DAFTAR ANALISA HARGA SATUAN BAHAN, UPAH DAN PERALATAN
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN
(DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
HARGA JUMLAH
NO URAIAN PEKERJAAN KOEFISIEN/SATUAN SATUAN BAHAN UPAH PERALATAN
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7
1 PEMBERSIHAN LAPANGAN RINGAN M²
Upah
Mandor - OH - - -
Pekerja - OH - - -
Jumlah - -
Dibulatkan :
2 PEMBUATAN BOUWPLANK M¹
Upah
Mandor - OH - - -
Kepala Tukang Kayu - OH - - -
Tukang Kayu - OH - - -
Pekerja - OH - - -
Bahan/Material
Kayu Meranti (Papan 2/18 cm) 0.0042 M³ - - -
Kayu Meranti (Usuk 5/7 cm) 0.0039 M³ - - -
Paku 0.0200 Kg - - -
Jumlah - -
Dibulatkan :
3 GALIAN TANAH BIASA SEDALAM 1 M (SECARA MANUAL)
Upah
Pekerja - OH - - - -
Mandor - OH - - - -
Jumlah - -
Dibulatkan :
4 GALIAN TANAH BIASA SEDALAM 1 - 2 M (SECARA MANUAL)
Upah
Pekerja - OH - - - -
Mandor - OH - - - -
Jumlah - -
Dibulatkan :
5 URUGAN TANAH KEMBALI (SECARA MANUAL)
Upah
Pekerja - OH - - - -
Mandor - OH - - - -
Jumlah - -
Dibulatkan :
6 PENGURUGAN TANAH DENGAN PEMADATAN
M3
M3
M3
Upah
Mandor - OH - - -
Pekerja - OH - - -
Bahan/Material
Tanah Urug 1.2000 M³ - - -
Sewa Peralatan
Alat Bantu 0.0213 Ls - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
7 URUGAN PASIR
Upah
Mandor - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pasir Urug / Timbun 1.2000 M³ - - - -
Jumlah - -
Dibulatkan :
8 MEMBUAT BETON BERTULANG CAMP. 1Pc : 2Ps : 3Kr
Upah
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Portland cement 50 Kg 6.4000 Zak - - - -
Pasir Beton / Cor 0.5400 M³ - - - -
Koral 0.8200 M³ - - - -
Jumlah - - -
Dibulatkan :
9 MEMBUAT LANTAI KERJA CAMP. 1 Pc : 3 Ps : 5 Kr
Upah
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Portland cement 50 Kg 5.0000 Zak - - - -
Pasir Beton / Cor 0.5000 M³ - - - -
Koral 1.0000 M³ - - - -
Jumlah - - -
Dibulatkan :
10 MEMBUAT BETON RABAT CAMP. 1 Pc : 3 Ps : 6 Kr
Upah
Pekerja - OH - - - -
Tukang Batu - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Semen PC 40 Kg 3.7257 Zak - - - -
Pasir Beton / Cor 0.5081 M³ - - - -
M3
M3
M3
M3
Koral 1.0161 M³ - - - -
Jumlah - - -
Dibulatkan :
11 READY MIX K-250 M3
Upah
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Beton Ready Mix K 250, on site Batam - 1.1000 M³ - - - -
Sewa Peralatan
Concrete Vibrator 0.1667 Jam - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
12 1 M² PEKERJAAN BEKISTING (PONDASI, KOLOM PRAKTIS) PAPAN CAMPUR M²
Upah
Pekerja - OH - - - -
Tukang Kayu - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Papan Meranti Campuran 0.0800 M³ - - - -
Paku 1.5000 Kg - - - -
Jumlah - - -
Dibulatkan :
13 1 M² PEKERJAAN BEKISTING (SLOOF, KOLOM) PAPAN CAMPUR M²
Upah
Pekerja - OH - - - -
Tukang Kayu - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Papan Meranti 0.1960 M³ - - - -
Paku 2.0000 Kg - - - -
Jumlah - - -
Dibulatkan :
14 1 M² PEKERJAAN BEKISTING BALOK M²
Upah
Pekerja - OH - - - -
Tukang Kayu - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Papan Meranti 0.2000 M³ - - - -
Triplek 9 mm 1.4400 Lbr - - - -
Paku 1.5000 Kg - - - -
Jumlah - - -
Dibulatkan :
15 1 M² PEKERJAAN BEKISTING PLAT LANTAI M²
Upah
Pekerja - OH - - - -
Tukang Kayu - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Papan Meranti 0.2700 M³ - - - -
Paku 3.0000 Kg - - - -
Triplek 9 mm 1.4400 Lbr - - - -
Jumlah - - -
Dibulatkan :
M2
M2
M2
M2
1 2 3 4 5 6 7
16 PEKERJAAN PEMBESIAN KG
Upah
Pekerja - OH - - - -
Tukang Besi - OH - - - -
Kepala Tukang Besi - OH - - - -
Mandor - OH - - - -
Bahan/Material
Kawat Ikat 0.0204 Kg - - - -
Besi Beton 1.1250 Kg - - - -
Jumlah - -
Dibulatkan :
17 PEMASANGAN BATU BATA TEBAL 1/2 BATA, 1 Pc : 2 Ps
Upah
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Batu Bata Merah 80.0000 Bh - - - -
Portland cement 50 Kg 0.5200 Zak - - - -
Pasir Pasang / Plester 0.0420 M³ - - - -
Jumlah - - -
Dibulatkan :
18 PEMASANGAN BATU BATA TEBAL 1/2 BATA, 1 Pc : 4 Ps
Upah
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Batu Bata Merah 80.0000 Bh - - - -
Portland cement 50 Kg 0.2640 Zak - - - -
Pasir Pasang / Plester 0.0530 M³ - - - -
Jumlah - - -
Dibulatkan :
19 PLESTERAN HALUS 1 PC : 2 PS (T = 15 MM)
