

iii

Page 4: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

viii

ABSTRAK

Derry Handoko Purba, 2015, Analisis dan Pengelolaan Sisa Material

Konstruksi Dan Faktor Penyebab Pada 3 Proyek Kelurahan Ditinjau Bagian

Pondasi Mengunakan Root Cause Analysis ( RCA ). Tugas Akhir Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret.

Material merupakan komponen yang penting dalam menentukan besarnya biaya

suatu proyek, lebih dari separuh biaya proyek diserap oleh material yang

digunakan. Pada tahap pelaksanaan konstruksi, penggunaan material di lapangan

sering menimbulkan sisa material yang beragam yang belum dikelola dengan baik

yang memungkinkan mengganggu gerakan / sirkulasi pekerjaan dalam proyek,

keselamatan kerja dalam proyek dan menjadi beban dalam biaya untuk sampah,

sehingga usaha untuk meminimalkan sisa material penting untuk diterapkan. Sisa

material (waste) merupakan salah satu masalah serius pada pelaksanaan proyek

konstruksi. Usaha meminimalkan sisa material konstruksi akan membantu

meningkatkan keuntungan kontraktor dan mengurangi dampak lingkungan. Oleh

karena itu perlu dilakukan perhitungan yang teliti dan tepat dalam menentukan

jumlah kebutuhan material yang akan digunakan dalam proyek serta dilakukan

evaluasi terhadap penggunaan material tersebut.

Untuk menghitung sisa material dilakukan penghitungan kuantitas sisa material

yaitu Sisa material = Pembelian material – Stok material – Kebutuhan material,

kemudian menghitung biaya sisa material dengan mengkalikan jumlah sisa

dengan harga satuan material, perhitungan persentase biaya sisa yaitu biaya sisa

material dibagi total biaya sisa material dikali 100%. Untuk mencari akar

penyebab digunakan Root Cause Analysis yaitu metode untuk mendapatkan

penyebab terjadinya sisa material.

Hasil rekapitulasi persentase sisa material kelurahan Gilingan : Tanah 87,39%,

Pasir 0,39%, Batu kali 0,055%, Beton 1,97%, Besi d 16 7,05%, Besi Ø 10 3,11 %,

Semen 0,39 % dengan jumlah biaya sisa material Rp. 6.464.762. Kelurahan

Jagalan : Tanah 60,2%, Pasir 1,745%, Batu kali 0%, Beton 3,7%, Besi d16 19,06

%, Besi Ø10 12,12%, Semen 3,165 % dengan jumlah biaya sisa material

Rp.2.527.140. Kelurahan Kauman : Tanah 55,2%, Pasir 3,65%, Batu kali 0%,

Beton 2,86%, Besi d16 14,95%, Besi Ø10 11,98%, Semen 11,34% dengan jumlah

biaya sisa material Rp. 3.151.142.Akar penyebab sisa material dibagi menjadi 4

penyebab utama yaitu desain, pengadaan material, penanganan material, dan

pelaksanaan pada pekerjaan. Dampak dari sisa material itu sendiri ialah terjadinya

tambahan pekerjaan dilapangan, mengganggu transportasi, rusaknya tanaman dan

terganggunya aktivitas pekerja di lokasi.

Kata kunci : biaya, sisa material, root cause analysis

Page 5: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

ix

ABSTRACT

Derry Handoko Purba, 2014, Analysis and Management for Construction’s

Waste Material and Causing Factor in 3 Government’s Project Specially in

Pondation Structure Using Root Cause Analysis ( RCA ). Final Project. Civil Engineering Major Engineering Department Sebelas Maret

University Surakarta

Construction material is an important component in determining the cost of a

project, more than half of the project cost is wasted on the used material. During

the implementation phase of construction, the use of materials in the field often

lead to a variety of waste material that has not been managed well which allows a

disturbance in the project movement / circulation, safety in the project, and a

burden in the garbage cost, therefore the effort to minimize the material waste is

important to be applied. Waste is one of the serious problems in the

implementation of construction projects. An effort to minimize material waste will

help increasing the contractors’s profit and reduce environmental impact.

Therefore, a careful and precise calculation in determining the amount of material

that will be used in the project is needed as well as an evaluation of the use of

these materials.

To calculate the quantity of waste material the Calculation of the quantity of waste

material is used, that is Waste material = Purchased material - Stock material -

Material needs, and then calculating the cost of waste material by multiplying the

number of waste material with the unit price of materials, the calculation of the

percentage of the remaining cost is the cost of the rest of the material divided by

the total cost of the rest of the material multiplied by 100%. To find the root

cause, the Root Cause Analysis is used which is a method to determine the causes

of waste material.

