6
AVTAR SINGH Mobile: +91 9318858455/ + 919418551182/+ 918988050087 E-Mail:[email protected] Seeking senior level assignments in Maintenance, Operations & Project Management with an Organization of repute. (Preferred Industry - Metro Railway, Power Sector or Switchgear Company, Real Estate (Preferred Location: Delhi/NCR, and Himachal Pradesh, Punjab, anywhere in North India) SYNOPSIS An astute professional with over 9 years two month of experience in Maintence, Project Management and Erection & Commissioning. Currently associated with M/S KURMI HYDRO ENERGIES PVT. LTD (8MW), Hydro Division of Chandigarh Distillers & bottlers Ltd., Chd, PUNJAB as Astt. MANAGER (O&M). Adept at handling erection & commissioning activities involving resource planning, in-process inspection, team Building and co-ordination with internal / external departments Adroit at implementing cost saving measures to achieve substantial reduction in terms of raw materials, manpower and machine utilization. Skilled in enhancing systems to bring greater cost efficiency levels & energy/ power reductions and on-time delivery Familiar with Hydro Turbine and all other Electrical & Mechanical Equipments use at Hydro Power Plant. Associated with operation team as a crew member of 70MW Budhil Hydro Electric Project, Himachal Pradesh. KNOWLEDGE FORTE Plant Operations & Maintenance Quality Control Project/People Management Installation & Commissioning Shift Operations Achieving the production target and maintaining all safety precautions / procedures as SOP and acting as In-charge of all activities of the plant as well as maintenance and quality control during the shift hours. Controlling the activities during plant emergencies, start-up and shutdown with the assistance of Panel and Field Operators. Process Engineering & Improvement Identifying areas of improvement and recommending process modifications and equipment calibrations to enhance Operational efficiencies of machine / equipment. Ensuring complete in-process quality control, handling routine maintenance, calibration and troubleshooting for analytical equipment on a regular basis for higher productivity / efficiency. CAREER PREVIEW SINCE JUNE 2014 KURMI HYDRO ENERGIES PVT. LTD. ASTT. MANAGER (O&M)

Avtar_singh CV 2016

Embed Size (px)

Citation preview

Page 1: Avtar_singh  CV 2016

AVTAR SINGHMobile: +91 9318858455/ + 919418551182/+ 918988050087

E-Mail:[email protected]

Seeking senior level assignments in Maintenance, Operations & Project Management with anOrganization of repute. (Preferred Industry - Metro Railway, Power Sector or Switchgear Company, Real Estate

(Preferred Location: Delhi/NCR, and Himachal Pradesh, Punjab, anywhere in North India)

SYNOPSIS

An astute professional with over 9 years two month of experience in Maintence, Project Management and Erection & Commissioning. Currently associated with M/S KURMI HYDRO ENERGIES PVT. LTD (8MW), Hydro Division of Chandigarh Distillers & bottlers Ltd., Chd, PUNJAB as Astt. MANAGER (O&M).

Adept at handling erection & commissioning activities involving resource planning, in-process inspection, teamBuilding and co-ordination with internal / external departments

Adroit at implementing cost saving measures to achieve substantial reduction in terms of raw materials, manpower and machine utilization. Skilled in enhancing systems to bring greater cost efficiency levels & energy/ power reductions and on-time delivery

Familiar with Hydro Turbine and all other Electrical & Mechanical Equipments use at Hydro Power Plant. Associated with operation team as a crew member of 70MW Budhil Hydro Electric Project, Himachal Pradesh.

KNOWLEDGE FORTEPlant Operations & MaintenanceQuality Control

Project/People ManagementInstallation & Commissioning

Shift OperationsAchieving the production target and maintaining all safety precautions / procedures as SOP and acting as In-charge of all activities of the plant as well as maintenance and quality control during the shift hours. Controlling the activities during plant emergencies, start-up and shutdown with the assistance of Panel and Field Operators.

Process Engineering & ImprovementIdentifying areas of improvement and recommending process modifications and equipment calibrations to enhanceOperational efficiencies of machine / equipment.Ensuring complete in-process quality control, handling routine maintenance, calibration and troubleshooting foranalytical equipment on a regular basis for higher productivity / efficiency.