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pasir Pasang / Plester 0.0171 M³ - - - -
Semen PC 40 Kg 0.1700 Zak - - - -
Jumlah - - -
Dibulatkan :
20 PLESTERAN HALUS 1 PC : 3 PS (T = 15 MM)
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
M2
M2
M2
M2
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pasir Pasang / Plester 0.0194 M³ - - - -
Semen PC 40 Kg 0.1630 Zak - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
21 PLESTERAN HALUS 1 PC : 4 PS (T = 15 MM)
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pasir Pasang / Plester 0.0170 M³ - - - -
Semen PC 40 Kg 0.1145 Zak - - - -
Jumlah - - -
Dibulatkan :
22 M2
Upah
Pekerja - OH - - - -
Tukang - Jam - - - -
Bahan/Material
Dinding Partisi Gypsum 2.2000 M2 - - - -
Cat Partisi Gypsum 1.0000 Kg - - - -
Rangka Alumunium + Accessories 2.5000 M1 - - - -
Jumlah - - -
Dibulatkan :
23 PEKERJAAN PASANG BATU TEMPEL PUALAM
Upah
Pekerja - OH - - - -
Tukang Batu - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Batu Pualam Bali 1.0500 M² - - - -
Portland cement 50 Kg 0.2350 Zak - - - -
Pasir Pasang / Plester 0.0350 M³ - - - -
Jumlah - - -
Dibulatkan :
24 KUSEN PINTU / JENDELA KAYU MERANTI M3
Upah
Mandor - OH - - - -
Kepala Tukang Kayu - OH - - - -
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Kayu Meranti (Balok 6/12 cm) 1.1000 M³ - - - -
Jumlah - - -
Dibulatkan :
25 DAUN PINTU PANIL (KAYU MERANTI) M2
Upah
Mandor - OH - - - -
Kepala Tukang Kayu - OH - - - -
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
M2
DINDING PARTISI DOUBLE GYPSUM (9 MM) DI CAT RANGKA ALUMANIUM 2 1/4" X 1"
M2
Bahan/Material
Kayu Meranti (Papan 2/18 cm) 0.0440 M³ - - - -
Paku Sekrup 25.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
26 PEMASANGAN KUDA-KUDA RANGKA ALUMINIUM M²
Upah
Mandor - OH - - - -
Tukang Besi - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Rangka Alumunium + Accessories 0.1000 M1 - - - -
Paku 0.1500 Kg - - - -
Jumlah - - -
Dibulatkan :
27 PEMASANGAN LISTPLANK KAYU MERANTI 2/10 & 2/18 CM M¹
Upah
Pekerja - OH - - - -
Tukang Kayu - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Kayu Meranti (Papan 2/18 cm) 0.0048 M³ - - - -
Kayu Meranti (Papan 2/10 cm) 0.0024 M³ - - - -
Paku 0.0500 Kg - - - -
Jumlah - - -
Dibulatkan :
28 PENUTUP ATAP SPANDEK MOTIF GENTENG M2
Upah
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Paku 0.5000 Kg - - - -
Atap Spandek Motif Genteng T = 0.36 mm 1.4000 M² - - - -
Jumlah - - -
Dibulatkan :
29 BUBUNG ATAP SPANDEK M
Upah
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Kayu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Bumbungan Atap Spandek / M 1.0500 M¹ - - - -
Paku 0.5000 Kg - - - -
Jumlah - - -
Dibulatkan :
30 PEMASANGAN PAPAN SINGAP M2
Upah
Mandor - OH - - - -
Kepala Tukang Kayu - OH - - - -
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Paku 0.1000 Kg - - - -
Kayu Meranti (Papan 2/18 cm) 0.0070 M³ - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
31 RANGKA PLAFOND RANGKA ALUMINIUM M2
Upah
Mandor - OH - - - -
Kepala Tukang Kayu - OH - - - -
Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Rangka Puring 2.7500 M¹ - - - -
Paku Sekrup 4.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
32 PEMASANGAN PLAFOND GYPSUM 9 MM M2
Upah
Mandor - Jam - - - -
Kepala Tukang - OH - - - -
Kepala Tukang Kayu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Gypsum Plat tebal 9 mm 0.3819 Lbr - - - -
Paku 0.0486 Kg - - - -
Jumlah - - -
Dibulatkan :
33 PEMASANGAN PLAFOND ALUMINIUM STRIP M2
Upah
Mandor - Jam - - - -
Kepala Tukang - OH - - - -
Kepala Tukang Besi - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Rangka Puring 0.3819 M¹ - - - -
Aluminium Strip 0.6820 M2 - - - -
Paku 0.0986 Kg - - - -
Jumlah - - -
Dibulatkan :
34 PEMASANGAN LANTAI KERAMIK 20X20 CM M¹
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Keramik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Semen PC 40 Kg 0.0200 Zak - - - -
Kapur Pasang 0.0200 M³ - - - -
Keramik 20 x 20 1.0500 M² - - - -
Pasir Pasang / Plester 0.0200 M³ - - - -
Jumlah - - -
Dibulatkan :
35 PEMASANGAN LANTAI KERAMIK 25X33 CM M¹
