EXCAVATOR ( E09)
Kode
I. URAIAN PERALATAN
Tenaga PWKapasitas Cp
Alat Baru a. Umur Ekonomis A
b. Jam Kerja dalam 1 Ttahun W
c. Harga Alat B
II. LAIN-LAIN
Tingkat Suku Bunga i
Upah Operator / Sopir U1
Upah Pembantu Operator / Pemb. Sopir U2
Bahan Bakar Bensin Mb
Bahan Bakar Solar Ms
Minyak Pelumas Mp
Asuransi dan lain-lain Ins
PPN diperhitungkan pada lembar rekapitulasi Biaya pekerjaan
III. BIAYA PASTI PER JAM KERJA
Nilai Sisat Alat = 10% x B C
Faktor Angsuran Modal :
i x (1 + i) A
D
( a + i ) A
- 1
Biaya Pasti per Jam
a. Biaya pengembalian modal (B - C ) x D)) : W E
b. Asuransi, dll ( Ins x B ) : W
F
BIAYA PASTI PERJAM = ( E + F ) G
IV. BIAYA OPERASIONAL PER JAM KERJA
Bahan Bakar (12%-15%) x Pw x Ms H
Jika W < 1500 ambil 12%
Pelumas (2,5%-3%) x Pw x Mp I
ambil 2,5%
Biaya Bengkel (6,25% dan 8,75%) x B / W J
bila W < 1500 ambil 6,25%
Perawatan dan perbaikan 12,5% - 17,5%) x B / W K
bila W = 0, ambil 12,5%
Operator (1 orang/jam) x U1 L
Pembantu Operator (1 orang/jam) x U2 M
Uraian
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 2/10
Biaya Operasi per Jam H + I + J + K + L + M P
TOTAL BIAYA SEWA ALAT EXCAVATOR 80 - 140 HP (E09) / JAM = ( G + P )
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 3/10
Harga Satuan Keterangan
100.00 HP6.00 M3
5.00 Tahun
2,000.00 Jam
322,658,640.00 Rp
15.00 % / Tahun
20,107.00 Rp./Jam
14,393.00 Rp./Jam
16,276.00 Liter
15,526.00 Liter
30,000.00 Liter
0.20 %
48,398,796.00 Rp
0.29832
40,907.99 Rp
322.66 Rp
41,230.65 Rp
186,312.00 Rp
75,000.00
14,116.32
20,166.17
20,107.00
14,393.00
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 4/10
330,094.48
371,325.13
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 5/10
EXCAVATOR ( E09)
Kode
I. URAIAN PERALATAN
Tenaga PW
Kapasitas Cp
Alat Baru a. Umur Ekonomis A
b. Jam Kerja dalam 1 Ttahun W
c. Harga Alat B
II. LAIN-LAIN
Tingkat Suku Bunga i
Upah Operator / Sopir U1
Upah Pembantu Operator / Pemb. Sopir U2
Bahan Bakar Bensin Mb
Bahan Bakar Solar Ms
Minyak Pelumas Mp
Asuransi dan lain-lain InsPPN diperhitungkan pada lembar rekapitulasi Biaya pekerjaan
III. BIAYA PASTI PER JAM KERJA
Nilai Sisat Alat = 10% x B C
Faktor Angsuran Modal :
i x (1 + i) A
D
( a + i ) A
- 1
Biaya Pasti per Jam
a. Biaya pengembalian modal (B - C ) x D)) : W E
b. Asuransi, dll ( Ins x B ) : W
F
BIAYA PASTI PERJAM = ( E + F ) G
IV. BIAYA OPERASIONAL PER JAM KERJA
Bahan Bakar (12%-15%) x Pw x Ms H
Jika W < 1500 ambil 12%
Pelumas (2,5%-3%) x Pw x Mp I
ambil 2,5%
Biaya Bengkel (6,25% dan 8,75%) x B / W J
bila W < 1500 ambil 6,25%
Perawatan dan perbaikan 12,5% - 17,5%) x B / W K
bila W = 0, ambil 12,5%Operator (1 orang/jam) x U1 L
Pembantu Operator (1 orang/jam) x U2 M
Biaya Operasi per Jam H + I + J + K + L + M P
TOTAL BIAYA SEWA ALAT EXCAVATOR 80 - 140 HP (E09) / JAM = ( G + P )
Uraian
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 6/10
Harga Satuan Keterangan
133.00 HP
0.93 M3
5.00 Tahun
2,000.00 Jam
1,577,442,240.00 Rp
15.00 % / Tahun
20,107.00 Rp./Jam
14,393.00 Rp./Jam
16,276.00 Liter
15,526.00 Liter
30,000.00 Liter
0.20 %
236,616,336.00 Rp
0.29832
199,994.61 Rp
1,577.44 Rp
201,572.05 Rp
247,794.96 Rp
99,750.00
69,013.10
98,590.14
20,107.00
14,393.00
549,648.20
751,220.25
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 7/10
TENAGA KAPASITAS HARGA ALAT YANG DIPA
ALAT ALAT ALAT JAM
UMUR KERJA H
ALAT 1 TAHUN A
(HP) - (Tahun) (Tahun) (Jam)
No. JENIS PERALATAN KODE
ALAT
HP Cp B A W
1 2 2a 3 4 5 6 7
1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 5,219,463,066 10.0 1,500.0 5,219
2. ASPHALT FINISHER E02 72.4 10.0 Ton 1,106,752,194 6.0 1,400.0 1,106
3. ASPHALT SPRAYER E03 4.0 850.0 Liter 90,909,072 5.0 2,000.0 90
4. BULLDOZER 100-150 HP E04 155.0 - - 1,571,428,241 5.0 2,000.0 1,571
5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 233,766,185 5.0 2,000.0 233
6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 97,401,681 2.0 1,500.0 97
7. CRANE 10-15 TON E07 138.0 15.0 Ton 627,391,800 5.0 2,000.0 627
8. DUMP TRUCK 3,5 Ton E08 100.0 6.0 Ton 322,658,640 5.0 2,000.0 322
9. DUMP TRUCK 10 TON E09 190.0 10.0 Ton 787,877,427 5.0 2,000.0 787
10. EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,577,442,240 5.0 2,000.0 1,577
11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 401,385,222 5.0 2,000.0 401
12. GENERATOR SET E12 180.0 135.0 KVA 551,947,040 5.0 2,000.0 551
13. MOTOR GRADER >100 HP E13 135.0 10,800.0 - 1,915,785,675 5.0 2,000.0 1,915
14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 1,130,952,143 5.0 2,000.0 1,130
15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,277,190,450 5.0 2,000.0 1,277
16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 603,636,287 5.0 2,000.0 603
17. TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 716,818,091 5.0 2,000.0 716
18. TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 539,771,904 5.0 2,000.0 539
19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 719,696,819 5.0 2,000.0 719
20. CONCRETE VIBRATOR E20 5.5 25.0 - 11,822,526 4.0 1,000.0 11
21. STONE CRUSHER E21 220.0 50.0 T/Jam 1,655,302,683 5.0 2,000.0 1,655
22. WATER PUMP 70-100 mm E22 6.0 - - 6,348,608 3.0 2,000.0 6
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 223,213,305 5.0 2,000.0 223
24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 60,064,250 3.0 2,000.0 60
25. TAMPER E25 4.7 121.0 Ton 20,166,165 4.0 1,000.0 20
26. JACK HAMMER E26 0.0 1,330.0 - 11,362,962 5.0 2,000.0 11
27. FULVI MIXER E27 345.0 2,005.0 - 194,805,154 4.0 1,000.0 194
28. CONCRETE PUMP E28 100.0 8.00 M3 151,246,238 6.0 2,000.0 151
29. TRAILER 20 TON E29 175.0 20.00 Ton 389,879,190 6.0 2,000.0 389
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 485,481,750 5.0 2,000.0 485
31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 1,922,799,019 6.0 2,000.0 1,92232. WELDING SET E32 40.0 250.00 Amp 33,983,723 5.0 2,000.0 33
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 3,024,924,750 6.0 2,000.0 3,024
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 0 4.0 2,000.0
KETERANGAN : 1 Tingkat Suku Bunga =
2 Upah Operator / Sopir / Mekanik =
3 Upah Pembantu Operator/Sopir/Mekanik =
4 Harga Bahan Bakar Bensin =
5 Harga Bahan Bakar Solar =
6 Minyak Pelumas =
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitula
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material)
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 8/10
8/12/2019 Analsia Alat AHSP 2013
http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 9/10
TENAGA KAPASITAS HARGA ALAT YANG DIPA
ALAT ALAT ALAT JAM
UMUR KERJA H
ALAT 1 TAHUN A
(HP) - (Tahun) (Tahun) (Jam)
No. JENIS PERALATAN KODE
ALAT
HP Cp B A W
1 2 2a 3 4 5 6 7
35. TRONTON E35 150.0 15.0 Ton 0 10.0 1,500.0
36. COLD MILLING MACHINE E37 248.0 1,000.0 m 0 5.0 2,000.0
37. ROCK DRILL BREAKER E36 3.0 - - 0 10.0 1,500.0
38. COLD RECYCLER E38 900.0 2,200.0 M 0 5.0 2,000.0
39. HOT RECYCLER E39 400.0 3.0 M 0 5.0 2,000.0 40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 0 4.0 1,000.0
41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 0 5.0 2,000.0
42. SLIP FORM PAVER E42 105.0 2.5 M 0 6.0 2,000.0
43. CONCRETE PAN MIXER E43 134.0 600.0 Liter 151,246,238 10.0 1,500.0 151
44. CONCRETE BREAKER E44 290.0 20.0 m3/jam 0 5.0 2,000.0
45. ASPAHLT TANKER E45 190.0 4,000.0 liter 0 6.0 2,000.0
46. CEMENT TANKER E46 190.0 4,000.0 liter 0 6.0 2,000.0
47. CONDRETE MIXER (350) E47 20.0 350.0 liter 73,051,261 2.0 2,000.0 73
48. VIBRATING RAMMER E48 4.2 80.0 KG 0 4.0 1,000.0
49. TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 443,181,053 5.0 2,000.0 443
50. BORE PILE MACHINE E50 125.0 60.0 CM 0 10.0 1,500.0
51. CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 0 5.0 2,000.0
52. BLENDING EQUIPMENT E52 50.0 30.0 Ton 20,000,000 10.0 1,500.0 20
53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 0 4.0 2,000.0
KETERANGAN : 1 Tingkat Suku Bunga =
2 Upah Operator / Sopir / Mekanik =
3 Upah Pembantu Operator/Sopir/Mekanik =
4 Harga Bahan Bakar Bensin =
5 Harga Bahan Bakar Solar =
6 Minyak Pelumas =
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitula
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material)
9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pem