Site Preparation and Environmental Issues
Chapter 20
Release 16/7/2009
Jetking Infotrain Ltd.
Chapter Objectives Explain Site preparation concept
Identify the Environmental factors affecting a site List the Safety Precautions and Measurement Explain the Data Center Location and Design
Perform Pre-installation inspection Identify the Safety and Protection Equipments List the Safety Considerations Explain the Conditioning power supply Identify the use and types of UPS
Release 16/7/2009
Jetking Infotrain Ltd.
Recall Microprocessor is a device that reads binary
instruction from memory, accepts binary data as input, processes data according to the instructions and provides results as output The Pentium processor has 32 bit and 64 bit address bus Some of the main features of Pentium processors are Superscalar Architecture, Functional Redundancy Check, Halt input and Power management
Release 16/7/2009
Jetking Infotrain Ltd.
Site Preparation Concepts Site preparation involves the planning process with
some issues such as physical location and power supply All the items are not applicable for every installation You must consider some issues before performing
any system installation
Release 16/7/2009
Jetking Infotrain Ltd.
Physical Location While choosing a location for new system, you must
take care of: Width of doorways and corridor Height of doorways and corridor While shifting the system to a new location, you must
take care of: Air temperature of the location Location should be clean Should use some safety equipments at the locationRelease 16/7/2009 Jetking Infotrain Ltd.
Question for GD
Time Limit-2mins
List down the things which you need to take care in
physical location for your system.
Release 16/7/2009
Jetking Infotrain Ltd.
Power Requirements Power measured in volt-amperes (VA) and in watts Systems VA rating measured by multiplying the
voltage and amperes (current) of a system
VA = volts amps
Watts = VA power factor
Release 16/7/2009
Jetking Infotrain Ltd.
Question for GD
Time Limit-2mins
What is the difference between Volts and watts
Release 16/7/2009
Jetking Infotrain Ltd.
Environmental Factors Temperature and Humidity The device must be
set up in an environment, where the temperature and relative humidity can be controlled. Temperature must be from 180C to 280C or 640F to 830F and Relative humidity should be between 40-60% Lighting device must be operated under sufficient
lighting conditions.
Release 16/7/2009
Jetking Infotrain Ltd.
Question for GDenvironmental factors?
Time Limit-2mins
What is do you understand by the term
Release 16/7/2009
Jetking Infotrain Ltd.
Safety Precautions and measurement Safety Precautions and Measurement includes :
Fire Protection - You should keep fire extinguisher for the fire protection. A first aid kit should be kept for emergency. Cabling - All the cables should be contained with suitable conduits or channels that are connected to a single device. A circuit breaker is an electrical switch which operates to protect the circuit from damage by overload or short circuit.Jetking Infotrain Ltd.
Release 16/7/2009
Data Center Location and Design - I While determining the data center location, you must
keep the following in mind:
Moisture and air leakage - Must check that data center is not located below the room that causes water or moisture leakage Contaminants Separates data center from the activities that can damage the environment
Access Make sure that the loading dock, freight elevator or other equipment entrances can sufficiently access the data centerJetking Infotrain Ltd.
Release 16/7/2009
Data Center Location and Design II
Security Proper security mechanism should be provided so that only a particular person can access the equipments Room Temperature and humidity You should take care that sufficient cooling equipment should be attached with the data center Airflow Must take care of airflow of the systems in the data center Raised Flooring Raised flooring must be designed to combine cabinets and racks and to maximize access to support equipment and cables.Jetking Infotrain Ltd.
Release 16/7/2009
Data Center Location and Design III Ceiling height Difference between the floor and
ceiling must be minimum height of 8 feet 6 inches (259 cm) Aisle Space Sufficient space at the front and back
of cabinets and rack provides proper servicing of the system Expansion Room Data center must be designed in
a way that can accommodate additional equipments in future
Release 16/7/2009
Jetking Infotrain Ltd.
Question for GD
Time Limit-2mins
List down the point which you need to take care
during data center location and design
Release 16/7/2009
Jetking Infotrain Ltd.
Pre-installation Inspection - I You must confirm the following points before starting
the installation:
Construction work must be completed before installing the device Installation area must be dust free
Suitable area must be available and easily reachable by the delivery truckJetking Infotrain Ltd.