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Keramik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Semen PC 40 Kg 0.0200 Zak - - - -
Kapur Pasang 0.0200 M³ - - - -
Keramik 25 x 33 (Marmer) 1.0500 M² - - - -
Pasir Pasang / Plester 0.0200 M³ - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
36 PEMASANGAN LANTAI KERAMIK UK 30X30 CM (ANTI SLIP) M¹
Upah
Tukang Keramik - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Semen PC 40 Kg 0.0200 Zak - - - -
Semen Warna 0.2000 kg - - - -
Keramik 30 x 30 cm (Anti Slip) 1.0500 M² - - - -
Pasir Pasang / Plester 0.0200 M³ - - - -
Jumlah - - -
Dibulatkan :
37 PEMASANGAN LANTAI HOMOGENEUS POLISH 60X60 CM M¹
Upah
Tukang Keramik - OH - - - -
Pekerja - OH - - - -
Kepala Tukang Batu - OH - - - -
Mandor - OH - - - -
Bahan/Material
Pasir Pasang / Plester 0.0700 M³ - - - -
Portland cement 50 Kg 0.1900 Zak - - - -
Keramik Homogeneus Polish 60 x 60 Cm 1.1000 M² - - - -
Jumlah - - -
Dibulatkan :
38 PEMASANGAN KERAMIK DINDING 20X25 CM (Homogeneus) M2
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Keramik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Semen PC 40 Kg 0.0900 Zak - - - -
Semen Warna 0.2000 kg - - - -
Keramik 20 x 25 (Dinding Homogeneus) 1.0500 M² - - - -
Pasir Pasang / Plester 0.0200 M³ - - - -
Jumlah - - -
Dibulatkan :
39 PEMASANGAN TITIK LAMPU TITIK
Upah
Kepala Tukang Listrik - OH - - - -
Tukang Listrik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Kabel NYA 500 Volt 2 x 1.5 mm2 20.0000 M¹ - - - -
T Doos PVC 2.0000 Bh - - - -
Pipa Paralon 5/8 2.0000 Btg - - - -
Fitting Plafon 1.0000 Bh - - - -
Isolator 2.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
40 PEMASANGAN TITIK STOP KONTAK GEDUNG TITIK
Upah
Kepala Tukang Listrik - OH - - - -
Tukang Listrik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Stop Kontak (Braco) 1.0000 Bh - - - -
Kabel NYA 500 Volt 2 x 1.5 mm2 0.0120 M¹ - - - -
Pipa Paralon 5/8 1.0000 Btg - - - -
T Doos PVC 0.7500 Bh - - - -
Jumlah - - -
Dibulatkan :
41 PEMASANGAN SAKLAR TUNGGAL TITIK
Upah
Kepala Tukang Listrik - OH - - - -
Tukang Listrik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Saklar Tunggal (Braco) 1.0000 Bh - - - -
Kabel NYA 500 Volt 2 x 1.5 mm2 0.0120 M¹ - - - -
Pipa Paralon 5/8 1.0000 Btg - - - -
T Doos PVC 0.7500 Bh - - - -
Jumlah - - -
Dibulatkan :
42 PEMASANGAN SAKLAR GANDA TITIK
Upah
Kepala Tukang Listrik - OH - - - -
Tukang Listrik - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Saklar Ganda (Braco) 1.0000 Bh - - - -
Kabel NYA 500 Volt 2 x 1.5 mm2 0.0120 M¹ - - - -
Pipa Paralon 5/8 1.0000 Btg - - - -
T Doos PVC 0.7500 Bh - - - -
Jumlah - - -
Dibulatkan :
43 PEMASANGAN INSTALASI AIR BERSIH M¹
Upah
Tukang Pipa - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Lem PVC 0.1000 Bh - - - -
Pipa PVC Dia 1/2" Type AW 1.0000 Btg - - - -
Jumlah - - -
Dibulatkan :
44 PEMASANGAN INSTALASI AIR KOTOR M¹
Upah
Pekerja - OH - - - -
Tukang Pipa - OH - - - -
Bahan/Material
Pipa PVC 4" type AW Pj. 6.00 Mt 0.2500 Lonjor - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
45 PEMASANGAN PIPA AIR KOTOR DIA 3" M¹
Upah
Tukang Pipa - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pipa PVC 3" Type C 1.1000 Btg - - - -
Lem PVC 0.1000 Bh - - - -
Jumlah - - -
Dibulatkan :
46 PEMASANGAN PIPA AIR KOTOR DIA 4" M¹
Upah
Tukang Pipa - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Pipa PVC 4" Type C 1.1000 Btg - - - -
Lem PVC 0.1000 Bh - - - -
Jumlah - - -
Dibulatkan :
47 PEMASANGAN KRAN AIR LOKAL BUAH
Upah
Kepala Tukang Pipa - OH - - - -
Tukang Pipa - OH - - - -
Bahan/Material
Kran Air 1/2 dlm 1.0000 Bh - - - -
Rol TBA 1.0000 Roll - - - -
Jumlah - - -
Dibulatkan :
48 KLOSET JONGKOK PORSELEN BUAH
Upah
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Bahan/Material
Closet Jongkok Porselen 1.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
49 KLOSET DUDUK PORSELEN BUAH
Upah
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Bahan/Material
Closet Duduk Porselen Warna Putih 1.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
50 PEMASANGAN WASTAFEL BUAH
Upah
Mandor - OH - - - -
Kepala Tukang Pipa - OH - - - -