Recapitulation percentage of the cost of waste material in kelurahan Gilingan: Soil

87.39%, Sand 0.39%, Stone 0.055%, Concrete 1.97%,D16 Iron 7.05 %, 3.11%

Iron Ø 10, Cement 0,39% with the cost of waste material Rp. 6464762. Kelurahan

Jagalan: Soil 60.2%, Sand 1.745%, Stone 0%, Concrete 3.7%, D16 iron 19.06%,

Ø10 Iron 12.12%, Cement 3.165% with the cost of waste material Rp.2.527. 140.

Kelurahan Kauman: Soil 55.2%, Sand 3.65%, Stone 0%, Concrete 2.86%, D16

iron 14.95%, Ø10 Iron 11.98%, Cement 11.34% with the cost of waste material

Rp. 3.151.142. The root cause of waste material is divided into 4 main causes

which are design, material procurement, material handling, and execution of the

work. The impact of waste material itself are the additional field work, transport

disturbance, crop damage and disturbance of activities of workers on the site.

Key words : cost, waste materials, root cause analysis

Page 6: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

iv

KATA PENGANTAR

Puji serta syukur penulis panjatkan kehadirat Tuhan Yang Maha Kuasa,

karena dengan rahmat, karunia, dan anugrah-Nya, Penulis dapat menyelesaikan

Skripsi dengan judul “Analisis dan Pengelolaan Sisa Material Konstruksi dan

Faktor Penyebab Pada Proyek Perumahan di Kota Solo Mengunakan Root Cause

Analysis ( RCA )” guna memenuhi syarat memperoleh gelar Sarjana Teknik dari

Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.

Dalam menyelesaikan skripsi ini, Penulis banyak dibantu oleh berbagai

pihak. Dengan penuh rasa hormat, pada kesempatan ini penulis mengucapkan

terima kasih yang sebesar-besarnya kepada :

1. Pimpinan Fakultas Teknik Universitas Sebelas Maret.

2. Pimpinan Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret

Surakarta.

3. Bapak Widi Hartono,S.T.,M.T. selaku Dosen Pembimbing I skripsi.

4. Bapak Ir. Sugiyarto, M.T. selaku Dosen Pembimbing II skripsi.

5. Tim Penguji Pendadaran.

6. Teman-teman Mahasiswa Teknik Sipil 2010 UNS.

7. Semua pihak yang telah membantu penulis dalam menyelesaikan skripsi ini.

Akhir kata semoga skripsi ini dapat memberikan manfaat bagi semua

penulis pada umumnya dan mahasiswa pada khususnya.

