33
F5259_B06 SpectralWaveV-NODE STM-16/STM-4/STM-1 Multiplexer RELEASE 2.10 EQUIPMENT INSTALLATION NEC Corporation 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan TEL +81-3-3454-1111 TELEX NECTOK J22686 FAX +81-3-3798-1510/9

B06 Equipment

  • Upload
    carlos

  • View
    17

  • Download
    0

Embed Size (px)

DESCRIPTION

NEC vnode

Citation preview

  • F5259_B06

    SpectralWave V-NODE

    STM-16/STM-4/STM-1 Multiplexer

    RELEASE 2.10

    EQUIPMENT INSTALLATION

    NEC Corporation

    7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan TEL +81-3-3454-1111

    TELEX NECTOK J22686 FAX +81-3-3798-1510/9

  • F5259_B06 EQUIPMENT INSTALLTION

    SpectralWave is a registered trademark of NEC Corporation.

    Copyright 2005-2006 by NEC Corporation.

    All rights reserved.

    The information of this manual was approved by product manager of CND.

    This manual is subject to change without notice.

    1st Issue Oct 2005

    Printed in China

  • F5259_B06 EQUIPMENT INSTALLATION

    CONTENTS

    Contents i

    E

    1. SUMMARY 1-1

    2. EQUIPMENT DESCRIPTION 2-1

    2.1 Description ........................................................................................2-1

    2.2 V-NODE Subrack View ......................................................................2-1

    2.3 V-NODE Subrack Dimensions..........................................................2-2

    3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT 3-1

    3.1 Environment and Performance........................................................3-1

    3.2 Safety Items.......................................................................................3-2

    3.3 Admonishment..................................................................................3-2

    4. OVERVIEW OF INSTALLATION TASKS 4-1

    4.1 Installation Flow................................................................................4-1

    4.2 Reference...........................................................................................4-1

    5. INVENTORY TOOLS 5-1

    5.1 Crew Tool Box ...................................................................................5-1

    5.2 Personal Tool Box.............................................................................5-3

    6. SITE PREPARATION 6-1

    7. UNPACK EQUIPMENT 7-1

    7.1 Unpack and Verify Contents.............................................................7-1

    8. INSTALL V-NODE SUBRACK 8-3

    8.1 To 19inch RACK ................................................................................8-3

    8.2 To NEC ETS V-RACK.........................................................................8-4

    9. GROUNDING SYSTEM 9-1

  • This page is intentionally left blank.

  • F5259_B06 EQUIPMENT INSTALLATION

    Summary 1-1

    E

    1. SUMMARY

    This manual provides the equipment descriptions for the system, rack layouts and Subracks used for the V-NODE, and their procedures.

    Detailed descriptions on boards and modules, and their installation procedures are provided in the Unit Installation manual.

    Descriptions and procedures for cable connections are provided in the Cable Installation manual.

    NOTE: The components that make up a V-NODE system are follows:

    l Boards (Interface) are installed into the Subrack.

    Include one MCP, two Powers INF, two CS, three FAN and thirteen interface boards.

    l Modules are mounted on the board for additional function.

    l A Subrack with the boards composes network element (NE).

  • This page is intentionally left blank.

  • F5259_B06 EQUIPMENT INSTALLATION

    Equipment Description 2-1

    2. EQUIPMENT DESCRIPTION

    2.1 Description V-NODE subracks can be installed into the ETSI rack and maximum 4 subracks can be installed into the NECs ETSI subrack (V-RACK).

    2.2 V-NODE Subrack View V-Node subrack view shows as follows. If you want to see the board view, please see the B07_UNIT INSTALLATION manual.

    Figure 2-1. V-NODE subrack view

  • F5259_B06 EQUIPMENT INSTALLATION

    Equipment Description 2-2 E

    2.3 V-NODE Subrack Dimensions Figure 2-2 shows the dimension of the V-Node equipment.

    Figure 2-2. V-NODE subrack dimension

  • F5259_B06 EQUIPMENT INSTALLATION

    Equipment Installation Safety Requirement 3-1

    3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT

    Follow the safety requirements below when installing the V-NODE equipment.