Tukang Pipa - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Wastafel Besar 1.0000 Bh - - - -
Kran Wastafel (Basin Tap) 1.0000 Bh - - - -
Pipa / Slang Spiral Saluran Kran 1.0000 Fit - - - -
Keni 1 D 1.0000 Bh - - - -
Sifon Wasser 1.0000 Set - - - -
Rol TBA 1.0000 Roll - - - -
Watermor 1.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
51 PENGECATAN TEMBOK DAN PLAFOND, INTERIOR SETARA NIPPON PAINT
Upah
Tukang Cat - OH - - - -
Kepala Tukang Cat - OH - - - -
Mandor - OH - - - -
Bahan/Material
Cat Tembok Nipon/Setara 0.3200 Kg - - - -
Amplas Kayu Halus 0.1000 Bh - - - -
Kuas Roll 7" Action 0.0100 Bh - - - -
Dempul Tembok 0.1500 Kg - - - -
Sewa Peralatan
Alat Bantu 1.0000 Ls - - - -
Jumlah - - -
Dibulatkan :
52 PENGECATAN KAYU (SINGAP)
Upah
Tukang Cat - OH - - - -
Kepala Tukang Cat - OH - - - -
Mandor - OH - - - -
Bahan/Material
Cat Minyak (Paton/Setara) 0.2000 Kg - - - -
Amplas Kayu Halus 1.0000 Bh - - - -
Kuas 4" 0.0350 Bh - - - -
Cat Dasar Meni Kayu 5 Kg 0.1700 Klg - - - -
Jumlah - - -
Dibulatkan :
53 PENGECATAN BESI (TERALIS)
Upah
Tukang Cat - OH - - - -
Kepala Tukang Cat - OH - - - -
Mandor - OH - - - -
Bahan/Material
Cat Besi Setara Kangaroo 0.5000 Kg - - - -
Amplas Besi 1.0000 Bh - - - -
Kuas 4" 0.0350 Bh - - - -
Cat Meni Besi 0.1000 Kg - - - -
M2
M2
M2
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
54 PELAPISAN WATER PROOFING
Upah
Tukang Cat - OH - - - -
Kepala Tukang Cat - OH - - - -
Mandor - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Aquaproof 0.3500 5 Kg - - - -
Serat Fiber 0.1000 M3 - - - -
Jumlah - - -
Dibulatkan :
55 PEKERJAAN SALURAN KELILING M¹
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Portland cement 50 Kg 0.4670 Zak - - - -
Pasir Pasang / Plester 0.0210 M³ - - - -
Batu Bata Merah 20.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
56 PEKERJAAN BAK KONTROL (30CM X 30 CM) BH
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Portland cement 50 Kg 0.8800 Zak - - - -
Pasir Pasang / Plester 0.0696 M³ - - - -
Batu Bata Merah 10.0000 Bh - - - -
Jumlah - - -
Dibulatkan :
57 PEMASANGAN KANSTIN M1
Upah
Mandor - OH - - - -
Kepala Tukang Batu - OH - - - -
Tukang Batu - OH - - - -
Pekerja - OH - - - -
Bahan/Material
Semen PC 40 Kg 0.3600 Zak - - - -
Kanstin K-7 1.0000 Bh - - - -
Pasir Pasang / Plester 0.0010 M³ - - - -
Jumlah - - -
Dibulatkan :
58 PEKERJAAN PEMBONGKARAN ATAP M2
Upah
M2
Pekerja Tak Terampil - Oh - - - -
Kepala Tukang - Oh - - - -
Jumlah - - -
Dibulatkan :
1 2 3 4 5 6 7
59 PEKERJAAN PEMBONGKARAN PLAFON + RANGKA M2
Upah
Tukang Kayu - Oh - - - -
Kepala Tukang - Oh - - - -
Jumlah - - -
Dibulatkan :
60 PEKERJAAN PEMBONGKARAN DINDING TEMBOK M3
Upah
Pekerja - Oh - - - -
Mandor - Oh - - - -
Jumlah - - -
Dibulatkan :
61 PEKERJAAN PEMBONGKARAN KAYU M2
Upah
Tukang Kayu - Oh - - - -
Pekerja - Oh - - - -
Jumlah - - -
Dibulatkan :
62 PEKERJAAN PEMBONGKARAN KUDA-KUDA KAYU M3
Upah
Tukang Kayu - Oh - - - -
Kepala Tukang - Oh - - - -
Pekerja - Oh - - - -
Mandor - Oh - - - -
Jumlah - - -
Dibulatkan :
63 PEKERJAAN PEMBONGKARAN RANGKA ATAP M3
Upah
Tukang Kayu - Oh - - - -
Kepala Tukang - Oh - - - -
Pekerja - Oh - - - -
Mandor - Oh - - - -
Jumlah - - -
Dibulatkan :
64 PEKERJAAN PEMBONGKARAN KUSEN M2
Upah
Tukang Kayu - Oh - - - -
Pekerja - Oh - - - -
Jumlah - - -
Dibulatkan :
DAFTAR ANALISA HARGA SATUAN BAHAN, UPAH DAN PERALATAN
TOTAL
(Rp)
8
-
-
-
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN
(DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN : REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
NO NAMA BAHAN SATUAN
1 2 3
A. BAHAN
1 Semen PC 40 Kg Zak
2 Portland cement 50 Kg Zak
3 Semen Warna kg
4 Portland cement kg
5 Pasir Beton / Cor M³
6 Pasir Pasang / Plester M³
7 Pasir Urug / Timbun M³
8 Tanah Urug M³
9 Kerikil M³
10 Batu Split 3/4 / Batu Granit M³
11 Batu Bata Merah Bh
12 Beton Ready Mix K 225, on site Batam - M³
13 Beton Ready Mix K 250, on site Batam - M³
14 Besi Beton Kg
15 Besi Beton (Ulir) Kg
16 Kawat Ikat Kg
17 Paku Kg
18 Paku Sekrup Bh
19 Paku Sumbat Bh
20 Rangka Puring M¹
21 Rangka Alumunium + Accessories
22 Alumunium Profil 4" Putih M¹
23 Papan Meranti M³
24 Kayu Meranti (Usuk 5/7 cm) M³