Surakarta, Januari 2015

Penulis

Page 7: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xi

DAFTAR ISI

HALAMAN JUDUL………………………………………………………………………i

HALAMAN PERSETUJUAN….………………………………………………………...ii

HALAMAN PENGESAHAN..………………………………………………………..…iii

MOTTO……………………………………………………………………………..……iv

PERSEMBAHAN…………………………………………………………………………v

ABSTRAK…………………………..…………………………………………...…..…viii

KATA PENGANTAR………………………………………...…………………………x

DAFTAR ISI……………………………………………………………………………..xi

DAFTAR TABEL……………………………………………………………………....xiv

DAFTAR GAMBAR……………………………………………………………………xv

BAB I PENDAHULUAN

1.1.Latar Belakang Masalah………………………………………………………………1

1.2.Rumusan Masalah………………………………………………………………….….2

1.3.Batasan Masalah………………………………………………………………………2

1.4.Tujuan Penelitian……………………………………………………………………...2

1.5.Manfaat Penelitian………………………………………………………………….…3

BAB 2 TINJAUAN PUSTAKA DAN LANDASAN TEORI

2.1.Tinjauan Pustaka……………………………………………………………………..4

2.2.Dasar Teori………………………………………………………………………..…..6

2.2.1.Material Konstruksi……………………………………………………………..…..6

2.2.2.Sisa Material……………………………………………………………………….14

2.2.3.Manajemen Material……………………………………………………………….19

2.3. RCA (Root Cause Analysis) …………………………………………….……….…21

2.3.1.Why Why Analysis…………………………………………………………..…...…22

2.3.2.Fishbone Diagram …………………………………………………………………23

Page 8: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xii

BAB 3 METODOLOGI PENELITIAN

3.1.Data Penelitian……………………………………………………………………….26

3.2.Analisis Data Penelitian…………………………………………………………...…26

3.3.Tahapan Penelitian Penelitian………………………………………………………..27

3.4.Pekerjaan Pondasi……………………………………………………………………29

3.5.Diagram Alir Penelitian………………………………………………………………30

BAB 4 ANALISIS DATA DAN PEMBAHASAN

4.1.Deskripsi Proyek…………………………………………………………………….31

4.2.Pekerjaan Galian Tanah.…………………………………………………………….32

4.3.Pekerjaan Urugan Pasir..…………………………………………………………….34

4.4.Pekerjaan Beton.....………………………………………………………………….36

4.5.Pekerjaan Besi…....………………………………………………………………….42

4.6.Perhitungan Sisa Material...………………………………………………………….43

4.7.Deskripsi Proyek……………………………………………………………………..46

4.8.Pekerjaan Galian Tanah.……………………………………………………………..47

4.9.Pekerjaan Urugan Pasir..………………...…………………………………………...48

4.10.Pekerjaan Beton.....………………………………………………………………....50

4.11.Perhitungan Sisa Material...………………………………………………..……….56

4.12.Deskripsi Proyek…………………………………………………………………....59

4.13.Pekerjaan Galian Tanah.………………………………………………………..…..59

4.14.Pekerjaan Urugan Pasir..………………...………………………………………….63

4.15.Pekerjaan Beton.....………………………………………………………………....64

4.16.Pekerjaan Besi…....……………………………………………………………...….69

4.17.Perhitungan Sisa Material...………………………………………………..……….70

4.18.Penyebab Sisa Material...………………………………………………..………….73

4.19.Pengelolaan Sisa Material...………………………………………………..……….75

4.20.Dampak Sisa Material...………………………………………………..……..…….78

Page 9: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xiii

BAB 5 KESIMPULAN DAN SARAN

5.1.Kesimpulan…………………………………………………………………………..79

5.2.Saran………………………………………………………………………………....80

DAFTAR PUSTAKA……………………………………………………………………xvii

Page 10: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xiv

DAFTAR TABEL

Tabel 2.1.Sumber dan penyebab terjadinya sisa material konstruksi………………..…..6

Tabel 4.1.Perhitungan Pekerjaan Besi………………………………………………..….42

Tabel 4.2.Perhitungan Biaya Sisa Material….………………………………………..…44

Tabel 4.3.Perhitungan Pekerjaan Besi………………………………………………..….54

Tabel 4.4.Perhitungan Biaya Sisa Material….………………………………………..…56

Tabel 4.5.Perhitungan Pekerjaan Besi………………………………………………..….67

Tabel 4.6.Perhitungan Biaya Sisa Material….………………………………………..…69

Tabel 5.1.Rekapitulasi Jumlah Biaya dan Persentase Sisa Material………………….…75

Page 11: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xv

DAFTAR GAMBAR

Gambar 2.1. Semen PC………………………………………………………………….9

Gambar 2.2. Agregat Halus…………………………………………………………….11

Gambar 2.3. Agregat Kasar…………………………………………………………….11

Gambar 2.4. Batako…………………………………………………………………….12

Gambar 2.5. Besi Tulangan……………………………………………………….…….13

Gambar 2.6. Beton Readymix…………………………………………………….….…14

Gambar 2.7. Fishbone Diagram…………………………………………………………26

Gambar 3.1. Diagram Alir Penelitian……………………………………………………32

Gambar 4.1. Penampang Pasangan Batu Kali Talud T1...………………………………37

Gambar 4.2. Penampang Pasangan Batu Kali Talud P1...………………………………38

