22
Page 1 of 2 Andres Hernandez 19 Brock St, Flat 2, BA1 2LW Curriculum Vitae Bath, UK 07830 777959 [email protected] Academic qualifications 2012 MSc Architectural Engineering: Environmental Design, University of Bath, United Kingdom (Merit expected) 2008 BArch Universidad Javeriana, Colombia. Part I and Part II RIBA validated course. (First Class Honours) Professional experience Ergos (April 2011 – September 2011) - Project Architect and Site Manager from the Technical Design until Construction Stages for an interior design firm. - Prepared construction details and specifications of stainless steel and architectural glass elements for high profile clients like a 5 star hotel in the Caribbean and a major theatre in Colombia. Gained detail orientation skills and specialized knowledge in different types of architectural glass products. Site manager for a 200 m² office renovation in the Colombian Stock Exchange building. Issued information to the contractor, provided further Information when required and reviewed information provided by contractors and specialists. CP-AUI (August 2010 – February 2011) - Project Architect from the Design Development until Tender Documentation Stages for an architecture and urbanism firm. - Participated in the design team for a new 6,700 m² public high school project with environmental features. Worked in all aspects of the project, from materials and finishes research to final construction drawings. Focused on construction detail drawings, gained knowledge in concrete frame, concrete block structures and detailing and passive sustainable techniques. Coordinated with engineers structural and MEP designs on a regular basis. Applied for detailed planning permission, prepared technical designs, specifications, production information and tender documentation. DEOBRA Ltda. (June 2009 - July 2010) - Project Architect from Preparation until Tender Action Stages for a construction company. - Part of the design team and coordinator for major health care projects in different regions of Colombia. Such as a new 4,000 m² Rehabilitation Centre for disabled children, a new 4,000 m² Clinic, the renovation of 17,000 m² of the main Military Hospital in the country and its master plan. Project designer for a new 600 m² Cafeteria. Besides developing the ability to work in complex/high profile projects, became familiar with international regulations, design and construction strategies of the health care sector. Coordinated engineering designs and client meetings in a regular basis for a period of a year from the appraisal and design brief until tender documentation. Steven Morales Arquitecto (February 2009 – May 2009) - Project Architect in different architectural competitions for new design firm. - Coordinated the competition projects for the renovation of ‘El Campin’ Stadium, three new public high schools in Colombia, and a mixed use tower for Benetton in Iran. Gained skills in site analysis, competition entry renderings and layouts, and advanced 3D modelling in Rhino. Jorge Gutierrez Arquitecto (January 2009 – April 2009) - Part-time Architectural Assistant during Concept Stage for independent architect. - Assisted in the development of the Master Plan for the 'Universidad Catolica' and the schematic design for the new library and new lecture building for the same University. Gained site analysis and BIM modelling skills.

Andres Hernandez Cv Portfolio

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1 of 2

Andres Hernandez 19 Brock St, Flat 2, BA1 2LW Curriculum Vitae Bath, UK

07830 777959 [email protected]

Academic qualifications

2012 MSc Architectural Engineering: Environmental Design, University of Bath, United Kingdom (Merit expected)

2008 BArch Universidad Javeriana, Colombia. Part I and Part II RIBA validated course. (First Class Honours)

Professional experience Ergos (April 2011 – September 2011)

- Project Architect and Site Manager from the Technical Design until Construction Stages for an interior design firm.

- Prepared construction details and specifications of stainless steel and architectural glass elements for high profile clients like a 5 star hotel in the Caribbean and a major theatre in Colombia. Gained detail orientation skills and specialized knowledge in different types of architectural glass products. Site manager for a 200 m² office renovation in the Colombian Stock Exchange building. Issued information to the contractor, provided further Information when required and reviewed information provided by contractors and specialists.