25 Kayu Meranti Campuran M³
26 Papan Meranti Campuran M³
27 Balok Meranti Campuran M³
28 Kayu Meranti (Balok 5/10 cm) M³
29 Kayu Meranti (Balok 6/12 cm) M³
30 Kayu Meranti (Papan 2/18 cm) M³
31 Kayu Meranti (Papan 2/10 cm) M³
32 Gypsum Plat tebal 9 mm Lbr
33 Triplek 9 mm Lbr
34 Dinding Partisi Gypsum
35 Bumbungan Atap Spandek / M M¹
36 Atap Spandek Motif Genteng T = 0.36 mm M²
37 Aluminium Strip
38 Keramik 20 x 25 (Dinding Homogeneus) M²
39 Keramik 20 x 20 M²
40 Keramik 25 x 33 (Marmer) M²
41 Keramik 30 x 30 cm (Anti Slip) M²
M1
M2
M2
42 Batu Pualam Bali M²
43 Keramik 25 x 33 cm (Homogeneus Polish) Bh
44 Keramik Homogeneus Polish 60 x 60 Cm M²
45 Stop Kontak (Braco) Bh
46 Kabel NYA 500 Volt 2 x 1.5 mm2 M¹
47 Fitting Plafon Bh
48 T Doos PVC Bh
49 Isolator Bh
50 Saklar Ganda (Braco) Bh
51 Saklar Tunggal (Braco) Bh
52 Saklar Triple (Braco) Bh
53 Saklar Kwarted (Braco) Bh
54 Las Doof Bh
55 Pipa Paralon 5/8 Btg
56 Kran Air 1/2 dlm Bh
57 Kran Wastafel (Basin Tap) Bh
58 Wastafel Besar Bh
59 Pipa / Slang Spiral Saluran Kran Fit
60 Sifon Wasser Set
61 Watermor Bh
62 Rol TBA Roll
63 Closet Duduk Porselen Warna Putih Bh
64 Pipa PVC 2" Type C M¹
65 Pipa PVC 3" Type C M¹
66 Pipa PVC 4" Type C M¹
67 Pipa PVC 4" type AW Pj. 6.00 Mt M¹
68 Pipa PVC Dia 1/2" Type AW M¹
69 Lem PVC Bh
70 Cat Tembok Nipon/Setara Kg
71 Cat Meni Besi Kg
72 Aquaproof Kg
73 Serat Fiber M²
74 Dempul Tembok Kg
75 Cat Minyak (Paton/Setara) Kg
76 Amplas Kayu Halus Bh
77 Amplas Besi Bh
78 Kuas Roll 7" Action Bh
79 Kuas 4" Bh
80 Cat Dasar Meni Kayu 5 Kg Klg
81 Cat Besi Setara Kangaroo Kg
82 Kanstin K-7 Bh
SEWA ALAT BERAT DAN RINGAN
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN
(DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN : REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
NO NAMA BAHAN SATUAN
1 2 3
B. SEWA PERALATAN
1 Concrete Vibrator Jam
2 Jack Hammer Jam
3 Alat Bantu Ls
4 Tamper Jam
5 Flat Bed Truck 3-4 M3 Jam
U P A H T E N A G A K E R J A
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN
(DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN : REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
NO U R A I A N T E N A G A SATUAN
1 2 3
C. UPAH
1 Pekerja OH
2 Tukang Kayu OH
3 Tukang Besi OH
4 Tukang Cat OH
5 Tukang Pipa OH
6 Tukang Listrik OH
7 Tukang Keramik OH
8 Tukang Batu OH
9 Kepala Tukang OH
10 Kepala Tukang Batu OH
11 Kepala Tukang Kayu OH
12 Kepala Tukang Besi OH
13 Kepala Tukang Cat OH
14 Kepala Tukang Listrik OH
15 Kepala Tukang Pipa OH
16 Kepala Tukang Keramik OH
17 Mandor OH
18 Mekanik OH
19 Operator OH
20 Tukang Jam
21 Pekerja Jam
22 Mandor Jam
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN
(Rp)
4
SEWA ALAT BERAT DAN RINGAN
HARGA SATUAN
(Rp)
4
U P A H T E N A G A K E R J A
HARGA SATUAN
(Rp)
4
BILL OF QUANTITY (BOQ)
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN (DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN : REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek (Uk. 120 Cm X 180 Cm) 1.000 Bh - -
2 Pek. Pembersihan Lapangan (Ringan) 450.500 M² - -
3 Pek. Pengukuran Bowplank 87.000 M¹ - -
Sub. Total
II PEKERJAAN PEMBONGKARAN
1 Pek. Pengangkutan (Pemindahan dan Pengembalian) Obat Farmasi 1.000 Ls - -
2 Pek. Pembongkaran Atap 293.343 M² - -
3 Pek. Pembongkaran Kuda - Kuda 8.496 M³ - -
4 Pek. Pembongkaran Rangka Atap 1.912 M³ - -
5 Pek. Pembongkaran Plafond + Rangka 277.256 M² - -
6 Pek. Pembongkaran Dinding Tembok 72.225 M³ - -
7 Pek. Pembongkaran Kusen dan Daun Pintu/Jendela 82.360 M² - -
8 Pek. Pemotongan Lahan 48.750 M³ - -
9 Pek. Pembuangan Puing Pembongkaran 1.000 Ls - -
Sub. Total
III PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi (100 s/d 200 CM) Manual 168.000 M³ - -
2 Pek. Urugan Pasir 5.600 M³ - -
3 Pek. Lantai Kerja Camp. 1 : 3 : 5 5.600 M³ - -
4 Pekerjaan Pondasi
a Pek. Bekisting Pondasi 105.379 M² - -
b Pek. Pembesian 5,201.099 Kg - -
c Pek. Beton Ready Mix K 250 33.480 M³ - -
5 Pek. Urugan Tanah Kembali 123.320 M³ - -
Sub. Total
IV PEKERJAAN STRUKTUR BETON BERTULANG
LANTAI I
1 Pek. Sloof Beton
a Pek. Bekisting Sloof 157.010 M² - -
b Pek. Pembesian 2,818.129 Kg - -