CAREER PREVIEWSINCE JUNE 2014 KURMI HYDRO ENERGIES PVT. LTD. ASTT. MANAGER (O&M)

MAR’08 TO JUNE 2014 Lanco Infratech Ltd., Chamba (H.P.) SR. Engineer (O & M)

JUN’07 to 08 Ship Switchgear Pvt. Ltd (Punjab) Engineer (Quality control)

ATTAINMENTSSuccessfully handled the following:

o Monitoring projects with respect to cost, resource deployment, time over-runs, quality compliance and manpower planning to ensure timely execution of projects.

o Planning and effecting predictive & preventive maintenance schedules for various equipment / lines to increase machine up time & equipment reliability.

Page 2: Avtar_singh  CV 2016

o Implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipment and maintaining requisite documents for the same.

o Evaluating & negotiating with vendors for price & various other terms & conditions.o Establishing and executing standard maintenance schedule to aim at Zero Break-Down time in

process control.o Identifying areas of bottlenecks in maintenance procedures and initiate process changes for

qualitative improvement.o Installation and commissioning of the heavy equipment conducting tests & inspections to ensure

operational effectiveness of plant & utilities.o Monitoring the installation of various plants and equipment during project commissioning.o As an In-charge of Electro-Mechanical team, successfully handle all maintenance work of Hydro

Power Plant since last one year.

PROFESSIONAL TRAINING UNDERGONETraining Name: 66KV SUBSTATION Organization Name: PUNJAB STATE ELECTRICITY BOARD DASUYA (PUNJAB)

Training Name: 3 PHASE MOTORSOrganization Name: KALSI METALS PVT. LTD JALANDHAR (PUNJAB)

Training Name: SWITCHGEAR TESTING Organization Name: SHIP SWITCHGEAR PVT. LTD (PUNJAB)

EDUCATION

2007 DEGREE IN ELECTRICAL ENGINEERING FROM PUNJAB TECHNICAL UNIVERSITY (70%)2002 +2(PCM) FROM PSEB (55%)1999 10th FROM PSEB (62%)

OthersAUTOCAD 2007 FROM CENTRAL TOOL ROOM LUDHIANA( INDO- GERMAN )

2000

IT FORTEConversant with MS Office, Windows and Internet Application.

PERSONAL SNIPPETSDate of Birth: 13th FEBRUARY 1983 Address: H.No. 2377, V&P.O. BEGOWAL TEHSIL BHOLATH DISTT. KAPURTHALA (PUNJAB) Linguistic Abilities: English, Hindi, Punjabi

ANNEXUREProjects Undertaken

1. Project Name:TESTING OF SWITCHGEARCompany Name: Ship Switchgear Pvt. Ltd.

Accountabilities: working as Testing and Quality control engineer (Electrical), Quality control of MCBS, Switches, ELCB, RCCB, and Isolator. Supply of items to Govt. Department as per DGS&D, Prepare daily production chart, Maintain records as per ISI & ISO-9001, Handle ISI inspection, Testing of Switchgear (MCB, RCCB) as per ISI, MCB, tripping characteristics, Glow wire test, 28 days test, Temperature rise, Handle Central power research institute Bhopal testing of Double break switches (63A, 100A, 200A, 400A)

Page 3: Avtar_singh  CV 2016

rating, Electrical and Mechanical endurance, Temperature rise test for both double break and MCB series.

2. Project name: Drinidhar Hydroelectric project – 5MW (SHIUNTA – H.P.)

COMPANY NAME: VAMSHI INDUSTRIAL POWER LTD

Accountabilities: Earth mat for 33kv switchyard and interconnection as per drawing

Erection and commission of hydroelectric project along with its transmission line. Erection of power house as per drawing. Erection of outdoor switchyard along with its Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of 13KM 33KV/11KV transmission line along with switchyard. Erection and commission Of 33KV interconnection works including RS JOIST.