CP-AUI (August 2010 – February 2011) - Project Architect from the Design Development until Tender Documentation Stages for an architecture

and urbanism firm. - Participated in the design team for a new 6,700 m² public high school project with environmental

features. Worked in all aspects of the project, from materials and finishes research to final construction drawings. Focused on construction detail drawings, gained knowledge in concrete frame, concrete block structures and detailing and passive sustainable techniques. Coordinated with engineers structural and MEP designs on a regular basis. Applied for detailed planning permission, prepared technical designs, specifications, production information and tender documentation.

DEOBRA Ltda. (June 2009 - July 2010) - Project Architect from Preparation until Tender Action Stages for a construction company. - Part of the design team and coordinator for major health care projects in different regions of Colombia.

Such as a new 4,000 m² Rehabilitation Centre for disabled children, a new 4,000 m² Clinic, the renovation of 17,000 m² of the main Military Hospital in the country and its master plan. Project designer for a new 600 m² Cafeteria. Besides developing the ability to work in complex/high profile projects, became familiar with international regulations, design and construction strategies of the health care sector. Coordinated engineering designs and client meetings in a regular basis for a period of a year from the appraisal and design brief until tender documentation.

Steven Morales Arquitecto (February 2009 – May 2009) - Project Architect in different architectural competitions for new design firm. - Coordinated the competition projects for the renovation of ‘El Campin’ Stadium, three new public high

schools in Colombia, and a mixed use tower for Benetton in Iran. Gained skills in site analysis, competition entry renderings and layouts, and advanced 3D modelling in Rhino.

Jorge Gutierrez Arquitecto (January 2009 – April 2009) - Part-time Architectural Assistant during Concept Stage for independent architect. - Assisted in the development of the Master Plan for the 'Universidad Catolica' and the schematic design

for the new library and new lecture building for the same University. Gained site analysis and BIM modelling skills.

Page 2 of 2

Professional experience Cont.

JGArchitects New York City (July 2007 – May 2008) - Design Intern from Preparation to Construction Stages for an architecture firm in Manhattan. - During architecture studies, had a one year placement in a New York City firm. Worked as part of the

design team in different projects, such as the Permanent Mission of Barbados to the United Nations and General Consulate in Manhattan, the Epsilon Offices and Building lobby in Manhattan, the Braunstein residence in Brooklyn, and the Cuban Art Space, an art gallery in Manhattan. In these projects worked doing responses to RFP’s / RFQ’s, Feasibility Studies, Projects’ Programme and Schedule, client meetings and the CAD drawings for the different stages of the projects. Working in a competitive international environment, developed the ability of working under pressure for high demanding clients and projects.

Freelance Architect (Project Designer January 2007 – September 2011) - Project Architect, Site Manager and Architectural Assistant in different stages for private clients. - Since undergraduate studies have worked as freelance architect parallel to studies or office work. Been

part and in charge of different scale projects such as a 6,500 m² Hotel under construction, 1,200 m² built Machining workshop, 1,500 m² unbuilt multifamily housing, 1,800 m² proposed multifamily housing, 200 m² private house under construction, 210 m² built office building expansion and a 150 m² unbuilt services facilities building for private clients in different regions of Colombia. Most of the projects were developed until Design Stage, and some until Construction and Use Stages working closely with clients, consultants and contractors.

Leopoldo Bonnet Arquitecto (June 2006 – September 2006) - Architectural Assistant and Site Manager from Preparation until Construction stages for an independent

architect. - First work experience during architecture studies. Gained skills in architectural design, drafting and Site

Management through a renovation of a 400 m² restaurant.

Skills Advanced use of:

- AutoCAD: 2D drawing and 3D modelling - Archicad (BIM): 2d drawing, 3D modelling, perspectives and renderings - Rhinoceros: 3D modelling - IES Virtual Environment: Building energy performance software - Ecotect: Daylighting analysis - 3D Max Studio: Rendering, animations and panoramic views - Maxwell Render: Rendering - Macromedia Flash: web layouts and animations - Adobe Photoshop: Layouts and image edition - Corel Draw: Layouts and image edition - Sketchup: 3D modelling - Microsoft Project: Project Programmes - Microsoft Office (Word, Excel, Power Point)

Other: - Hand sketching and rendering - Model making

Languages: - English (fluent), Spanish (native)

Awards

2011 Santander Masters Scholarship / University of Bath

References:

Available upon request.