c Pek. Beton Ready Mix K 250 18.934 M³ - -
2 Pekerjaan Kolom Kontruksi
a Pek. Bekisting Kolom 159.056 M² - -
b Pek. Pembesian 1,787.200 Kg - -
c Pek. Beton Ready Mix K 250 11.651 M³ - -
3 Pekerjaan Kolom Praktis
a Pek. Bekisting Kolom Praktis 79.560 M² - -
b Pek. Pembesian 666.406 Kg - -
c Pek. Beton Ready Mix K 250 3.381 M³ - -
4 Pekerjaan Balok Latay (Diatas Kusen)
a Pek. Bekisting Balok 7.740 M² - -
b Pek. Pembesian 91.913 Kg - -
c Pek. Beton Ready Mix K 250 0.503 M³ - -
5 Pek. Balok Lantai
a Pek. Bekisting Balok 128.660 M² - -
b Pek. Pembesian 4,283.206 Kg - -
c Pek. Beton Ready Mix K 250 27.232 M³ - -
6 Pek. Plat Lantai
a Pek. Bekisting Plat Lantai 257.412 M² - -
b Pek. Pembesian 5,638.920 Kg - -
c Pek. Beton Ready Mix K 250 34.848 M³ - -
7 Pek. Canopy Beton
a Pek. Bekisting Plat Lantai 9.328 M² - -
b Pek. Pembesian 67.549 Kg - -
c Pek. Beton Ready Mix K 250 1.370 M³ - -
1 2 3 4 5
LANTAI II
1 Pekerjaan Kolom Kontruksi
a Pek. Bekisting Kolom 98.020 M² - -
b Pek. Pembesian 1,140.463 Kg - -
c Pek. Beton Ready Mix K 250 7.540 M³ - -
2 Pekerjaan Kolom Praktis
a Pek. Bekisting Kolom Praktis 39.120 M² - -
b Pek. Pembesian 338.559 Kg - -
c Pek. Beton Ready Mix K 250 1.625 M³ - -
3 Pekerjaan Balok Latay (Diatas Kusen)
a Pek. Bekisting Balok 2.452 M² - -
b Pek. Pembesian 58.229 Kg - -
c Pek. Beton Ready Mix K 250 0.319 M³ - -
4 Pek. Ring Balok 1
a Pek. Bekisting Ring Balok 103.600 M² - -
b Pek. Pembesian 1,501.695 Kg - -
c Pek. Beton Ready Mix K 250 9.700 M³ - -
5 Pek. Ring Balok 2
a Pek. Bekisting Ring Balok 222.900 M² - -
b Pek. Pembesian 2,555.490 Kg - -
c Pek. Beton Ready Mix K 250 19.926 M³ - -
6 Pek. Ring Balok 3
a Pek. Bekisting Ring Balok 39.600 M² - -
b Pek. Pembesian 373.254 Kg - -
c Pek. Beton Ready Mix K 250 2.640 M³ - -
7 Pek. Canopy Beton
a Pek. Bekisting Plat Lantai 9.328 M² - -
b Pek. Pembesian 33.774 Kg - -
c Pek. Beton Ready Mix K 250 1.370 M³ - -
8 Pek. Plat Lantai 1
a Pek. Bekisting Plat Lantai 109.698 M² - -
b Pek. Pembesian 2,111.554 Kg - -
c Pek. Beton Ready Mix K 250 14.231 M³ - -
9 Pek. Plat Lantai 2
a Pek. Bekisting Plat Lantai 97.337 M² - -
b Pek. Pembesian 1,475.983 Kg - -
c Pek. Beton Ready Mix K 250 17.750 M³ - -
Sub. Total
V PEKERJAAN DINDING DAN PLESTERAN
LANTAI I
1 Pek. Pasang Dinding Batu Bata Camp. 1 : 2 41.378 M² - -
2 Pek. Pasang Dinding Batu Bata Camp. 1 : 4 449.611 M² - -
3 Pek. Plesteran + Acian Camp. 1 : 2 T = 15 mm 82.755 M² - -
4 Pek. Plesteran + Acian Camp. 1 : 4 T = 15 mm 899.221 M² - -
5 Pek. Pasang Dinding Partisi Doubel Gypsum 9 mm Lapis Cat R. Aluminium 64.000 M² - -
6 Pek. Plesteran Afwerking Beton Camp. 1 : 3 T = 1.5 Cm 12.758 M² - -
7 Pek. Profil Tiang Teras 1.000 Ls - -
8 Pek. Pas. Batu tempel Pualam Bali 18.040 M² - -
9 Pek. Profil Dinding 1.000 Ls - -
LANTAI II
1 Pek. Pasang Dinding Batu Bata Camp. 1 : 4 387.590 M² - -
2 Pek. Plesteran + Acian Camp. 1 : 4 T = 15 mm 775.180 M² - -
3 Pek. Plesteran Afwerking Beton Camp. 1 : 3 T = 1.5 Cm 10.155 M² - -
4 Pek. Profil Dinding 1.000 Ls - -
Sub. Total
VI PEKERJAAN KUSEN, PINTU DAN JENDELA
LANTAI I
1 Pek. Pas. Kusen dan Pintu Folding Gate Lipat (P1) + Assecories 2.000 Set - -
2 Pek. Pas. Pintu Kaca Tempred T: 12 mm (P2) + Assecories 1.000 Set - -
3 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P3) + Assecories 2.000 Set - -
4 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P4) + Assecories 5.000 Set - -
5 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P6) + Assecories 1.000 Set - -
6 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J1) + Assecories 6.000 Set - -
7 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J2) + Assecories 1.000 Set - -
8 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J3) + Assecories 2.000 Set - -
9 Pek. Pas. Kusen Alumunium Jendela Kaca Bersisihan (BV1) + Assecories 2.000 Set - -
10 Pek. Pas. Kusen Alumunium Jendela Kaca Bersisihan (BV3) + Assecories 4.000 Set - -
11 Pek. Pas. Pintu Fiber Glass + Kunci + Rangka 3.000 Set - -
12 Pek. Pasang Teralis Jendela Hollow 0.5" x 1" 16.614 m2 - -
13 Pek. Pemasangan Plat Stainless Steel pada Pintu P2 1.000 Ls - -
1 2 3 4 5 6
LANTAI II