    3.1 Environment and Performance l When performing hazardous work or entering potentially hazardous areas, wear

    protective equipment, such as head or eye protection.

    l Smoking or open flames are prohibited in the operation area.

    l Properly remove and dispose of all unused hazardous materials.

    l Comply with hazardous material documentation and reporting requirements

    l After using any power tools or other equipment, they must be cleaned up and put in storage on a daily basis.

    l Keep all tools within the designated work area.

    l When cutting any kind of material, safety glasses are required.

    l When handling conducting cables, the cable ends must be taped or insulated at all times.

    l Do not wear any jewelry or any other kinds of accessories, such as ID around the neck, while working.

    l All accidents on-site must be reported to appropriate personnel and to your supervisor as soon as possible.

  • F5259_B06 EQUIPMENT INSTALLATION

    Equipment Installation Safety Requirement 3-2 E

    3.2 Safety Items Have all safety items available on-site:

    Caution Tape

    Safety Cones

    Safety Glasses/Goggles

    First Aid Kit

    3.3 Admonishment Installers must also be familiar with and able to employ the following Safety Requirements:

    CAUTION

    ESD

    ESD Sensitive Equipment The V-NODE equipment is ESD sensitive. Every precaution should be observed while working around this equipment. Personnel should always wear ESD grounding straps while handling any boards and modules. Place them in an ESD proof bag when they are not actually installed in the system.

  • F5259_B06 EQUIPMENT INSTALLATION

    Overview of Installation Tasks 4-1

    E

    4. OVERVIEW OF INSTALLATION TASKS

    Tasks to install the SpectralWave V-NODE equipment are listed below:

    4.1 Installation Flow

    ORDER TASKS (Sections Containing Procedures) DESCRIPTION

    1 6. Site Preparation Prepare the installation site. Define floor layout.

    2 7. Unpack Equipment Receive equipment, uncrate and inspect received equipment.

    3 Install Rack See appropriate instruction manual.

    4 8. Install V-NODE Subrack Install Subrack into the rack.

    4.2 Reference Procedures for the following tasks are provided in a separate manual:

    ORDER TASKS (Sections Containing Procedures) REFERENCE

    5 Verify strap settings on boards before installing them into the Subrack. Unit Installation manual.

    6 Install boards into the Subrack. Unit Installation manual.

    7 Power and Grounding Cable Installation manual.

    8 Route and connect cables. Cable Installation manual.

  • This page is intentionally left blank..

  • F5259_B06 EQUIPMENT INSTALLATION

    Inventory Tools 5-1

    5. INVENTORY TOOLS

    Before starting the equipment installation, confirm that the following tools are available:

    5.1 Crew Tool Box

    # TOOLS CHECKS / YOUR NOTES

    1 Hammer Drill

    2 Cordless Electric Drill & Bit Index

    3 Electric Drill

    4 Torque Wrench

    5 Large Pry Bar

    6 Torque Screw Driver

    7 3/8-inch Masonry Bit

    8 5/8-inch Masonry Bit

    9 TBM-14 Hydraulic Crimper (with assorted dies)

    10 TBM-25S Hand Crimper

    11 Jig Saw

    12 Hacksaw

    13 Portable Band Saw

    14 3-inch Hole Saw

    15 1-inch Hole Saw

    16 Heat Gun

    17 Wire-Wrap Gun

    18 Optical Light Source / Optical Power Meter

    19 Ratchet & Socket Set

    20 Cable Cutters

    21 Cable Jacks; for reels

    22 Extension Cords

    23 Plumb Bob (Line)

    24 4-foot Steel Level

    25 Chalk Line

    26 Antistatic Wrist Strap (3M 2224 Charge-Guard or equivalent)

  • F5259_B06 EQUIPMENT INSTALLATION

    Inventory Tools 5-2

    # TOOLS CHECKS / YOUR NOTES

    27 Canvas Tarpaulin (fireproof & ESD resistant)

    28 Safety Cones & Safety Tapes

    29 P-Touch Label Maker & Various Cartridges

    30 Brady Label & Labels

    31 Working Lamp / Drop Light

    32 Heavy Duty Flashlight

    33 Two 6-feet Ladders (Fiberglass)

    34 Vacuum Cleaner and Canister

    35 Broom and Dust Pan

  • F5259_B06 EQUIPMENT INSTALLATION

    Inventory Tools 5-3

    E

    5.2 Personal Tool Box

    # TOOLS CHECKS / YOUR NOTES

    36 Cable Scissors

    37 Cable Butting Knife

    38 Cable Lacing Needles

    39 Cable Stripper

    40 Hand Wire / Cable Cutters

    41 Cable-Side Cutter

    42 Wire Wrap/Unwrap Tool

    43 Sockets

    44 Crimping Tool (AMP 59500-0, 45066-3)

    45 Claw Hammer

    46 Ball Peen Hammer

    47 Adjusted Wrenches

    48 Pry Bar

    49 Screw Drivers (assorted)

    50 Nut Drivers (assorted)

    51 Digital millimeters

    52 Speed Square

    53 Drill Bits

    54 Pliers

    55 Needle-Nose File / Rat Tail File

    56 Flat or Bastard File

    57 Torpedo Level

    58 Center Punch

    59 Sponge

    60 Flashlight

    61 Marking Pens

    62 Measuring Tapes

  • This page is intentionally left blank.

  • F5259_B06 EQUIPMENT INSTALLATION

    Site Preparation 6-1

    E

    6. SITE PREPARATION

    l Verify the location for the V-NODE Subrack to be installed.

    l Determine the availability and location of the following terminals:

    Station power

    Fiber distribution panel (FDP) or enhanced interface panel (EIP)

    Alarm distribution panel

    l Determine the position and direction of all cable runs.

  • This page is intentionally left blank.

  • F5259_B06 EQUIPMENT INSTALLATION

    Unpack Equipment 7-1

    E

    7. UNPACK EQUIPMENT

    7.1 Unpack and Verify Contents

    PROCEDURE

    1. Verify that all crates and cartons have been received.

    2. Verify that crates and cartons are not damaged.

    3. Locate markings on the box, and position the box with the correct side up according to the markings.

    4. Open the carton with the carton knife or a razor blade.

    5. Remove the contents from the carton, and place them on a flat patch.

    6. Check the contents of the carton against the packing list.

    7. Check the contents (Subracks, modules, cables, etc.) for visible damages.

    NOTE: Contact NEC or your project contractor if any damage is found.

  • This page is intentionally left blank.

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-3

    8. INSTALL V-NODE SUBRACK

    8.1 To 19inch RACK This section describes the mounting method of the V-NODE subrack for 19 inch standard rack.

    Attention!

    Since the Subrack is heavy (11 kg), two or more people are required for the installation. Subrack should be installed according to following procedure.

    (1) Mount the subrack slowly into the rack.

    (2) Fasten the subrack to the rack with appropriate screw.

    Figure 8-1 Fasten Subrack to Standard Rack

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-4

    8.2 To NEC ETS V-RACK

    This section describes the mounting method of the V-NODE subrack for the NEC ETS V-RACK (ETS V-Rack). For information about the ETS V-Rack, refer to ETS V-Rack manual. Subrack mounting kit is necessary to mount the V-NODE subrack in the NEC ETS V-Rack. Before starting the installation work, check supplied components of the subrack mounting kit shown in Table 8-1 and Table 8-2.

    Table 8-1 SUBRACK MOUNTING KIT ITEM NEC CODE NUMBER QTY

    Subrack Mounting Kit E32-002-F5291-0A00 1

    Table 8-2 Component List of Subrack Mounting Kit

    ITEM NEC CODE NUMBER QTY

    Subrack Support (L) 128-B26375-03 1

    Subrack Support(R 128-B26375-04 1

    Cable Support 128-B05323-02 2

    RAC Nut 125-B03310-07 10

    Screw (M6) PL-CPIMSX6X10X3GF 10

    Screw (M4) PL-CPIMSX4X X3GF 4

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-5

    Figure 8-2 Components of Subrack Mounting Kit

    The following flowchart shows a series of procedures necessary for installing the subrack. The subrack should be mounted according to these procedures.