ANDRESHERNANDEZPORTFOLIO

CONT

ENTS

Andres HernandezB. Arch., MSc Environmental Design19 Brock St, Flat 2BA1 2LW Bath, UK44 7830 777 [email protected]

2 Rehabilitation Center for Disabled Children

4 Hospital Militar Central Master Plan

6 H.M.C. Waiting Rooms

8 H.M.C. Cafeteria

10 Universidad Catolica Library and Master Plan

12 El Campin Stadium Renovation Competition

14 Public Highschool Competitions

16 Internship Projects JGArchitects

18 Permanent Mission of Barbados To The United Nations and General Consulate

20 Machining Workshop Gravillera Albania

22 El Tesoro Apartments

24 Edificio Contador Apartments

26 Imbricaciones Urbanas

32 Enigma Bar

34 Santo Domingo Public Library

36 Students’ Housing

| PROJECT UNDER CONSTRUCTION | DE OBRA LTDA.Located in the north of Bogota, it was designed with another architect under the supervision of the Principal. The 20,000 sq ft program consists of a Clinic, School, Water therapy area, Gym, Accommodation for 20 students and Sports Centre, divided in 2 volumes that intersect at the main hall.

2

HOSP

ITAL

MILIT

AR CE

NTRA

LMa

ster

Plan

, Clin

ic an

d Hot

el

| MASTER PLAN PROPOSAL | DE OBRA LTDAPart of the year 2015 Hospital’s expansion plan a new proposed building would include a new orthopedics floor, two different specialty floors for rent, and commercial spaces in the ground floor. It was intented to create a new design language for the hospital and its future projects.Part of the year 2020 Hospital’s expansion plan, a small boutique hotel was proposed (right) targeted to health tourism as an additional service for the Hospital’s main surgeries.

4

| PROJECT UNDER CONSTRUCTION | DE OBRA LTDAFor Colombia’s biggest and most important military hospital, I worked in the design of the public waiting rooms among other spaces. The concept was to make a warmer and more comfortable space for customers trough textures, basic shapes and colours with a minimum intervention of the existing landmark.

6

CAFE

TERI

A

| DESIGN PROPOSAL | DE OBRA LTDA.Designed with another architect in the office, it’s located over an existing plaza in the middle of the hospital. The main concept was to put the lightest building (visually and structurally) over the plaza. The roof is intended to be viewed from the 14 floors of the Hospital’s main tower.

8

| PROPOSAL PROJECT | JORGE GUTIERREZ ARQUITECTOThe university required a 20 year master plan for its physical growth. Among the general master plan proposals, I participated in the schematic design of two buildings: The new Library and the new Classrooms building.

UNIVERSIDADCATOLICALibrary and Master Plan

10

| COMPETITION PROJECT | STEVEN MORALES ARQUITECTOThe idea comes from the image of the Savanna surrounded by clouds, where the stadium is a diffused plateau that stands in its context, respectful and subtle despite its mass and size. We wanted to present the stadium as a landmark, delicate and light, contrary to its current image - seeking a less aggressive image with its immediate environment, given its proximity to a dense urban and residential context.

12

| COMPETITION PROJECTS | STEVEN MORALES ARQUITECTOThree schools were thought the most flexible as possible. Being able to let the local communities use the cultural and recreation spaces during any hour without affecting its safety or normal operation.