1 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P3) + Assecories 2.000 Set - -
2 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P4) + Assecories 2.000 Set - -
3 Pek. Pas. Kusen dan Pintu Rangka Aluminium (P5) + Assecories 1.000 Set - -
4 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J1) + Assecories 8.000 Set - -
5 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J2) + Assecories 2.000 Set - -
6 Pek. Pas. Kusen dan Jendela Kaca Rangka Aluminium (J4) + Assecories 2.000 Set - -
7 Pek. Pas. Kusen Alumunium Jendela Kaca Bersisihan (BV1) + Assecories 4.000 Set - -
8 Pek. Pas. Kusen Alumunium Jendela Kaca Bersisihan (BV2) + Assecories 2.000 Set - -
9 Pek. Pas. Kusen Alumunium Jendela Kaca Bersisihan (BV3) + Assecories 3.000 Set - -
10 Pek. Pas. Pintu Fiber Glass + Kunci + Rangka 1.000 Set - -
11 Pek. Pasang Teralis Jendela Hollow 0.5" x 1" 18.649 m2 - -
Sub. Total
VII PEKERJAAN KUDA - KUDA DAN RANGKA ATAP
LANTAI I
1 47.694 M² - -
LANTAI II
1 176.470 M² - -
Sub. Total
VIII PEKERJAAN ATAP
LANTAI I
1 Pek. Pasang Atap Spandek Motif Genteng t=0.36mm 51.636 M² - -
2 Pek. Pasang Perabung Atap Spandek t=0.36mm 8.525 M¹ - -
3 Pek. Pasang Singap 1.181 M² - -
LANTAI II
1 Pek. Pasang Atap Spandek Motif Genteng t=0.36mm 186.531 M² - -
2 Pek. Pasang Perabung Atap Spandek t=0.36mm 20.592 M¹ - -
3 Pek. Pasang Singap 3.477 M² - -
Sub. Total
VIX PEKERJAAN PLAFOND
LANTAI I
1 Pek. Pasang Rangka Plafond Aluminium 272.543 M² - -
2 Pek. Pasang Plafond Gybsum Board T = 9 mm 272.543 M² - -
3 Pek. Pasang List Cornice Gybsum 245.835 M¹ - -
4 Pek. Pasang Plafond Aluminium Strip + Rangka 51.235 M² - -
LANTAI II
1 Pek. Pasang Rangka Plafond Aluminium 269.819 M² - -
2 Pek. Pasang Plafond Gybsum Board T = 9 mm 269.819 M² - -
3 Pek. Pasang List Cornice Gybsum 149.190 M¹ - -
4 Pek. Pasang Plafond Aluminium Strip + Rangka 76.350 M² - -
Sub. Total
X PEKERJAAN LANTAI
LANTAI I
1 Pek. Urugan Tanah Dipadatkan 60.150 M³ - -
2 Pek. Urugan Pasir 15.175 M³ - -
3 Pek. Pasang Keramik Lantai 60 X 60 Cm (Homogeneus Polish ) 261.542 M² - -
4 Pek. Pasang Keramik Dinding 25 X 30 Cm (Marmer) 6.589 M² - -
Pek. Rangka Atap meliputi kuda-kuda, gording, kaso, reng, nok, jurai, dll, menggunakan bahan konstruksi baja ringan, METAL ZINCALUME dengan spesifikasi : berbahan baku metal zincalume dengan komposisi lapisan aluminium 55%, zinc 43,5% dan 1.5 % silicon alloy
Pek. Rangka Atap meliputi kuda-kuda, gording, kaso, reng, nok, jurai, dll, menggunakan bahan konstruksi baja ringan, METAL ZINCALUME dengan spesifikasi : berbahan baku metal zincalume dengan komposisi lapisan aluminium 55%, zinc 43,5% dan 1.5 % silicon alloy
5 Pek. Pasang Keramik Dinding 25 X 30 Cm (Homogeneus) 24.840 M² - -
LANTAI II
1 Pek. Pasang Keramik Lantai 60 X 60 Cm (Homogeneus Polish ) 272.133 M² - -
2 Pek. Pasang Keramik Dinding 25 X 30 Cm (Marmer) 11.380 M² - -
3 Pek. Pasang Keramik Dinding 25 X 30 Cm (Homogeneus) 62.460 M² - -
4 Pek. Pelapisan Waterproofing 250.350 M² - -
Sub. Total
1 2 3 4 5 6
XI PEKERJAAN INSTALASI LISTRIK
LANTAI I
1 Pek. Pasang Instalasi Titik Lampu 21.000 Titik - -
2 Pek. Pasang Stop Kontak 15.000 Bh - -
3 Pek. Pasang Saklar Tunggal 8.000 Bh - -
4 Pek. Pasang Saklar Ganda 2.000 Bh - -
5 Pek. Pasang Saklar Triple 1.000 Bh - -
6 Pek. Pasang Lampu Downlight 20 Watt 18.000 Bh - -
7 Pek. Pasang Lampu Downlight 15 Watt 3.000 Bh - -
8 Pek. Pasang Exhaust Fan 7.000 Bh - -
9 Pek. Pasang Zakering Khas/MCB 1.000 Bh - -
LANTAI II
1 Pek. Pasang Instalasi Titik Lampu 17.000 Titik - -
2 Pek. Pasang Stop Kontak 6.000 Bh - -
3 Pek. Pasang Saklar Tunggal 6.000 Bh - -
4 Pek. Pasang Saklar Ganda 1.000 Bh - -
5 Pek. Pasang Saklar Empat 1.000 Bh - -
6 Pek. Pasang Lampu Downlight 20 Watt 16.000 Bh - -
7 Pek. Pasang Lampu Downlight 15 Watt 1.000 Bh - -
8 Pek. Pasang Exhaust Fan 6.000 Bh - -
9 Pek. Pasang Zakering Khas/MCB 1.000 Bh - -
Sub. Total
XII PEKERJAAN INSTALASI AIR BERSIH DAN KOTOR
LANTAI I
1 Pek. Pasang Instalasi Air Bersih Dan Kotor 1.000 Ls - -
2 Pek. Pasang Closed Duduk Porselin 3.000 Bh - -
3 Pek. Pasang Bak Air Lapis Keramik 3.000 Bh - -
4 Pek. Pasang Wastafel Lengkap 1.000 Bh - -
