    1 12 8 no.s 0.550

    2 12 4 no.s 0.526

    3 12 4 no.s 0.526

    Bar no. Shape of the Bar Dia Spacing M1

    1 16 4 no.s 10.770

    2 8 200 0.400

    3 16 1 no.s 7.830

    4 16 4 no.s 4.310

    Plinth Beam-230 X 350 MM

    M1

    M2

    M1M2

    M1 M2

    M1 M2

    M1

    M2

    M1

    Extra Bar

    M1 M2

  • 7/31/2019 BBS HT (2)

    3/25

    5 8 200 0.400

    1 40.73 kg

    2 0.00 kg

    3 281.36 kg

    Column above Plinth Beam-450 X 450MM

    Bar no. Shape of the Bar Dia Spacing M1

    1 12 4 no.s 4.425

    2 16 4 no.s 4.425

    3 8 200 1.050

    1 129.74 kg

    2 132.56 kg

    3 234.55 kg

    Bar no. Shape of the Bar Dia Spacing M1

    1 16 4 no.s 10.770

    8mm

    12mm

    16mm

    ABSTRACT-38mm

    12mm

    16mm

    Roof Beam-230 X 350 MM

    ABSTRACT-4

    M1

    M2

    M1

    M2

    M1

    M2

    M1

    M2

    M1

    M2

    M1 M2

  • 7/31/2019 BBS HT (2)

    4/25

    2 8 200 0.400

    3 16 1 no.s 7.830

    4 16 4 no.s 4.310

    5 8 200 0.400

    1 40.73 kg

    2 0.00 kg

    3 281.36 kg

    Bar no. Shape of the Bar Dia Spacing M1

    1 10 200 4.410

    2 10 200 10.870

    Roof Slab

    8mm

    12mm

    16mm

    ABSTRACT-5

    M1

    M2

    M1

    Extra Bar

    M1 M2

    M1

    M2

    M1 M2

    M1 M2

  • 7/31/2019 BBS HT (2)

    5/25

    1 641.48 kg

    Bar no. Shape of the Bar Dia Spacing M1

    1 8 150 0.365

    28 250 0.760

    3 8 250 1.910

    4 8 250 1.910

    8M 10MM 12MM

    1 Pile Foundation 0.096 0.000 0.193

    2 Pile Cap 0.000 0.000 0.131

    3 Plinth Beam 0.041 0.000 0.000

    4 Column Above PB 0.130 0.000 0.133

    5 Roof Beam 0.041 0.000 0.000

    6 Roof Slab 0.000 0.641 0.0007 Chajja 0.077 0.000 0.000

    Total 0.384 0.641 0.457

    MT MT MT

    QTY

    SR.NO STRUCTURE NAME

    FINAL ABSTRACT

    Chajja

    ABSTRACT-6

    10mm

    M1

    M2

    M1

    M1M2

    M1

    Extra Bar

    M1

    Extra Bar

  • 7/31/2019 BBS HT (2)

    6/25

    G SCHEDULE FOR PILE

    DEPTH: 6.500 mtr. DIA OF PILE: 0.450

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

    0.500 0.030 6.790 - 4 27.160 0.888 24.118

    0.400 0.040 6.670 - 4 26.680 1.578 42.101

    0.000 0.000 29.190 - 1 29.190 0.391 11.413

    0.000 0.000 0.520 - 3 1.560 0.391 0.610

    8 Nos

    0.096 MT

    0.193 MT

    0.337 MT

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

  • 7/31/2019 BBS HT (2)

    7/25

    1.000 0.030 1.490 - 8 11.920 0.888 10.585

    0.200 0.030 0.666 - 4 2.664 0.888 2.366

    0.500 0.030 0.966 - 4 3.864 0.888 3.431

    Total Weight:

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

    0.400 0.040 11.090 - 4 44.360 1.578 70.000

    0.160 0.000 0.560 - 51 28.560 0.391 11.167

    0.000 0.040 7.750 - 1 7.750 1.578 12.230

    0.400 0.040 4.630 - 4 18.520 1.578 29.225

    ABSTRACT-2

  • 7/31/2019 BBS HT (2)

    8/25

    0.160 0.000 0.560 - 21 11.760 0.391 4.598

    0.041 MT

    0.000 MT

    0.281 MT Height of column 4.525

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

    0.300 0.030 4.665 - 4 18.660 0.888 16.570

    0.300 0.040 4.645 - 4 18.580 1.578 29.319

    1.050 0.000 2.100 - 20 41.475 0.391 16.217

    0.130 MT

    0.133 MT

    0.235 MT

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

    0.400 0.040 11.090 - 4 44.360 1.578 70.000

  • 7/31/2019 BBS HT (2)

    9/25

    0.160 0.000 0.560 - 51 28.560 0.391 11.167

    0.000 0.040 7.750 - 1 7.750 1.578 12.230

    0.400 0.040 4.630 - 4 18.520 1.578 29.225

    0.160 0.000 0.560 - 21 11.760 0.391 4.598

    0.041 MT

    0.000 MT

    0.281 MT

    M2Std. Bend

    correction

    Length

    of bar

    Spacing

    Length

    No. of

    Bars

    Total

    length

    Unit

    Weight)Weight

    0.200 0.025 4.560 10.920 56 255.360 0.617 157.557

    0.200 0.025 11.020 4.460 24 264.480 0.617 163.184

  • 7/31/2019 BBS HT (2)

    10/25

  • 7/31/2019 BBS HT (2)

    11/25

    mtr.

    RemarksNo. of

    bends

    192.944 2

    336.808 2

    91.304 0

    4.88 0

    RemarksNo. of

    bends

  • 7/31/2019 BBS HT (2)

    12/25

    84.680 2

    18.928 2

    27.448 2

    131.056 Kgs

    RemarksNo. of

    bends

    140.000 2

    22.334 0

    24.460 2

    116.900 2

  • 7/31/2019 BBS HT (2)

    13/25

    18.392 0

    RemarksNo. of

    bends

    132.560 2

    234.552 2

    129.736 0

    RemarksNo. of

    bends

    140.000 2

  • 7/31/2019 BBS HT (2)

    14/25

  • 7/31/2019 BBS HT (2)

    15/25

    RemarksNo. of

    bends

    32.990 2

    14.250 2

    14.935 0

    14.935 0

    77.110 kg

  • 7/31/2019 BBS HT (2)

    16/25

    Sr No. Description No. L B H/D Quantity

    1 Pile 8 0.785 0.203 6 7.630 M-35

    2 Pile Cap 8 0.7 0.7 0.5 1.960 M-25

    PCC 8 0.9 0.9 0.1 0.648

    -8 0.785 0.203 0.1 -0.127 M-20

    3 Plinth Beam 2 8.590 0.230 0.350 1.383 M-25

    4 3.530 0.230 0.350 1.137 M-25

    PCC 2 8.590 0.430 0.100 0.739 M-20

    4 3.530 0.430 0.100 0.607 M-20

    4 Column Above PB 8 0.450 0.450 4.100 6.642 M-25

    Stub Column 8 0.450 0.450 1.200 1.944 M-25

    5 Roof Beam 2 9.340 0.230 0.350 1.504 M-25

    4 3.780 0.230 0.350 1.217 M-25

    6 Roof Slab 1 10.000 4.000 0.150 6.000 M-25

    7 Chajja 5 2.000 0.600 0.113 0.678 M-25

    8 Grade Slab 1 10.920 4.460 0.100 4.870 M-20

    -6 0.45 0.45 0.1 -0.122 M-20

    Total Concrete Qty 31.96 m3

    Total Concrete Qty

  • 7/31/2019 BBS HT (2)

