F5259_B06
SpectralWave V-NODE
STM-16/STM-4/STM-1 Multiplexer
RELEASE 2.10
EQUIPMENT INSTALLATION
NEC Corporation
7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan TEL +81-3-3454-1111
TELEX NECTOK J22686 FAX +81-3-3798-1510/9
F5259_B06 EQUIPMENT INSTALLTION
SpectralWave is a registered trademark of NEC Corporation.
Copyright 2005-2006 by NEC Corporation.
All rights reserved.
The information of this manual was approved by product manager of CND.
This manual is subject to change without notice.
1st Issue Oct 2005
Printed in China
F5259_B06 EQUIPMENT INSTALLATION
CONTENTS
Contents i
E
1. SUMMARY 1-1
2. EQUIPMENT DESCRIPTION 2-1
2.1 Description ........................................................................................2-1
2.2 V-NODE Subrack View ......................................................................2-1
2.3 V-NODE Subrack Dimensions..........................................................2-2
3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT 3-1
3.1 Environment and Performance........................................................3-1
3.2 Safety Items.......................................................................................3-2
3.3 Admonishment..................................................................................3-2
4. OVERVIEW OF INSTALLATION TASKS 4-1
4.1 Installation Flow................................................................................4-1
4.2 Reference...........................................................................................4-1
5. INVENTORY TOOLS 5-1
5.1 Crew Tool Box ...................................................................................5-1
5.2 Personal Tool Box.............................................................................5-3
6. SITE PREPARATION 6-1
7. UNPACK EQUIPMENT 7-1
7.1 Unpack and Verify Contents.............................................................7-1
8. INSTALL V-NODE SUBRACK 8-3
8.1 To 19inch RACK ................................................................................8-3
8.2 To NEC ETS V-RACK.........................................................................8-4
9. GROUNDING SYSTEM 9-1
This page is intentionally left blank.
F5259_B06 EQUIPMENT INSTALLATION
Summary 1-1
E
1. SUMMARY
This manual provides the equipment descriptions for the system, rack layouts and Subracks used for the V-NODE, and their procedures.
Detailed descriptions on boards and modules, and their installation procedures are provided in the Unit Installation manual.
Descriptions and procedures for cable connections are provided in the Cable Installation manual.
NOTE: The components that make up a V-NODE system are follows:
l Boards (Interface) are installed into the Subrack.
Include one MCP, two Powers INF, two CS, three FAN and thirteen interface boards.
l Modules are mounted on the board for additional function.
l A Subrack with the boards composes network element (NE).
This page is intentionally left blank.
F5259_B06 EQUIPMENT INSTALLATION
Equipment Description 2-1
2. EQUIPMENT DESCRIPTION
2.1 Description V-NODE subracks can be installed into the ETSI rack and maximum 4 subracks can be installed into the NECs ETSI subrack (V-RACK).
2.2 V-NODE Subrack View V-Node subrack view shows as follows. If you want to see the board view, please see the B07_UNIT INSTALLATION manual.
Figure 2-1. V-NODE subrack view
F5259_B06 EQUIPMENT INSTALLATION
Equipment Description 2-2 E
2.3 V-NODE Subrack Dimensions Figure 2-2 shows the dimension of the V-Node equipment.
Figure 2-2. V-NODE subrack dimension
F5259_B06 EQUIPMENT INSTALLATION
Equipment Installation Safety Requirement 3-1
3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT
Follow the safety requirements below when installing the V-NODE equipment.
3.1 Environment and Performance l When performing hazardous work or entering potentially hazardous areas, wear
protective equipment, such as head or eye protection.
l Smoking or open flames are prohibited in the operation area.
l Properly remove and dispose of all unused hazardous materials.
l Comply with hazardous material documentation and reporting requirements
l After using any power tools or other equipment, they must be cleaned up and put in storage on a daily basis.
l Keep all tools within the designated work area.
l When cutting any kind of material, safety glasses are required.
l When handling conducting cables, the cable ends must be taped or insulated at all times.
l Do not wear any jewelry or any other kinds of accessories, such as ID around the neck, while working.
l All accidents on-site must be reported to appropriate personnel and to your supervisor as soon as possible.
F5259_B06 EQUIPMENT INSTALLATION
Equipment Installation Safety Requirement 3-2 E
3.2 Safety Items Have all safety items available on-site:
Caution Tape
Safety Cones
Safety Glasses/Goggles
First Aid Kit
3.3 Admonishment Installers must also be familiar with and able to employ the following Safety Requirements:
CAUTION
ESD
ESD Sensitive Equipment The V-NODE equipment is ESD sensitive. Every precaution should be observed while working around this equipment. Personnel should always wear ESD grounding straps while handling any boards and modules. Place them in an ESD proof bag when they are not actually installed in the system.
F5259_B06 EQUIPMENT INSTALLATION
Overview of Installation Tasks 4-1
E
4. OVERVIEW OF INSTALLATION TASKS
Tasks to install the SpectralWave V-NODE equipment are listed below:
4.1 Installation Flow
ORDER TASKS (Sections Containing Procedures) DESCRIPTION
1 6. Site Preparation Prepare the installation site. Define floor layout.