Gambar 4.3. Penampang Pasangan Batu Kali Talud P2...………………………………39

Gambar 4.4. Penampang Beton Foot Plate……………...………………………………40

Gambar 4.5. Penampang Beton Kolom Bawah Sloof (K1)…..…………………………40

Gambar 4.6. Penampang Beton Bawah Sloof (K2)……...………………………………41

Gambar 4.7. RCA’s diagram Kelurahan Gilingan ….…..………………………………45

Gambar 4.8. Penampang Pasangan Pondasi Batu Kali…..………………………………50

Gambar 4.9. Penampang Pasangan Pondasi Rolag Bata...………………………………51

Gambar 4.10. Penampang Beton Foot Plate FP1………....…………………………….52

Gambar 4.11. Penampang Beton Foot Plate FP2……...…..……………………………53

Gambar 4.12. Penampang Beton Sloof (S1)…………....……………………………..…54

Gambar 4.13. Penampang Beton Sloof (S2)…………....…………………………….….54

Gambar 4.14. RCA’s diagram Kelurahan Jagalan.. ….…..…………………………..…58

Gambar 4.15. Penampang Pasangan Pondasi Batu Kali..…………………………….….64

Gambar 4.16. Penampang Beton F1……….…………....…………………………….…65

Gambar 4.17. Penampang Beton F1……….…………....…………………………….…66

Gambar 4.18. Penampang Beton F3……….…………....…………………………….…67

Gambar 4.19. RCA’s diagram Kelurahan Kauman ….…..…………...…………………72

Gambar 4.20. RCA’s Diagram……….…………....…………………………….………73

Gambar 4.21. Sisa Material Pasir.……….…………....…………………………….…...76

Gambar 4.22. Sisa Material Besi ……….…………....……………………………….…77

Page 12: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xvi

Gambar 4.23. Sisa Material Semen……….…………....……………………….…….…77

Gambar 4.24. Sisa Material Beton……….…………....……………………….……..…78

Page 13: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xvii

DAFTAR PUSTAKA

Bossink, B. A. G., and Brouwers, H. J. H., Construction waste: Quantification and source

evaluation, Journal of Construction Engineering and Management,March 1996. pp. 55–60.

Dobler, D.W., Burt, D.N., and Lee, Lamar Jr, Purchasing And Materials Management, McGraw-

Hill Book Company., 1990.

Budiadi, Yohanes. 2008. Evaluasi Faktor Penyebab, Kuantitas, Akibat dan Tindak Lanjut

terhadap Sisa Material pada Proyek Rumah Tinggal. Tesis, Universitas Kristen Petra Surabaya.

Farmoso, C.T., et al., Material waste in building industry: Main causes and prevention, Journal

of Construction Engineering and Management, Agustus 2002, pp. 316–325.

Gavilan, R. M., and Bernold, L. E., Source Evaluation of Solid Waste in Building Construction,

Journal of Construction Engineering and Management, September 1994. pp. 536 – 552.

Haposan, Jermias. 2009. Identifikasi Material Sisa pada Proyek Ruko San Diego Pakuwon City

Surabaya. Skripsi, Institut Teknologi Sepuluh Nopember Surabaya.

Intan, Suryanto. Analisa dan evaluasi sisa material konstruksi: Sumber penyebab, Kuantitas, dan

Biaya. Dimensi Teknik Sipil, Maret 2005. Vol.7. No.1. pp.36–45.

Loosemore, M., and Teo, M.M.M., A Theory of waste behaviour in the construction industry,

Journal construction management and economics, Mei 2001. pp. 741-751.

Nugraha, Paulus; Natan, Ishak. 1985. Manajemen Proyek Konstruksi Jilid 1, Kartika Yuda.

Rahim, Irwan Ridwan. 2001. Penilaian Sisa Material pada Pelaksanaan Proyek Perumahan

(Studi Kasus: Pembangunan Rumah Di Kawasan Tanjung Bunga, Makassar). Tesis, Institut

Teknologi Sepuluh Nopember Surabaya.

Sari, Ika Destiana. 2006. Analisa dan Evaluasi Sisa Material Konstruksi pada Pembangunan

Ruko di Kota Malang. Skripsi, Universitas Muhammadiyah Malang.

Skoyles, E.F., Material wastage: A misuse of resources, Building Research and Practice,

July/April 1976, pp. 232–243.

Stuckhart, George., Construction Materials Management, Marcel Dekker, Inc., 1995.

Tchobanoglous, G., Theisen, H., and Vigil, S.A., Integrated solid management, McGraw-Hill.

Inc., New Jersey. 1993.

Thomas, H.R., Sanvido, V.E., and Sanders, S.R., “Impact of material management on

productivity–A case study”, Journal of Construction Engineering and Management, ASCE 115

(3)., 1989. pp. 370–384.

Page 14: ANALISIS DAN PENGELOLAAN SISA MATERIAL KONSTRUKSI

perpustakaan.uns.ac.id digilib.uns.ac.id

commit to user

xviii

Widjaja, Katarina Raninda. 2008. Penanganan Kontraktor terhadap Direct Waste Material pada

Proyek Konstruksi di Surabaya. Skripsi, Universitas Kristen Petra Surabaya.

Intan, Suryanto. Analisa dan evaluasi sisa material konstruksi: Sumber penyebab,

Kuantitas, dan Biaya. Dimensi Teknik Sipil, Maret 2005. Vol.7. No.1. pp.36–45.