    17/25

    M-35 M-25 M-20

    7.630

    1.960

    0.521

    1.383

    1.137

    0.739

    0.607

    6.642

    1.944

    1.504

    1.217

    6.000

    0.678

    4.749

    7.630 22.465 6.616

    M-35 M-25 M-20

    Grade

  • 7/31/2019 BBS HT (2)

    18/25

    Description

    m m

    Door 1 2.1

    Window 1.8 1.2

    Rolling shutter 3 3.75

    SR. No. Description No. L B Qty Unit

    1 1 4 4 16 m2

    2 1 3 4 12 m2

    3 1 3 4 12 m2

    Total Qty 40 m2

    SR. No. Description No. L B Qty Unit

    1 4 4 3.95 63.2 m2

    2 4 4 3.95 63.2 m2

    4 3 3.95 47.4 m2

    Deduction -4 1 2.1 -8.4 m2

    -5 1.8 1.2 -10.8 m2

    -1 3 3.75 -11.25 m2

    Total Qty 143.35 m2

    SR. No. Description No. L B Qty Unit

    1 2 10.92 4.45 97.19 m2

    2 2 4.23 4.45 37.65 m2

    3 Chajja 10 2 0.6 12.00 m2

    Size

    Qty flooring

    Qty Plastering--Int. Plaster

    Qty Plastering--Ext. Plaster

  • 7/31/2019 BBS HT (2)

    19/25

  • 7/31/2019 BBS HT (2)

    20/25

  • 7/31/2019 BBS HT (2)

    21/25

  • 7/31/2019 BBS HT (2)

    22/25

    Unit

    m2

    m2

    m2

    m2

    m2

    m2

    Unit

    Rmt

    Rmt

    Rmt

    Unit

    m2

    m2

    Unit

    m2

  • 7/31/2019 BBS HT (2)

    23/25

  • 7/31/2019 BBS HT (2)

    24/25

    GHARPURE ENGG & CONS.PVT. LTD

    3 NAME OF STRUCTURE :-

    ABSTRACT DT- 28.04.2012

    SR. NO PARTICULARS UNIT Qty RATE AMOUNT REMARK

    1 PILING WORK-450 MM DIA RMT 48 900 43200.00

    PILING WORK-450 MM DIA RMT 4 1500 6000.00

    2 PCC M-20 GRADE M3 6.62 4600 30431.53

    3 RCC M-25 GRADE M3 22.46 4750 106706.61

    4 RCC M-35 GRADE M3 7.63 4900 37387.98

    5 STEEL BAR MT 2.617 52000 136063.41

    6 SHUTTERING M2 179.34 200 35868.64 WITH SHUTTERIN

    7 BRICK MASONRY M3 22.63 4700 106370.40

    8 PLASTERING WORK

    a)INTERNAL PLASTER M2 143.35 160 22936.00

    b)EXTERNAL PLASTER M2 122.59 250 30646.25

    c)CEILING RENDERING M2 40 50 2000.00

    9 WATER PROOFING M2 42.00 715 30030.00

    10 FLOORING

    a)IPS FLOORING M2 40 220 8800.00

    11 RUBBLE/MURUM SOLING M3 500 0.00

    12 DOOR &WINDOWS

    a)ALU GLAZED DOOR M2 6.30 3150 19845.00

    b) GI ROLLING SHUTTER M2 11.25 2625 29531.25 WITH GEAR

    c)ALU. GLAZED WINDOW M2 10.80 2200 23760.00

    13 PAINTING WORK

    a)INTERNAL PAINTING M2 143.35 130 18635.50

    b)EXTERNAL PAINTING M2 122.59 140 17161.90

    c)CEILING PAINTING M2 40 130 5200.00

    14 GRANITE BOXING M2 2600 0.00

    TOTAL(RS) 710574

    Area 4.46 10.92 48.7032 Sqm

    Rate per sqm 14590