2 7. Unpack Equipment Receive equipment, uncrate and inspect received equipment.
3 Install Rack See appropriate instruction manual.
4 8. Install V-NODE Subrack Install Subrack into the rack.
4.2 Reference Procedures for the following tasks are provided in a separate manual:
ORDER TASKS (Sections Containing Procedures) REFERENCE
5 Verify strap settings on boards before installing them into the Subrack. Unit Installation manual.
6 Install boards into the Subrack. Unit Installation manual.
7 Power and Grounding Cable Installation manual.
8 Route and connect cables. Cable Installation manual.
This page is intentionally left blank..
F5259_B06 EQUIPMENT INSTALLATION
Inventory Tools 5-1
5. INVENTORY TOOLS
Before starting the equipment installation, confirm that the following tools are available:
5.1 Crew Tool Box
# TOOLS CHECKS / YOUR NOTES
1 Hammer Drill
2 Cordless Electric Drill & Bit Index
3 Electric Drill
4 Torque Wrench
5 Large Pry Bar
6 Torque Screw Driver
7 3/8-inch Masonry Bit
8 5/8-inch Masonry Bit
9 TBM-14 Hydraulic Crimper (with assorted dies)
10 TBM-25S Hand Crimper
11 Jig Saw
12 Hacksaw
13 Portable Band Saw
14 3-inch Hole Saw
15 1-inch Hole Saw
16 Heat Gun
17 Wire-Wrap Gun
18 Optical Light Source / Optical Power Meter
19 Ratchet & Socket Set
20 Cable Cutters
21 Cable Jacks; for reels
22 Extension Cords
23 Plumb Bob (Line)
24 4-foot Steel Level
25 Chalk Line
26 Antistatic Wrist Strap (3M 2224 Charge-Guard or equivalent)
F5259_B06 EQUIPMENT INSTALLATION
Inventory Tools 5-2
# TOOLS CHECKS / YOUR NOTES
27 Canvas Tarpaulin (fireproof & ESD resistant)
28 Safety Cones & Safety Tapes
29 P-Touch Label Maker & Various Cartridges
30 Brady Label & Labels
31 Working Lamp / Drop Light
32 Heavy Duty Flashlight
33 Two 6-feet Ladders (Fiberglass)
34 Vacuum Cleaner and Canister
35 Broom and Dust Pan
F5259_B06 EQUIPMENT INSTALLATION
Inventory Tools 5-3
E
5.2 Personal Tool Box
# TOOLS CHECKS / YOUR NOTES
36 Cable Scissors
37 Cable Butting Knife
38 Cable Lacing Needles
39 Cable Stripper
40 Hand Wire / Cable Cutters
41 Cable-Side Cutter
42 Wire Wrap/Unwrap Tool
43 Sockets
44 Crimping Tool (AMP 59500-0, 45066-3)
45 Claw Hammer
46 Ball Peen Hammer
47 Adjusted Wrenches
48 Pry Bar
49 Screw Drivers (assorted)
50 Nut Drivers (assorted)
51 Digital millimeters
52 Speed Square
53 Drill Bits
54 Pliers
55 Needle-Nose File / Rat Tail File
56 Flat or Bastard File
57 Torpedo Level
58 Center Punch
59 Sponge
60 Flashlight
61 Marking Pens
62 Measuring Tapes
This page is intentionally left blank.
F5259_B06 EQUIPMENT INSTALLATION
Site Preparation 6-1
E
6. SITE PREPARATION
l Verify the location for the V-NODE Subrack to be installed.
l Determine the availability and location of the following terminals:
Station power
Fiber distribution panel (FDP) or enhanced interface panel (EIP)
Alarm distribution panel
l Determine the position and direction of all cable runs.
This page is intentionally left blank.
F5259_B06 EQUIPMENT INSTALLATION
Unpack Equipment 7-1
E
7. UNPACK EQUIPMENT
7.1 Unpack and Verify Contents
PROCEDURE
1. Verify that all crates and cartons have been received.
2. Verify that crates and cartons are not damaged.
3. Locate markings on the box, and position the box with the correct side up according to the markings.
4. Open the carton with the carton knife or a razor blade.
5. Remove the contents from the carton, and place them on a flat patch.
6. Check the contents of the carton against the packing list.
7. Check the contents (Subracks, modules, cables, etc.) for visible damages.
NOTE: Contact NEC or your project contractor if any damage is found.
This page is intentionally left blank.
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-3
8. INSTALL V-NODE SUBRACK
8.1 To 19inch RACK This section describes the mounting method of the V-NODE subrack for 19 inch standard rack.
Attention!
Since the Subrack is heavy (11 kg), two or more people are required for the installation. Subrack should be installed according to following procedure.
(1) Mount the subrack slowly into the rack.
(2) Fasten the subrack to the rack with appropriate screw.