COMP

ETITI

ONS

PUBL

IC H

IGHS

CHOO

L

14

| BUILT PROJECTS | JG ARCHITECTS NEW YORK CITYDuring my architecture studies, I had a one year placement in a New York City firm. Worked as part of the design team in different projects, such as the Epsilon Offices and Building lobby in Manhattan, the Braunstein residence in Brooklyn, and the Cuban Art Space, an art gallery in Manhattan. In these projects I worked doing responses to RFP’s / RFQ’s, Feasibility Studies, Projects’ Programmes and Schedules, client meetings and the CAD drawings for the different phases of the projects. Working in a competitive international environment, I developed the ability of working under pressure for high demanding clients and projects.

16

MISSION OF| BUILT PROJECTS | JG ARCHITECTS NEW YORK CITY The main projects I worked on from the proposal until the final stages were the Permanent Mission of Barbados to the United Nations and General Consulate in Manhattan. In these projects I worked doing responses to RFP’s / RFQ’s, Feasibility Studies, Projects’ Programmes and Schedules, client meetings and the CAD drawings for the different phases of the projects. Working in most of the phases gave me the opportunity to develop excelent relations with both client and engineers.

TO THE UNITED NATIONS AND GENERAL CONSULATEBARBADOSPERMANENT

18

| BUILT PROJECT | INDEPENDENT WORKDesign of a CNC workshop for heavy parts, located in a town near Bogota. The client (an important gravel company) required abundant daylight and to use recycled structure parts from another building, like concrete columns and metal joists; which determined the new mixed structure. W

ORKS

HOP

Gravillera Albania MACH

ININ

G 20

| PROPOSAL PROJECT | INDEPENDENT WORKLocated in a narrow lot in a city in the north of Colombia, it was designed for a private developer to minimize construction times through prefabricated elements and repetitive structural units. It consists mostly of duplex apartments with all its rooms with external views, and excellent sun exposure.

22

| UNBUILT PROJECT | INDEPENDENT PROJECTDesign of a 5 stories apartment building in the north of Bogota for a private developer. With 3 types of apartments per floor and 2 penthouses. An exposed concrete element integrates the whole façade giving it movement , rhythm and depth.

apartments

24

| ACADEMIC PROJECT | DEGREE PROJECTFor my degree project I proposed a model of ‘urban overlapping’ (inhabited bridges) in downtown Bogota generating units of habitable links between urban areas and systems disjointed by motorways. The buildings themselves seek an organic link over motorways in a resemblance to middle age’s inhabited bridges over rivers.

26

| ACADEMIC PROJECT | DEGREE PROJECTAn overlap between different uses was proposed, allowing a continuous occupancy in space and time. Through office towers, flats, an hotel, a mall and an exhibition centre, it would create not only a physical connection between two sides, but an innovative live urban link.

28

| ACADEMIC PROJECT | DEGREE PROJECTA significant plaza located directly over the motorway creates a pedestrian friendly space in a place that otherwise would not be habitable. Pedestrian spaces could recover car oriented infrastructure not only for a more efficient use of land, but for better urban life.

30

| ACADEMIC PROJECT |Located in Bogota’s bar area it’s designed for tree different experiences in different floors. The vertical circulation is the main articulator functionally and formally. It has tree different entrances that cross each other spatially in the main hall.

32

SANTO DOMINGO | ACADEMIC PROJECT |Located in Bogota and designed with another student. The program is separated in two main spiral buildings, related trough the public space. One above grade for reading, research and storage of digital buildings, related trough the public space. One above grade for reading, research and storage of digital and printed information and other for complementary cultural activities like auditoriums and multiple media rooms. The internal programs are developed trough spirals around inner central spaces.

34

STUD

ENTS

| ACADEMIC PROJECT |Located in Cartagena in the Colombian Caribbean. Designed with two other students, it was proposedfor the expansion of an existing colonial house. The shapes of the buildings and the patios are conceived in a contemporary language that doesn’t try to copy the existing buildings, presenting instead a reinterpretation of the colonial architecture (materials, elements and spaces) in a more dynamic way.HO

USIN

G

36