3. Project Name: IKU-II Hydroelectric Project - 5MW (Tang – H.P.)Company Name: Vamshi hydro energies power pvt. Ltd.

Accountabilities: Assisting of testing commission, supervisory of erection and commission activities

Operation & maintence of 5MW HEP Iku-II, Preparation of DGR data, Preparation of

Monthly maintains & annual maintains reports, maintain tripping records, inspection

Of all electro-mechanical equipment, Installation of earthing system which includes

Earth mat, riser, earth electrodes, Erection, installion and commission works of control

System which includes, Generator transformer protection panel, Generator relay

Metring and protection panel, synchronizing panel, turbine governor system and oil

Pressure system, MIV control system, LAVT panel, NGT, Float cum boost charger

(FCBC) with battery bank.

4. Project Name: Banner –III Hydroelectric Project – 5MW ( Dharamshala- H.P)Company Name: Vamshi hydro- Energies power Pvt. Limited

Accountabilities: Erection and commission of hydroelectric project along with its transmission line. Erection of power house as per drawing. Erection of outdoor switchyard along with its Equipments like CT, PT, Vacuum circuit breaker, sf6 circuit breaker, Isolator, lightning Arrestors, control and relay panels etc.Erection of Power Transformer (7.5MVA) and Auxiliary Transformer (100 KVA) , DG set (100 KVA).Erection and Commission of 13KM 33KV/11KV transmission line along with switchyard. Erection and commission Of 33KV interconnection works

5. Project Name: Upper khauli Hydroelectric Project - 5MW (Shahpur – H.P.)Company Name: Vamshi Industial power Ltd.

Accountabilities: Operation of 5MW hydro-electric project, Outdoor switchyard and Balance of Plant with optimum

efficiency, Normal operation, Emergency Handling and safe shutdown of Units, Line up of the units and its auxiliaries, Changeover of equipments, Routine testing of Protection System and annunciation system, Issue

Page 4: Avtar_singh  CV 2016

and cancellation of PTW (Permit to work) system, Monitor plant operations and handle emergencies including shutdown of units and load throw- off to control generation as per requirement. Emergency Equipment trial and restoration of process and equipment. Familiar with Indian Electricity ACT and Rule.

6. Project Name: Budhil Hydroelectric Project-2x35MW, (Chamba-HP)

Company Name: Lanco Infratech Ltd.Accountabilities: Operation of 70MW hydro-electric project, 220KV Gas insulated switchyard and

Balance of Plant with optimum efficiency, Normal operation, Emergency Handling and safe shutdown of Units, Line up of the units and its auxiliaries, Changeover of equipments, Routine testing of Protection System and annunciation system, Issue and cancellation of PTW( Permit to work ) system, Safe Isolation, Personnel Safety and Equipment Safety ,Monitor plant operations and handle emergencies including shutdown of units and load throw- off to control generation as per requirement. Emergency Equipment trial and restoration of process and equipment. Familiar with Indian Electricity ACT and Rule. I have associated as a team leader of Operation and maintenance team.

7. Project name: Kurmi Hydro energies Pvt. Ltd – 8MW (RAMPUR – H.P.)

COMPANY NAME: KURMI HYDRO ENERGIES PVT LTD.

Accountabilities: Errection and commission of francis turbines along with its generator. Project Manager of 3* 2.67MW HEP, Operation and maintance of Horizontal Francis turbines and Generator, Power Transformer(12MVA),Dealing with Govt Deptt, Dealing With HPSEB for JMR, Manage all aspects of an operating portfolio of utility scale residential and commercial assets, both Financial and Technical. Manage, Direct and Schedule day to day and long range activities for assigned properties and ensure that all programs and procedures of the O&M staff are being properly implemented.

-Actively moniter performance, weather and security data from operating plants.-Maintain a formalized database tracking physical characteristics of the asset, contracts, contractual obligations and system performance.-Experience of working for operation and maintenance of medium voltage switchgear and circuit breakers, protective relay systems, inverts and high voltage transformers.-Ensure performance of repair activities including task planning, parts ordering and repair execution.-Manage warranty claims issues with equipment vendors along with investigating quality problems reported in the field. To ensure strict adherence to corporate values in complying with all regulatory requirements including environmental, safety and other relevant laws and regulations.-To manage the Hydro plant based on best practices being followed hydro industry with an emphasis on planning/scheduling preventive maintenance.

Page 5: Avtar_singh  CV 2016

DATE 12/7/2016

Place: Rampur (HP) (AVTAR SINGH)