5 Pek. Pasang Kran Air (Ex Lokal) 10.000 Bh - -
6 Pek. Pasang Floor Drain 3.000 Bh - -
7 Pek. Pasang Keramik Lantai Anti Slip 20 X 20 Cm 16.300 M² - -
8 Pek. Pasang Keramik Dinding 20 X 25 Cm (Homogeneus Polish) 60.301 M² - -
9 Pek. Septictank + Peresapan 2.000 Unit - -
LANTAI II
1 Pek. Pasang Instalasi Air Bersih Dan Kotor 1.000 Ls - -
2 Pek. Pasang Closed Duduk Porselin 1.000 Bh - -
3 Pek. Pasang Bak Air Lapis Keramik 1.000 Bh - -
4 Pek. Pasang Wastafel Lengkap 1.000 Bh - -
5 Pek. Pasang Kran Air (Ex Lokal) 4.000 Bh - -
6 Pek. Pasang Floor Drain 1.000 Bh - -
7 Pek. Pasang Keramik Lantai Anti Slip 20 X 20 Cm 10.446 M² - -
8 Pek. Pasang Keramik Dinding 20 X 25 Cm (Homogeneus Polish) 26.688 M² - -
9 Pek. Pasang Pipa Air Hujan PVC Ø 3" 81.200 M¹ - -
Sub. Total
XIII PEKERJAAN TANGGA
1 Pek. Pondasi Tangga
a Pek. Bekisting Pondasi 4.213 M² - -
b Pek. Pembesian 85.434 Kg - -
c Pek. Beton Ready Mix K 250 0.653 M³ - -
2 Pek. Plat Tangga
a Pek. Bekisting Plat Lantai 37.705 M² - -
b Pek. Pembesian 1,005.382 Kg - -
c Pek. Beton Ready Mix K 250 4.949 M³ - -
3 Pek. Pasang Keramik Tangga Anti Slip 30 X 30 Cm 37.626 M² - -
4 Pek. Pasang Handle Drill Tangga Besi Stainless Steel Ø 2.5" 15.943 M¹ - -
Sub. Total
XIV PEKERJAAN PENGECATAN
LANTAI I
1 Pek. Pengecatan Dinding dan Beton 3 Lapis (Cat Setara Nippon) 1,063.840 M² - -
2 Pek. Pengecatan Plafond 3 Lapis (Cat Setara Nippon) 272.543 M² - -
3 Pek. Pengecatan Minyak ( Papan Singap) 1.181 M² - -
4 Pek. Pengecatan Teralis 16.614 M² - -
1 2 3 4 5
LANTAI II
1 Pek. Pengecatan Dinding dan Beton 3 Lapis (Cat Setara Nippon) 777.004 M² - -
2 Pek. Pengecatan Plafond 3 Lapis (Cat Setara Nippon) 269.819 M² - -
3 Pek. Pengecatan Minyak ( Papan Singap) 3.477 M² - -
4 Pek. Pengecatan Teralis 18.649 M² - -
Sub. Total
XV PEKERJAAN INSTALASI PENANGKAL PETIR
1 a Pemasangan dan Pengadaan Instalasi Penangkal Petir 1.000 Ls - -
Type EF Lightning Preventor
b Coaxial cable 5 mm berikut clamp dan conduit electroda pentanahan 1.000 Ls - -
(Copper Rod) terbuat dari Pipa Tembaga diameter min 25mm, pada ujung
bawah pipa terpasang copper rod yang dibuat runcing sepanjang
0,5 m dan ditanam minimal 12 m kedalam tanah
c Copper Rod 25 mm (@2.5M) 2.000 bh - -
d Pengeboran untuk penanaman Electrode Pentanahan 1.000 Ls - -
Sub. Total
XVI PEKERJAAN PENGECORAN JALAN MASUK
1 Pek. Jalan Masuk Beton
a Pek. Bekisting 180.000 M² - -
b Pek. Pembesian 1,972.800 Kg - -
c Pek. Beton Ready Mix K 250 90.000 M³ - -
2 Pek. Pemasangan Kanstin K-7 187.055 M¹ - -
Sub. Total
XVII PEKERJAAN LUAR BANGUNAN
1 Pek. Saluran Keliling Bangunan 67.100 M¹ - -
2 Pek. Pasang Bak Kontrol 6.000 Bh - -
3 Pek. Rabat Beton + Acian 2.667 M³ - -
4 Shop Drawing dan As Built Drawing 1.000 Ls - -
5 Dokumentasi dan Pelaporan 1.000 Ls - -
6 Pek. Papan Nama Gudang Farmasi 1.000 Ls - -
7 Pek. Pas. Profil Dinding Papan Nama Gedung 1.000 Ls - -
8 Pek. Pembersihan Akhir 1.000 Ls - -
Sub. Total
J u m l a h
R E K A P I T U L A S I
BILL OF QUANTITY (BOQ)
PROGRAM : PENGADAAN DAN PENGAWASAN OBAT DAN MAKANAN
KOTA BATAM TAHUN ANGGARAN 2011
KEGIATAN : PENINGKATAN PELAYANAN KESEHATAN KEFARMASIAN (DAK, PENDAMPING DAN OPERASIONAL)
PEKERJAAN : REHABILITASI GUDANG FARMASI
LOKASI : KOTA BATAM
NO URAIAN PEKERJAAN JUMLAH
I PEKERJAAN PERSIAPAN Rp. -
II PEKERJAAN PEMBONGKARAN Rp. -
III PEKERJAAN PONDASI Rp. -
IV PEKERJAAN STRUKTUR BETON BERTULANG Rp. -
V PEKERJAAN DINDING DAN PLESTERAN Rp. -
VI PEKERJAAN KUSEN, PINTU DAN JENDELA Rp. -
VII PEKERJAAN KUDA - KUDA DAN RANGKA ATAP Rp. -
VIII PEKERJAAN ATAP Rp. -
VIX PEKERJAAN PLAFOND Rp. -
X PEKERJAAN LANTAI Rp. -
XI PEKERJAAN INSTALASI LISTRIK Rp. -
XII PEKERJAAN INSTALASI AIR BERSIH DAN KOTOR Rp. -
XIII PEKERJAAN TANGGA Rp. -
XIV PEKERJAAN PENGECATAN Rp. -
XV PEKERJAAN INSTALASI PENANGKAL PETIR Rp. -
XVI PEKERJAAN PENGECORAN JALAN MASUK Rp. -
XVII PEKERJAAN LUAR BANGUNAN Rp. -
A JUMLAH Rp -
B DIBULATKAN Rp -
TERBILANG :
Batam, 2011Penawar,
CV. / PT.
Nama JelasJabatan
BILL OF QUANTITY (BOQ)
JUMLAH
HARGA
(Rp)
6
-
-
-
6
-
-
6
-
-
-
-
-
6
-
-
-
6
-
-
-
-
-
R E K A P I T U L A S I
BILL OF QUANTITY (BOQ)
JUMLAH
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp. -
Rp -
Rp -