Figure 8-1 Fasten Subrack to Standard Rack
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-4
8.2 To NEC ETS V-RACK
This section describes the mounting method of the V-NODE subrack for the NEC ETS V-RACK (ETS V-Rack). For information about the ETS V-Rack, refer to ETS V-Rack manual. Subrack mounting kit is necessary to mount the V-NODE subrack in the NEC ETS V-Rack. Before starting the installation work, check supplied components of the subrack mounting kit shown in Table 8-1 and Table 8-2.
Table 8-1 SUBRACK MOUNTING KIT ITEM NEC CODE NUMBER QTY
Subrack Mounting Kit E32-002-F5291-0A00 1
Table 8-2 Component List of Subrack Mounting Kit
ITEM NEC CODE NUMBER QTY
Subrack Support (L) 128-B26375-03 1
Subrack Support(R 128-B26375-04 1
Cable Support 128-B05323-02 2
RAC Nut 125-B03310-07 10
Screw (M6) PL-CPIMSX6X10X3GF 10
Screw (M4) PL-CPIMSX4X X3GF 4
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-5
Figure 8-2 Components of Subrack Mounting Kit
The following flowchart shows a series of procedures necessary for installing the subrack. The subrack should be mounted according to these procedures.
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-6
Figure 8-3. The Procedures for Installing the Subrack
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-7
Figure 8-4 and Figure 8-5 shows one sample about the standard mounting positions for the V-NODE subrack. If you install the cable from the upper side of the subrack, please make a space 100mm or more between the suracks. (Figure 8-4) And if you install the cable from left or right side of the subrack, you can install as Figure 8-5.
Figure 8-4 Subrack Mounting Positions
(The Case of Cabling from upper side)
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-8
Figure 8-5 Subrack Mounting Positions
(The Case of Cabling from left or right side)
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-9
Procedure 8-1: Attach the RAC Nut
Attach the RAC nuts at both sides to the mounting positions shown in Figure 8-4 and Figure 8-5.
Figure 8-6 Attach RAC Nut
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-10
Procedure 8-2: Mounting Subrack support
(1)Insert the subrack supports into the square holes on the V-Rack rear panel.
Figure 8-7 Insert Subrack support
(2) Fasten the M4 screws to fix the subrack supports.
Figure 8-8 Fasten screws to fix Subrack supports
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-11
Procedure 8-3: Mounting Cable support
(1) Insert the cable supports into the square holes on the V-Rack rear panel.
Figure 8-9 Insert cable supports into the square holes
(2) Fasten the M4 screws to fix the cable supports. Keep in mind that the fastened positions of the cable support is differed with the cable install location.
Figure 8-10 Fasten screws to fix cable support
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-12
Procedure 8-4: Mounting the Optical Tray of Subrack
(1) Loosen the hex-head screw on the subrack.
NOTE: Do not take off the hex-head screws from the subrack.
(2) Hang the optical tray slowly on the hex-head screws.
(2) Fasten the optical tray to the V-Rack with hex-head screws.
NOTE: When you use the hex-head screw to fix the tray to the subrack, please use the supplied hex-head wrench.
Figure 8-11. Mounting the Optical Tray
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-13
Procedure 8-5: Mounting Subrack
(1) Mount the subrack slowly on the subrack supports. (2) Fasten the subrack to the V-Rack with M6 screws.
Figure 8-12 Fasten Subrack to V-Rack
Attention!
1. The Subrack is heavy (11 kg), two or more person are required for the installation.
2. When you install the subrack, please un-installed the board from the subrack.
F5259_B06 EQUIPMENT INSTALLATION
Install V-NODE Subrack 8-14 E
Attachment Cable Support (Option) When you install the cables from upper of subrack, the appending cable support can be used. Procedure is shown as follows.
(1) Attach the RAC nuts at both sides to the attachment of cable support which shown Figure 8-13. (2) Fasten the cable support on the V-Rack with M6 screws.
Figure 8-13 Fasten Cable Support on the V-Rack
F5259_B06 EQUIPMENT INSTALLATION
GROUNDING SYSTEM 9-1 E
9. GROUNDING SYSTEM
There are 3 types of grounding: frame ground (FG); battery ground (BG); signal ground (SG). Every type of grounding insulates from other groundings.
If need use shield to prevent the internal circuit from electromagnetic radiation, connect with the frame ground (FG).
CONTENTS1. SUMMARY2. EQUIPMENT DESCRIPTION2.1 Description2.2 V-NODE Subrack View2.3 V-NODE Subrack Dimensions
3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT3.1 Environment and Performance3.2 Safety Items3.3 Admonishment
4. OVERVIEW OF INSTALLATION TASKS4.1 Installation Flow4.2 Reference
5. INVENTORY TOOLS5.1 Crew Tool Box5.2 Personal Tool Box
6. SITE PREPARATION7. UNPACK EQUIPMENT7.1 Unpack and Verify Contents
8. INSTALL V-NODE SUBRACK8.1 To 19inch RACK8.2 To NEC ETS V-RACK
9. GROUNDING SYSTEM