Release 16/7/2009
Pre-installation Inspection - II
Sufficient aisle space must be provided Power connections must be installed and located properly Network access (where necessary) has been defined and implemented
There must be sufficient space in the corridors and doors so that the devices can be brought in easilyJetking Infotrain Ltd.
Release 16/7/2009
Hands on Perform the Pre-installation check list verification as
mentioned in the page no 416 of the text book
Release 16/7/2009
Jetking Infotrain Ltd.
Safety and Protection Equipment: Cable management equipment Protects people
against the accidents and devices against power loss Emergency Power-Off switch Provides protection
against various dangerous electrical situations Fire-Fighting Equipment with an Electrical Rating
Must equip site with fire fighting equipment such as fire extinguishers
Release 16/7/2009
Jetking Infotrain Ltd.
Safety and Protection Equipment: Lightning Protection Prevents damage at the
location with large power surges Power-Line Treatment Improves the power
quality.
Release 16/7/2009
Jetking Infotrain Ltd.
Safety Consideration - I There are various safety considerations, which need
to be considered before handling a computer. Some of them are :
Always use an anti-static mat or grounding wrist strap while working with any systems. If any cables or component need to be plugged which is loose, first turn off the computer and then properly replace it.Jetking Infotrain Ltd.
Release 16/7/2009
Safety Consideration - II Avoid using carpets on floor while working, as
carpet generates many static charges. Always maintain a clean atmosphere while working. Never use metallic instruments to touch switches or other components as they may damage the components. Never touch any of the components of computer unless you are properly grounded.
Release 16/7/2009
Jetking Infotrain Ltd.
Question for GD
Time Limit-2mins
List down the safety and protection equipment list
Release 16/7/2009
Jetking Infotrain Ltd.
Power Conditioners Helps in optimizing the quality of power supply Used for protecting components from electric spikes,
by providing it with a steady voltage Come in a variety of sizes depending upon their applications
Release 16/7/2009
Jetking Infotrain Ltd.
UPS (Uninterruptible Power Supply) Used to provide a steady or uninterrupted supply of
current in case of power failure Helps in filtering of the AC current
Release 16/7/2009
Jetking Infotrain Ltd.
Types of UPS Three types of UPS are:
Standby UPS Inline UPS Line-Interactive UPS
Release 16/7/2009
Jetking Infotrain Ltd.
Standby UPS Primary circuit form the AC current outlet along with
an inline surge suppressor and filter In case of power failure, the UPS switches from this
primary circuit to secondary circuit
Release 16/7/2009
Jetking Infotrain Ltd.
Inline UPS When a failure in AC current occurs, switching of
circuit is not needed Design of the Inline UPS is called as a double conversion
Release 16/7/2009
Jetking Infotrain Ltd.
Line-Interactive UPS Reduces the switching time
Has an automatic voltage regulator called as the
buck-boost feature
Release 16/7/2009
Jetking Infotrain Ltd.
Question for GD
Time Limit-2mins
Which type of Ups is best and why?
Release 16/7/2009
Jetking Infotrain Ltd.
Calculating UPS requirement UPS requirement calculator is designed to estimate
the size and load capacity of an UPS for components of a computer system UPS requirement for one system is 550 VA UPS requirement for 5 systems, 10 systems and 50
systems are 2 KV, 3 KV, and 15 KV respectively
Release 16/7/2009
Jetking Infotrain Ltd.
Hands on Calculate UPS rating for your one of the computer
laboratory in your centre
Release 16/7/2009
Jetking Infotrain Ltd.
Summary - I Site preparation involves issues such as physical
location, power supply requirement, and environmental factors Power is measured in volt-amperes (VA) and in watts.
Both VA and watt are important in preparing wiring, power conditioning, and cooling The device must be set up in an environment, where
the temperature and relative humidity can be controlledRelease 16/7/2009 Jetking Infotrain Ltd.
Summary - II There are various safety considerations, which need
to be considered before handling a computer Power conditioner is a device, which helps in
optimizing the quality of power supply UPS is a device, which is used to provide a steady
or uninterrupted supply of current in case of a power failure
Release 16/7/2009
Jetking Infotrain Ltd.
Mind Map Draw the mind map to summarize this chapter
Release 16/7/2009
Jetking Infotrain Ltd.