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-6

    Figure 8-3. The Procedures for Installing the Subrack

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-7

    Figure 8-4 and Figure 8-5 shows one sample about the standard mounting positions for the V-NODE subrack. If you install the cable from the upper side of the subrack, please make a space 100mm or more between the suracks. (Figure 8-4) And if you install the cable from left or right side of the subrack, you can install as Figure 8-5.

    Figure 8-4 Subrack Mounting Positions

    (The Case of Cabling from upper side)

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-8

    Figure 8-5 Subrack Mounting Positions

    (The Case of Cabling from left or right side)

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-9

    Procedure 8-1: Attach the RAC Nut

    Attach the RAC nuts at both sides to the mounting positions shown in Figure 8-4 and Figure 8-5.

    Figure 8-6 Attach RAC Nut

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-10

    Procedure 8-2: Mounting Subrack support

    (1)Insert the subrack supports into the square holes on the V-Rack rear panel.

    Figure 8-7 Insert Subrack support

    (2) Fasten the M4 screws to fix the subrack supports.

    Figure 8-8 Fasten screws to fix Subrack supports

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-11

    Procedure 8-3: Mounting Cable support

    (1) Insert the cable supports into the square holes on the V-Rack rear panel.

    Figure 8-9 Insert cable supports into the square holes

    (2) Fasten the M4 screws to fix the cable supports. Keep in mind that the fastened positions of the cable support is differed with the cable install location.

    Figure 8-10 Fasten screws to fix cable support

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-12

    Procedure 8-4: Mounting the Optical Tray of Subrack

    (1) Loosen the hex-head screw on the subrack.

    NOTE: Do not take off the hex-head screws from the subrack.

    (2) Hang the optical tray slowly on the hex-head screws.

    (2) Fasten the optical tray to the V-Rack with hex-head screws.

    NOTE: When you use the hex-head screw to fix the tray to the subrack, please use the supplied hex-head wrench.

    Figure 8-11. Mounting the Optical Tray

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-13

    Procedure 8-5: Mounting Subrack

    (1) Mount the subrack slowly on the subrack supports. (2) Fasten the subrack to the V-Rack with M6 screws.

    Figure 8-12 Fasten Subrack to V-Rack

    Attention!

    1. The Subrack is heavy (11 kg), two or more person are required for the installation.

    2. When you install the subrack, please un-installed the board from the subrack.

  • F5259_B06 EQUIPMENT INSTALLATION

    Install V-NODE Subrack 8-14 E

    Attachment Cable Support (Option) When you install the cables from upper of subrack, the appending cable support can be used. Procedure is shown as follows.

    (1) Attach the RAC nuts at both sides to the attachment of cable support which shown Figure 8-13. (2) Fasten the cable support on the V-Rack with M6 screws.

    Figure 8-13 Fasten Cable Support on the V-Rack

  • F5259_B06 EQUIPMENT INSTALLATION

    GROUNDING SYSTEM 9-1 E

    9. GROUNDING SYSTEM

    There are 3 types of grounding: frame ground (FG); battery ground (BG); signal ground (SG). Every type of grounding insulates from other groundings.

    If need use shield to prevent the internal circuit from electromagnetic radiation, connect with the frame ground (FG).

    CONTENTS1. SUMMARY2. EQUIPMENT DESCRIPTION2.1 Description2.2 V-NODE Subrack View2.3 V-NODE Subrack Dimensions

    3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT3.1 Environment and Performance3.2 Safety Items3.3 Admonishment

    4. OVERVIEW OF INSTALLATION TASKS4.1 Installation Flow4.2 Reference

    5. INVENTORY TOOLS5.1 Crew Tool Box5.2 Personal Tool Box

    6. SITE PREPARATION7. UNPACK EQUIPMENT7.1 Unpack and Verify Contents

    8. INSTALL V-NODE SUBRACK8.1 To 19inch RACK8.2 To NEC ETS V-RACK

    9. GROUNDING SYSTEM